Information Exchange Committee | Retail Market Executive Committee
The Information Exchange Committee (IEC) is an elected body of industry representatives and independent members, formed in accordance with clause 7.2A2 of the National Electricity Rules. The Secretariat for the IEC is provided by the Australian Energy Market Operator Limited in accordance with the IEC Operating Manual. The Retail Market Executive Committee (RMEC) is an elected body of industry representatives providing an advisory role to AEMO. The Secretariat for the RMEC is provided by AEMO in accordance with the RMEC Operating Manual.
Level 22 530 Collins Street Melbourne VIC 3000
Postal Address: GPO Box 2008 Melbourne VIC 3001
T 1300 858724 F 03 9609 8080
Joint IEC and RMEC Teleconference
Papers
11 July 2013
This page intentionally blank
IEC & RMEC TELECONFERENCE (11 JULY 2013) AGENDA PAGE 1
AGENDA
IEC & RMEC 11 JULY 2013 (#49)
2:00 – 4:00PM (TELECONFERENCE)
Meeting ID: 70917
Password: Not required
Dial in from your phone:
AEMO Internal x3001
QLD (07) 3347 3001
NSW (02) 8884 5998
VIC (03) 9609 8800
TOLL FREE 1300 202 105
1. Confirmation of attendance, agenda and preliminary matters
2. Retail Market Program Milestone Report
3. Other business
3.1. Next meeting (face-to-face):
Meeting #50 (F2F) IEC & RMEC 8 August 2013, Brisbane 12:30pm – 3:30pm
IEC & RMEC TELECONFERENCE (11 JULY 2013) AGENDA PAGE 2
ATTENDEES:
Members:
Mr Peter Carruthers IEC (Chair)
Independent
Director Jarosite Consulting
Mr Terry Grimwade RMEC (Chair) Group Manager
Market Development
AEMO
Mr Shaun Dennison IEC
Independent
Director Farrier Swier
Ms Fiona Savage IEC/RMEC
Retail
Senior Industry Development
Manager
Energy Australia
Mr Arun Wadhwa IEC/RMEC
Retail
Manager Network Performance Origin Energy
Mr Alex Cruickshank IEC/RMEC
Retail
Manager Wholesale Markets
and Metering Regulation
AGL Energy Ltd
Mr Kevin Kehl IEC/RMEC
DNSP
EGM Customer and Corporate
Relations
Energex
Mr Brendan Bloore IEC/RMEC
DNSP
General Manager Customer
Services
Powercor Australia
Mr Keith Yates
IEC/RMEC
DNSP
Executive Manager Regulation
and Pricing
Ausgrid
Observers:
Mr Carl Andersen IEC/RMEC
Secretary
Specialist Retail Development AEMO
Mr Oriel Mendoza Manager Retail Development
& Change Implementation
AEMO
Mr Lee Brown Manager Metering Services
AEMO
Mr Craig Dickson
Business Analyst AEMO
Apologies:
None
IEC & RMEC MEETING (11 JULY 2013) AGENDA ITEM: 1 PAGE 1
IEC AND RMEC MEETING
FOR DECISION
1. PURPOSE
Welcome members and other attendees; confirm attendance, alternates, conflicts of
interest and agenda for the joint IEC and RMEC July Meeting (#49).
2. BACKGROUND
The IEC and RMEC have various obligations under the National Electricity Rules,
Operating Manuals, Election Procedures and Terms of Reference that govern meeting
arrangements.
3. SIGNIFICANT ISSUES
The IEC to confirm the following preliminary matters:
attendance and approval of alternates
quorum of at least two DNSP members, two Local Retailer/Market Customer members, and one independent member
conflicts of interest, if any, for IEC members and alternates
The RMEC to confirm the following preliminary matters:
attendance and approval of any alternates
quorum of at least two DNSP members, two Market Customer members and one AEMO member
conflicts of interest, if any, for RMEC members and alternates
The IEC and RMEC to confirm the following preliminary matters:
meeting agenda and any items for other business.
SUBJECT: PRELIMINARY MATTER – CONFIRMATION OF ATTENDANCE
AND AGENDA
AGENDA ITEM: 1
IEC & RMEC MEETING (11 JULY 2013) AGENDA ITEM: 1 PAGE 2
4. IMPLICATIONS/ACTIONS
Completion of the preliminary matters outlined above will ensure the IEC meets its
obligation under the National Electricity Rules and the IEC and RMEC meet their
respective obligations under Operating Manuals, Election Procedures and Terms of
Reference.
5. DRAFT RESOLUTIONS
The Chairperson confirmed attendance at the meeting and sought approval for alternates
where no previous approval was in place.
The IEC approved [name] as an alternate for [name] and [insert any additional
alternates].
The RMEC approved [name] as an alternate for [name] and [insert any additional
alternates].
The Chairperson confirmed that a quorum of IEC members and a quorum of RMEC
members were in attendance.
The IEC and RMEC noted that there [were/were not] further conflicts of interests arising
from matters to be considered at the joint IEC and RMEC meeting or declarations of
interests from members.
The IEC and RMEC confirmed the following items for other business:
[list other business items]
SUBMITTED BY: CARL ANDERSEN
TITLE: IEC AND RMEC SECRETARY
#
Reference Group
Chair/ Project
Manager
Milestone/ deliverable
Priority & effort
(high, medium,
low)
Start date
Target
completion
date
Actual
completion
date
%
completeStatus
Effective
dateActivity status
1 Oriel Mendoza
(BMRG)
B2B Procedures version 2.0 HM 09-Apr-13 12-Aug-13 60% Mid Nov-13 IEC/RMEC endoresed the release
of the initial consultation on
28/3/13.
Published 9 April
Responses Due 16 May
IEC Endorse Draft 13 June
Draft Det Published 17 June
Responses Due 2 July
IEC Endorse Final 8 August
Final Published 12 August
2 Oriel Mendoza
(BMRG)
NEM RoLR Process version
1.3
HM 09-Apr-13 12-Aug-13 60% Mid Nov-13 As per B2B Consultation
3 Oriel Mendoza
(BMRG)
MSATS Procedures version
3.8
MM 09-Apr-13 12-Aug-13 60% Mid Nov-13 Published 9 April
Responses Due 16 May
Draft Det Published 17 June
Responses Due 2 July
Final Published 12 August
6 Oriel Mendoza
(BMRG)
MSATS – release 46.82 MM 14-Feb-13 15-Nov-13 60% Mid Nov-13
6.1 CSDN - - - - -
-
- QC 776 (CSDN) - Systematic
changes are new schema version
to accomendate changes to
sensitive load and Customer
Details Request.
B2B and NEM RoLR consultations
underway - refer above.
RDs complete
Development completion due 30
Sept
6.2 SGSD - - - - -
-
- QC 756 (SGSD) - Systematic
changes are removes the
validations currently in MSATS to
allow the MDP to update
Datastream.
MSATS consultation underway -
refer above.
RDs complete
Development completion due 30
Sept
7 Oriel Mendoza
(BMRG)
MSATS – release 46.83
(Tentative)
MM TBA 15-May-14 0% Mid May-
14
7.1 Review of PMD/VMD
Process
- - - - -
-
- QC721 - AEMO has put forward
proposed solutions that may
include some system changes.
July BMRG meeting to discuss
solution options for CBA. May
miss implementation deadlines.
8 Roy Kaplan
(MRG)
National Measurement
Institute project – review of
Guideline to the National
Measurement Act and
assessment of impact on
Procedures and Rules.
HM 01-May-11 01-Jan-13 01-Jan-13 100% Lifting of exemption occurred on 1
Jan 2013.
9 Roy Kaplan
(MRG)
Metrology Procedure update
9.2 Roy Kaplan
(MRG)
Update to jurisductional
material as a consequence of
Rule change and
harmonisation of jurisdictional
requirements.
MM 01-Apr-12 TBC 60% Needs to be reschduled to fit in
with emerging higher priority items.
9.3 Roy Kaplan
(MRG)
Metrology Procedure Part A
update Version 3.1
HH 04-Mar-13 12-Jun-13 100% Changes accommodate the
introducton of FRC in Tasmania 1
January 2014
12 Roy Kaplan
(MRG)
Current Transformer Testing
12.3 Roy Kaplan
(MRG)
Current Transformer Testing
Working Group – ongoing
development
HH 01-Dec-11 31-Aug-13 70% Ongoing development of strategy
to review test results of initial 12
month test period.
13 Roy Kaplan
(MRG)
Embedded Network review HM 01-Apr-12 30-Dec-13 90% Review of status of embedded
network provisions following AER
publication of network expemption
framework. Will now be extended
to include imlications of Power of
Choice review.
16 METER DATA DELIVERY HH Feb. 2012 TBC (based
on defined
business
requirements
)
2%
B2B PROCEDURES, PROCESSES AND RELATED IEC PROJECTS
NEM RoLR PROCESSES
MSATS PROCEDURES AND PROCESSES
MSATS SYSTEM AND B2B e-HUB
METROLOGY WORKS PROGRAM
AEMO MANAGED PROJECTS
G
P
P
H
G
G
G
G
G
G
G
G
A
Retail Market Program Milestone Report
IEC & RMEC Teleconference (11 July 2013) Agenda Item 2 Page 1
Issue 1 & 2: Timeliness of
Data Provision
16.2 Roy Kaplan
(MRG)
ICF submission on
Scheduled Reading Date
obligations
TBC (based
on MRG
review)
Discussed at MRG. Referred to
MDPWG for input.
Issue 3: Reasons for Late
Data Provision
16.3 Lee Brown
(MSWG)
Conflicting NSRD within
MDFF & MSATS
HL 01-Feb-13 30-Nov-13 80% Issued to the MSWG from the
SGSD after passing CBA. All
agreed changes have been made
in draft to the MDFF Specification
document and agreed at MSWG.
Remainder of the document is in
the process of being updated and
cleansed with a target to
commence consultation in August
'13.]
17 Oriel Mendoza
(BMRG)
Retail Change Management
ProcessHH 11-Apr-13 30-Nov-13 10% N/A May - Obtain support for project
from GRCF & GRCF NA
Early June - Draft process
Late June - Gas and electricty
group discussion
July - Updated process -
second draft
October - Final draft process.
November - Present final draft
for endorsement
G
H
G
A
Retail Market Program Milestone Report
IEC & RMEC Teleconference (11 July 2013) Agenda Item 2 Page 2
Initiative January February March April May June July August September October November December
Current Transformer Testing
NEM B2B Version 1.9
MSATS Release 3.7 (46.81)
CSDN SGSD Project
2013 TimelineEnvironmental Scan Timeline
IEC Approval Req’d for all NEM
B2B Consultations
IEC Approval
RMEC Recommendation
Draft
Determination
Release 46.81
Release 46.82
IEC Approval
RMEC Recommendation
IEC Approval
RMEC Recommendation
*Indicative Only (release
date TBD)
1st Round Consultation
Watching
Brief
Review for
Implication
KeyGovernance
& RG MgmtEnd 2
nd
Consult’n
End 1st
Consult’n
IEC
Face to Face
IEC
TeleconBMRG
Meeting
T
2nd
Round
Consultation
B2B Chg Pack/
Prima facie case
2nd
Round
Consultation
1st Round
Consult’n
Final Determination
Final Determination
Draft Determination
B2B Chg Pack/
Prima facie case
IEC Approval
RMEC Recommendation
1st Round Consultation
Draft Determination
IEC Approval
RMEC Recommendation
MRG
Meeting
IEC & RG Meetings
*Workshop
T T T T
6/2 14/2 6/3 14/3 3/4 11/4 1/5 9/5 5/6 13/6 3/7 11/7 1/8 8/8 4/9 12/9 2/10 10/10 7/11 *14/11 12/12W
14/1 13/2 10/4 12/6 7/8 16/10 20/11
NEM B2B Version 2.0
MSATS Release 3.8 (46.82)
NEM RoLR Version 1.3
May 2013 Release
November 2013 Release
NEM B2B Version 2.1
MSATS Release 3.9 (46.83)
May 2014 Release
NECF(NSW/SA/VIC/QLD)
DRET – Energy White Paper
Energy Networks Regulation (PC)
Senate Ctee on Electricity Prices
In Home Displays (VIC)
NSW Smart Metering
Productivity Commission Final Report
Policy decision expected Q4 2013
Decisions Pending from NSW/VIC/QLD
Pending Policy decision from VIC DPI
Pending NSW Gov discussion paper outcome. Submission close 28 Feb 2013
SA NECF Go-Live 1 February 2013
Retail Market Procedure Governance
IEC & RMEC Cost Benefit Review
Reference Group Protocol
AEMC Rule Change Submission
Proposal to improve interactions between IEC/RMEC & RGs
Smart Metering (Restart)
Power of Choice
Electric/Natural Gas Vehicles
NECF (Smart Metering)
Flexible Pricing
EA Rule Change NMI Standing Data
Business Continuity Process
RoLR Testing Project
Action Required – to be referred to BMRG for Review for implications
AEMC Decision Paper
Action Required – to be referred to BMRG for Review for implications
Pending recommendation released after SCER mtg Dec 2012
Pending recommendation released after SCER mtg Dec 2012
Pending recommendation released after SCER mtg Dec 2012
Pending recommendation released after SCER mtg Dec 2012
Tasmania FRC 1 January 2014
Metrology Version 3.0
CT Test Period – Year 1
1st Round Consultation
2nd
Round ConsultationFinal Determination
Draft Determination
Network Billing Governance
Draft Letter to Jurisdiction(s)
Draft Results
Jurisdictional Response Proposed Network Billing Framework
Draft Letter
* Jurisdictional responses
Pending Policy decision from DRET
Draft Report development
Scope, draft &
review changesNB Scope review & documentation
CT Testing Period
IEC Approval
IEC Approval
Network Billing
CTTWG
Metrology
Consult with industry
Comments due 26 April 2013
Pending recommendation released after SCER mtg Dec 2012