jennifer montgomery_end of summer presentation

12
JEN MONTGOMERY 2014 SUMMER INTERNSHIP Mechanical Engineering Field Intern Pipeline Operations UAA Mechanical Engineering Student (3 More Semesters!)

Upload: jennifer-montgomery

Post on 15-Apr-2017

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jennifer Montgomery_End of Summer Presentation

JEN MONTGOMERY2014 SUMMER INTERNSHIP

Mechanical Engineering Field InternPipeline OperationsUAA Mechanical Engineering Student(3 More Semesters!)

Page 2: Jennifer Montgomery_End of Summer Presentation

Safety Minute

Be Aware of Your Surroundings

Page 3: Jennifer Montgomery_End of Summer Presentation

Summer Focus• June 20th 24hr Shutdown (RGV-39)• Informal Fall Protection Needs Assessment• Critical Spares• Helicopter Ride

Page 4: Jennifer Montgomery_End of Summer Presentation

June 20th 24 Hour Shutdown

Ken Paison (HCC, Safety Rep), Eric Hoffman (HCC, Superintendent), Carol Adamczak (APSC, Shops Team Supervisor Pipeline)

Collaborating and reviewing the procedure to ensure safe operations during the shutdown.

RGV-39

COMPLETED: Major Maintenance Shutdown - 24 hours

Valve Testing - Atigun to PS05

Page 5: Jennifer Montgomery_End of Summer Presentation

Dalton Hwy

Page 6: Jennifer Montgomery_End of Summer Presentation

Informal Fall Protection Needs Assessment

• Area of Interest• Photos• Tasks• Access Frequency• Current Resolution • Recommendations• Detailed Resolution

Fall Protection Authorized User

DBI Trauma Straps

Full Body Harness

Confined Space Rescue Tripod

Page 7: Jennifer Montgomery_End of Summer Presentation

Comparison of PSV Connections Threaded Valve Flanged Valve34-PSV-404

Manifold Building

Welded Flange

Swivel Flange Would be Better!

Page 8: Jennifer Montgomery_End of Summer Presentation

Critical Spares

• Critical Spares Analysis (Equipment List) Excel Spreadsheet

• Compilation of Critical Spares and Supporting Documentation (F:\90_Day_Temp\Critical Spares)

• Passport (Looking up SN’s, Model Numbers, Cost, Etc.)

• EMIS (Engineering and Maintenance Information Search)

• TDDI (Technical Drawing & Drawing Index)• Update Pictures at PS01 (G:\ML Valve AS-Found

Effort) • Ordering Spares (Form 0245)

Page 9: Jennifer Montgomery_End of Summer Presentation

Helicopter Ride

Safety Briefing with Gayle Reese

PS07

The Real “Bridge to Nowhere”

Surveillance

High Point Encapsulation Vents (Sniffing for Hydrocarbon Vapors)

Encapsulation Monitoring from PLMP 385.7 to 494.46-Unintended Consequences

Page 10: Jennifer Montgomery_End of Summer Presentation

Delta Leasing Fun Run!

Tim Rupp, Me, Jared Tee, Janette Fuller, Paul Eckman

Page 11: Jennifer Montgomery_End of Summer Presentation

Special Thanks • Ann Marie White, Pipeline Advisor, Pipeline Operations• John Baldridge, Senior Director, Pipeline Operations• Shana Clay, Admin Assistant, Pipeline Operations & Maintenance • Russell Bonar, O&M Mechanical Support Engineer, ROW Integrity Engineering • Carol Adamczak, Shops Team Supervisor, Pipeline• Janette Fuller, Maintenance Technician, FAI Maintenance Base• Christopher Harding, Instrument Technician, Pipeline Operations• Jared Tee, PS01 Field Electrical Engineer, Project Engineering• Eric Hoffman, Superintendent/Pipefitter, HCC • Ed Davis, PS04 Engineer, Engineering - Operations Engineering North• Taryn Byrd, Mechanical Engineer Intern• Tabetha Toloff, Alaska Native Program Manager, CEO• Dorothy Lord-Matthew, Alaska Native Program Coordinator, CEO• Frank Duncklee, Pipeline & Civil Maintenance Coordinator, Right of Way• Larry Graham, Pipeline Security Captain, Doyon Security

Page 12: Jennifer Montgomery_End of Summer Presentation

Questions?