CASE STUDY 2 (CHAPTER 5)JJ510 INDUSTRIAL MAINTENANCEQUESTION :As we already know, every factory, which opened there must be a machine for production use. The plant operators certainly do not want to incur a loss on the failure of machines operating in the production of the product. Therefore, one way to use is the method of preventive maintenance. Preventive maintenance is a schedule of planned maintenance actions aimed at the prevention of breakdowns and failures. The primary goal of preventive maintenance is to prevent the failure of equipment before it actually occurs. It is designed to preserve and enhance equipment reliability by replacing worn components before they actually fail.
You are prompted to provide a method for applying preventative maintenance on mechanical components that often occurs in the industrial production.
Give your opinion on matters referred to below:
Identify some visual symptoms that indicate imminent bearing failure Identify some visual symptoms that indicate imminent gear failure Identify some common problems with belt drives and recommend how to prevent these problems from occurring again Identify some common problems with chains and sprockets and recommend how to prevent these problems from occurring again