jin huang m.i.t. hall a analysis workshop dec 14, 2009 @...

15
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLab

Upload: others

Post on 07-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Jin HuangM.I.T.

Hall A Analysis WorkshopDec 14, 2009 @ JLab

Page 2: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Extended Target Correction

• Origin of the Correction

• Raster Correction

• New Raster Cable Map

Coincidence TOF Calibration for E06010

• Introduction

• LHRS Timing

• BigBite Timing

• Coincidence Timing

Hall A Analysis WorkshopJin Huang <[email protected]> 2

Page 3: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Origin of the Correction

Raster Correction

New Raster Cable Map

Hall A Analysis WorkshopJin Huang <[email protected]> 3

Page 4: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

HRS Optics Matrix◦ Base on VDC track parameters: t, y, th, ph

◦ Target Variables: y, th, ph, dp

But with one assumption◦ xtg = 0

◦ Or equal to

beam along hall center line

HRS at 90º

How to make it work for real configuration?

-> Extended Target CorrectionTHaExtTargCor in analyzer

Hall A Analysis WorkshopJin Huang <[email protected]> 4

Page 5: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

To model the correction:1. Fix track on VDC

2. Shift beam location, HRS angle

3. Look at shift on target variables to produce same track on VDC

A simple magnet modeling◦ Use 1st order transportation matrix in HallA NIM

Hall A Analysis WorkshopJin Huang <[email protected]> 5

Focal Plane Variables

=TargetVariables

x

Page 6: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

From the 1st model:

In analyzer we apply two correctionsbelieve from fitting of data

Hall A Analysis WorkshopJin Huang <[email protected]> 6

0

TermsOrder SecondSmaller cot129.02.0

TermsOrder SecondSmaller cot416.0645.0

0

0

beam

tg

beam

tg

tg

beam

tg

tg

beam

tg

dy

dy

dy

dph

ydy

ddp

ydy

dth

0.19)(

61.0)(

tg

tg

tg

tg

xd

ddp

xd

dth

Page 7: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Leading correction on beam x (horizontal) isSecond order

Leading correction on HRS angle isThird order

These two term could be ignored

Detail could be found at http://www.jlab.org/~jinhuang/Meeting/2009.09.25%20Transversity%20Collaboration%20Meeting/173.htm

Hall A Analysis WorkshopJin Huang <[email protected]> 7

Page 8: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Raster determine beam position

Two independent raster: x, y

Two raster cable found swapped long before Transversity◦ New raster cable map

◦ Patch on Analyzer (Sept 09, 2009 -> CVS)

Suggested check for your experiment

Hall A Analysis WorkshopJin Huang <[email protected]> 8

Page 9: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Hall A Analysis WorkshopJin Huang <[email protected]> 9

Page 10: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Check L.tr.tg_dp dependency◦ Cutting central ray into spectrometer

◦ A peak structure should be correlated with Beam Y

Hall A Analysis WorkshopJin Huang <[email protected]> 10

Should be no slopeShould be a slope

Lower Res. on momentum

Page 11: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Positive slope on raster current VS target Y ->+rawcury (should be rawcurx) is toward beam left = +X in Hall Coordinate System

Hall A Analysis WorkshopJin Huang <[email protected]> 11

Before Correction

React z Res.destroyed a lot

Page 12: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

Hall A Analysis WorkshopJin Huang <[email protected]> 12

Page 13: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

From top edge of carbon foils+rawcurx (should be rawcury) is toward vertical down= -Y in Hall Coordinate System

Hall A Analysis WorkshopJin Huang <[email protected]> 13

Page 14: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

From top edge of carbon foils+rawcurx (should be rawcury) is toward vertical down= -Y in Hall Coordinate System

Hall A Analysis WorkshopJin Huang <[email protected]> 14

Page 15: Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, 2009 @ JLabhallaweb.jlab.org/.../Extended-Target-Corrections-Jin.pdf · 2009-12-15 · Jin Huang  Hall A

To fix the raster cable map in db_rb.Raster.dat

1. Downloading Newest Analyzer from CVS◦ Thanks to Ole fixing the THaRaster

2. Change Raster Cable map from

TO

3. Similar for right arm is available

Hall A Analysis WorkshopJin Huang <[email protected]> 15

[Raster_detmap]

1 4 1 21 24 27 1881

-1 0 0 0 0 0 0

[Raster_detmap]

1 4 1 21 25 25 1881

1 4 1 21 24 24 1881

1 4 1 21 26 27 1881

-1 0 0 0 0 0 0