january 10, 2020 development and building services centre … · 2020. 6. 9. · 1 retain the first...

13
CitiWest Consulting Ltd. - Civil Engineers #101 - 9030 King George Blvd., Surrey, B.C. V3V 7Y3 Tel: 604-591-2213 Fax: 604-591-5518 e-mail: [email protected] www.citiwest.com January 10, 2020 File: 19-3988 City of Vancouver Development and Building Services Centre Ground Floor, 515 W. 10 Avenue Vancouver, BC V5Z 4A8 Attn: Yan Zeng Dear Madam: Re: 3353 Cambie Street, Vancouver Rainwater Management Plan We have prepared this Rainwater Management Plan for this commercial development at 3353 Cambie Street, Vancouver, to comply with the Green Building Policy for Rezoning (Green Infrastructure Implementation Plan). System Summary The system is designed so that no additional on-site storm water will be discharged to the municipal system. This is achieved by a combination of methods that fall under Tiers 1, 2 and 3. Below are the Criteria used to determine the Rainwater Management Plan and the most stringent Criteria will be implemented at the site. 1. Retain the first 24mm of rainfall in 24 hours as listed in the Rainwater Management Bulletin in effect since July 11, 2018. 2. Control the 5-year post-development flow to 5-year pre-development flow rate (use 2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as post-development condition). 3. LEED v4 (85 th percentile storm event detained). CRITERIA DESCRIPTION VOLUME REQUIRED 1 Retain the first 24mm of rainfall in 24 hours 20.82 m 3 . 2 Control the 5-year, 24-hr 2014 post- development flow to 5-year 24-hr 2100 post-development flow rate 4.26 m 3 . 3 LEED v4 (85 th percentile storm event detained) 17.88 m 3 . Rainwater detention for Criteria 1 is the worst case. Thus, by addressing Criteria 1, all the remaining Criteria will be automatically addressed. An oil interceptor is added to the onsite system to achieve the 80% TSS removal as per the Rainwater Management Bulletin dated July 11, 2018.

Upload: others

Post on 28-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

CitiWest Consulting Ltd. - Civil Engineers #101 - 9030 King George Blvd., Surrey, B.C. V3V 7Y3 Tel: 604-591-2213 Fax: 604-591-5518 e-mail: [email protected] • www.citiwest.com

January 10, 2020

File: 19-3988 City of Vancouver Development and Building Services Centre Ground Floor, 515 W. 10 Avenue Vancouver, BC V5Z 4A8 Attn: Yan Zeng Dear Madam:

Re: 3353 Cambie Street, Vancouver

Rainwater Management Plan We have prepared this Rainwater Management Plan for this commercial development at 3353 Cambie Street, Vancouver, to comply with the Green Building Policy for Rezoning (Green Infrastructure Implementation Plan). System Summary The system is designed so that no additional on-site storm water will be discharged to the municipal system. This is achieved by a combination of methods that fall under Tiers 1, 2 and 3. Below are the Criteria used to determine the Rainwater Management Plan and the most stringent Criteria will be implemented at the site. 1. Retain the first 24mm of rainfall in 24 hours as listed in the Rainwater Management

Bulletin in effect since July 11, 2018. 2. Control the 5-year post-development flow to 5-year pre-development flow rate (use

2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as post-development condition).

3. LEED v4 (85th percentile storm event detained).

CRITERIA DESCRIPTION VOLUME REQUIRED

1 Retain the first 24mm of rainfall in 24 hours 20.82 m3.

2 Control the 5-year, 24-hr 2014 post-development flow to 5-year 24-hr 2100 post-development flow rate

4.26 m3.

3 LEED v4 (85th percentile storm event detained)

17.88 m3.

Rainwater detention for Criteria 1 is the worst case. Thus, by addressing Criteria 1, all the remaining Criteria will be automatically addressed. An oil interceptor is added to the onsite system to achieve the 80% TSS removal as per the Rainwater Management Bulletin dated July 11, 2018.

Page 2: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

H:\Projects\3988\Docs\200110 Rainwater Mgmt Letter.docx 2

System Based on VanMap orthophotos, the pre-development site is almost at 100% hard surface with an asphalt parking lot to the west and a relatively flat building roof to the east. Please refer to Figure 1, 2016 Orthophotos and Figure 2, 1999 Orthophotos in Appendix 1. The Preliminary Rainwater Management Plan is prepared based on the architectural layout prepared by Radiant City Architecture Inc., dated December 13, 2019, and in the absence of the onsite landscape drawing. Based on the current architectural layout and discussion with the architect, the outdoor space for the daycare on the second floor can be covered with topsoil and sod. (Tier 1). Rainwater falling on the covered outdoor area on the second floor can be directed to the landscaped area. (Tier 2). The roof drain will be directed to a stormwater detention system and the maximum release rate will be set to the pre-development rate at 0.0095 cu. m/s to satisfy City requirements. For an extreme storm event, stormwater on the second floor will be directed to the area drain in the landscaped area, which will be set 0.03m higher than the sod elevation to collect the flow. Stormwater will then be directed to the oil interceptor. A bypass system will be used to safely release the overflow to the municipal system to prevent flooding of the development. As per the water quality requirements, water (24mm for low pollutant generating surfaces like roofs, and 48mm for high pollutant generating surfaces like driveways) that leaves the site must be treated to a standard of 80% TSS removal. All water leaving the site will first be directed to a stormceptor unit to remove a minimum of 80% TSS. The proposed location of the stormceptor unit and model number has been provided in Appendix 1. The location will be confirmed during in the DP stage. A Section 219 Rainwater Management Agreement Covenant will be required once the Final RWMP is accepted by the City. The Final RWMP will be attached to the covenant and be registered on the property’s title. After construction, the Engineer of Record will be required to inspect the RWM system and determine whether it has been substantially completed according to the covenant and Final RWM plan. Please let me know if you have any questions. Yours truly, CitiWest Consulting Ltd. Peter Yue, P. Eng. Project Engineer PY/py Attach.

Page 3: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Appendix 1

Page 4: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

H:\Projects\3988\Docs\200110 Rainwater Mgmt Letter.docx

Pre-Development Site Plan

Figure 1. 2016 Orthophotos from City of Vancouver Legacy VanMap.

Figure 2. 1999 Orthophotos from City of Vancouver Legacy VanMap.

Page 5: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

H:\Projects\3988\Docs\200110 Rainwater Mgmt Letter.docx

Pre-Development Site Drainage

Figure 3. Pre-Development Site Drainage –

City of Vancouver VanMap Infrastructure Viewer

Page 6: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

H:\Projects\3988\Docs\200110 Rainwater Mgmt Letter.docx

Calculation

Site Location: 3353 Cambie Street Total Site Area: 868 m2 Pre-development run-off coefficient calculation Parking lot 503.3 m2

Roof 364.7 m2

Total 868.0 m2

Average Runoff coefficient for the site = [503.3 x 0.8 + 364.7 x 0.85] / 868 = 0.821 Proposed development run-off coefficient calculation Landscape area on ground level: 0 m2 Patio and other hardscape area fronting Cambie Street: 73.58 m2 Patio and other hardscape area on second floor: 114.04 m2

Landscape area on second floor: 219.88 m2 Rooftop at 6th level area: 448.24 m2 Hardscape fronting Tupper Street 12.26 m2 Total Site Area: 868 m2

Average Runoff coefficient for the site = [73.58 x 0.8 + 114.04 x 0.85 + 219.88 x 0.18 + 448.24 x 0.85 + 12.26 x 0.8] / 868 = 0.6753 Criteria 1 24mm x (868m2) = 20.832 m3

Criteria 2 Refer to the excel = 4.256 m3

Criteria 3 20.6mm x (868m2) = 17.88 m3

Rainwater detention for Criteria 1 is the worst case. Thus, by addressing Criteria 1, all the remaining Criteria will be automatically addressed.

Rainwater retention (landscape on slab) Landscape area on second floor = 219.88 m2 Soil depth = 450mm Void ratio for topsoil = 0.25 Volume in soil for retention = 219.88 m3 x 0.45 x 0.25 = 24.74 m3

24.74 m3> 20.83m3 (Criteria 1)

Landscape on slab (second floor) is capable of retaining the required volume.

Page 7: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

H:\Projects\3988\Docs\200110 Rainwater Mgmt Letter.docx

Release Rate The rainfall intensity, I, is based on the City of Vancouver Intensity Duration Frequency (IDF) curves and the 5-year 10-minute duration to be 48mm/hr.

Area of the site = 868 m2

Pre-development runoff coefficient = 0.82 Q5 (pre-development for 10-min event) = (0.82 x 48mm x 0.868 ha)/3600 = 9.49 L/s. Maximum release rate for post-development is set at 9.49 L/s.

Page 8: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Project No. 3988

Client 3353 Cambie Street, Vancouver

Date January 8, 2020 (*) - Type II distribution per southwest BC

Description Criteria 2 calculation

Comments Control the 5-year post development flow to 5-year pre-development flow rate.

(use 2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as Post-development condition).

Site area to detain (Ha)= 0.0868

Vancouver 2014 Time/Intensity Curve: Vancouver 2100 Climate Change Time/Intensity Curve:

Time Intensity (*) Area Runoff Coeff Q in Q out Q det Time Intensity (*) Area Runoff Coeff Q in Q out Q det

min mm/hr Ha R m3/sec m3/sec m3 min mm/hr Ha R m3/sec m3/sec m3

5Yr 2hr 5Yr 2hr (2014 out)

0 0.0868 0.82 0 0 0 0.0868 0.65 0 0

5 8.35 0.0868 0.82 0.001651 0.001651 0 5 10.90 0.0868 0.65 0.001708 0.001651 0.017055

10 8.35 0.0868 0.82 0.001651 0.001651 0 10 10.90 0.0868 0.65 0.001708 0.001651 0.017055

15 10.02 0.0868 0.82 0.001981 0.001981 0 15 13.08 0.0868 0.65 0.002049 0.001981 0.02046

20 10.02 0.0868 0.82 0.001981 0.001981 0 20 13.08 0.0868 0.65 0.002049 0.001981 0.02046

25 15.04 0.0868 0.82 0.002973 0.002973 0 25 19.62 0.0868 0.65 0.003075 0.002973 0.030704

30 15.04 0.0868 0.82 0.002973 0.002973 0 30 19.62 0.0868 0.65 0.003075 0.002973 0.030704

35 15.04 0.0868 0.82 0.002973 0.002973 0 35 19.62 0.0868 0.65 0.003075 0.002973 0.030704

40 15.04 0.0868 0.82 0.002973 0.002973 0 40 19.62 0.0868 0.65 0.003075 0.002973 0.030704

45 16.70 0.0868 0.82 0.003303 0.003303 0 45 21.80 0.0868 0.65 0.003416 0.003303 0.034109

50 16.70 0.0868 0.82 0.003303 0.003303 0 50 21.80 0.0868 0.65 0.003416 0.003303 0.034109

55 18.37 0.0868 0.82 0.003632 0.003632 0 55 23.97 0.0868 0.65 0.003757 0.003632 0.037515

60 18.37 0.0868 0.82 0.003632 0.003632 0 60 23.97 0.0868 0.65 0.003757 0.003632 0.037515

65 23.39 0.0868 0.82 0.004624 0.004624 0 65 30.52 0.0868 0.65 0.004783 0.004624 0.047758

70 23.39 0.0868 0.82 0.004624 0.004624 0 70 30.52 0.0868 0.65 0.004783 0.004624 0.047758

75 18.37 0.0868 0.82 0.003632 0.003632 0 75 23.97 0.0868 0.65 0.003757 0.003632 0.037515

80 18.37 0.0868 0.82 0.003632 0.003632 0 80 23.97 0.0868 0.65 0.003757 0.003632 0.037515

85 13.37 0.0868 0.82 0.002643 0.002643 0 85 17.45 0.0868 0.65 0.002734 0.002643 0.027298

90 13.37 0.0868 0.82 0.002643 0.002643 0 90 17.45 0.0868 0.65 0.002734 0.002643 0.027298

95 11.67 0.0868 0.82 0.002308 0.002308 0 95 15.23 0.0868 0.65 0.002388 0.002308 0.023839

100 11.67 0.0868 0.82 0.002308 0.002308 0 100 15.23 0.0868 0.65 0.002388 0.002308 0.023839

105 10.02 0.0868 0.82 0.001981 0.001981 0 105 13.08 0.0868 0.65 0.002049 0.001981 0.02046

110 10.02 0.0868 0.82 0.001981 0.001981 0 110 13.08 0.0868 0.65 0.002049 0.001981 0.02046

115 6.68 0.0868 0.82 0.001322 0.001322 0 115 8.72 0.0868 0.65 0.001367 0.001322 0.013649

120 6.68 0.0868 0.82 0.001322 0.001322 0 120 8.72 0.0868 0.65 0.001367 0.001322 0.013649

0 0 0.0868

27.84 mm 0 36.33 mm Detained Volume (m^3)= 0.682127

2014 5-YEAR 2 HR PRE VS 2100 5-YEAR POST 2 HR

CRITERIA 2

Page 9: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Project No. 3988

Client 3353 Cambie Street, Vancouver

Date January 8, 2020 (*) - Type II distribution per southwest BC

Description Criteria 2 calculation

Comments Control the 5-year post development flow to 5-year pre-development flow rate.

(use 2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as Post-development condition).

Site area to detain (Ha)= 0.0868

Vancouver 2014 Time/Intensity Curve: Vancouver 2100 Climate Change Time/Intensity Curve:

Time Intensity (*) Area Runoff Coeff Q in Q out Q det Time Intensity (*) Area Runoff Coeff Q in Q out Q det

min mm/hr Ha R m3/sec m3/sec m3 min mm/hr Ha R m3/sec m3/sec m3

5Yr 6hr 5Yr 6hr (2014 out)

0 0.0868 0.821 0 0 0 0.0868 0.6753 0 0

10 5.54 0.0868 0.821 0.001097 0.001097 0 10 7.21 0.0868 0.6753 0.001175 0.001097 0.046742

20 5.54 0.0868 0.821 0.001097 0.001097 0 20 7.21 0.0868 0.6753 0.001175 0.001097 0.046742

30 5.54 0.0868 0.821 0.001097 0.001097 0 30 7.21 0.0868 0.6753 0.001175 0.001097 0.046742

40 6.46 0.0868 0.821 0.001279 0.001279 0 40 8.41 0.0868 0.6753 0.001369 0.001279 0.054484

50 6.48 0.0868 0.821 0.001283 0.001283 0 50 8.44 0.0868 0.6753 0.001374 0.001283 0.054678

60 6.46 0.0868 0.821 0.001279 0.001279 0 60 8.41 0.0868 0.6753 0.001369 0.001279 0.054484

70 8.33 0.0868 0.821 0.001649 0.001649 0 70 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

80 8.33 0.0868 0.821 0.001649 0.001649 0 80 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

90 8.33 0.0868 0.821 0.001649 0.001649 0 90 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

100 7.40 0.0868 0.821 0.001465 0.001465 0 100 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

110 7.39 0.0868 0.821 0.001462 0.001462 0 110 9.62 0.0868 0.6753 0.001566 0.001462 0.062323

120 7.40 0.0868 0.821 0.001465 0.001465 0 120 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

130 7.50 0.0868 0.821 0.001485 0.001485 0 130 9.77 0.0868 0.6753 0.001591 0.001485 0.063291

140 7.39 0.0868 0.821 0.001462 0.001462 0 140 9.62 0.0868 0.6753 0.001566 0.001462 0.062323

150 7.40 0.0868 0.821 0.001465 0.001465 0 150 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

160 11.09 0.0868 0.821 0.002196 0.002196 0 160 14.44 0.0868 0.6753 0.002352 0.002196 0.093581

170 11.09 0.0868 0.821 0.002196 0.002196 0 170 14.44 0.0868 0.6753 0.002352 0.002196 0.093581

180 11.09 0.0868 0.821 0.002196 0.002196 0 180 14.44 0.0868 0.6753 0.002352 0.002196 0.093581

190 8.33 0.0868 0.821 0.001649 0.001649 0 190 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

200 8.33 0.0868 0.821 0.001649 0.001649 0 200 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

210 8.33 0.0868 0.821 0.001649 0.001649 0 210 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

220 8.33 0.0868 0.821 0.001649 0.001649 0 220 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

230 8.33 0.0868 0.821 0.001649 0.001649 0 230 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

240 8.33 0.0868 0.821 0.001649 0.001649 0 240 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

250 8.33 0.0868 0.821 0.001649 0.001649 0 250 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

260 8.33 0.0868 0.821 0.001649 0.001649 0 260 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

270 8.33 0.0868 0.821 0.001649 0.001649 0 270 10.84 0.0868 0.6753 0.001766 0.001649 0.070258

280 7.40 0.0868 0.821 0.001465 0.001465 0 280 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

290 7.39 0.0868 0.821 0.001462 0.001462 0 290 9.62 0.0868 0.6753 0.001566 0.001462 0.062323

300 7.40 0.0868 0.821 0.001465 0.001465 0 300 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

310 7.40 0.0868 0.821 0.001465 0.001465 0 310 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

320 7.39 0.0868 0.821 0.001462 0.001462 0 320 9.62 0.0868 0.6753 0.001566 0.001462 0.062323

330 7.40 0.0868 0.821 0.001465 0.001465 0 330 9.63 0.0868 0.6753 0.001569 0.001465 0.06242

340 6.46 0.0868 0.821 0.001279 0.001279 0 340 8.41 0.0868 0.6753 0.001369 0.001279 0.054484

350 6.46 0.0868 0.821 0.001279 0.001279 0 350 8.41 0.0868 0.6753 0.001369 0.001279 0.054484

360 6.46 0.0868 0.821 0.001279 0.001279 0 360 8.41 0.0868 0.6753 0.001369 0.001279 0.054484

46.25 mm Detained Volume (m^3)= 0 60.22 mm Detained Volume (m^3)= 2.340684

*Max volume*

2014 5-YEAR 6 HR PRE VS 2100 5-YEAR POST 6 HR

CRITERIA 2

Page 10: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Project No. 3988

Client 3353 Cambie Street, Vancouver

Date January 8, 2020 (*) - Type II distribution per southwest BC

Description Criteria 2 calculation

Comments Control the 5-year post development flow to 5-year pre-development flow rate.

(use 2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as Post-development condition).

Site area to detain (Ha)= 0.0868

Vancouver 2014 Time/Intensity Curve: Vancouver 2100 Climate Change Time/Intensity Curve:

Time Intensity (*) Area Runoff Coeff Q in Q out Q det Time Intensity (*) Area Runoff Coeff Q in Q out Q det

min mm/hr Ha R m3/sec m3/sec m3 min mm/hr Ha R m3/sec m3/sec m3

5yr 12hr 5yr 12hr (2014 out)

0 0.0868 0.821 0 0 0 0.0868 0.6753 0 0

10 2.54 0.0868 0.821 0.000504 0.000504 0 10 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

20 2.54 0.0868 0.821 0.000504 0.000504 0 20 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

30 2.54 0.0868 0.821 0.000504 0.000504 0 30 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

40 3.19 0.0868 0.821 0.000631 0.000631 0 40 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

50 3.19 0.0868 0.821 0.000631 0.000631 0 50 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

60 3.19 0.0868 0.821 0.000631 0.000631 0 60 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

70 3.83 0.0868 0.821 0.000758 0.000758 0 70 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

80 3.83 0.0868 0.821 0.000758 0.000758 0 80 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

90 3.83 0.0868 0.821 0.000758 0.000758 0 90 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

100 4.46 0.0868 0.821 0.000882 0.000882 0 100 5.80 0.0868 0.6753 0.000944 0.000882 0.036818

110 4.46 0.0868 0.821 0.000882 0.000882 0 110 5.80 0.0868 0.6753 0.000944 0.000882 0.036818

120 4.46 0.0868 0.821 0.000882 0.000882 0 120 5.80 0.0868 0.6753 0.000944 0.000882 0.036818

130 5.73 0.0868 0.821 0.001134 0.001134 0 130 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

140 5.73 0.0868 0.821 0.001134 0.001134 0 140 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

150 5.73 0.0868 0.821 0.001134 0.001134 0 150 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

160 7.64 0.0868 0.821 0.001513 0.001513 0 160 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

170 7.64 0.0868 0.821 0.001513 0.001513 0 170 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

180 7.64 0.0868 0.821 0.001513 0.001513 0 180 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

190 10.83 0.0868 0.821 0.002144 0.002144 0 190 14.08 0.0868 0.6753 0.002293 0.002144 0.089441

200 10.83 0.0868 0.821 0.002144 0.002144 0 200 14.08 0.0868 0.6753 0.002293 0.002144 0.089441

210 10.83 0.0868 0.821 0.002144 0.002144 0 210 14.08 0.0868 0.6753 0.002293 0.002144 0.089441

220 13.38 0.0868 0.821 0.002649 0.002649 0 220 17.40 0.0868 0.6753 0.002834 0.002649 0.110541

230 13.38 0.0868 0.821 0.002649 0.002649 0 230 17.40 0.0868 0.6753 0.002834 0.002649 0.110541

240 13.38 0.0868 0.821 0.002649 0.002649 0 240 17.40 0.0868 0.6753 0.002834 0.002649 0.110541

250 10.20 0.0868 0.821 0.002019 0.002019 0 250 13.26 0.0868 0.6753 0.002159 0.002019 0.08423

260 10.20 0.0868 0.821 0.002019 0.002019 0 260 13.26 0.0868 0.6753 0.002159 0.002019 0.08423

270 10.20 0.0868 0.821 0.002019 0.002019 0 270 13.26 0.0868 0.6753 0.002159 0.002019 0.08423

280 8.27 0.0868 0.821 0.001638 0.001638 0 280 10.76 0.0868 0.6753 0.001752 0.001638 0.068341

290 8.27 0.0868 0.821 0.001638 0.001638 0 290 10.76 0.0868 0.6753 0.001752 0.001638 0.068341

300 8.27 0.0868 0.821 0.001638 0.001638 0 300 10.76 0.0868 0.6753 0.001752 0.001638 0.068341

310 7.64 0.0868 0.821 0.001513 0.001513 0 310 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

320 7.64 0.0868 0.821 0.001513 0.001513 0 320 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

330 7.64 0.0868 0.821 0.001513 0.001513 0 330 9.94 0.0868 0.6753 0.001618 0.001513 0.06313

340 6.37 0.0868 0.821 0.001261 0.001261 0 340 8.28 0.0868 0.6753 0.001349 0.001261 0.052622

350 6.37 0.0868 0.821 0.001261 0.001261 0 350 8.28 0.0868 0.6753 0.001349 0.001261 0.052622

360 6.37 0.0868 0.821 0.001261 0.001261 0 360 8.28 0.0868 0.6753 0.001349 0.001261 0.052622

370 5.10 0.0868 0.821 0.001009 0.001009 0 370 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

380 5.10 0.0868 0.821 0.001009 0.001009 0 380 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

390 5.10 0.0868 0.821 0.001009 0.001009 0 390 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

400 5.73 0.0868 0.821 0.001134 0.001134 0 400 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

410 5.73 0.0868 0.821 0.001134 0.001134 0 410 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

420 5.73 0.0868 0.821 0.001134 0.001134 0 420 7.45 0.0868 0.6753 0.001213 0.001134 0.047326

430 3.83 0.0868 0.821 0.000758 0.000758 0 430 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

440 3.83 0.0868 0.821 0.000758 0.000758 0 440 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

450 3.83 0.0868 0.821 0.000758 0.000758 0 450 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

460 5.10 0.0868 0.821 0.001009 0.001009 0 460 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

470 5.10 0.0868 0.821 0.001009 0.001009 0 470 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

480 5.10 0.0868 0.821 0.001009 0.001009 0 480 6.63 0.0868 0.6753 0.00108 0.001009 0.042115

490 3.83 0.0868 0.821 0.000758 0.000758 0 490 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

500 3.83 0.0868 0.821 0.000758 0.000758 0 500 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

510 3.83 0.0868 0.821 0.000758 0.000758 0 510 4.98 0.0868 0.6753 0.00081 0.000758 0.031608

520 3.19 0.0868 0.821 0.000631 0.000631 0 520 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

530 3.19 0.0868 0.821 0.000631 0.000631 0 530 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

540 3.19 0.0868 0.821 0.000631 0.000631 0 540 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

550 2.54 0.0868 0.821 0.000504 0.000504 0 550 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

560 2.54 0.0868 0.821 0.000504 0.000504 0 560 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

570 2.54 0.0868 0.821 0.000504 0.000504 0 570 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

580 3.19 0.0868 0.821 0.000631 0.000631 0 580 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

590 3.19 0.0868 0.821 0.000631 0.000631 0 590 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

600 3.19 0.0868 0.821 0.000631 0.000631 0 600 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

610 2.54 0.0868 0.821 0.000504 0.000504 0 610 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

620 2.54 0.0868 0.821 0.000504 0.000504 0 620 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

630 2.54 0.0868 0.821 0.000504 0.000504 0 630 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

640 2.54 0.0868 0.821 0.000504 0.000504 0 640 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

650 2.54 0.0868 0.821 0.000504 0.000504 0 650 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

660 2.54 0.0868 0.821 0.000504 0.000504 0 660 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

670 3.19 0.0868 0.821 0.000631 0.000631 0 670 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

680 3.19 0.0868 0.821 0.000631 0.000631 0 680 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

690 3.19 0.0868 0.821 0.000631 0.000631 0 690 4.14 0.0868 0.6753 0.000674 0.000631 0.026311

700 2.54 0.0868 0.821 0.000504 0.000504 0 700 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

710 2.54 0.0868 0.821 0.000504 0.000504 0 710 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

720 2.54 0.0868 0.821 0.000504 0.000504 0 720 3.31 0.0868 0.6753 0.000539 0.000504 0.021015

63.70 mm 0 82.83 mm Detained Volume (m^3)= 3.156821

2014 5-YEAR 12 HR PRE VS 2100 5-YEAR POST 12 HR

CRITERIA 2

Page 11: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Project No. 3988

Client 3353 Cambie Street, Vancouver

Date January 8, 2020 (*) - Type II distribution per southwest BC

Description Criteria 2 calculation

Comments Control the 5-year post development flow to 5-year pre-development flow rate.

(use 2014 IDF 5-year storm event rate as pre-development and 2100 IDF 5-year storm event rate as Post-development condition).

Site area to detain (Ha)= 0.0868

Vancouver 2014 Time/Intensity Curve: Vancouver 2100 Climate Change Time/Intensity Curve:

Time Intensity (*) Area Runoff Coeff Q in Q out Q det Time Intensity (*) Area Runoff Coeff Q in Q out Q det

min mm/hr Ha R m3/sec m3/sec m3 min mm/hr Ha R m3/sec m3/sec m3

5yr 24hr 5yr 24hr (2014 out)

0 0.0868 0.821 0 0 0 0.0868 0.6753 0 0

20 1.75 0.0868 0.821 0.000347 0.000347 0 20 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

40 1.75 0.0868 0.821 0.000347 0.000347 0 40 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

60 1.75 0.0868 0.821 0.000347 0.000347 0 60 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

80 2.19 0.0868 0.821 0.000434 0.000434 0 80 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

100 2.19 0.0868 0.821 0.000434 0.000434 0 100 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

120 2.19 0.0868 0.821 0.000434 0.000434 0 120 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

140 2.64 0.0868 0.821 0.000522 0.000522 0 140 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

160 2.64 0.0868 0.821 0.000522 0.000522 0 160 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

180 2.64 0.0868 0.821 0.000522 0.000522 0 180 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

200 3.07 0.0868 0.821 0.000607 0.000607 0 200 3.98 0.0868 0.6753 0.000649 0.000607 0.049592

220 3.07 0.0868 0.821 0.000607 0.000607 0 220 3.98 0.0868 0.6753 0.000649 0.000607 0.049592

240 3.07 0.0868 0.821 0.000607 0.000607 0 240 3.98 0.0868 0.6753 0.000649 0.000607 0.049592

260 3.94 0.0868 0.821 0.000781 0.000781 0 260 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

280 3.94 0.0868 0.821 0.000781 0.000781 0 280 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

300 3.94 0.0868 0.821 0.000781 0.000781 0 300 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

320 5.26 0.0868 0.821 0.001041 0.001041 0 320 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

340 5.26 0.0868 0.821 0.001041 0.001041 0 340 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

360 5.26 0.0868 0.821 0.001041 0.001041 0 360 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

380 7.46 0.0868 0.821 0.001477 0.001477 0 380 9.69 0.0868 0.6753 0.001577 0.001477 0.120603

400 7.46 0.0868 0.821 0.001477 0.001477 0 400 9.69 0.0868 0.6753 0.001577 0.001477 0.120603

420 7.46 0.0868 0.821 0.001477 0.001477 0 420 9.69 0.0868 0.6753 0.001577 0.001477 0.120603

440 9.21 0.0868 0.821 0.001824 0.001824 0 440 11.96 0.0868 0.6753 0.001948 0.001824 0.148942

460 9.21 0.0868 0.821 0.001824 0.001824 0 460 11.96 0.0868 0.6753 0.001948 0.001824 0.148942

480 9.21 0.0868 0.821 0.001824 0.001824 0 480 11.96 0.0868 0.6753 0.001948 0.001824 0.148942

500 7.02 0.0868 0.821 0.00139 0.00139 0 500 9.12 0.0868 0.6753 0.001485 0.00139 0.113519

520 7.02 0.0868 0.821 0.00139 0.00139 0 520 9.12 0.0868 0.6753 0.001485 0.00139 0.113519

540 7.02 0.0868 0.821 0.00139 0.00139 0 540 9.12 0.0868 0.6753 0.001485 0.00139 0.113519

560 5.71 0.0868 0.821 0.00113 0.00113 0 560 7.41 0.0868 0.6753 0.001207 0.00113 0.092265

580 5.71 0.0868 0.821 0.00113 0.00113 0 580 7.41 0.0868 0.6753 0.001207 0.00113 0.092265

600 5.71 0.0868 0.821 0.00113 0.00113 0 600 7.41 0.0868 0.6753 0.001207 0.00113 0.092265

620 5.26 0.0868 0.821 0.001041 0.001041 0 620 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

640 5.26 0.0868 0.821 0.001041 0.001041 0 640 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

660 5.26 0.0868 0.821 0.001041 0.001041 0 660 6.83 0.0868 0.6753 0.001112 0.001041 0.085015

680 4.39 0.0868 0.821 0.000869 0.000869 0 680 5.70 0.0868 0.6753 0.000929 0.000869 0.071011

700 4.39 0.0868 0.821 0.000869 0.000869 0 700 5.70 0.0868 0.6753 0.000929 0.000869 0.071011

720 4.39 0.0868 0.821 0.000869 0.000869 0 720 5.70 0.0868 0.6753 0.000929 0.000869 0.071011

740 3.52 0.0868 0.821 0.000696 0.000696 0 740 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

760 3.52 0.0868 0.821 0.000696 0.000696 0 760 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

780 3.52 0.0868 0.821 0.000696 0.000696 0 780 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

800 3.94 0.0868 0.821 0.000781 0.000781 0 800 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

820 3.94 0.0868 0.821 0.000781 0.000781 0 820 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

840 3.94 0.0868 0.821 0.000781 0.000781 0 840 5.12 0.0868 0.6753 0.000834 0.000781 0.063762

860 2.64 0.0868 0.821 0.000522 0.000522 0 860 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

880 2.64 0.0868 0.821 0.000522 0.000522 0 880 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

900 2.64 0.0868 0.821 0.000522 0.000522 0 900 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

920 3.52 0.0868 0.821 0.000696 0.000696 0 920 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

940 3.52 0.0868 0.821 0.000696 0.000696 0 940 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

960 3.52 0.0868 0.821 0.000696 0.000696 0 960 4.57 0.0868 0.6753 0.000743 0.000696 0.056842

980 2.64 0.0868 0.821 0.000522 0.000522 0 980 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

1000 2.64 0.0868 0.821 0.000522 0.000522 0 1000 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

1020 2.64 0.0868 0.821 0.000522 0.000522 0 1020 3.43 0.0868 0.6753 0.000558 0.000522 0.042672

1040 2.19 0.0868 0.821 0.000434 0.000434 0 1040 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1060 2.19 0.0868 0.821 0.000434 0.000434 0 1060 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1080 2.19 0.0868 0.821 0.000434 0.000434 0 1080 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1100 1.75 0.0868 0.821 0.000347 0.000347 0 1100 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1120 1.75 0.0868 0.821 0.000347 0.000347 0 1120 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1140 1.75 0.0868 0.821 0.000347 0.000347 0 1140 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1160 2.19 0.0868 0.821 0.000434 0.000434 0 1160 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1180 2.19 0.0868 0.821 0.000434 0.000434 0 1180 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1200 2.19 0.0868 0.821 0.000434 0.000434 0 1200 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1220 1.75 0.0868 0.821 0.000347 0.000347 0 1220 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1240 1.75 0.0868 0.821 0.000347 0.000347 0 1240 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1260 1.75 0.0868 0.821 0.000347 0.000347 0 1260 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1280 1.75 0.0868 0.821 0.000347 0.000347 0 1280 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1300 1.75 0.0868 0.821 0.000347 0.000347 0 1300 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1320 1.75 0.0868 0.821 0.000347 0.000347 0 1320 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1340 2.19 0.0868 0.821 0.000434 0.000434 0 1340 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1360 2.19 0.0868 0.821 0.000434 0.000434 0 1360 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1380 2.19 0.0868 0.821 0.000434 0.000434 0 1380 2.85 0.0868 0.6753 0.000463 0.000434 0.035423

1400 1.75 0.0868 0.821 0.000347 0.000347 0 1400 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1420 1.75 0.0868 0.821 0.000347 0.000347 0 1420 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

1440 1.75 0.0868 0.821 0.000347 0.000347 0 1440 2.28 0.0868 0.6753 0.000371 0.000347 0.028338

87.75 mm 0 113.94 mm Detained Volume (m^3)= 4.255715

2014 5-YEAR 24 HR PRE VS 2100 5-YEAR POST 24 HR

CRITERIA 2

Page 12: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

3345

3377

Ca

mbi

e S

t.

Tup

per

St.

W 17th Ave

W 18th Ave

3353

Pro

pert

y lin

e

Pro

pert

y lin

e

Bui

ldin

g lin

e

True

Property line

Property line

Residentialabove retail

CourtyardResidential

aboveparking

4

AC-5.0

3

AC-5.0

DN 10%

-16' - 7"

UP10%

Pro

pert

y lin

e

Pro

pert

y lin

e

Property line

Property line

10%

3

2

DN4

End of tripbathroom

-12' - 10"

10' - 0"

141' - 10"

Stair 1

Bui

ldin

g lin

e

13%

53' - 5"13' - 0"40' - 6" 24' - 11"

66' -

0"

131' - 10"

Daycaredrop off

11 Class Abicycles

Stair 2 Class Bloading

Class Aloading

Garbage/recycling

1

5

6

7

8

Daycaredrop off

Daycaredrop off

Mechanical

4

AC-5.0

3

AC-5.0

Pro

pert

y lin

e

Pro

pert

y lin

e

10

9

11

12

13

Property line

14

Mechanical

17

16

18

19

20

21

22

Mechanical

DN10%

UP10%

10' - 0"

141' - 10"

Stair 1

Bui

ldin

g lin

e

10%DN

66' -

0"

131' - 10"

Property line

-25' - 1" -21' - 0"

Stair 2

15

Storage

40' - 6" 44' - 2" 47' - 2"

4

AC-5.0

3

AC-5.0

Pro

pert

y lin

e

Pro

pert

y lin

e

Property line

Property line

24

23

25

26

27

2831

30

32

33

34

35

36

MechanicalMechanical

UP

10' - 0"

141' - 10"

Stair 1

Bui

ldin

g lin

e

47' - 2"

10%DN

10%

41' - 2"

66' -

0"

131' - 10"

Stair 2

29

-33' - 3" -29' - 2"

Storage

43' - 6"

Scale

Drawing Notes

1. This drawing reflects the intent of the design. Verify existing conditions and dimensions on site and report any discrepancies between drawings and site conditions to the Architect prior to construction.

2. Noted dimensions take precedence over scaled dimensions. 3. If this drawing is copied or not printed at full size, verify drawing scale

before scaling dimensions. 4. Site dimensions are approximate (refer to survey as necessary.) 5. Read drawings in conjunction with Architectural Notes, Specifications

and Site Instructions, and drawings and specifications of other disciplines, including Structural, Electrical, Mechanical, Plumbing, Civil and Interior Design. Report discrepancies or conflicts to the Architect.

6. Where conflicts arise between notes, specifications, drawings, manufacturers’ instructions, general trade practices and statutory requirements, the more stringent shall apply. In cases where the conflict impacts the cost or any visible aspect of the work, advise the Architect.

7. All proposed substitutions and deviations from drawings, notes and specifications shall be submitted in writing to the Architect for written approval prior to construction.

8. These drawings are not record drawings nor as-built drawings and may not be relied on for any purposes other than the current project.

Standards

1. All work shall conform to statutory requirements, including applicable Building, Electrical, Plumbing, Gas and Fire Codes, local Codes and Bylaws, Building Inspector requests, and Safety and Health Standards.

2. All work requiring the involvement of a professional engineer is to be carried out under the authority of an appropriate registered engineer.

3. Installation of all materials, equipment, fixtures and systems shall be done in accordance with Manufacturers’ instructions.

4. Where construction or installation requires additional elements not specifically shown in these drawing, such elements shall be deemed to be included and shall be provided. The General Contractor shall coordinate installation of blocking and/or backing required for supporting wall or ceiling fixtures, handrails, furniture, equipment, and accessories as needed, whether or not these are shown on the drawings.

Radiant City Architecture Inc.

#222-1118 Homer St. Vancouver BC V6B 6L5Tel: 604-551-9376 [email protected]

As indicated

COPYRIGHT NOTICEThese drawing is an instrument of service and remains the property of the Architect. It is not to be used or reproduced for any purpose other than construction of the current project without the explicit written consent of the Architect.

Project Number

Date Plotted

Drawn By

Checked By RJB

20

18

11

28

1/2/

2020

5:2

3:47

PM

Z:\

185

6 -

Ca

mbi

e S

t Day

care

\Rev

it\1 8

56

- C

ambi

e S

t Day

care

.rvt

1/2/2020 5:23:47 PM

1/2/20205:23:47 PM

AC-4.0Site and Parking Level Plans

1856

JC

3353 Cambie St.Vancouver BC

Cambie St. Daycare

No. Description Date1 Concept Review 2019-03-012 Social Planning Review 2019-04-053 Rezoning Preliminary Enquiry 2019-06-114 Rezoning Enquiry 2019-07-125 Rezoning Enquiry Meeting 2019-12-046 Consultant Review 2020-01-02

1/64" = 1'-0"

Site Plan1

1/32" = 1'-0"

Parking 12

1/32" = 1'-0"

Parking 23

1/32" = 1'-0"

Parking 34

pyue
Oval
pyue
Callout
OIL INTERCEPTOR
pyue
Oval
pyue
Line
pyue
Arrow
pyue
Callout
EX.250mm STORM
pyue
Callout
OIL INTERCEPTOR
pyue
Arrow
pyue
Arrow
pyue
Callout
SERVICE CONNECTION TO STORM MAIN AT 2.0%
Page 13: January 10, 2020 Development and Building Services Centre … · 2020. 6. 9. · 1 Retain the first 24mm of rainfall in 24 hours 20.82 m3. 2 Control the 5-year, 24-hr 2014 post-development

Pro

pert

y lin

e

Pro

pert

y lin

e

4

AC-5.0

3

AC-5.0

6 Class Bbicycles

DN1 in 222% DN

DN10%

Bui

ldin

g lin

e

0.00'

Stair 1

Stair 2

6 Class Bbicycles

RETAIL

Temporarystorage area

Lobby

Property line

Property line

13% 10%

127' - 10"2' - 0"

66' -

0"

45' - 5"20' - 0" 12' - 4" 52' - 1"

2' - 0"10' - 0"

141' - 10"

12 stroller spaces

DN

Pro

pert

y lin

e

4

AC-5.0

3

AC-5.0

Stair 1

Daycare8 infants, 8 toddlers and 8 preschoolers

OutdoorCoveredoutdoor

Property line

Property line

Bui

ldin

g lin

e

Pro

pert

y lin

e

66' -

0"

10' - 0"

141' - 10"2' - 0"

2' - 0" 55' - 10" 72' - 0"

Stair 2

Bui

ldin

g lin

e

Pro

pert

y lin

e

Pro

pert

y lin

e

4

AC-5.0

3

AC-5.0

Stair 1

Property line

Property line

Office

66' -

0"

10' - 0"

141' - 10"2' - 0"

68' - 0"

Stair 2

4' - 0"57' - 10"

Bui

ldin

g lin

e

4

AC-5.0

Pro

pert

y lin

e

Pro

pert

y lin

e

3

AC-5.0

Stair 1

Property line

Property line66

' - 0

"

10' - 0"

Office

141' - 10"2' - 0"

68' - 0"61' - 10"

Stair 2

Scale

Drawing Notes

1. This drawing reflects the intent of the design. Verify existing conditions and dimensions on site and report any discrepancies between drawings and site conditions to the Architect prior to construction.

2. Noted dimensions take precedence over scaled dimensions. 3. If this drawing is copied or not printed at full size, verify drawing scale

before scaling dimensions. 4. Site dimensions are approximate (refer to survey as necessary.) 5. Read drawings in conjunction with Architectural Notes, Specifications

and Site Instructions, and drawings and specifications of other disciplines, including Structural, Electrical, Mechanical, Plumbing, Civil and Interior Design. Report discrepancies or conflicts to the Architect.

6. Where conflicts arise between notes, specifications, drawings, manufacturers’ instructions, general trade practices and statutory requirements, the more stringent shall apply. In cases where the conflict impacts the cost or any visible aspect of the work, advise the Architect.

7. All proposed substitutions and deviations from drawings, notes and specifications shall be submitted in writing to the Architect for written approval prior to construction.

8. These drawings are not record drawings nor as-built drawings and may not be relied on for any purposes other than the current project.

Standards

1. All work shall conform to statutory requirements, including applicable Building, Electrical, Plumbing, Gas and Fire Codes, local Codes and Bylaws, Building Inspector requests, and Safety and Health Standards.

2. All work requiring the involvement of a professional engineer is to be carried out under the authority of an appropriate registered engineer.

3. Installation of all materials, equipment, fixtures and systems shall be done in accordance with Manufacturers’ instructions.

4. Where construction or installation requires additional elements not specifically shown in these drawing, such elements shall be deemed to be included and shall be provided. The General Contractor shall coordinate installation of blocking and/or backing required for supporting wall or ceiling fixtures, handrails, furniture, equipment, and accessories as needed, whether or not these are shown on the drawings.

Radiant City Architecture Inc.

#222-1118 Homer St. Vancouver BC V6B 6L5Tel: 604-551-9376 [email protected]

As indicated

COPYRIGHT NOTICEThese drawing is an instrument of service and remains the property of the Architect. It is not to be used or reproduced for any purpose other than construction of the current project without the explicit written consent of the Architect.

Project Number

Date Plotted

Drawn By

Checked By RJB

20

18

11

28

1/2/

2020

5:2

3:48

PM

Z:\

185

6 -

Ca

mbi

e S

t Day

care

\Rev

it\1 8

56

- C

ambi

e S

t Day

care

.rvt

1/2/2020 5:23:48 PM

1/2/20205:23:48 PM

AC-4.1Floor Plans

1856

JC

3353 Cambie St.Vancouver BC

Cambie St. Daycare

No. Description Date1 Concept Review 2019-03-012 Social Planning Review 2019-04-053 Rezoning Preliminary Enquiry 2019-06-114 Rezoning Enquiry 2019-07-125 Rezoning Enquiry Meeting 2019-12-046 Consultant Review 2020-01-02

1/32" = 1'-0"

First Floor on Cambie St.1

1/32" = 1'-0"

Second Floor2

1/32" = 1'-0"

Third Floor3

1/32" = 1'-0"

Fourth Floor4

pyue
Polygon
pyue
Polygon
pyue
Callout
450mm TOPSOIL WITH SOD
pyue
Oval
pyue
Callout
OIL INTERCEPTOR