State Transit Update

Virginia Transit Association

May 25, 2016

Jennifer MitchellAgency Director

Page 2: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

2

Public Transportation

Programs$471.2 Passenger and

Freight Rail Programs, $211.5

Human Service Transportation

Programs$13.7

Planning, Regulation, and Safety Programs

$6.0

Agency Operating Budget$13.4

Commuter Assistance

Programs, $9.6

Rail Preservation Programs

$6.0

Rail Industrial Access Programs,

$1.9

DRPTBudgeted Expenditures - FY 2017

$733.3 Million

DRPT FY 2017Budget

5/25/2016 State Transit Update

Page 3: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Virginia Beach Light Rail Extension 3.5 Mile extension from

Newtown Road to Town Center

3 new stations

3 new light rail vehicles

Revenue service planned for December 2019

Norfolk DEIS

Peninsula Transit Study September 2017The Tide

Extension

5/25/2016 3State Transit Update

Page 4: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

GRTC –The Pulse 7.6 mile from Henrico County to Richmond

Lane Construction selected as design-build

$24.9M TIGER grant from USDOT

Operation to begin October 2017Bus Rapid Transit:Richmond

5/25/2016 4State Transit Update

Page 5: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Transform 66:Inside the Beltway

55/25/2016 State Transit Update

Page 6: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Initial Multimodal Program

Two new HOT lanes with tolls operational Summer 2017

Initial FY 17 program to be funding by Commonwealth

Future programs to be funded with toll revenues

MOA between Commonwealth and NVTC

To be eligible for funding, program components, projects must:

Be legally eligible – benefit the toll payers Meet the Transform 66 Improvement Goals Be obligated or implemented by Toll Day One

Transform 66:Inside the Beltway

65/25/2016 State Transit Update

Page 7: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

7

Transform 66:Outside the Beltway

5/25/2016 State Transit Update

Page 8: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Projects include:

Addition of two express lanes in each direction with solo drivers paying a variable toll and HOV3 vehicles riding for free

Three regular lanes in each direction free to all traffic

High-frequency peak-hour bus service with predictable travel times

Direct access between the express lanes and new and expanded commuter lots

4,000 new Park and Ride spaces

Transform 66:Outside the Beltway

5/25/2016 State Transit Update 8

Page 9: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Projected Transit Capital Revenues

5/25/2016 State Transit Update 9

Page 10: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Transit Capital Project Revenue Advisory Board

Created by HB 1359 and Budget Amendment #448 2c

Principle directives Examine impacts of expiration of transit capital bonds Identify possible replacement revenues Develop methodologies for prioritizing new and

existing transit funds

Proposals for prioritization will be HB-2 like for new revenues

State of Good repair may have other prioritization methodology in place of or in addition to current

Will ultimately inform how GA addresses transit capital bond expiration before 2018

5/25/2016 State Transit Update10

Page 11: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Metro Safety Commission

Tri State Oversight Committee (TOC) is State Safety Oversight program (SSO) for WMATA mandated under MAP-21

The TOC has a role in oversight authority, but does not have appointment to take action

USDOT tasked VA-MA-DC to form Metro Safety Commission by February 2017

Enabling legislation will be brought forward in 2017 General Assembly Session

USDOT to withhold up to 5% of federal urban transit funding if February deadline not reached

WMATA

5/25/2016 11State Transit Update

Page 12: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

SafeTrack

May 5 WMATA announces SafeTrack

Three years worth of work consolidated into one

15 work surges, daily system shutdown at midnight

Entire lines single-tracking for up to 3 weeks at a time

40-50 additional Metrobuses to ease passenger impact

WMATA

5/25/2016 12State Transit Update

Page 13: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

Project Partners

DRPT, VDOT, Transurban, CSX

Purpose

Accelerate projects for long-term, multimodal network

Resolve bottlenecks, congestion, safety concerns

Accommodate growth

Projected Cost

$1.4 Billion

The Atlantic Gateway

5/25/2016 13State Transit Update

Page 14: Jennifer Mitchell State Transit Update Agency Director€¦ · Beltway 5/25/2016 State Transit Update 5. Initial Multimodal Program Two new HOT lanes with tolls operational Summer

5/25/2016 14State Transit Update