jblm sustainability and net zero presentation 11-09-14
TRANSCRIPT
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
1/9
Joint Base Lewis-McChord
Installation SustainabilityProgram
Paul Steucke, Jr.Environmental Division Chief
Joint Base Lewis-McChord14 September 2011
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
2/9
Military members40,228 Civilian Workforce ~ 15,000
Family Members61,147 Industrytraining &maintenance Major utilities Hospital (Madigan)
Housing - family and singlesoldiers
JBLM and Sustainability Sustainability Program developedin 2002
Winner of the 2010 Sec Army andSec Defense Sustainability Awards
Strategic and operational:6 planning teams, working across all7 lines of effort in the JBLM
Strategic Plan, pursuing8 aggressive goals, striving for
military mission, community andenvironmental sustainability,
All overseen by the InstallationSustainability Board (ISB),
And driven by an ISO 14001
Environmental Management System
Designated as one of the Armys
Net Zero Installations for waterand waste
Will compete for Net Zero Energyas well
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
3/9
5. Maintain the ability of JBLM to meet its current and future
military missions without compromising the integrity ofnaturaland cultural resources, both on the installation and regionally
6. Maintain the ability of JBLM to meet its current and future
military missions without compromising the integrity ofnaturaland cultural resources, both on the installation and regionally
7. NET ZERO WATER by 2020
2. NET ZERO ENERGY by 2020
JBLM Sustainability Goals
4. NET ZERO WASTE by 2020
(Today)
(Ver. 2, 2007)1. Reduce installation stationary source and
non-source motor vehicle air emissions 85%by 2025
2. Sustain allactivities on post usingrenewable energy sources and generate allelectricity on post by 2025
3. Reduce total energy consumption by 30%by 2015
3. Create sustainable neighborhoods for alivable JBLM community that enhancesthe Puget Sound Region
5. Cycle all material use to achieve zero netwaste by 2025
6. Recover all listed and candidate federal species in the PugetSound Region
8. Treat all wastewaters to Class A Reclaim Standards by 2025 to
conserve water resources and improve Puget Sound water quality
4. Create sustainable neighborhoods for alivable JBLM community that enhancesthe Puget Sound Region
7. Recover all listed and candidate federal species in the PugetSound Region
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
4/9
Achieve Net Zero Waste
The Strategy involves Reduction
Hazardous MaterialManagementGreen Procurement Curb Illegal Dumping
Recycled ContentProducts
(AffirmativeProcurement)
EnergyEfficientProducts
(Energy Star,FEMP)
BiobasedProducts(Plant-
Derived)
Water EfficientProducts
(WaterSense)
Electronic
ProductEnvironmental
AssessmentTool (EPEAT)
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
5/9
Achieve Net Zero Waste
And Diversion
~ Diverted in excess of 70% Solid Waste in 2010~ Produced in excess of 15,000 tons of products~ Saved over $1.6M
Repurpose Recycle
Compost
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
6/9
Achieve Net Zero Water
Current facility uses outdatedtechnology
New facility will be capable ofproducing class A reclaimed water
Phase I (new plant) in the FY13MCA program
Phase II (TBD) would convey
treated water back upstream forreuse and infiltration into theaquifer
Treat all Wastewater Treatment
Plant effluent to Class A reclaimedwater standards and reuse
Stormwaterdiversion from
JBLM Northturns a formerlandfill borrow
pit into awetlands areaand infiltratesrunoff into the
local aquifer
Manage storm water
Low Impact Development
Onsite infiltration
Stormwater reused to create wetlands
Reuse process water
Water from Superfund pump & treatsite provides cooling water for MadiganHVAC system and infiltrates to
groundwaterIrrigation of main parade fieldprime opportunity for water reuse
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
7/9
Achieve Net Zero Energy
Energy Conservation -reduce demand by >30%
Partnership withBonneville Power Admin -Utility Energy Services
Contract (UESC)
Energy audits identifiedenergy saving opportunities
$18M investment reaps
$39M in improvements viarebates
Improve energyperformance via MCAconstruction to LEED goldand platinum, or better
Renewable Energytransition from fossil fuels andfulfill energy needs via renewables
Renewable Energy SourcesJBLM potentialbiomassand possibly others
JBLM Yakima potentialsolar and wind
Innovative energy systems Solar wallpreheats air
flow into maintenancebuilding
Wastewater treatment plantdigester gas reformed intohydrogen and powering
forklifts and a 37 footshuttle bus
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
8/9
Other Team Activities
Air Quality ~ Reduce Air Emissionsby 85% Alternate Fuels (E85, Biodiesel, CNG) Commute Trip Reduction program Electric Vehicles
Sustainable Community Sustainable Master Plan Walkable neighborhoods, mixed usedevelopment, transportation options
Sustainable Training Lands Army Compatible Use Buffer Program Habitat preservation = trainingpreservation
-
8/4/2019 JBLM Sustainability and Net Zero Presentation 11-09-14
9/9
Questions?
Paul SteuckeEnvironmental DivisionPublic Works, JBLM, WA
(253) 966-1760/6463
Argue for yourlimitations, and sureenough, they are yours
-Richard Bach