POTENTIAL DISASTERS IN EDUCATION SECTOR AND THEIR RISK MANAGEMENT IN NEPAL April 16-19,2012 ,Singapore on Results Based Public Sector Excellence in Disaster Risk Management. JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal. Types of Natural Disasters. Flood Landslide - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

POTENTIAL DISASTERS IN EDUCATION SECTOR AND THEIR RISK MANAGEMENT IN

NEPAL

April 16-19,2012 ,Singapore on

Results Based Public Sector Excellence in Disaster Risk Management

JHAPPER SINGH VISHOKARMA

MINISTRY OF EDUCATION,

Government of Nepal

Page 2: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal
Page 3: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Types of Natural Disasters

FloodLandslideEarthquakeDraughtLitening etc.

Earthquake has been a burning issue in the country due to the following facts.(11th most risk zone in the world)

Page 4: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Some Scenario of Disaster’s Event

Page 5: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Earthquake Scenario (in Haitee): Earthquake Scenario (in Haitee): Similar to Kathmandu city in overall planningSimilar to Kathmandu city in overall planning

Page 6: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Recent Earthquake in Nepal(September 18,2012)

04/21/23 e"sDksf] sf/0f tyf c;/x? 6

Page 7: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Some Earthquake Risk Facts in Nepal

Page 8: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Source: Department of Mine and Geology, Govt. Of Nepal

Frequently Occured Earthquakes in Nepal

8

Page 9: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Earthquake Risk Zone in Nepal

9

Page 10: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

10

Earthquake Risk of Nepalese Schools

Page 11: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

SCHOOL STATISTICS AND TYPES:

Total nos.: 33160 (including religious schools like Madarsha, Gurukul etc)Out of the above

Types : Community aided: Suppoted by govt. and no total responsbility of community. Community managed: Suppoted by govt. and management by communityCommunity unaided:Partial or no support by govt.Private/Institutional: Supported by parents and trustees

Page 12: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

School building typology in Nepal

Page 13: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Problems of School Building Structure:-Use of weak construction materials-Heavy wall and roofs-Poor quality control of construction process-Untied gable wall-Lack of integrity between different structural components/elements -More number of stories than permissible for particular type of construction-Unsymmetrical plans and load path

Page 14: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Earthquake Risk of Nepalese Schools

14

Earthquake Intensity

Number of Schools with Different Potential Damage Grades if MMI IX level Earthquake is considered

Total Schools Affected by one

Earthquake among Total of 82170 School Buildings in

Nepal

No Damage

Slight Damage (DG1)

Moderate Damage (DG2)

Heavy Damage (DG3)

Partial Collapse (DG4)

Complete Collapse (DG5)

MMI IX for all School Buildings

0 0 3154 17434 28798 32785 82170

about 75% (DG4 and DG5 in table) of the schools need intervention. Among them, 60% require retrofitting and approximately 15% require demolition and reconstruction)

Page 15: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Estimated Casualty at Schools during Scenario Earthquake:If the earthquake occurs at day time when the schools are open, there will be more than 110,000 deaths and about 300,000 serious to moderate injuries. As per the scenario developed based on the interpretation made from the study on various parts of Nepal, approximately 60% of the existing school buildings in Nepal need to be retrofitted to ensure safety for IX intensity level of shaking

Out of total 82,170 school buildings, approximately 61,628 buildings need immediate intervention and remaining 20,542 buildings which are found relatively good and recently constructed can be left for now.

Page 16: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Approximate total cost required in making all the schools earthquake safe is about

US$ 1638 million and tentative time required is about 15 years. ( NSET, 2011)

• Approximately 5 years to make all the schools of the valley (Kathmandu)safer. The budget required is approximately 32 million US$. This cost is inclusive of civil works for retrofitting and reconstruction, detail assessment and design of 980 school buildings, supervision and training and survey of all the existing school buildings of the valley.

Page 17: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

GOVERNMENT INITIATIVES

National Risk Reduction Consortium (NRRC) in 2009 with DPs. The consortium has brought together ADB,DFID,USAID,EC,UNOCHA,UNDP,UN ISDR,IFRC and the World Bank to work in this disaster risk management from last couples of years

Page 18: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

FIVE FLAGSHIP PROGRAM FOR DISASTER RISK MANAGEMENT (DRM): (In 2009 A.D.)

These are:• (i) Seismic safe schools and hospitals • (ii) Enhanced emergency response capacity • (iii) Flood management in the Koshi River

Basin • (iv) Strengthening community based disaster

risk management and• (v) Strengthening institutional capacity and

disaster risk management.

Page 19: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Members:Other line mMinistries like MOLD,MOE,MOHP, and DPs

Institutiona Set up upto the local Level

NRRC STEERING COMMITTEE, MOHA (FOCAL MINISTRY)

Institutional Setup For DRM inNepal

Page 20: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Long Term Vision for Nepal as a DRR Resilient Country

• DRR laws and institution • Safer design of building• Land use plan • DRR in pubic work• DRR insurance scheme• Clean and green development• Early warning system• Risk Mapping• Preparedness and Mitigation

Page 21: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Overall Policy Status

• 10th Five-Year Plan (2002-2007): Realization

• Interim National Development Plan(2008-

2010):Vision,Goal and Programes

• National Strategy for Disaster Risk Mangement in Nepal,2009:Priority,strategy and structural provision

• The interim National Development Plan(2011-2014): Vision,Goal and Programes

• Commitment to Hygo Framework of action (HFA) (2005-2015): National and international commitment

Page 22: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Legal Framework

• The Constitution: Right to Environment • Natural Disaster Relief Act,1982 • Nepal National Building Code,1994• Local Self Governance Act,1999• DRR Preparedness and planning directives,2010• DRR relief and Rescue standard,2008

Page 23: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Status of educational policies on DRR

• Use of building codes: Environment protection prerequisite befor building construction

• Development of environment friendly school environment (SSRP)

• Development of public awarness through formal,non formal,and training programs on DRR (Interim Plan,2011-14)

• Building nattional capacity on DRR (Interim plan,2011-14)

Page 24: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

DRR Issues and Challenges

• Capacity Building

• DRR plan and their sustainability

• Networking, co-ordination

• Monitoring and support

• Preparedness and earlywarning system

• Resource management

Page 25: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

MOE DRR Initiatives

1.Structural Initiatives: Establishment of focal desk in the ministry

• Provision of focal points at DEO in 24 disaster prone districts

• Building codes and retrofitting program to the schools

• Construction of temporary learning centres

Page 26: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

MOE DRR Initiatives

2.Curriculum Initiatives related to DRR (Non-structural):

• Curricular mapping

• Curricular integration

• Development of text books and teacher guides and other learning materials

• Development of DRR monitoring and assessment tools

Page 27: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

MOE DRR Initiatives

3.Capacity related initiatives:

• Oreintation package developed, orientation program to the school teachers,focal points,teachers and engineers

• Development of contigencies plan on DRR and emergency response plan

Page 28: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Way forward

• Building a culture of safety

• Building a culture of resilient

• Building a culture of partnership (PPP model)

• Building a culture of accountability• Building a disaster related law and in action.

(Goverment of Nepal has forwarded “Disaster Risk Mangament Act” to the Parliament for approval)

Page 29: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Some Earthquake Scenarios

Page 30: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

30

Beam-column joints may not be able to develop the strength of the connected members, and this can lead to sudden brittle failure of the joint

Damage in RC BuildingDamage in RC Building

Page 31: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

1989 Earthquake in Nepal

31

Page 32: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

From ‘Images of Century’

1934 Earthquake in Nepal

32

Page 33: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Some Observations of 18 Some Observations of 18 SeptSept.,2012.,2012 Earthquake Earthquake

33

Page 34: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

04/21/23 e"sDksf] sf/0f tyf c;/x? 34

Page 35: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

School buiding in recent earthquake

04/21/23 e"sDksf] sf/0f tyf c;/x? 35

Page 36: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Which building is stronger for Earthquake?

04/21/23 e"sDksf] sf/0f tyf c;/x? 36

Page 37: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Before Retrofitting

Page 38: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal
Page 39: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal
Page 40: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Earthquake Drill

Page 41: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

Stone in Cement Sand Mortar Building

Earthquake Resistant Building

Horizontal bands and vertical reinforcement

Page 42: JHAPPER SINGH VISHOKARMA MINISTRY OF EDUCATION, Government of Nepal

THANK YOU