JCOP Workshop September 8th 1999 H.J.Burckhart
1
ATLAS DCS
• Organization of Detector and Controls Architecture
• Connection to DAQ
• Front-end System
• Practical Points
• Conclusions
JCOP Workshop September 8th 1999 H.J.Burckhart
2
Scope of DCSScope of DCS
Detector Sub-detectors Experiment’s infrastructure
“External Services” Services of CERN infrastructure LHC accelerator DAQ
JCOP Workshop September 8th 1999 H.J.Burckhart
3
ATLAS picture here
JCOP Workshop September 8th 1999 H.J.Burckhart
4
Detector Organisation Detector Organisation
JCOP Workshop September 8th 1999 H.J.Burckhart
5
Detector organisationDetector organisation
Hierarchical organisation of quasi independent units (“objects”) Separation for various reasons (organisational, operational,
geometrical, etc.) Units have to operate stand-alone and integrated Data flow mainly vertically
Common Infrastructure handled like a subdetector
JCOP Workshop September 8th 1999 H.J.Burckhart
6
JCOP Workshop September 8th 1999 H.J.Burckhart
7
Hierarchical levels of DCSHierarchical levels of DCSSupervisor Level
operator console shift operator, sub-system expert
server data base, conn. DAQ, External system
Subsystem control levelLocal Ctrl Station Gas, HV, endcap
--------------------------------------------------------------------------
Device ControlFieldbus node chamber, sector
PLC cooling
VME HV
Sensors
SCADA
FE I/O
JCOP Workshop September 8th 1999 H.J.Burckhart
8
Consequences of Detector organisation Consequences of Detector organisation on DCSon DCS
Subdetector groups choose mapping Unit<==>DCS_level
I/F definition SCADA <==> Front-end I/O HW (industry) standards standard SW protocols
High numbers of channels (>>10k) multiplexed in F/E Separation Tools <==> Applications
work done at different geographical places guaranties homogeneity
JCOP Workshop September 8th 1999 H.J.Burckhart
9
External systemsExternal systems
JCOP Workshop September 8th 1999 H.J.Burckhart
10
Interaction with External SystemsInteraction with External Systems
Exchange of (result) data some imported data fully treated in SCADA
Possibility to send commands and receive feedback Exchange of (dynamic) Status information
==> Use common mechanism with all External Systems
(LDIWG)
JCOP Workshop September 8th 1999 H.J.Burckhart
11
Connection DCS - DAQConnection DCS - DAQ
Complete operational independence DCS needed already during production, assembly, installation DCS needed 365/365, 24/24, DAQ during data taking periods Data paths of DAQ and DCS should be separated
Independence MUST NOT result in restrictions of functionality Seamless information exchange Sending commands and getting feedback in both directions Common Data Base
JCOP Workshop September 8th 1999 H.J.Burckhart
12
Boundary DCS - DAQBoundary DCS - DAQ
DAQ treats all aspects of physics event data (‘event #’): data flow, quality monitoring, storage, etc.
DCS treats other data (‘time stamp’) Interaction DAQ <==> LHC via DCS
JCOP Workshop September 8th 1999 H.J.Burckhart
13
Interaction with DAQInteraction with DAQ
DAQ control and configuration services organised in
“Backend DAQ components” (SCADA has similar
components)
Information ServiceExchange of dynamic information (e.g.status)
==> bi-directional interface with SCADA (filtered)
Message Reporting Systemreports asynchronously events (e.g. error messages, state changes)
==> SCADA has to inject it’s ‘events’ (e.g. actions, state changes)
JCOP Workshop September 8th 1999 H.J.Burckhart
14
Interaction with DAQ (cont.)Interaction with DAQ (cont.)
Run Controlco-ordinates DAQ sub-systems
==> sending/receiving commands and getting feedback about
success/failure
Graphical User Interfaceoperator interaction, viewing of DAQ state
==> top level of DCS should be accessible
JCOP Workshop September 8th 1999 H.J.Burckhart
15
Interaction with DAQ (cont.)Interaction with DAQ (cont.)
Data Base Configuration (HW, SW, parameters, calibration constants, etc.) command logging (operator, “automatic”, etc.) incident logging (alarms, state changes, etc.) storage of measurement results (currents, temperatures, etc.)
ATLAS wide DB for DAQ, DCS and Offline
Naming conventions according to HW (PBS,ABS)
==> This DB is the master DB for DCS
JCOP Workshop September 8th 1999 H.J.Burckhart
16
Product Breakdown StructureProduct Breakdown Structure
JCOP Workshop September 8th 1999 H.J.Burckhart
17
Examples of operations (‘Use case’)Examples of operations (‘Use case’)
Calibration DCS driven interleaved during data taking DAQ driven
Start of run (load, configuration, start) Partitioning Loading parameters
JCOP Workshop September 8th 1999 H.J.Burckhart
18
Why separating DAQ and DCS?Why separating DAQ and DCS?
Time scale DAQ in constant evolution Avoid additional requirements on SCADA
platform real time
4 LHC experiments, 4 DAQ systems (?) ATLAS DAQ design already advanced Past experience
JCOP Workshop September 8th 1999 H.J.Burckhart
19
Front-end I/OFront-end I/O Fieldbus
general purpose node (LMB) dedicated Fieldbus node commercial Fieldbus device
PLC SoftPLC VME with RTUnix
dedicated processor (e.g. image processing), DSP real time response (e.g. radiation monitor), triggered (e.g. beam dump) high number of channels, high volume I/O
JCOP Workshop September 8th 1999 H.J.Burckhart
20
Important SCADA featuresImportant SCADA features
• support of hierarchical objects
• partitioning (stations loosely coupled)
• good connection to external DB
• powerful API
• driver tool kit
• capable to support ATLAS naming convention
• multi-platform
JCOP Workshop September 8th 1999 H.J.Burckhart
21
Subdetector Time scaleSubdetector Time scale
• SCT– production 1/01 =>
– assembly 4/03 =>
– installation 3/04 =>
• Pixel– mounting 4/01
– assembly 4/03
• TileCal– production => 12/01
– assembly + calibration 2002
– installation 2003
• TRT– construction =>mid 2002
– assembly + test 2002
– installation 3/04
• LAr– EC assembly 1/01 => 10/01
– calibration 12/01 => 6/02
– installation 1/03 =>
• Muon– Decision about SCADA begin 2001
JCOP Workshop September 8th 1999 H.J.Burckhart
22
SCADA time scaleSCADA time scale
• SCADA is nucleus of DCS (ATLAS, JCOP)
• subdetector groups want practical experience in their environment
• start bottom up (Front-end I/O, simple devices, composite systems)– avoid stand-alone solutions
– re-use developments
JCOP Workshop September 8th 1999 H.J.Burckhart
23
SCADA time scale (cont.)SCADA time scale (cont.)
• Detector time scale– final elements ready end 2001
– calibration on surface 2002
– installation 2003 ==>
• Use of SCADA– learning (3 months)
– prototype application (6 months)
– real application (12 months)
==> some subdetector groups need to start essentially now
JCOP Workshop September 8th 1999 H.J.Burckhart
24
Organisation of workOrganisation of work
SCADA vendorMaintains product (platform, OS, F/E drivers)
CERN Controls Groupconnection to CERN Infrastructure and LHC, drivers, generic
applications (e.g. gas, HT)
LHC Detector Controls Groupsintegration of subdetectors (rules), general purpose I/O, operations,
subdetector “experiment infrastructure”
JCOP Workshop September 8th 1999 H.J.Burckhart
25
Organisation of work (cont.)Organisation of work (cont.)
Sub-detector Controls expert(s)integration of units (states, info exchange), control procedures
sub-system expertcontrol algorithms, HW functions
JCOP Workshop September 8th 1999 H.J.Burckhart
26
To do now ...To do now ...
• Start field work with subdetectors
• make organizational plan (course, license, etc.)
• make prioritized list of common developments and applications
• start engineering final system
JCOP Workshop September 8th 1999 H.J.Burckhart
27
ConclusionsConclusions
• ATLAS wants to continue the common approach
• SCADA system looks promising (many thanks to IT/CO for evaluation)
• implement now real subdetector application(s) with the most promising (and affordable) product