Overview
Introduction to pigging: a s
Why do we do it?
Licence 8b project
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
3/25
Pi in What?
In-line inspection of pipelinePIG: Pipeline Inspection Gauge
Different pigs, different objectives, e.g.:
Cleaning Data collection
Pipeline inspection without disrupting gas flow
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
4/25
Pi in Wh ?
Part of integrity management: Collect data on entire pipeline
= Validate structural integrity
Regular inspections
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
5/25
Pi in How?
Pushed along by gas flow
Launcher (insert)
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
6/25
Pi in Run
Normal operation
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
7/25
Pi in Run
Normal operation
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
8/25
Pi in Run
Depressurise launching chamber nser p g
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
9/25
Pi in Run
Pressurise launching chamber repare or aunc
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
10/25
Pi in Run
Start to Launch Open chamber isolation valve Close bypass valve Gas flows through chamber
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
11/25
Pi in Run
Launch g eaves c am er
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
12/25
Pi in Run
Pig is travelling as ow as norma
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
13/25
Pi in Run
Ready to receive as ow roug c am er
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
14/25
Pi in Run
Receive g s so a e n e c am er
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
15/25
Pi in Run
Depressurise chamber e r eve p g
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
16/25
Licence 8b Pro ect
Pigging operation of Licence 8b pipelineAim: conduct intelligent pigging
Intelligent = can record data
Includes: Pigging runs
Validation digs
Multi-disciplinary team Engineering, Projects, Operations, Response &
Control, Mapping, Commercial, Pigging vendor
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
17/25
Licence 8b Pi eline
From Hexham to Kooragang Island (NSW)~12km of DN350 pipe
Issues:
Goes through swamp/mangrove and under river Difficulties with access
Supplies the largest gas customer in NSW
Never been pigged before
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
18/25
Licence 8b - Pi in
Use different pigs: 1s : Foam pig
2nd: Gauge pig
: n e gen p g
e resu ts o t e rst two runs w eterm nethe intelligent pig can be used
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
19/25
Licence 8b - Pi in
Foam pig: Wrapped polyurethane sections
Designed to disintegrate if there are serious issues
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
20/25
Licence 8b - Pi in
Gauge pig: Aluminium gauge plate
Designed to deform due to impact with obstructions
o yure ane scs pus con am nan s ou o e p pe
- Cleans pipeline for intelligent pig
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
21/25
Licence 8b - Pi in
Intelligent pig: XYZ co-ordinates
Corrosion
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
22/25
Licence 8b - Results
Raw data interpreted by pigging vendor Results returned to Jemena
Validation digs
Expose 2 locations Compare pigging data with reality
Validate results
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
23/25
Use of Results
Corrosion assessment Assess effect on pressure containment
Predict rate
Integrity Digs Long term program to monitor/repair corrosion
e ects over t me
-
7/25/2019 Jess+Escandor+-+Pipeline+Pigging
24/25
Im ortance of i in
Effective way to retrieve data on the entirep pe ne
Part of integrity management
Helps Jemena to ensure safe, continuous supplyof gas
-