JANUARY 30 2013 Laurie Corcoran DEMAND RESOURCE STRATEGY ANALYST ISO NEW ENGLAND, INC. Update on Baseline/Outages Project

Upload: feivel

Post on 09-Feb-2016

32 views

Category:

Documents


0 download

DESCRIPTION

JANUARY 30 2013. Laurie Corcoran. DEMAND RESOURCE STRATEGY ANALYST ISO NEW ENGLAND, INC. Update on Baseline/Outages Project. Status of Baseline/Outages Project. ISO-NE is working to develop a solution for the transition period that addresses baseline accuracy during outages. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: JANUARY 30 2013

JANUARY 30 2013

Laurie CorcoranDEMAND RESOURCE STRATEGY ANALYST

ISO NEW ENGLAND, INC.

Update on Baseline/Outages Project

Page 2: JANUARY 30 2013

Status of Baseline/Outages Project

• ISO-NE is working to develop a solution for the transition period that addresses baseline accuracy during outages.

• Implementing a solution for the transition period is difficult :– IT support is very limited– Must account for multiple assets behind the same meter which may

be interacting with one another

• Under full-integration the requirement for an asset to be measured at the Retail Delivery Point solves the most difficult issue.

2