joe casey terminal operations management
DESCRIPTION
Joe Casey TERMINAL OPERATIONS MANAGEMENT. INTERMODAL REPAIRS: The Good, The Bad and the Ugly (or Proper, Improper and Temporary). THE GOOD (PROPER REPAIRS). COMFORM TO AAR INTERMODAL INTERCHANGE RULES, APPENDIX B – CORRECT UNIT REPAIR PROCEDURES - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/1.jpg)
Joe CaseyJoe CaseyTERMINAL OPERATIONS MANAGEMENTTERMINAL OPERATIONS MANAGEMENT
INTERMODAL REPAIRS: The Good, The Bad and the Ugly
(or Proper, Improper and Temporary)
![Page 2: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/2.jpg)
THE GOOD(PROPER REPAIRS)
•COMFORM TO AAR INTERMODAL INTERCHANGE RULES, APPENDIX B – CORRECT UNIT REPAIR PROCEDURES
•CONFORM TO MANUFACTURER’S SPECIFICATIONS
![Page 3: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/3.jpg)
POSTS PROPERLY CAPPED, MAXIMUM THREE IN A ROW
![Page 4: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/4.jpg)
PANEL PATCH PROPERLY RIVETED AND CAULKED
![Page 5: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/5.jpg)
THE BAD(IMPROPER REPAIRS)
• REPAIRS THAT MAY CAUSE REPAIRS THAT MAY CAUSE EQUIPMENT FAILURE EQUIPMENT FAILURE “DOWN THE ROAD” “DOWN THE ROAD”
• FAILURE, OFTENTIMES, FAILURE, OFTENTIMES, MEANS DAMAGE TO FREIGHT MEANS DAMAGE TO FREIGHT AND POSSIBLE INJURYAND POSSIBLE INJURY
![Page 6: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/6.jpg)
WELDS FAILING
SIGNS OF HEAT/PAINT
RELATED TO THE REPAIR
![Page 7: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/7.jpg)
PROPER REPAIRS MUST BE MADE USINGLIKE MATERIALS
BEVELED, PAINTED
STEEL SQUARE, RAW
ALUMINUM
![Page 8: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/8.jpg)
POSTS CAPPED IN CENTER, USING DIFFERENT MATERIALS AND
MORE THAN THREE IN A ROW
![Page 9: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/9.jpg)
ALWAYS KEEP AAR RULES IN MIND BEFORE CORRECTING
IMPROPER REPAIRS
•UNITS IDENTIFIED WITH IMPROPER REPAIRS MUST BE HANDLED AS FOLLOWS:
1.IF THE COST OF CORRECTING IMPROPER REPAIRS EXCEDES $100, THE COST MUST BE ACCEPTED BY THE PARTY RESPONSIBLE FOR THE REPAIR.
2.IF THE RESPONSIBLE PARTY CANNOT BE DETERMINED, AUTHORIZATION MUST BE OBTAINED FROM THE EQUIPMENT OWNER.
![Page 10: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/10.jpg)
THE UGLY(TEMPORARY REPAIRS)
•REPAIRS THAT ARE NOT INTENDED TO PERMANENTLY FIX THE DAMAGE
•REPAIRS THAT WILL ALLOW THE EQUIPMENT TO GET TO DESTINATION SAFELY, WITH NO RISK OF FAILURE
![Page 11: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/11.jpg)
![Page 12: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/12.jpg)
![Page 13: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/13.jpg)
![Page 14: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/14.jpg)
•CONSULT WITH INDUSTRY PROFESSIONALS – THEY WILL HELP YOUR COMPANY RECOGNIZE SHORTFALLS /LIABILITY
•USE ANY RESOURCES TO DEVELOP TRAINING PROGRAMS AND PROCEEDURES
•TRAIN YOUR DRIVERS, EQUIPMENT MANAGERS AND ANY OTHER PERTAINANT STAFF
•ENSURE THAT TRAINING IS UP-TO-DATE, ACCURATE AND USE “REFRESHER” COURSES YEARLY
PROPER REPAIRS DEPEND ON PROPER TRAINING
![Page 15: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/15.jpg)
TERMINAL OPERATIONS MANAGEMENT
IN COOPERATION WITH CANADIAN PACIFIC AND THE CCIB
Do I Write the Damage or Don’t I?
THAT is the Question!
![Page 16: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/16.jpg)
1. IS ANY COMPONENT CUT OR BROKEN? (WATCH FOR TAR-TAPE OR CAULKING)
2. IS THE UNIT UNSAFE?(ARE ANY COMPONANTS FAILING, IS IT STRUCTURALLY SOUND)
3. IS THE LOADING CAPACITY LIMITED BECAUSE THE UNIT IS BENT BY 3” OR MORE? (INTERIOR VOLUME OR CAPABILITY OF LOADING ON RAILCAR)
4. IS THE UNIT GOING TO LEAK – WIND OR WATER?(CAN YOU SEE DAYLIGHT FROM THE INSIDE?)
YES = WRITE IT NO = DON’T WRITE IT!
QUALITY NOT QUANTITY!
![Page 17: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/17.jpg)
DOES THIS “DAMAGE” AFFECT THE USE OF DOES THIS “DAMAGE” AFFECT THE USE OF THIS UNIT?THIS UNIT?
Door Frame / J-Bar bent slightly. Door operation is not affected and NO damage needs to be noted and no repair made.
![Page 18: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/18.jpg)
TERMINAL OPERATIONS MANAGEMENT CANADIAN PACIFIC RAILWAY
TRAINING UNIT
![Page 19: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/19.jpg)
DAMAGE/REPAIR EXAMPLESDAMAGE/REPAIR EXAMPLES
Each is an Improper Repair and no damage needs to be noted.
This is a good repair.
![Page 20: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/20.jpg)
DAMAGE / REPAIR EXAMPLESDAMAGE / REPAIR EXAMPLES
Broken Side Post CapGood Repair of a Cut or Broken
Post (Cap)
![Page 21: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/21.jpg)
![Page 22: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/22.jpg)
![Page 23: Joe Casey TERMINAL OPERATIONS MANAGEMENT](https://reader036.vdocument.in/reader036/viewer/2022062304/56813f93550346895daa8540/html5/thumbnails/23.jpg)
IF YOU HAVE ANY QUESTIONS ABOUT PROPER REPAIRS,
CONTACT:
•THE EQUIPMENT MANUFACTURER
•THE EQUIPMENT OWNER
•CCIB
THANK YOU FOR YOUR TIME!
Joe Casey, Director of Maintenance & RepairTerminal Operations Management
www.terminalops.com