jeff wen portfolio 20150202

Upload: jeff-wen

Post on 07-Apr-2016

236 views

Category:

Documents


5 download

DESCRIPTION

Projects from undergraduate study 2011-2014

TRANSCRIPT

Page 1: Jeff Wen Portfolio 20150202
Page 2: Jeff Wen Portfolio 20150202
Page 3: Jeff Wen Portfolio 20150202
Page 4: Jeff Wen Portfolio 20150202
Page 5: Jeff Wen Portfolio 20150202
Page 6: Jeff Wen Portfolio 20150202
Page 7: Jeff Wen Portfolio 20150202
Page 8: Jeff Wen Portfolio 20150202

54321 6 7 8 9 10 11 12

AA

A110

BB

A110

13 14 15 16 17

D

C

B

A

Mesh see throughfence 20mm

STAFFCYCLE

PARKING

PUBLICCYCLE

PARKING

FEMALEAMENITIES

MALEAMENITIES

LIFT

FIRESTAIR 2

FIRESTAIR 1

1 2 3 4 5 6 7 8

9 10 11

1918171615141312

M4

20

21

M5 M6

PAYSTATION

FHR

FHR

FHR

BICYCLERAMP

1:8

CARPARK

ENTRY1:6

FW1

FW1

FW1

FW1

FW1FW1

FW1FW1

FW2

FW2

FW2

SERVICEENTRY

SERVICEENTRY

SERVICEENTRY

SERVICEENTRY

COL1 COL1 COL1 COL1 COL1 COL1 COL1

COL1COL1COL1COL1

COL1 COL1 COL1 COL1COL1

COL1

COL1 COL1

COL1

COL1COL1

COL1COL1

COL1COL1

COL1 COL1 COL1

COL1COL1COL1COL1

COL1

COL1 COL1 COL1

COL1COL1COL1

COL1

PLANT ROOM

FIRE WATERSTORAGE

TANK

TOWN WATERSTORAGE TANK

CONCRETE BUND H150mm

UP1:8

UP 1:8

FW2

FW2

FW2

FW2

FH

FH

SERVICEENTRY

1 2 3 4 5 7

1 2 3 4 5 7

PUMPROOM

SERVICEVEHICLE

PARKING AREA

SERV

ICE

CORR

IDO

R

DRAINAGE LINE

BICYCLE RACK

PLINTHH150mm

W1

W1

W1W1

W1W1

W1

W1

W1

W1

W1

W1

W1W2

W1

W1

W1

SSL: +0.450

SSL: +0.450

SSL: +0.450

SSL: +0.450

FFL: +0.450

FFL: +0.450

AMB

AMB

SSL: +0.450SSL: +0.450

DRAINAGEGRATE

UP

UP

MALE SHOWER

FEMALESHOWER

LOCKERS

LOCKERS

CO

NC

RE

TE B

UN

D H

150m

m

SHR

PWD w. SHRSSL: +0.400

PLINTH H150mm

SUBSTATIONSSL: +0.600

UP

UP

FW2

FW2

DRAINAGE GRATE

DR

AIN

AG

E G

RA

TE

W2

W2

FH

WS WS WS WS WS WS WS WS

WSWSWSWSWSWSWSWS

100m

m S

TEP

DO

WN

100mm STEP DOWN

100m

m S

TEP

DO

WN

100mm STEP DOWN

100mm STEP DOWN

100mm STEP DOWN

DISABLEPARKING

DISABLEPARKING

FALL FALL

FALL FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

HC

HC

HC

HC

HC

HC

TGI

TGIW2

DRAINAGE LINE

DRAINAGE LINE

DRAINAGE LINE

W1

W1

W2

CARPARKSSL: +0.300

LINE OF LEVEL ABOVE

LIN

E O

F LE

VEL

ABO

VE

3300

3190

4500

2810

2565

2975

2950

4748

2530

2500

2800

3200

3040

3360

2880

5720

5306

8

4170 2620 3335 3060 2450 5000 5000 5000 4750 2300 6330 2440 3665 4440 4890 3600

SERVICE CORRIDOR

SERV

ICE

CORR

IDO

R

SERVICE CORRIDOR

RISERABOVE

FW3

FW3 FW3

FW3 FW3

4225

9

1045

031

809

1050

7450

750

5050

7650

4938

7500

5621

750

300

750

300

300

6221

6000

6738

5700

6850

300

7450

300

500

5400

950

238

5700

300

2500

300

3400

5700

300

5400

821

821

5400

6000

2500

4238

5700

1050

4850

45249

8

62508300 49814 300750300 2500 300 750 300 6894 300

5214 9017 8250 9200 7050 6330 5803 3100 2008 5936

63050

24031 13500 7500 14777 300300300 5217 300 3344 2500 2500 740 2500 2500 2500 750 2500 2500 2492 1828 6102 309300 8189 431 6606 6752 300

750 300 658 32097 300300 7000 300 4400 300 9986 300 750 3003190 5674 2600 5094 1200 2500 2500 2500 1297 6200 300 300 7000 300 3700 300 5586 100 5000

5340

930

075

010

400

300

750

2884

930

011

460

300

300

3699

300

1020

010

040

0030

044

0010

044

0030

060

9022

7010

030

0082

148

0040

0030

025

0030

060

0030

070

0030

044

3830

025

1230

0288

4800

300

821

3843

882

157

0057

0067

3856

7768

4877

75

58041300 51441 650 5350 300

750300 2658 2500 700 2500 2500 600 2500 2500 1300 2500 2500 2500 1300 6006 6200 5591 5735 300 6001 3006148 1480 1350 14801006 5094 1200 7500 1297 6009 1700 300 4767 300 5359 100 1400 100 3500 300

d01

d01

d01

d01

d01

d01

d01

d01

d01

d01

d01

d01

d01 d01

d01

d01

d01

d01

JEFF WEN N8097062DAH811 DESIGN 8

CLEMENTINE REGNARD/QUEENSLANDUNIVERSITY OFTECHNOLOGY

HALL OF DEMOCRACY

40 GEORGE STREET,BRISBANE QLD 4000

NOTES1. DIMENSIONS TO BE VERIFIED ON SITE PRIOR TOCOMMENCEMENT, PREPARATION OF SHOP DRAWINGS ORMANUFACTURING. FIGURED DIMENSIONS TAKE PRECEDENCEOVER SCALING.2. VERIFY LOCATION OF EXISTING SERVICES BEFORECOMMENCEMENT.3. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THEBUILDING CODE OF AUSTRALIA, BUILDING ACT 1975 ASAMENDED, STANDARD BUILDING BY-LAWS AND RELEVANTAUSTRALIAN STANDARDS.

JW JEFF WENARCHITECTS

CHECKED:

APPROVED:

PROJECT NUMBER:

DATE:

SCALE:

DRAWN BY:

REVISION:

SHEET NUMBER:

PROJECT:

CLIENT:

LOCATION:

DRAWING TITLE

ISSUE DATE BY AMENDMENT

JEFF WEN

1 : 200BASE LEVEL

1

P14-03

WALL TYPE LEGENDSBALUSTRADE LEGEND

COLUMN LEGENDCOL1: 600mm DIAMETER CYLINDERCOLUMN

COL2: 300mm DIAMETER CYLINDERCOLUMN

BAL1: 100mm REINFORCED CONCRETE

BAL2: 50mm STAINLESS STEEL FRAMEWITH 10mm GLAZING

FW1 FLOOR WASTE TYPE 1FW2 FLOOR WASTE TYPE 2SD STRIP DRAINAGELAD WALL MOUNTED LADDERLCR LIGHT CONTROL ROOMCAB WALL MOUNTED CABINETAMB AMBULANTHD HAND DRYER

A101

1:100

24/10/2014

BASE FLOOR PLAN

NORTH

W1

W2

W3

W4

W5

W6

W7

REINFORCED CONCRETE INSITU300mm

300mm REINFORCED CONCRETEINSITU WITH 10mm PORCELAINCLADDING PANELS ON 90mmSTEEL STUD

90mm STEEL STUD FRAME WITHINSULATION DOUBLE SIDED WITH50mm CAVITY

190mm CONCRETE BLOCK COREFILLED WITH 90mm STEEL STUD ONEXTERIOR SIDE WITH 9mmPLASTERBOARD. INTERIOR SIDE90mm STEEL STUD WITH 10mmACOUSTIC PANELS

90mm STEEL STUD FRAMING WITHINSULATION

190mm CONCRETE BLOCK WITH50mm CAVITY, 90mm STEEL STUDFRAME WITH INSULATION AND5mm STAINLESS STEEL CLADDING

110mm CONCRETE BLOCK WITH TILEFINISH

W8 50mm HEXO GLASS WALL BLOCK INALUMINIUM FRAME. refer to detail

W9 110mm CONCRETE BLOCK, 50mmCAVITY, 90mm STEEL STUD FRAMINGWITH INSULATION, 10mm TIMBERCLADDING FINISH

W10 10mm POLYURETHANE PANEL,100mm ALUMINIUM TRUSS SYSTEMWITH INSULATION, 30mm CAVITY,100mm ALUMINIUM TRUSS SYSTEMWITH INSULATION, 10mmPLASTERBOARD PANEL

TEMPORARYPARKING AREA

WASTEBIN

AREA

CAR PARKENTRANCE

FALL

FALL

WASHDOWNAREA

SSL: +3.900

OUTDOORSEATING AREA

FW1

SD

SD

SD

SD

SD

FW1

FW1

FW1

FW1

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL FALL

FALL

UP

BICYCLE RAMP1:8

GARDEN AREA 1

FFL: +4.000

FFL: +4.000

GARDEN AREA 1FFL: +3.900

CASCADE

FW1

FW1

GEORGE ST.

WILLIAM ST.

MAR

GAR

ET S

T.

ALIC

E ST

.

EXISTING BUILDING

FW1

FALL

FALL

FW1

FW1

FW1

319°82'00"

241°

04'0

0"22

7°85

'00"

139°30'00"

48°2

6'00

"

3000

4833

6000

300

4488

3000

8500

1085 2500

3000

3000

3000

3000

EXISTING KURBEXISTING KURB

EXIS

TIN

G K

UR

B

NEW

KUR

B

NEW

KUR

B

SERVICE PARKING

EXIS

TIN

G K

UR

B

EXIS

TIN

G K

UR

BEX

ISTI

NG

KU

RB

EXISTING KURB

NORTHJEFF WEN N8097062DAH811 DESIGN 8

CLEMENTINE REGNARD/QUEENSLANDUNIVERSITY OFTECHNOLOGY

HALL OF DEMOCRACY

40 GEORGE STREET,BRISBANE QLD 4000

NOTES1. DIMENSIONS TO BE VERIFIED ON SITE PRIOR TOCOMMENCEMENT, PREPARATION OF SHOP DRAWINGS ORMANUFACTURING. FIGURED DIMENSIONS TAKE PRECEDENCEOVER SCALING.2. VERIFY LOCATION OF EXISTING SERVICES BEFORECOMMENCEMENT.3. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THEBUILDING CODE OF AUSTRALIA, BUILDING ACT 1975 ASAMENDED, STANDARD BUILDING BY-LAWS AND RELEVANTAUSTRALIAN STANDARDS.

JW JEFF WENARCHITECTS

CHECKED:

APPROVED:

PROJECT NUMBER:

DATE:

SCALE:

DRAWN BY:

REVISION:

SHEET NUMBER:

PROJECT:

CLIENT:

LOCATION:

DRAWING TITLE

ISSUE DATE BY AMENDMENT

JEFF WEN

1 : 200SITE PLAN

1P14-04 A100

1:200

24/10/2014

SITE PLAN

FW1 FLOOR WASTE TYPE 1FW2 FLOOR WASTE TYPE 2SD STRIP DRAINAGELAD WALL MOUNTED LADDERLCR LIGHT CONTROL ROOMCAB WALL MOUNTED CABINETAMB AMBULANTHD HAND DRYER

Page 9: Jeff Wen Portfolio 20150202

UP UP

UP

UP

DN

54321 6 7 8 9 10 11 12

AA

A110

BB

A110

13 14 15 16 17 18 19 20 21

D

C

B

A

MEETING HALL

SHOP STG 1

SECURITY

FIRECONTROL

PREP ROOM TECH ROOM

MALETOILET

FEMALETOILET

ELEC MECH HYDR

PWDCLEANER'S

ROOM

LIFT

RECEPTION

TGITGI

LOBBY 1

ENTRY 1

TEMPORARYPARKING

AREA

WASTE BIN AREA

CAR PARKENTRANCE

CAFE

KITCHEN

INDOORSEATING

AREA

OUTDOORSEATING

AREA

TEMP'WASTEAREA

SERVICE

ENTRY 4

ENTRY 3

ENTRY 2

LOBBY 2 LOBBY 3

LINE OF LEVEL ABOVE LINE OF LEVEL ABOVE

LIN

E O

F LE

VEL

ABO

VE

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL2 COL2 COL2 COL2 COL2 COL2

ATRIUM

WALKPATHCOL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

COL1

TGI

TGI

TGI

TGI

TGI

TGI

LCR

URINAL

OPENSEATING AREA

OPENSEATING AREA

FW1

FW1

DR

AIN

AGE

GR

ATE

LCR1

A111

2

A111

STG2

DP

DP

FW1

FW1

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSDSDSDSDSD

SDSDSD

FW1

FW1

FW1

FW1

FW1

FW1

FW1

FW1

FW1

FALL

FALL

FALL

FALL FALLFALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL FALL

FALLFALLFALL

FALL

FALL

FALL

FALL

WASH DOWNAREA

FALL

FHR

FHR REFER TOELEVATION FOR

INSTALLATION

FH

FHR

FH

AMB

AMB

TIMBERCLADDINGCOVER

FFL: +4.000

SSL: +4.000

FFL: +4.100

RL: +4.500

RL: +4.500

FFL: +4.000FFL: +4.000

SSL: +4.000 SSL: +4.000 SSL: +4.000

HRHRHRUP UP

SSL: +4.000

SSL: +4.000

DN

BICYCLERAMP

1:8

ENTRY 5

BAL1

100m

mST

EPDO

WN

100mm STEP DOWN

100mm STEP DOWN

100m

m S

TEP

DO

WN

SSL: +3.900

GARDENAREA 1

FFL: +4.000

FFL: +4.000

GARDENAREA 1

FFL: +3.900

HD

HD

HD

COL2

COL2

BAL

1

BAL1

LIN

E O

F LE

VEL

ABO

VE

d01

d02

d03

d04

d05

d06

d07

d08

d09

d10

d11

d13

d12

d14 d15

d16

d17

d18

d19

d20

d21

d22

d23

d24 d25 d26

d27

d28

d29

d30

d31

LAD

LAD

CASCADE

DP

DP

DP

CAB

DESK

CAB

COL3

COL3

w01

w02

w03

w04

w05

w06

w07

w07

w08

w09

w10

w11

w12

w13

w14w15w16w17w18

w19w20w21w22w23

W1

W1

W1

W1

W1

FIRESTAIR 2

FIRESTAIR 1

W1

W2

W1

W1

W1W1

W1

W1 W1

W11

W11

W4

W3

W2

W2

W7

W7

W7

W3

W1

W7

W5

W4

W5

W5

W5W5

W10

W10

W8

W8

W10W2

W9W8

W6

W7

W8

W6

W6

W5

W11 W11

3300

3190

4500

2810

2565

2975

2950

5720

2880

3360

3040

3200

2800

2500

2530

4748

4170 2620 3335 3060 2450 5000 5000 5000 4750 2300 6330 2440 3665 4440 4890 3600 6760 3800 3420 6057

W10

W10

SD

SD

SD

SD

SD

CF2

FHB

5306

8

8308630

074

5030

010

380

8500

1553

066

2175

5030

030

040

0030

018

3030

025

0030

057

0030

0

5000 5000 5000 5000 5000 5000 5000 50004979 4983

5003

4969

5066

4888

5081

4016

4922

4994

7191

920

2306

5750

250

8289

5012

5358

5558

3080

9230

6300

6541

300

5700

300

1179

755

0610

7425

6028

5060

0017

950

8967 2900 2010 290 5610 290 4660 290 11050 1200300 4739 30394119563253 340117342 5000 5000 7050 6000 6000 3300 17181

1358

974

1000

1000 1200

1200

9380

4000

7000

4780

2040

61916031

20003000

21302

5619 9474218 2832 25060921900

5321 262455952 9332 17090

6356 5456 5456 536750004170 5955 5510 5000 5555 5625 5449 5238 5054

5306

8

4896

5010

4315

5108

4011

7693

8376

5598

4372

6855

3538

4226

3957

3970

4130

6000 16474 100 4800 29925 1200 33702

2320

1500

120025001085

5250

4500

2408

1851

1440

300

2512

300

4038

100

2000

100

2200

300

3000

300

6000

300

2500

300

2350

7271

3000

JEFF WEN N8097062DAH811 DESIGN 8

CLEMENTINE REGNARD/QUEENSLANDUNIVERSITY OFTECHNOLOGY

HALL OF DEMOCRACY

40 GEORGE STREET,BRISBANE QLD 4000

NOTES1. DIMENSIONS TO BE VERIFIED ON SITE PRIOR TOCOMMENCEMENT, PREPARATION OF SHOP DRAWINGS ORMANUFACTURING. FIGURED DIMENSIONS TAKE PRECEDENCEOVER SCALING.2. VERIFY LOCATION OF EXISTING SERVICES BEFORECOMMENCEMENT.3. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THEBUILDING CODE OF AUSTRALIA, BUILDING ACT 1975 ASAMENDED, STANDARD BUILDING BY-LAWS AND RELEVANTAUSTRALIAN STANDARDS.

JW JEFF WENARCHITECTS

CHECKED:

APPROVED:

PROJECT NUMBER:

DATE:

SCALE:

DRAWN BY:

REVISION:

SHEET NUMBER:

PROJECT:

CLIENT:

LOCATION:

DRAWING TITLE

ISSUE DATE BY AMENDMENT

JEFF WEN

1 : 200Ground Floor

1

GROUND FLOOR

P14-03 A102

1

1:200

WALL TYPE LEGEND

FLOOR PLAN LEGENDS

BALUSTRADE LEGEND

COLUMN LEGENDCOL1: 600mm REINFORCED CONCRETECOLUMN

COL2: 300mm REINFORCED CONCRETECOLUMN

BAL1: HEIGHT 1100mmX100mm THICKCONCRETE w. TEXTURE FINISH

BAL2: 10mm THICK GLAZING @ H1100mm

FW1 FLOOR WASTE TYPE 1FW2 FLOOR WASTE TYPE 2SD STRIP DRAINAGELAD WALL MOUNTED LADDERLCR LIGHT CONTROL ROOMCAB WALL MOUNTED CABINETAMB AMBULANTHD HAND DRYER

NORTH

W1

W2

W3

W4

W5

W6

W7

REINFORCED CONCRETE INSITU300mm

300mm REINFORCED CONCRETEINSITU WITH 10mm PORCELAINCLADDING PANELS ON 90mmSTEEL STUD

90mm STEEL STUD FRAME WITHINSULATION DOUBLE SIDED WITH50mm CAVITY

190mm CONCRETE BLOCK COREFILLED WITH 90mm STEEL STUD ONEXTERIOR SIDE WITH 9mmPLASTERBOARD. INTERIOR SIDE90mm STEEL STUD WITH 10mmACOUSTIC PANELS

90mm STEEL STUD FRAMING WITHINSULATION

190mm CONCRETE BLOCK WITH50mm CAVITY, 90mm STEEL STUDFRAME WITH INSULATION AND5mm STAINLESS STEEL CLADDING

110mm CONCRETE BLOCK WITH TILEFINISH

W8 50mm HEXO GLASS WALL BLOCK INALUMINIUM FRAME. refer to detail

W9 110mm CONCRETE BLOCK, 50mmCAVITY, 90mm STEEL STUD FRAMINGWITH INSULATION, 10mm TIMBERCLADDING FINISH

W10 10mm POLYURETHANE PANEL,100mm ALUMINIUM TRUSS SYSTEMWITH INSULATION, 30mm CAVITY,100mm ALUMINIUM TRUSS SYSTEMWITH INSULATION, 10mmPLASTERBOARD PANEL

COL1: 600mm DIAMETER CYLINDERCOLUMN

COL2: 300mm DIAMETER CYLINDERCOLUMN

BAL1: 100mm REINFORCED CONCRETE

BAL2: 50mm STAINLESS STEEL FRAMEWITH 10mm GLAZING

54321 6 7 8 9 10 11 12 13 14 15

PWD w.SHR

SSL: +0.400FOOTPATHLIFT 1LIFT 2CARPARK

EXIT

EXIT

SECURITYROOM

STORAGEROOM

SHOP

MEETING ROOM GALLERY

OFFICE LOBBY OFFICE

LOUNGE 3

RECEPTION

5A114

5A113

4A113

7A114

COL 1 COL 1 COL 1 COL 1COL 1 COL 1

BAL 2

BAL 2

KINGSPAN K-DEKROOF PANELS

10mm DOUBLESHEETINGGLAZING

LADDER

STEEL BAR FIXEDTO TRUSS

COL 1COL 1

10mm DOUBLESHEETING GLAZING

10mm DOUBLESHEETING GLAZING

10mm DOUBLESHEETING GLAZING

WET WALLDRY WALL

DRAIN PIPE

SAND

DRAIN

10mm DOUBLESHEETINGGLAZING

10mm DOUBLESHEETINGGLAZING

10mm DOUBLESHEETINGGLAZING

HEXO ROOFSYSTEM

100mmSTEP UP

FLOOR100mm STEPUP FLOOR

FHR

FHR

CB1 CB1 CB1 CB1 CB1 CB1CB1

d13d14 d18

d01

d01

d01

COL 2 COL 2 COL 2 COL 2 COL 2

COL 2 COL 2 COL 2 COL 2 COL 2

L K I H GNOPQ M FJ

DISABLEPARKING

LIFT ENTRANCE LIFT

LIFT OVER-RUN

LOBBY 3

LOUNGE 2

FEMALEAMENITY 1

FEMALEAMENITY 2

MEETING ROOM

CAVITY

CAVITY

CAVITY

HYDRAULICSERVICE RISER

DISABLEPARKING

PLANT ROOM THOROUGHFARE FIRESTAIR 2

MALEAMENITY 1

MALEAMENITY 2

PWDAMENITY 1

PWDAMENITY 2

PWDAMENITY 3

FEMALE STAFFAMENITIES

PASSAGEWAY

PASSAGEWAY

STAFFLOUNGE

SERVICE VEHICLEPARKING

GARDEN AREA

WILLIAM ST.

3A113

BASE LEVELSSL 0.300

GROUND LEVELSSL 4.300

FIRST LEVELSSL 8.300

SECOND LEVELSSL 12.300

CEILINGFCL 16.000

ROOF LEVELSSL 21.000

WET WALLDRY WALL

DRAIN PIPE

SAND

DRAIN

DP

FALL

DP

KINGSPAN K-DEKROOF PANELS

REINFORCEDCONCRETE COREWALL

100mmSTEP UPFLOOR

BAL 2

BAL 2 BAL 2

COL 2

COL 2

COL 1COL 1

d23

d04

d03

2A113

150mmPLINT

TURF

STRUCTURE SLABOF EXISTINGBUILDING

GROUND LINEURINAL STANDREFER TODETAIL

SD

DP

CB1 CB1 CB1 CB1

CEILING FRAMING

1A113

1A114

DOUBLE TRUSSSYSTEM w.INSULATION

COLOURBONDGUTTER SYSTEM

21°

JEFF WEN N8097062DAH811 DESIGN 8

CLEMENTINE REGNARD/QUEENSLANDUNIVERSITY OFTECHNOLOGY

HALL OF DEMOCRACY

40 GEORGE STREET,BRISBANE QLD 4000

NOTES1. DIMENSIONS TO BE VERIFIED ON SITE PRIOR TOCOMMENCEMENT, PREPARATION OF SHOP DRAWINGS ORMANUFACTURING. FIGURED DIMENSIONS TAKE PRECEDENCEOVER SCALING.2. VERIFY LOCATION OF EXISTING SERVICES BEFORECOMMENCEMENT.3. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THEBUILDING CODE OF AUSTRALIA, BUILDING ACT 1975 ASAMENDED, STANDARD BUILDING BY-LAWS AND RELEVANTAUSTRALIAN STANDARDS.

JW JEFF WENARCHITECTS

CHECKED:

APPROVED:

PROJECT NUMBER:

DATE:

SCALE:

DRAWN BY:

REVISION:

SHEET NUMBER:

PROJECT:

CLIENT:

LOCATION:

DRAWING TITLE

ISSUE DATE BY AMENDMENT

JEFF WEN

1 : 100Section BB

BB

1 : 100Section AA

AA

P14-03 A110

1:100

24/10/2014

SECTION 1

FLOOR PLAN LEGENDSFW1 FLOOR WASTE TYPE 1FW2 FLOOR WASTE TYPE 2FW3 FLOOR WASTE TYPE 3SD STRIP DRAINAGELAD WALL MOUNTED LADDERLCR LIGHT CONTROL ROOMCAB WALL MOUNTED CABINETAMB AMBULANTHD HAND DRYERCB1 CONCRETE BEAM 1BAL 2 BALUSTRADE 2DP DRAIN PIPE

BALUSTRADE LEGEND

COLUMN LEGEND

BASE LEVELSSL 0.300

GROUND LEVELSSL 4.300

FIRST LEVELSSL 8.300

SECOND LEVELSSL 12.300

CEILING LEVELFCL 16.000

ROOF LEVELSSL 21.000

COL1: 600mm DIAMETER CYLINDERCOLUMN

COL2: 300mm DIAMETER CYLINDERCOLUMN

BAL1: 100mm REINFORCED CONCRETE

BAL2: 50mm STAINLESS STEEL FRAMEWITH 10mm GLAZING

Page 10: Jeff Wen Portfolio 20150202
Page 11: Jeff Wen Portfolio 20150202
Page 12: Jeff Wen Portfolio 20150202
Page 13: Jeff Wen Portfolio 20150202
Page 14: Jeff Wen Portfolio 20150202
Page 15: Jeff Wen Portfolio 20150202
Page 16: Jeff Wen Portfolio 20150202
Page 17: Jeff Wen Portfolio 20150202
Page 18: Jeff Wen Portfolio 20150202
Page 19: Jeff Wen Portfolio 20150202
Page 20: Jeff Wen Portfolio 20150202
Page 21: Jeff Wen Portfolio 20150202
Page 22: Jeff Wen Portfolio 20150202
Page 23: Jeff Wen Portfolio 20150202
Page 24: Jeff Wen Portfolio 20150202