joint mission environment test capability (jmetc) overview · october 2011--september 2012 navy...
TRANSCRIPT
Joint Mission Environment Test Capability (JMETC)
Overview
ITEA Test Instrumentation Workshop
AJ Pathmanathan
JMETC Deputy PM - Engineering
May 16 2012
Risk mitigation needs Technology shortfalls
Risk mitigation solutions Advanced development
Capabilities
Service
Modernization and
Improvement
Programs
Acquisition Programs
and Advanced Concept
Technology
Demonstrations
TampE Multi-
ServiceAgency
Capabilities
DoD Corporate
Distributed
Test Capability
TRMC
Joint Investment
Programs
FY12 PB
Budget Request
$2503M
Transition
Requirements
Strategic Plan for
DoD TampE Resources
Service
TampE Needs and
Solutions Process
DoD SampT Investment
Plans Priority
Investment Areas
Strategic Planning Guidance
(63 Funding) (65 Funding) (64 Funding)
The TRMC ldquoBlueprintrdquo Putting Test Capabilities on the DoD Map
2
Established in FY2002
Develops technologies required to test future warfighting capabilities
63 RDTampE funds
~$95M year
8 current Test Tech Areas
Directed Energy
High Speed Systems
Netcentric Systems
Cyberspace Test
Autonomous Systems
Advanced Instrumentation
Spectrum Efficiencies
Electronic Warfare
Established in FY1991
Develops or improves test capabilities that have multi-Service utility
64 RDTampE funds
~$140M year
43 current projects
19 projects developing core Joint capabilities
ndash 4 projects improving interoperability test cap
11 projects improving threat representations used in testing
13 projects addressing near-term OT shortfalls
Established in FY2007
Provides corporate infrastructure for distributed Joint testing
65 RDTampE funds
~$19M year
68 current sites
Maintains Network connections Security agreements
Integration software Interface definitions Distributed test tools
Reuse repository
3 3
TRMC Investment Programs Overview
TampESampT CTEIP JMETC
2012 2030
Individual Systems WHAT do we test Mission-Level
amp Systems of Systems Capabilities
Events WHEN do we test Continuously
Decision-Makers For WHOM do we test Decision-Makers
amp Warfighters
Agile
Streamlined
Affordable
Continuous
Goal Distributed Integrated Testing and Training
The DoD TampE process must evolve to be
Test Resource Management Center
Future TampE Process
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated live virtual and
constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems in a Joint and cyberspace
environment
A new way of thinking for many in the
Test and Evaluation Community
5
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
Risk mitigation needs Technology shortfalls
Risk mitigation solutions Advanced development
Capabilities
Service
Modernization and
Improvement
Programs
Acquisition Programs
and Advanced Concept
Technology
Demonstrations
TampE Multi-
ServiceAgency
Capabilities
DoD Corporate
Distributed
Test Capability
TRMC
Joint Investment
Programs
FY12 PB
Budget Request
$2503M
Transition
Requirements
Strategic Plan for
DoD TampE Resources
Service
TampE Needs and
Solutions Process
DoD SampT Investment
Plans Priority
Investment Areas
Strategic Planning Guidance
(63 Funding) (65 Funding) (64 Funding)
The TRMC ldquoBlueprintrdquo Putting Test Capabilities on the DoD Map
2
Established in FY2002
Develops technologies required to test future warfighting capabilities
63 RDTampE funds
~$95M year
8 current Test Tech Areas
Directed Energy
High Speed Systems
Netcentric Systems
Cyberspace Test
Autonomous Systems
Advanced Instrumentation
Spectrum Efficiencies
Electronic Warfare
Established in FY1991
Develops or improves test capabilities that have multi-Service utility
64 RDTampE funds
~$140M year
43 current projects
19 projects developing core Joint capabilities
ndash 4 projects improving interoperability test cap
11 projects improving threat representations used in testing
13 projects addressing near-term OT shortfalls
Established in FY2007
Provides corporate infrastructure for distributed Joint testing
65 RDTampE funds
~$19M year
68 current sites
Maintains Network connections Security agreements
Integration software Interface definitions Distributed test tools
Reuse repository
3 3
TRMC Investment Programs Overview
TampESampT CTEIP JMETC
2012 2030
Individual Systems WHAT do we test Mission-Level
amp Systems of Systems Capabilities
Events WHEN do we test Continuously
Decision-Makers For WHOM do we test Decision-Makers
amp Warfighters
Agile
Streamlined
Affordable
Continuous
Goal Distributed Integrated Testing and Training
The DoD TampE process must evolve to be
Test Resource Management Center
Future TampE Process
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated live virtual and
constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems in a Joint and cyberspace
environment
A new way of thinking for many in the
Test and Evaluation Community
5
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
Established in FY2002
Develops technologies required to test future warfighting capabilities
63 RDTampE funds
~$95M year
8 current Test Tech Areas
Directed Energy
High Speed Systems
Netcentric Systems
Cyberspace Test
Autonomous Systems
Advanced Instrumentation
Spectrum Efficiencies
Electronic Warfare
Established in FY1991
Develops or improves test capabilities that have multi-Service utility
64 RDTampE funds
~$140M year
43 current projects
19 projects developing core Joint capabilities
ndash 4 projects improving interoperability test cap
11 projects improving threat representations used in testing
13 projects addressing near-term OT shortfalls
Established in FY2007
Provides corporate infrastructure for distributed Joint testing
65 RDTampE funds
~$19M year
68 current sites
Maintains Network connections Security agreements
Integration software Interface definitions Distributed test tools
Reuse repository
3 3
TRMC Investment Programs Overview
TampESampT CTEIP JMETC
2012 2030
Individual Systems WHAT do we test Mission-Level
amp Systems of Systems Capabilities
Events WHEN do we test Continuously
Decision-Makers For WHOM do we test Decision-Makers
amp Warfighters
Agile
Streamlined
Affordable
Continuous
Goal Distributed Integrated Testing and Training
The DoD TampE process must evolve to be
Test Resource Management Center
Future TampE Process
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated live virtual and
constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems in a Joint and cyberspace
environment
A new way of thinking for many in the
Test and Evaluation Community
5
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
2012 2030
Individual Systems WHAT do we test Mission-Level
amp Systems of Systems Capabilities
Events WHEN do we test Continuously
Decision-Makers For WHOM do we test Decision-Makers
amp Warfighters
Agile
Streamlined
Affordable
Continuous
Goal Distributed Integrated Testing and Training
The DoD TampE process must evolve to be
Test Resource Management Center
Future TampE Process
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated live virtual and
constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems in a Joint and cyberspace
environment
A new way of thinking for many in the
Test and Evaluation Community
5
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated live virtual and
constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems in a Joint and cyberspace
environment
A new way of thinking for many in the
Test and Evaluation Community
5
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
The JMETC Mission
6
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate Live Virtual
and Constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
7
JMETC Enables Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Integrated
Test
Resources
JMETC
Infrastructure
Reuse Repository
Distributed Test Support Tools
Data Management Solutions
JMETC
Network on
SDREN
Customer Support TENA Test and Training Enabling Architecture
Virtual
Prototype
Hardware
in the
Loop
Installed
Systems
Test
Facility
Range
Environment
Generator
Threat
Systems
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA Standard Interface Definitions
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
TENA
Common
Middleware
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Connectivity
Ft Huachuca (4)
JITC JTDL CMIS JTRS
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB SIMAF
As of 30 Apr 2012
0
20
40
60
80
FY06 FY07 FY08 FY09 FY10 FY11
JMETC Site Expansion
Sites
Dedicated trusted connectivity on SDREN (part of the GIG)
Encrypted for Secret ndash System High
DISA-registered IP address space
Active monitoring of network performance
Capable of supporting multiple simultaneous test events Bethpage NGC BAMS
Functional Sites 68
New Sites Planned 9
Connection Points to Other Networks 7
Ft Greely CRTC
MHPCC
PMRF Bldg 105
Pax River (8)ESTEL E2CD MCL ACETEF SAIL ATR E-2C SIL UASIL MFS JMETC SYSCON East Agg Rtr
Aberdeen ACCN
Langley (2) C-GIIF TDLITC
JS J8 DDC4 C4AD
Wallops Island (2) SCSC SSDS
Dahlgren (2) CEDLIWSL
Dam Neck CDSA
Newport News NGC VASCIC
Norfolk COMOPTEVFOR
McLean MITRE NCEL
Bethpage NGC BCN
Eglin AFB (5) AOC DTF GWEF KHILS JDAT
Hurlburt Field C2DAC
Camp Pendleton MCTSSA
China Lake (3) FA-18 IBAR TSPIL
Edwards (2)
Corona NSWC
Point Loma SSC-PAC 59140 SSC-PAC HAIPE
Point Mugu (2) ITEC EA-6B
West Agg Rtr
Rancho Bernardo NGC BAMS
412th EWG IFAST Ridley
Palmdale NGC BAMS
Redstone (10) SMDC
RTC DTCC GMAN
SED Patriot THAAD FAAD
GSIL JLENS MUSE SIV
(2) SED-PSEM AMRDEC
LMCO Global Vision Network Arlington VA
Moorestown CSEDS
Crane NWSC RDTampE
Army
Air Force
Navy
Marines
Joint
Industry
Academia
GTRI
Sites in Hawaii
Site in Alaska
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
How a Test Planner Views JMETC
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
9
CNR Radio JLENS
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
10
JMETC Network
Reusable Persistent Connectivity
bull Reuse enables the customer to avoid
bull Acquiring network equipment
bull Processing the security agreements bull Obtaining Authority to Connect (ATC)
bull Obtaining Authority to Operate (ATO)
bull Generating agreements to connect with test partners
bull Testing the equipment installation
bull Testing the network configuration
bull Reuse enables the customer to
bull Test capabilities early and often
bull Execute Unscheduled Unplanned testing whenever needed
bull Focus on the test rather than the network
Customer time and dollars not spent on
infrastructure by leveraging JMETC sites
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
Common Infrastructure
Components
Technical Expertise
Persistent Network Connectivity
Common Tools
Standard
Interfaces
Definitions
Enabling
Middleware
TENA
JMETC Network on SDREN
TENA Standard
Object Models
JMETC Tools Evaluation (including InterTEC)
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
12
JMETC FY12 Major Events
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
Customer Event Record Event Dates
Joint JITC Joint Interoperability Tests JIT 12 - 12345
(Continuous) October 2011--September 2012
Navy Broad Area Maritime Surveillance (BAMS) Environment
Integration October 2011--September 2012
Air Force Air Force Systems Interoperability Test (AF SIT) 12-01 02 October 2011-May 2012
Air Force AGILE Fire Phase V February 2012
Marine Corps GroundAir Task Oriented Radar Developmental Testing May --September 2012
Joint JIAMDO CorrelationDe-correlation Interoperability Test
(CDIT) Integration and Test Events (Continuous) OCONUS January--November 2012
Joint JIAMDO Joint Tactical Air Picture (JTAP) (Coincides with
AGILE Fire Phase VI) August 2012
Joint AGILE Fire Phase VI September 2012
Army Network Integration EventNetwork Integration Rehearsal
(NIENIR) Risk Reduction 3d4th QTR 2012
Navy Accelerated Mid-Term Interoperability Improvement
Program (AMIIP) October 2011--May 2012
ArmyNavy Vengeance January--August 2012
Navy NavAir Integrated Warfare Capability (IWC) March--August 2012
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
13
Example FA-18 Interoperability Check
China Lake
One week from initial coordination to test complete
Sequence
FA-18 data-link testers attended JMETC Users Group 04 on 20-21 May 2008
Learned which sites are already connected by JMETC
Called JMETC PM on 18 June requesting JMETC support Needed to link FA-18 lab at China Lake with F-16 lab at Eglin
JMETC was ready to support on 20 June Verified ports and protocols were open at site firewalls
First interoperability test conducted on 24 June Initial test identified interoperability problems Software modified that day
Successful re-test the following day on 25 June
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
14
Description
bull Assessment of B-2 Link-16
interoperability with AWACS
bull Connected live B-2 on ramp at
Whiteman AFB MO an
AWACS HITL at Tinker AFB
OK within a distributed C2
environment
IMPACT-- Cost Savings and Better
Product
bull Early testing led to early identification
and correction of Link 16 interoperability
issues
bull No range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
B-2 Spirit ICE Data Link Test
Sample of Measures
Timeliness and accuracy of
message exchanges
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
15
Joint Integrated Air and Missile
Defense Organization (JIAMDO)
bull Supported several test initiatives focused on track management
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to
FY-10
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JIAMDO CDIT OCONUS
Ongoing from August 2010
bull Executed first JMETC supported
Coalition Test in 4 months
bull High visibility and kudos bull ldquoThis is the first air platform engineering
level coalition testing we are aware of for
IAMDrdquo - RADM Archer M Macy Director
JIAMDO Email to General Cartwright JCS
Vice Chairman 10102010
bull ldquo[CDIT participants supported by JMETC]
accomplished what no one has been able to
do in the last ten years in bringing high
fidelity coalition systems engineering testing
to fruitionrdquo ndash CDR Tony Simmons
Capabilities Development Division Chief
JIAMDO Email to ADM Macy1072010
bull PURPOSE All-Service amp Coalition Integration of System Track Management to fully realize existing capabilities
bull System(s) Under Test US E2-C and UK E3-D
bull Key Lessons Learned Takeaways
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Customer Testing Success
Battlefield Airborne
Communication Node (BACN)
Joint Urgent Operational Need
bull Integration of BACN payload onto
multiple platforms for solution to
net-centric warfare challenges of
o Beyond line-of-sight comm
o Relay bridge and range
extension for ground forces and
supporting aircraft
bull Distributed testing included Live-fly
DT and Operational Utility Evaluation
in Fall 2010
bull Acceptance and additional platform
testing will continue throughout FY
2012
IMPACT--Cost Savings and
Better Product
bull Efficient integration of DT and OT
bull All required assets not available on-site
bull Distributed testing saved ldquo$12Mrdquo
bull Urgent capability fielded
17
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
18
Interoperability Certification
Joint Interoperability Test
Command (JITC)
Joint Tactical Data Link
(JTDL) Testing
bull JITC conducts interoperability
assessments standards conformance
and interoperability certification testing
of joint tactical data links in HWIL and
operationally realistic environments to
validate the implementation of
approved standards in a Joint
environment
bull Typically 5year
IMPACT--Joint Interoperability
JITC 12-02
bull Tactical Data Link Variable Message Format C2 for B2B E3 AWACS E2 Hawkeye Forward Area Air Defense System Advanced MANPADS
bull Testing completed ahead of schedule
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Customer Testing Success
Air-to-Ground Integrated
Layer Exploration (AGILE)
bull Sponsored by the Simulation and
Analysis Facility (SIMAF) USAF Air Systems Command
bull LVC venue for selected initiatives to explore Joint airspace integration procedures and data exchange requirements within and between Air and Ground domains to execute Joint Fires
bull JMETC provides infrastructure and technical support for all AGILE events
bull AGILE VI scheduled for Aug 2012
IMPACT--TampE Efficiencies
bull AGILE Phase V MainEx Feb 2012
bull 13 sites connected by JMETC
bull 7 programs Including Network Enabled Weapon (SDB II) Digitally Aided Close Air Support and Joint tactical Air Picture
bull Operationally realistic LVC scenarios
bull 80 of systems were live
19
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Customer Testing Success
Broad Area Maritime
Surveillance System
(BAMS)
bull Integrated SoS providing multi-sensor
persistent maritime ISR to the
Maritime Patrol and Reconnaissance
Force
bull Distributed testing used as solution for
distinct test data and network
requirements
o Programmatic needs
o Engineering needs
IMPACT--Efficiency Lower
Technical Risk
bull Test earlytest often
bull Real time connectivity between system
developer (NG) and Navy System
Integration Laboratory (Pax) to address
risks before flight testing 20
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Sites and Test Activities
21
0
50
100
150
200
250
300
350
400
450
FY07 FY08 FY09 FY10 FY11 FY12
of Test Days
of JMETC Sites
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future distributed testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of JMETC customers acquisition programs test events ranges LVC sites tools and network providers
22
Next JMETC Users Group Meeting bull Fall 2012 bull Location TBD bull Anticipated Tracks
bull User Requirements bull SecurityInfo Assurance bull Data Management bull Cyberspace TampE bull Distributed Test Tools bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate and resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
JMETC Program Points of Contact
JMETC Program Manager Chip Ferguson chipfergusonosdmil
571-372-2697
JMETC Senior Technical Advisor George Rumford
georgerumfordosdmil
571-372-2711
JMETC Lead Engineer AJ Pathmanathan arjunapathmanathanosdmil
571-372-2702
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
571-372-2701
JMETC Website wwwjmetcorg
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil
Questions
AJ Pathmanathan
JMETC Deputy PM for Engineering
(571) 372-2702
ArjunaPathmanathanosdmil