ject c u gas - amazon s3€¦ · location: scott county, il - st. louis county, mo capacity: 400...
TRANSCRIPT
ONGOING PROJECTS Construction Underway
24 Pipeline News | August 2019 | Pipeline-News.com
GASThe Americas | U.S.ASPEN MIDSTREAM – (12/18)
Project: Austin Chalk Pipeline Type: Project includes pipeline constructionLength: 90 milesLocation: Katy, TXCapacity: 200 MMcf/dCompletion: 3Q 2019
ATLANTIC COAST PIPELINE LLC – (4/19)
Owners: Dominion Energy; Duke Energy; Piedmont Natural Gas and Southern Company Gas
Project: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCompletion: 2021Comments: Project will transport domestically-
produced, clean-burning natural gas from West Virginia to communities in Virginia and North Carolina. Work held up until 3Q 2019 due to permitting issues.
Contractor: Spring Ridge Constructors LLCType: Project includes pipeline construction
Contractor: Michels Corp.Type: Project includes pipeline construction
Contractor: Price Gregory International Inc.Type: Project includes pipeline construction
Contractor: Rockford Corp.Type: Project includes pipeline construction
Contractor: U.S. Pipeline Inc.Type: Project includes pipeline construction
Project: Atlantic Coast PipelineSegment: Supply Header ProjectType: Project includes pipeline construction
and facility modificationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel
County, WVCapacity: 1.5 MMDth/dCompletion: 4Q 2019Comments: Project will move Marcellus Shale
gas from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina
Contractor: Ace Pipeline Inc. Type: Project includes pipeline construction
BLUE MOUNTAIN MIDSTREAM LLC – (7/18)
Project: Blue Mountain Delivery ProjectType: Project includes pipeline constructionLength: 10 milesLocation: Grady County, OKCapacity: 255 MMcf/dComments: Project will run from Blue Mountain
Midstream’s natural gas processing plant in Grady County, OK
CARDINAL MIDSTREAM III LLC – (3/19)
Owner: Cardinal Midstream LLCProject: Iron Horse Gathering SystemType: Project includes construction of a gas
gathering and processing systemLength: 100 milesLocation: Canadian, Grady, Caddo and McClain
counties, OKCapacity: 200 MMcf/dComments: System includes the Iron Horse Plant,
designed to accommodate additional expansions that would bring total processing capacity to 600 MMcf/d to serve production growth, and is anchored by a long-term acreage dedication from Travis Peak Resources LLC
COGENT MIDSTREAM – (6/19)
Project: Cogent Residue PipelineCapacity: 400 MMcf/dLocation: Midland Basin, TexasDimensions: 25 miles, 20-inch pipelineCompletion: Q4 2019Summary: The pipeline that will deliver residue
gas from Cogent’s Big Lake Natural Gas Processing Complex to Kinder Morgan’s GCX Pipeline.
COLUMBIA PIPELINE GROUP INC. – (4/18)
Owner: TransCanada Corp.Project: B-System ProjectType: Project includes construction of pipeline,
replacement of existing pipeline and upgrades to equipment and facilities
Length: 20.8 milesDiameter: 20 inchesLocation: Fairfield and Franklin counties, OHComments: Project will also retire an existing 17.6
mile pipeline as part of Columbia’s ongoing Modernization Program to ensure the safe and reliable delivery of vital natural gas supply lines for the wider Columbus, OH metro area
Contractor: Price Gregory International Inc.
Type: Project includes construction of pipeline, replacement of existing pipeline and upgrades to equipment and facilities
CONSUMERS ENERGY – (10/17)
Project: Saginaw Trail PipelineType: Project will be executed in five phases
and includes take up and relay of existing pipeline
Length: 94 milesDiameter: 24 inchesLocation: Saginaw, Genesee,Oakland counties, MICompletion: 2022Comments: Project is part of the Transmission
Enhancements for Deliverability & Integrity (TED-I) and will be built in five stages
Contractor: Welded ConstructionType: Project includes construction of Phase 1
of the pipeline
DTE ENERGY – (8/18)
Operator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction
and four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio and MichiganCapacity: 1.5 Bcf/dCompletion: 4Q 2019
Contractor: FluorType: Front-end engineering and design
Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and MichiganContractor: Latex ConstructionType: Pipeline constructionLocation: Ohio
Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio
ENABLE MIDSTREAM PARTNERS – (3/19)
Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline
and associated metering facilitiesLength: 68 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228,000 dth/dCompletion: 2019Comments: The 20-year contract will support
OG&E’s planned conversion of two 500
Projects added and updated for the current month are highlighted
GAS
25Pipeline-News.com | August 2019 | Pipeline News
Innovation based. Employee owned. Expect more.
281-580-5700www.Polyguard.com
“Non-Shielding“ Corrosion ControlCoatings for the Pipeline Industry
www.Polyguard.com/pipeline
Polyguard’s RD-6 has been used in the North American rehab and girth weld market since 1988. RD-6 differentiates itself through its speed, simplicity and proven performance record.
RD-6Coating System
®
rd6_island Vertical_PLN_19.indd 1 6/17/2019 9:02:18 AM
megawatt coal-fired generating units to natural gas
Contractor: R&R Pipeline Inc.Type: Project includes pipeline construction
Contractor: Troy Construction Co.Type: Project includes pipeline construction
Project: Enable Gas Transmission Expansion/Enable Oklahoma Intrastate Transmission Expansion
Type: Project includes the expansion of two existing pipelines
Location: Oklahoma (SCOOP/STACK)
ENBRIDGE INC. – (5/19)
Project: South Texas Expansion ProjectType: Project includes mainline reversal, new
compression and station reversal on existing pipeline
Location: Vidor, TX – Petronila, TXCapacity: 400 MDth/dCompletion: 2019Comments: Project will expand the existing South
Texas Pipeline System in South Texas, an area with increasing load from the market in Mexico
ENERGY TRANSFER PARTNERS – (1/18)
Project: Revolution PipelineType: Project includes the construction of
pipeline and a fractionation facilityLength: 120 milesDiameter: 24 and 30 inchesCapacity: 440 MMcf/dLocation: Butler County, PA – Revolution Plant
Contractor: Capstone EnergyType: Project includes pipeline constructionContractor: WillbrosType: Project includes pipeline construction
Contractor: PumpcoType: Project includes pipeline construction
EQT MIDSTREAM PARTNERS LP – (2/18)
Project: Equitrans Expansion ProjectType: Project includes construction of pipeline and
expansion of existing compressor stationsLength: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington
counties, PA; Wetzel County, WVCapacity: 600 MMcf/d
GULF COAST EXPRESS PIPELINE LLC – (6/18)
Project: Gulf Coast Express Pipeline ProjectType: Project includes pipeline constructionLength: 447 milesDiameter: 36 and 42 inches
Location: Coyanosa, TX - Agua Dulce, TXCapacity: 1.92 Bcf/dCompletion: 4Q 2019Project: Driver to High Plains LateralType: Project includes construction of a
pipeline lateralLength: 9 miles Diameter: 36 inches
Location: Midland, TXComments: Project is associated with the Gulf Coast
Express Pipeline
Contractor: Taylor Construction Co. Inc.Type: Project includes pipeline constructionContractor: Pumpco Inc.Type: Project includes pipeline construction
GAS
ONGOING PROJECTS Construction Underway
26 Pipeline News | August 2019 | Pipeline-News.com
Contractor: Strike LLCType: Project includes pipeline construction
JACKALOPE GAS GATHERING SERVICES LLC – (9/18)
Project: Jackalope Gas Gathering System ExpansionType: Project includes expansion of an existing
gathering system and the associated Bucking Horse Gas Processing Facility
Location: Converse County, WYCapacity: 200 MMcf/dCompletion: 4Q 2019
KINDER MORGAN INC.– (9/18)
Project: SK PipelineType: Project includes construction of pipeline
and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Completion: 3Q 2019
Operator: Tennessee Gas Pipeline Co. LLCProject: Abandonment and Capacity Restoration
Project (ACR Project)Type: Project includes abandonment of
certain natural gas pipeline facilities and modifications of existing pipeline
facilities and compressor stationsLength: 964 miles (abandonment) 14 miles (construction)Diameter: 2 , 16, 30 and 36 inchesLocation: Natchitoches Parish, LA; Columbiana County, OH; KentuckyComments: Project will abandon pipeline
facilities from Station 40 in Natchitoches Parish, LA, to Station 216 in Columbiana County, OH, and construct replacement facilities in OH and KY. Construction of the replacement facilities will enable TGP to abandon the lines by sale to UMTP, which plans to convert the lines to non-jurisdictional natural gas liquids transportation as a component of the UMTP Project
Project: Gulf Coast Southbound Expansion Phase IIType: Project includes construction of
additional compression facilities at NGPL’s new compressor station
Location: Chicago Market, IL - Agua Dulce Hub, LACapacity: 250 MDth/dCompletion: 4Q 2019
MARATHON PETROLEUM
Project: Whistler Pipeline
Location: Permian Basin to the Coastal Bend region of Texas
Capacity: 2 Bcf/d Dimensions: 42 inches, 475 miles Completion: Initial service in 3Q 2021 Summary: A favorable decision by three investors
prompted the go-ahead. The pipeline will carry gas from Waha to the Agua Dulce area of South Texas, both gas pricing hubs. It will have several upstream links to plants in the Midland Basin and to the Agua Blanca Pipeline, and tap into the expanding Mexican and LNG markets.
MILLENNIUM PIPELINE CO. LLC – (3/19)
Project: Eastern System UpgradeType: Project includes construction of
looped pipeline, new compression capabilities and upgrades to existing stations
Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCompletion: Delayed
MOUNTAIN VALLEY PIPELINE LLC – (3/19)Project: Mountain Valley Pipeline
GAS
Our name says it all.
Untitled-2 1 1/3/2018 7:09:52 AM
27Pipeline-News.com | August 2019 | Pipeline News
Type: Project includes construction of pipeline and three compressor stations
Length: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania
County, VACapacity: 2 Bcf/dCompletion: 4Q 2019Contractor: Precision Pipeline LLCType: Project includes pipeline constructionContractor: Price Gregory InternationalType: Project includes pipeline construction
Contractor: US Trinity Energy Services LLCType: Project includes pipeline construction
ONEOK INC. – (3/19)
Type: Project includes expansions of the existing WesTex Transmission and ONEOK Gas Transportation systems, and making the Roadrunner Gas Transmission Pipeline bi-directional
Location: Permian Basin and OklahomaCapacity: 1.7 Bcf/dCompletion: 2019Comments: Projects are backed by multiple firm
transportation commitments
PASO NORTE PIPELINE GROUP – (REV 5/18)
Project: Paso Norte PipelineType: Project includes pipeline constructionLength: 340 milesDiameter: 32 inchesLocation: Deming, NM - Mexico/ChihuahuaCapacity: 366 MMcf/dComments: Project will deliver efficient, clean
burning, and cost effective natural gas from the United States to a dynamic region of North Central Mexico; the western portion of the State of Chihuahua
PIEDMONT NATURAL GAS CO. INC. – (3/18)
Project: Line 434 ProjectType: Project includes construction of gas
distribution lines and facilitiesLength: 35 milesDiameter: 30 inchesLocation: Laurinburg, NCCapacity: 80 Bcf/yComments: Project will put swine-waste gas on
Piedmont’s system for use by Duke Energy at two of its plants (H.F. Lee Station Combined Cycle Plant and Sutton Combined Cycle Plant)
Contractor: Troy Construction Co.Type: Project includes pipeline construction
POMELO CONNECTOR LLC – (4/18)
Owner: Canyon Midstream Partners LLCProject: Pomelo Connector PipelineType: Project includes construction of pipeline
and a compressor stationLength: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400,000 Dth/dComments: Project will provide firm transportation
capacity between Texas Eastern Transmission LP and the Nueces Header to be constructed by Valley Crossing Pipeline LLC
SPIRE INC. – (3/18)Operator: Spire STL Pipeline LLCProject: Spire STL PipelineType: Project includes installation of steel
pipeline and minor modifications to Line 880
Length: 65 miles
Diameter: 24 inchesLocation: Scott County, IL - St. Louis County, MOCapacity: 400 MMcf/dCompletion: 4Q 2019
GAS
Call Jim Filipowicz today! (800)334-5964 or (406)761-4848Steel Etc. • 1408 52nd St. N • Great Falls, MT
Flume PipeNew & Used STD & Heavy Wall PipeUsed Railroad Flat Cars & Tank Cars
Get your product where you need it, when you need it!
Material delivered to job sites ON TIME in the Continental US & Canada
Featurin
g:
Coal Slag Blast Abrasive
Grit Sizes8-20 Course • 16-40 Medium
20-40 Med Fine • 30-60 Fine • 40-60 Extra Fine
Environmentally friendly NO heavy metal<.2% Free silica
Consistent, hard angular particlesFast cleaning
Blastox blending® availableCARB & QPL approved
ONGOING PROJECTS Construction Underway
28 Pipeline News | August 2019 | Pipeline-News.com
Comments: Project will connect to the existing Rockies Express Pipeline
Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading of pipeContractor: Michels Corp.Type: Project includes pipeline construction
STERLING ENERGY – (3/18)
Project: Jackson Lake Gas Gathering SystemType: Project includes construction of a
pipeline gathering systemLength: 12.2 milesDiameter: 12 inchesLocation: Morgan County, CO – Weldona, COCompletion: 1Q 2020Comments: Project will connect to the Jackson
Lake Gas Processing Facility and be built adjacent to another pipeline that is already on the property
TALLGRASS INTERSTATE GAS TRANSMISSIONLLC – (2/18)
Owner: Tallgrass Energy Partners LPProject: Segment 55 Pipeline Abandonment ProjectType: Project includes abandoning an existing
pipeline segment in placeLength: 47 milesDiameter: 16 inchesLocation: Converse and Platte counties, WYComments: Segment will be sold to Tallgrass Midstream
LLC and converted to a crude oil pipeline
TELLURIAN
Project: Haynesville Global Access Pipeline (HGAP)
Capacity: 2 Bcf/dLocation: Southwest LouisianaDimensions: 160 miles of gas pipeline.Completion: 2Q 2023 (work to begin 2022)Summary: Tellurian is currently seeking shippers for
its pipeline and production facilities in DeSoto Parish, which will be connected to existing and proposed infrastructure near Gillis in Calcasieu Parish.
TELLURIAN
Project: Delhi Connector Pipeline (DCPL)Capacity: 2 Bcf/dLocation: Southwest LouisianaDimensions: 180 miles of 42-inch gas pipeline.Completion: 2023 (work to begin 2021)
Summary: Tellurian began a binding open season for the Delhi Connector, joining the Perryville/Delhi Hub in Richland Parish, to Gillis, La.
TRANSCONTINENTAL GAS PIPE LINE CO. LLC – (5/18)
Project: St. James Supply LateralType: Project includes construction of
pipeline, compressor stations and a pig receiver site
Length: 0.7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161,500 Dth/dCompletion: 2020
UGI ENERGY SERVICES – (4/19)
Project: Auburn Gathering System ExpansionType: Project includes construction of two
additional compressor stationsLocation: Susquehanna and Wyoming counties, PACapacity: 150 MMcf/dCompletion: 1Q 2020Comments: Project will transport gas from acreage
being produced by Cabot Oil & Gas
GAS
We are committed to maintaining the highest safety standards for our teams and the environment. No questions asked. We do the right thing, every time.
HORIZONTAL DIRECTIONAL DRILLING/DIRECT PIPE® SERVICES: River, road, and railroad crossings / Shore approaches / Intersects / Installing steel, HDPE, and FPVC / Design/Build and EPC Services
Certified in Safety and Environment: OHSAS 18001:2007 and ISO 14001:2015.
www.mears.net
29Pipeline-News.com | August 2019 | Pipeline News
and will boost total system capacity to 620 MMcf/d
WBI ENERGY INC. – (10/18)
Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,
interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station
Length: 38 milesDiameter: 16 inchesLocation: Clay County MN; Cass, Burleigh,
Stutsman and Barnes counties, NDCapacity: 40 MMcf/d
Project: Line Section 27 ExpansionType: Project includes expansion of the existing
Line Section 27 pipeline including pipeline construction and installation of associated facilities
Length: 13 milesDiameter: 24 inchesLocation: Northwest North DakotaCapacity: 200 MMcf/dComments: Upon completion, the total
transportation capacity on WBI Energy’s Line Section 27 will be over 600 MDth/d
WILLIAMS PARTNERS LP – (8/19)
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,
upgrades and existing facility modifications
Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCompletion: 4Q 2019Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and
replacement with 20-inch diameter line and facility upgrades
Length: 7 milesDiameter: 8 inchesLocation: Snohomish County, WA
Operator: Transcontinental Gas Pipe Line Company, LLC
Project: Gulf Connector Expansion Project
Type: Project includes increasing compression on the existing pipeline
Location: Texas – LouisianaCapacity: 475 MDth/dCompletion: 4Q 2019
WILLIAMS – (06/19)
Project: Northeast Supply Enhancement (NSE)Capacity: 400.2 Btu/dLocation: NortheastDimensions: 10 miles of 42-inch pipe; offshore 23
miles of 26-inch pipe.Completion: Fall 2020 (to begin work 3Q 2019)Summary: FERC issued a certificate of public
convenience and necessity to Williams authorizing the Northeast Supply Enhancement (NSE) project – an expansion of the existing Transco natural gas pipeline designed to serve New York markets.
The project will expand existing Transco pipeline infrastructure in Pennsylvania, New Jersey and New York primarily by looping – placing new pipe alongside of existing pipe parallel to the existing right-of way.
The project will also add 21,902 hp at an existing compressor station, a new
GAS
1209 Hardy StreetHouston, TX 77020Tel: (713) 222-0146Tel: (800) 231-7205Fax: (713) 222-7403
Copyright 2015Knapp Polly Pig, Inc.All rights reserved
E-mail: [email protected]
By-pass ports::Gauging plates::Transmitter cavities::Medium or heavy density foam
Available options:
Single piece bodyBi-Directional
Condensate removalParaffin scrapingDewateringCommissioning
Quality-built in Houston, Texasfor over 25 years
FOAM DISC PIGThe Original Manufacturer of the
Steel wire brush
Rounded nose Extended-Length
Plastic brush
30 Pipeline News | August 2019 | Pipeline-News.com
ONGOING PROJECTS Construction Underway
32,000 hp compressor station and related facilities.
WILLIAMS PARTNERS LP – (1/19)
Project: Gateway Expansion ProjectType: Project includes installation of additional
electric horsepower at an existing compressor station (Station 303), modifications to an existing meter station and the replacement of an existing meter station
Location: Essex County, NJ; Passaic County, NJCapacity: 65 MDth/dStart: 4Q 2019Completion: 4Q 2020/2021Status: Project has FERC approvalComments: Williams has executed agreements with
PSEG Power and UGI Energy Services for firm transportation service under the project
WILLIAMS TRANSCONTINENTAL – (REV 3/18)
Owner: Williams Partners LPProject: Southeast Market Pipelines ProjectSegment: Hillabee Expansion (Phases I, II and III)Type: Project includes pipeline looping and
installation of additional compression on
the mainlineLength: 45 milesDiameter: 42 inchesLocation: Coosa, Chilton and Choctaw counties, ALCapacity: 1.2 MMDth/dCompletion: 4Q 2021
GAS The Americas | CANADA
ENBRIDGE INC. – (6/18)
Project: Spruce Ridge ProgramType: Project includes the addition of two
new sections of pipeline and additional compression on an existing pipeline
Length: 25 milesDiameter: 24 and 36 inchesLocation: Chetwynd, BC and Fort St. John, BCCapacity: 402 MMcf/dCompletion: 3Q 2019
KEYERA CORP. – (2/18)
Project: North Wapiti Pipeline SystemType: Project includes construction of a sour
gas gathering pipeline, a condensate and water pipeline, and a compressor station
Length: 21 milesDiameter: 8 and 12 inchesLocation: Grande Prairie, ABCapacity: 150 MMcf/dCompletion: 2Q 2019
NOVA GAS TRANSMISSION LTD. – (9/18
Project: Northwest Mainline Loop (Boundary Lake North Section)
Type: Project includes pipeline loopingLength: 14 milesLocation: Clear Hills County, ABComments: Project will transport sweet natural gas
from a tie in connection adjacent to the Owl Lake South Meter Station to the existing Hidden Lake Compressor Station
PEMBINA PIPELINE CORP. – (7/18)
Project: Peace Pipeline Expansion (Phase VI)Type: Project includes pipeline construction and
installation of additional pump stationsDiameter: 16 and 20 inchesLocation: LaGlace - Wapitiand, AB and Kakwa to
Lator, ABCompletion: 1Q 2020
GAS
Safely & Effectively Clean High Flow Rate
Gas Transmission Pipelines
with 1.5D Bends.
Speed Control Cleaning PIG (SCP) tool
New Fleet Available!
InlineServices.com | 888.412.7286
31Pipeline-News.com | August 2019 | Pipeline News
TRANSCANADA CORP. – (11/18)Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline
and compressor stationsLength: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Completion: 2Q 2024
Contractor: Pacific Atlantic Pipeline Construction Inc.Type: Contract includes pipeline construction
Contractor: Surerus Murphy Joint VentureType: Contract includes pipeline construction
Contractor: SA Energy GroupType: Contract includes pipeline constructionContractor: Macro Spiecapag Joint VentureType: Contract includes pipeline constructionProject: North Montney ProjectType: Project includes construction of pipeline,
associated metering facilities, valve sites and compression facilities
Length: 190 milesDiameter: 42 inchesLocation: Peace River, AB
Completion: 3Q 2019
Contractor: Quanta Services Inc.Type: Contract includes pipeline construction
for spread three of the mainlineLength: 39 milesLocation: Fort St. John, BC
Contractor: Macro Enterprises Inc.Type: Contract includes pipeline construction
for spread two of the project
Contractor: SpiecapagType: Contract includes pipelaying for the project
TRANSGAS – (1/19)
Project: South Saskatoon Type: Project includes pipeline constructionLength: 38 milesLocation: Vascoy to Patience LakeCompletion: 4Q 2019Comments: The project involves initial
construction work to prepare the area, begin drilling the river crossing, and marking out right of ways. After initial construction, pipeline construction will begin.
GAS The Americas | CARIBBEAN/SOUTH CENTRAL AMERICA
ENERGÍA ARGENTINA S.A. – (REV 3/19)
Project: Argentina Northeast Gas PipelineSegment 1: Formosa, Salta and Santa Fe
Segment 2: Formosa, Chaco and Santa FeSegment 3: Corrientes and MisionesType: Project includes the construction of
three sections, comprising 1,810 km of trunk lines and 2,334 km of branch lines
Length: 2,574 miles (trunklines: 1,450) (gathering lines: 1,124 miles)Diameter: 24 inches (trunklines) 4 to 10 inches (gathering lines)Location: Formosa, Chaco, Santa Fe, Salta, Corrientes
and Misiones provinces, ArgentinaCapacity: 11.2 MMcf/dComments: Project will supply natural gas to 168 cities
and will connect to the national pipeline network and to the Juana Azurduy Pipeline linking Argentina with Bolivia
Contractor: Tenaris
GAS
sidebooms.com I 918-858-4201
Modernize your 583R pipelayer with a state-of-the-art MIDWESTERN hydraulic conversion kit. Our new 583R-MMC kit replaces the old, unconventional OEM draw works and linkage controls with a high-efficiency, electro-hydraulic winch package that puts all the boom controls back in your right hand! This is a cost effective way to get your 583R back on the right-of-way, while improving safety and increasing productivity. Let MIDWESTERN put you back to work!
583R-MMC
ONGOING PROJECTS Construction Underway
32 Pipeline News | August 2019 | Pipeline-News.com
Type: Contract includes pipe supplyLength: 1,330 miles (trunklines) 403 miles (gathering lines)
Contractor: SIAT S.A. Type: Contract includes pipe supply
Contractor: Techint E&C-PanedileType: Contract includes engineering and
constructionSegment: Section I
Contractor: Vertúa S.A.Type: Contract includes engineering and
constructionSegment: Section II
Contractor: Helport-CPC-Rovella Carranza and Contreras Hnos
Type: Contract includes engineering and construction
Segment: Section III
PATAGONIA – (6/19)
Project: Cordillerano Pipeline ExtensionType: Project includes the compressor plant in
Rio Senguer, along with 62 miles (100
km) of reinforcing gas pipelines, running parallel to the current one
Location: Bariloche, ArgentinaLength: 62 miles, 12-inch pipelineCompletion: 1Q 2020Comments: According to government sources work,
which is underway in Pilcaniyeu, Villa La Angostura, Trevelin and Gobernador Costa is more than 40% complete.
PERU – (REV 11/17)
Project: Southern Peruvian GaslineType: Project includes pipeline constructionLength: 620 milesDiameter: 32 inchesLocation: Camisea field - Southern PeruCapacity: 800 MMcf/dStatus: Peru has canceled a contract for
construction of the pipeline after the consortium hired to build it failed to meet its financing deadline. Odebrecht SA, the subject of a multinational corruption investigation, led the consortium with a 55% stake, Enagas SA held 25% and Grupo Grana y Montero 20%
Comments: If built, project will improve the existing
Peruvian Energy Network, contributing to the development of an Energy Node and Petrochemical Hub in Southern Peru
Contractor: Tipiel SAType: Project includes the front-end
engineering and design for the pipeline
GAS The Americas | MEXICO
COMISION FEDERAL DE ELECTRICIDAD – (12/17)
Project: Empalme Branch PipelineType: Project includes pipeline constructionLength: 12.5 milesDiameter: 24 inchesLocation: Sonora - EmpalmeCapacity: 236 MMcf/dStatus: Project is experiencing commissioning
delays Comments: Project will transport gas from the Sásabe-
Guaymas and Guaymas-El Oro pipelines to a combined cycle power plant
Contractor: Gasoducto de AguaprietaType: Project includes pipeline constructionProject: Hermosillo Branch PipelineType: Project includes pipeline construction
GAS
33Pipeline-News.com | August 2019 | Pipeline News
brandt.ca 1-877-533-3133
SAY HELLO TO THE TOUGHEST, SAFEST, AND MOST STABLE
PIPELAYERS ON EARTH.Brandt pairs the performance advantages of John Deere’s 1050K-based dozer platform with our exclusive boom and winch configuration and best- in-class SmartLiftTM Dynamic Stability Monitoring system for unrivalled capacity, load control and operator visibility.
The result? You get the safest, best-handling and most stable machine on the job site. That’s Powerful Value. Delivered.
Length: 30 milesDiameter: 16 inchesLocation: Sonora - HermosilloCapacity: 100 MMcf/dStatus: Project is experiencing commissioning delays\Comments: Project will transport gas from the Sásabe -Guaymas Pipeline to a combined cycle power plantContractor: Gas Natural del NoroesteType: Project includes pipeline construction FERMACA PIPELINE EL ENCINO, S DE R.L. DE C.V. – (REV 6/17)
Owner: FermacaProject: La Laguna–Aguascalientes Natural Gas
PipelineType: Project involves building and operating a
natural gas pipelineLength: 290 milesDiameter: 42 inchesLocation: Durango - Zacatecas - AguascalientesCapacity: 1.2 Bcf/dComments: Pipeline will supply CFE’s power plants in
Aguascalientes and Jalico states, as well as central and western parts of the country
Contractor: Fermaca Pipeline el Encino, S de R.L. de C.V.
Type: Project includes engineering, procurement and construction for the pipeline
TRANSCANADA CORP. – (REV 4/19)
Project: Tuxpan-Tula PipelineType: Project includes the construction and
operation of a natural gas pipelineLength: 178 milesDiameter: 36 inchesLocation: Tuxpan, Veracruz - TulaCapacity: 703 MMcf/dCompletion: DelayedComments: Pipeline will transport natural gas brought
from the US (through a future South Texas-Tuxpan Maritime Pipeline) to the states of Veracruz, Puebla and Hidalgo where it will be connected to the country’s pipeline network
Contractor: Jacobs Engineering GroupType: Project includes engineering, procurement
and construction for the pipelineProject: Tula - Villa de Reyes PipelineType: Project involves pipeline constructionLength: 284 milesDiameter: 36 inchesLocation: Tula, Hidalgo - Villa de Reyes, San Luis
PotosíCapacity: 550 MMcf/dComments: Work halted due to permitting costs.
GAS International | AFRICA
DANGOTE INDUSTRIES LTD. – (4/19)Owner: Dangote GroupProject: East West Offshore Gas Gathering SystemType: Project includes construction of two
parallel subsea pipelinesLength: 684 milesDiameter: 38 inchesLocation: Bonny, Rivers - Ogidigben – Olokola -
Lekki, LagosCapacity: 3 Bcf/dCompletion: 2Q 2025 (Phase II)Comments: Project will create a corridor for
evacuation of trapped gas from offshore platforms in Nigeria to allow their monetization and will deliver gas to a new build gas receiving plant to be located at the Dangote Refinery Complex in Lekki, Lagos
Contractor: Paradigm Environmental System Consultants
Type: Contracts includes conducting an Envir-onmental Impact Assessment for the project
GALSI PIPELINE – (REV 10/16)
Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of
351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities
Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: Delayed indefinitelyComments: The initial transport capacity will be
8 Bcm per year
KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)
Pipeline: Trans-African Pipeline Type: Project includes the construction of a
new gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve access
to energy across West Africa and establish a competitive regional market for electricity
GAS
ONGOING PROJECTS Construction Underway
34 Pipeline News | August 2019 | Pipeline-News.com
NIGERIAN NATIONAL PETROLEUM CORP. – (6/18)
Project: Ajaokuta - Kaduna – Kano (AKK) PipelineType: Project includes pipeline constructionLength: 381 milesDiameter: 40 inchesLocation: Kaduna - KanoCost: $2.8 billionCompletion: 4Q 2020Comments: Project will help establish connectivity
between the East, West and North parts of Nigeria
Contractor: OilServe/OandoType: Contract includes construction of Lot 1
of the pipelineLength: 125 milesCost: $855 million
Contractor: Brentex/China Petroleum Pipeline BureauType: Contract includes construction of Lot 3
of the pipelineLength: 137 milesCost: $1.2 billion
NOBLE ENERGY
Project: Alen Gas ProjectLocation: Republic of Equatorial GuineaCapacity: 950 MMcfe/d
Dimensions: 43 miles (70 km); 24-inch natural gas equivalent
Completion: 2021Summary: Designed to transport natural gas
processed through the Alen offshore platform to onshore facilities.
GAS International | ASIA PACIFIC
APA GROUP – (3/18)
Owner 1: Gold Road Resources Ltd., 50%Owner 2: Gold Fields Ltd., 50%Project: Yamarna Gas PipelineType: Project includes pipeline construction
and a gas-fired stationLength: 123 milesLocation: Yamarna, Western AustraliaCost: $180 millionComments: Project is part of the Gruyere Project and
will be built east of Laverton in Western Australia, running from a connection point off the existing Eastern Goldfields Gas Pipeline to the new Gruyere gold mine project site
Contractor: NacapType: Project includes pipeline construction
AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)
Project: Azeri PipelineType: Project includes the construction of new
pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria,
Albania and ItalyCompletion: 2019Comments: Pipeline will have a capacity of 16 Bcm/y
GAIL INDIA LTD. – (3/18)
Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase I)
Type: Project includes construction of a transmission pipeline and multiple spur lines
Length: 470 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Phulpur – DobhiCapacity: 565 Bcf/d (Phase I and II)Cost: $50 millionComments: Project will usher Industrial development
in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries
GAS
“SAFETY FIRST - SERVICE ALWAYS”
• Pipeline Stringing - 60’ + 80’ pipe
• Unloading/Stockpiling Pipe from rail sidings
•Ship discharge/Project Pipe
• General/Heavy Hauling (Nationwide)
•Logistics/Cost Estimates
Contact:Jimmy MontgomeryJimmy@mtilogistics
Phone: (877) 787-4644, (713) 592-6766Fax: (713) 592-6769
Website: MTILOGISTICS.COM
Untitled-1 1 1/3/2018 7:08:24 AM
35Pipeline-News.com | August 2019 | Pipeline News
Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,
procurement and construction
Contract: IL&FS Engineering & Construction Co. Ltd.
Type: Project includes pipelaying
Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase II)
Type: Project includes pipeline constructionLength: 1,180 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Jharkhand - West Bengal - OdishaCapacity: 565 Bcf/d (Phase I and II)Cost: $146 millionCompletion: 4Q 2020Comments: Project will usher Industrial development
in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries
Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,
procurement and construction
Contract: IL&FS Engineering & Construction Co. Ltd.Type: Project includes pipelaying
GUJARAT STATE PETROLEUM CORP. – (REV 12/16)
Contractor: GSPL India Gasnet
Project: Mehsana-Bhatinda PipelineType: Project includes the construction of new
pipelineLength: 1,037 milesLocation: Mehsana-BhatindaComments: Pipeline is currently being considered
for cancellation but, if built, will have a transportation capacity of 30 MMcf/d
Contractor: GAILProject: Mallavaram-Bhilwara PipelineType: Project includes the construction of new
pipelineLength: 984 milesLocation: Mallavaram - BhilwaraComments: Pipeline is currently being considered for
cancellation.
IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17)
Owner: Gas Authority of India Ltd.Project: Kochi-Koottanad-Bangalore-Mangalore
PipelineType: Project includes the laying and
construction of 30-inch pipeline along with associated works
Length: 685 milesLocation: KeralaCompletion: 2019Comments: GAIL has won a second extension for
completing the project as it faces unprecedented problems in getting land in Kerala and Tamil Nadu
PETROVIETNAM GAS/MOECO/PTTEP – (REV 6/16)
Project: O Mon Gas PipelineType: Project includes the construction of
risers, subsea pipeline, onshore pipeline and a line break valve
Length: 248 milesLocation: Malay Basin - southern VietnamCompletion: 2023Comments: Pipeline will have a capacity of 20.3
MMcm/y
RELIANCE INDUSTRIES – (REV 11/16)
Owner: China National Petroleum Corp.Project: Shahdol-Phulpur PipelineType: Project includes the construction of new
pipelineLength: 188 milesLocation: Shahdol - Jaysing Nagar - Beohari-Gurh
- PhulpurCompletion: 2023Comments: Pipeline will have a capacity of 4.3
MMcm/d
Project: Dahej Nagothane Ethane Pipeline Project Type: Project includes the construction of new
pipelineLength: 301 milesLocation: Dahej, Gujarat – Nagothane, Maharashtra Comments: Project will transport 1.25 mtpa of liquid
ethane
OILThe Americas | U.S.
ENLINK MIDSTREAM PARTNERS LP — (6/19)
Project: Avenger Crude Oil Gathering SystemType: Project includes construction of a
gathering systemLength: 57 milesLocation: Eddy and Lea counties, NMCompletion: 1Q 2020Comments: System is anchored by a 10-year contract
with Devon Energy Corp. and is supported by dedications from Devon’s Todd (Eddy and Lea Counties, NM) and Potato Basin (Eddy County, NM) development areas
EPIC PIPELINE CO. LLC – (REV 4/19)
Project: EPIC Crude Oil PipelineType: Project includes pipeline construction Length: 730 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,
TX - Corpus Christi, TX Capacity: 900,000 bpdCompletion: 3Q 2019Status: EPIC has executed definitive agreements
to add Diamondback Energy as a
strategic partner and signed other new primary shippers
Comments: Project will link producers’ NGL reserves in the Permian and Eagle Ford Basins to Gulf Coast refiners, petrochemical companies and export markets, and will run side by side with the previously announced EPIC NGL Pipeline
Contractor: Pumpco Inc. Type: Project includes pipeline construction
Contractor: Holloman Corp. Type: Project includes pipeline construction
Contractor: MPG Pipeline Contractors LLCType: Project includes pipeline construction
EXXONMOBIL PIPELINE CO. — (6/18)
Project: Delaware Connector PipelineType: Project includes pipeline constructionLength: 48 milesDiameter: 30 inchesLocation: Loving and Winkler counties, TX
Comments: Pipeline will help the company triple Permian output by 2025
GIBSON ENERGY INC. – (5/19)Project: Viking PipelineType: Project includes pipeline constructionLength: 75 milesLocation: Viking Basin – Hardisty, ABCapacity: 13,000 bpd (initial), 25,000 bpd
(maximum)Completion: In Service March 1
JUPITER LLC – (11/18)Project: Jupiter Pipeline
Type: Project includes construction of pipelineLength: 670 milesDiameter: 16, 20 inchesLocation: Orla, TX – Port of Brownsville, TXCapacity: 30,000 bpdCompletion: 2020
NOBLE MIDSTREAM PARTNERS LP – (11/18)
Project: Wink Trunk LineType: Project includes pipeline constructionLength: 95 milesDiameter: 20 inches
GAS | OIL
ONGOING PROJECTS Construction Underway
36 Pipeline News | August 2019 | Pipeline-News.com
Location: Pecos County, TX - Winkler County, TXCapacity: 200 MMbpdCompletion: 4Q 2019
NUSTAR PERMIAN TRANSPORTATION ANDSTORAGE LLC – (6/18)
Project: County Line Lateral Pipeline System/County Line Lateral Loop
Type: Project includes construction of multiple interconnects connecting to the existing system
Location: Howard County, TXLength: 13 milesDiameter: 16 inchesCapacity: 70,000 bpd
ORYX MIDSTREAM SERVICES II LLC – (REV 8/18)
Project: Oryx II PipelineType: Project includes pipeline construction
and loopingLength: 400 milesDiameter: 16, 20 and 24 inchesLocation: Carlsbad, NM - Midland, TXCapacity: 650 MMbbl (transportation), 1.5 MMbbl
(storage)Completion: 4Q 2019
Contractor: Holloman Corp.Type: Contract includes the engineering,
procurement and construction of pipeline
PLAINS ALL AMERICAN PIPELINE LP – (11/18)
Project: Cactus II PipelineType: Project includes construction of two
pipelines that will connect to the existing Cactus network
Length: 80 milesDiameter: 20 inchesLocation: Odessa, TX – McCamey, TX (first
pipeline), Corpus Christi, TX – Ingleside, TX
(second pipeline)Capacity: 185,000 bpdStatus: Project’s capacity has been fully
committedCompletion: 3Q 2019
PLAINS ALL AMERICAN PIPELINE, PHILLIPS 66
Project: Red Oak Pipeline system
Location: Cushing, Okla., to Gulf Coast Dimensions: 30- and 20-inch pipe, 675 miles
(estimate) Capacity: 400 MMbpd Completion: 1Q 2021 Summary: The joint venture will transport crude oil from the Permian Basin and Cushing, Okla., to Houston and multiple locations along the Texas Gulf Coast. The project is underpinned with long-term shipper volume commitments. A 30-inch pipeline segments will run from Cushing to Wichita Falls and Sealy, Texas, and from Sealy to Corpus Christi and Ingleside. A 20-inch segment will run from Houston to Beaumont.
SEABROOK LOGISTICS LLC – (3/18)
Owner 1: Magellan Midstream Partners LP, 50%Owner 2: LBC Tank Terminals LLC, 50%Type: Project includes the construction a
bi-directional pipelineLength: 13 milesDiameter: 24 inchesLocation: Seabrook, TXContractor: Troy Construction Co.Type: Project includes pipeline construction
TALLGRASS ENERGY/SILVER CREEKMIDSTREAM (6/19)
Project: Powder River Gateway Project Type: Project includes construction of two
pipelinesLength: 52 milesDiameter: 12 inchesLocation: Converse County, WYCapacity: 200,000 bpdCompletion: 4Q 2019
OIL The Americas | CANADA
PEMBINA PIPELINE CORP. – (REV 4/19)
Project: Phase IV ExpansionType: Project involves the expansion of the Fox
Creek and Namao Pipeline through two new pump stations
Location: Fox Creek - NamaoLength: 137 milesDiameter: 20 inchesCapacity: 180,000 bpd
Completion: 3Q 2019Comments: Pembina has the ability to further expand
capacity between Fox Creek and Namao by adding additional pump stations
Project: Phase V ExpansionType: Project involves pipeline construction,
installation of a new pump station and upgrading an existing pump station
Location: Lator and Fox Creek, ABLength: 60 milesDiameter: 20 inchesCapacity: 260,000 bpd (transmission) 40,000 bpd (storage)Status: Clearing of the right-of-way is almost
completeCompletion: 2Q 2019Comments: Project will address capacity constraints
between Lator and Fox Creek by adding capacity, which will support growth in the prolific Monteny and Deep Basin resource plays
PEMBINA PIPELINE CORP.
Project: Peace Pipeline System (Phase VIII) Location: Gordondale to La Glace corridor of
Alberta, B.C. Dimensions: 10 and 16 inches Completion: In stages between 1Q 2020 and 2Q 2022 Summary: The additional capacity will
accommodate incremental demand in the Montney area. The expansion will allow segregated pipeline service for propane-plus mix and ethane-plus mix NGL from the central Montney area at Gordondale into the Edmonton region for market delivery.
RANGELAND MIDSTREAM CANADA
Project: Marten Hills Pipeline SystemCapacity: Not determinedLocation: Northcentral AlbertaDimensions: 53 miles (85 km) of crude and
condensate pipeline.Completion: 2Q 2020 Summary: The system will gather crude oil
production from the Clearwater formation, described by the company as “emerging as an extremely economic play with low extraction costs using modern multilateral horizontal drilling.”
NGLThe Americas | U.S.
ENERGY TRANSFER PARTNERS LP – (12/18)Project: Lone Star Express Pipeline Expansion
Type: Project includes pipeline construction and an additional fractionation facility
Length: 352 miles
Diameter: 24 inchesLocation: West Texas - Mont Belvieu, TXCapacity: 150,000 bpdCompletion: 4Q 2020
ENTERPRISE PRODUCTS PARTNERS LP – (12/18)
Project: Mentone PipelineType: Project includes construction of large-
diameter gathering and residue pipelines and expanding compression capabilities
OIL | NGL
37Pipeline-News.com | August 2019 | Pipeline News
NGL | PRODUCTS
Length: 66 milesLocation: Loving County, TXCapacity: 40,000 bpdCompletion: 2Q 2019Comments: Project will allow the Mentone natural
gas processing plant to link to the partnership’s NGL system, including the Shin Oak Pipeline scheduled for completion in the second quarter of 2019, as well as Enterprise’s existing Texas Intrastate natural gas pipeline network
EPIC NGL PIPELINE LP – (REV 8/19)
Project: EPIC NGL Pipeline - Phase IVType: Project includes construction of pipelineLength: 650 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,
TX - Corpus Christi, TX Capacity: 220,000 bpd (initial) 440,000 bpd (maximum)Completion: 4Q 2019Comments: First phase of the project is complete
Project: WPX LateralType: Project includes construction of a
pipeline lateralLength: 6 milesDiameter: 8 inchesLocation: Reeves County, TXCompletion: 3Q 2019Comments: Project is associated with the EPIC
NGL Pipeline
ONEOK INC. – (11/18)Project: Arbuckle II NGL PipelineType: Project includes pipeline constructionLength: 530 milesDiameter: 24 and 30 inchesLocation: Oklahoma - Mont Belvieu, TX
Capacity: 500 MMbpd (initial), 1 MMbpd (maximum)Completion: 1Q 2021
PHILLIPS 66 – (8/18)
Project: Sweeny PipelineType: Project includes associated pipeline
construction for the Sweeny Hub ExpansionLocation: Old Ocean, TXCompletion: 4Q 2020Comments: Project is part of the Sweeny Hub ExpansionTARGA RESOURCES CORP. – (REV 5/18)
Project: Grand Prix NGL PipelineType: Project includes construction of pipelineLength: 75 milesDiameter: 24, 30 inchesLocation: West Texas - Mont Belvieu, TX North Texas - OklahomaCapacity: 450 Mbpd (initial) 950 Mbpd (maximum)Completion: 2Q 2019Comments: Targa announced the Grand Prix NGL
Pipeline Extension, which will run from North Texas to Oklahoma and have an initial capacity of 300 Mbpd and a maximum capacity of 950 Mbpd
Contractor: WHC Energy Services Inc.Type: Project includes pipeline construction
WEST TEXAS LPG PIPELINE LTD. – (REV 6/18)Project: Delaware Basin ExtensionType: Project includes construction of pipeline, two pump stations and pipeline loopingLength: 120 milesDiameter: 16 inches Location: Midland, TX - Reeves County, TXCapacity: 110,000 bpd (initial)
Contractor: WHC Energy Services LLCType: Project includes pipeline construction
Project: Delaware Basin Extension LoopingType: Project includes construction of pipeline loopingLength: 30 milesDiameter: 16 inches Location: Midland and Howard counties, TXComments: Project is associated with the Delaware Basin Extension on the existing West Texas LPG PipelineContractor: WHC Energy Services LLCType: Project includes pipeline construction
WOOD GROUP – (1/19)
Type: Project includes steel pipeline construction
Location: West TXLength: 80 milesStatus: Contract awardedComments: Wood has been awarded a $43 million
contract by a large-cap midstream company
NGL The Americas | CANADA
SEMCAMS MIDSTREAM AND KEYERA
Project: Canada Liquids Pipeline SystemLocation: Northern Midland BasinCapacity: 100,000 bpd, expandable to 200,000
bpdDimensions: 171 miles (275 km); 16-inch condensate,
12-inch NGL pipelines.Completion: 2022Summary: The pipeline will connect the liquids-
rich Montney and Duvernay production areas of northwestern Alberta to the fractionation and condensate hubs in Fort Saskatchewan, Alberta.
PRODUCTSThe Americas | U.S.AIR LIQUIDE AMERICA CORP. – (3/18)
Owner: Air Liquide SAProject: Air Liquide St. James PipelineType: Project includes pipeline constructionLength: 25 milesDiameter: 12 inchesLocation: St. James Parish, LACost: $170 millionCompletion: 4Q 2019
Contractor: Air Liquide Global E&C SolutionsType: Project includes engineering
Contractor: Hollico Inc.Type: Project includes pipeline construction
CENEX PIPELINE LLC – (8/19)
Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline
replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, NDCompletion: 4Q 2019
ENBRIDGE OFFSHORE FACILITIES LLC – (12/18)
Project: Vito Field Development ProjectType: Project includes development of the Vito
Field
Length: 67 milesDiameter: 10, 18 inchesLocation: offshore New Orleans, LA
Contractor: Subsea 7Type: Contract includes pipeline installation
ONEOK INC. – (11/18)
Project: West Texas LPG System Expansion IIType: Project includes upgrades to two existing
pumps and pipeline looping on the existing West Texas LPG System
Location: Midland County, TX – Loving County, TXCapacity: 80,000 bpdCompletion: 1Q 2020
ONGOING PROJECTS Construction Underway
38 Pipeline News | August 2019 | Pipeline-News.com
PRODUCTS The Americas | CANADA
HUSKY ENERGY – (10/17)
Owner 2: Suncor Energy (25%)Owner 3: Nalcor Energy (5%)Project: West White Rose Extension ProjectType: Project includes the construction of a
new fixed wellhead platform in the White Rose Field
Location: offshore St. JohnsCapacity: 75,000 bpdCompletion: 1Q 2022
Contractor: TechnipFMC Type: Contract includes engineering,
procurement, construction and installation subsea equipment, including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose FPSO vessel
PRODUCTS The Americas | CARRIBBEAN/SOUTH CENTRAL AMERICA
INFRAESTRUCTURA MARINA DEL GOLFO – (4/18)
Owner: TransCanada Corp.Project: Sur de Texas-Tuxpan PipelineType: Project includes pipeline constructionLength: 497 milesDiameter: 42 inchesCapacity: 2.6 MMcf/dLocation: Gulf of Mexico - Tuxpan, VeracruzCompletion: 4Q 2019Comments: The subsea gas pipeline will interconnect
with the Nueces-Brownsville Pipeline and the Tuxpan-Tula Pipeline
Contractor: M2 SubseaType: Project includes pipeline span support
installation for the projectComments: M² Subsea will manage the project
working closely with local partner Frontera Resources using the Mexican flagged multipurpose support vessel Tehuana, as well as installing grout supports along the southern leg of the pipeline to prevent stress during installation and hydrostatic testing
Contractor: AllseasType: Project includes the supply a Ballgrab
Pipeline Recovery Tool (PRT) for a subsea pipeline
Contractor: Nippon Steel & Sumitomo Metal Corp./Mitsui & Co. Ltd.
Type: Project includes the supply of a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline
Contractor: Shawcor Ltd.Type: Project includes the coating of pipe
with the application of concrete weight coating in a variety of thicknesses (2.25, 2.75 and 3.5 inches) and the installation of 5,000 sacrificial anodes
PETROBRAS – (12/18)
Project: Rota 3 Gas Export PipelineType: Project includes construction of the third
subsea pipeline segment of an existing system
Length: 6 milesDiameter: 24 inchesLocation: offshore Rio de Janeiro
Contractor: McDermott International Inc. Type: Contract includes design, engineering,
procurement, construction and installation of a rigid concrete coated pipeline to the shore, including a horizontal directional drill, tie-in spools and pre-commissioning services
PRODUCTS The Americas | MEXICO
FIELDWOOD ENERGY – (11/18)
Project: Katmai Field DevelopmentType: Project includes the development of the
deepwater Katmai FieldLength: 25 milesDiameter: 12 inchesLocation: US Gulf of Mexico (Green Canyon 40)
Contractor: Subsea Integration AllianceType: Contract includes project management,
engineering, procurement, construction and installation of a flowline and tie-ins
PEMEX EXPLORACIÓN Y PRODUCCIÓN – (6/19)
Project: Ayatsil Field PipelineType: Project includes subsea pipeline flowline
installation in support of its Ayatsil FieldLength: 3 milesDiameter: 8 and 24 inchesLocation: Bay of Campeche, offshore MexicoCompletion: 2Q 2019
Contractor: McDermott International Inc.Type: Contract includes design and detailed
engineering, procurement, construction and installation of two subsea pipelines
TECHNIP FMC – (5/17)Owner: Shell Offshore Inc.Project: Kaikias deep water projectType: Project includes the delivery, integration,
and installation of the subsea production system and subsea riser, jumper and flowline equipment for phase one of the project
Location: Gulf of Mexico
PRODUCTS