JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E Rigid Pavements and Concrete Materials Branch Construction Division, TxDOT 2014 Short Course
![Page 2: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/2.jpg)
Footer Text Date
Jointed PCC Pavements - Jointed Portland
Cement Concrete Pavements Jointed Concrete Pavement (JCP) Jointed Plain Concrete Pavement (JPCP) In Texas, Concrete Pavement Contraction
Design (CPCD)
CPCD = JCP = JPCP
2
![Page 3: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/3.jpg)
Footer Text Date
Table of Contents
3
16-19
20-25
26-34
34-37
3-15 Background
Current Statewide CPCD Conditions
2014 CPCD Memo
2014 CPCD Standard
Summary of Success
1
2
3
4
5
![Page 4: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/4.jpg)
Footer Text Date
Dowel Bars
Tie Bars
ACP Base
CPCD Under Construction
4
CPCD Before Concrete Paving
CPCD After Concrete Paving
![Page 5: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/5.jpg)
Footer Text Date
National Level Usage of CPCD
5
![Page 6: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/6.jpg)
Footer Text Date
Texas Usage of CPCD
TxDOT has started to use CPCD since 1930’s. TxDOT has began to construct CRCP since
1950’s.
6
![Page 7: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/7.jpg)
Footer Text Date
Oldest CPCD Sections in Service
7
District County HighwayConstruction
YearP_Age
PavementType
Thickness(in.)
BMT-US59_0065-08-014 Beaumont Jefferson US 59 1938 76 CPCD 6BMT-US90_ 0028-11-024 Beaumont Orange US 90 1943 71 CPCD 7.5DAL-SH183_0094-02-006 Dallas Dallas and Tarrant SH 183 1944 70 CPCD 8DAL-SL12_ 0094-03-009 Dallas Dallas SL 12 1949 65 CPCD 9BMT-SH87_0306-03-023 Beaumont Jefferson SH 87 1951 63 CPCD 9DAL-US 77-0196-01-008 Dallas Denton US 77 1954 60 CPCD 10DAL-US77-0196-01-008 Dallas DENTON US 77 1954 60 CPCD 10DAL-US 77-0196-01-010 Dallas Denton US 77 1955 59 CPCD 10DAL-US 77-0196-01-012 Dallas Denton US 77 1955 59 CPCD 10DAL-US77-0196-01-010 Dallas DENTON US 77 1955 59 CPCD 10DAL-US77-0196-01-012 Dallas DENTON US 77 1955 59 CPCD 10BMT-US90_ 0028-13-014 Beaumont Jefferson US 90 1957 57 CPCD 11DAL-IH35-0195-02-016 Dallas Denton IH 35 1959 55 CPCD 10BMT-IH10_0028-13-018 Beaumont Jefferson IH 10 1960 54 CPCD 9BMT-SH347_0667-01-023 Beaumont Jefferson SH 347 1960 54 CPCD 10DAL-IH 35-0195-02-016 Dallas Denton IH 35 1960 54 CPCD 10BMT-SH124_0368-01-033 Beaumont Chambers SH 124 1962 52 CPCD 10BMT-SH73_0508-03-009 Beaumont Jefferson SH 73 1962 52 CPCD 10BMT-SH124_ 0368-01-033 Beaumont Chambers SH 124 1962 52 CPCD 10BMT-US90_ 0028-07-024 Beaumont Jefferson US 90 1964 50 CPCD 10
Moon Won, P.E.
![Page 8: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/8.jpg)
Footer Text Date 8
![Page 9: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/9.jpg)
Footer Text Date 9
![Page 10: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/10.jpg)
Footer Text Date
CPCD Lane Miles and Conditions In 1985
10
![Page 11: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/11.jpg)
Footer Text Date
CPCD Lane Miles In 1985
11
PES1985 Report
Percentageof Mileage
MileageEvaluated Total Mileage Percent
ACP 35.53% 25,816 72,660 94.7%CRC 55.07% 1,346 2,444 3.2%JCP 21.83% 352 1,612 2.1%
Total 76,716 100.0%
• 60% of Texas Concrete Pavement was CRCP • 40% of Texas Concrete Pavement was CPCD
![Page 12: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/12.jpg)
Footer Text Date
CPCD Condition In 1980’s
12
![Page 13: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/13.jpg)
Footer Text Date
2000 Memo – Selection of Concrete Pavement Type
13
![Page 14: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/14.jpg)
Footer Text Date
CPCD Usage in Recent Years
14
Pavement Type
FY 05 – FY 08 Letting Lane Miles
FY 09 - FY 13 Letting Lane Mils
Total
CRCP 2,719 4,183 6,902
JCP 106 102 208
• 6,902/13,572 =50.8% After construction, about 50% CRCP on our network is less than 10 yrs old. • 208/ 3,727 =5.5% After construction, about 5.5% JCP on our network is less than 10 yrs old. • The three longest Interstate highway in Texas are: IH10 (878.6 miles), IH20 (636 miles, and
IH35 (503.9 miles)
![Page 15: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/15.jpg)
Footer Text Date
CPCD Lane Mile History
15
Pavement Type
1985 MainLane Mileage
1995 Lane Miles
2005 Lane Miles
2014 Lane Miles
ACP 72,660 168,156.7 177,071.9 179,842.8 CRCP 2,444 6,081.6 9,940.3 13,572.7 JCP 1,612 2,755.1 4,403.1 3,727.6 Statewide 76,716 176,993.4 191,415.3 197,143.1
![Page 16: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/16.jpg)
Footer Text Date
2. Current Statewide CPCD Conditions
16
Lane Miles PercentPavement Type 2011 2012 2013 2014 2014
Flexible or Asphalt concrete Pavement (ACP) 179,318.3 179,485.9 179,599.9 179,842.8 91.2%
Continuously Reinforced Concrete Pavement (CRCP) 13,109.1 13,387.9 13,778.7 13,572.7 6.9%Jointed Concrete Pavement (JCP) 3,895.0 3,947.6 3,823.2 3,727.6 1.9%STATEWIDE 196,322.4 196,821.4 197,201.8 197,143.1
• 78% of Texas Concrete Pavement is CRCP • 22% of Texas Concrete Pavement is CPCD
![Page 17: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/17.jpg)
Footer Text Date
CPCD Conditions – PMIS FY 2010 to FY 2013
17
![Page 18: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/18.jpg)
Footer Text Date
CPCD Ride Scores – PMIS FY 2010 to FY 2013
18
![Page 19: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/19.jpg)
Footer Text Date
Lessons Learned
CPCD Sections were placed directly on subgrade
CPCD Sections were constructed without dowel bars
CPCD Sections were constructed without tied concrete shoulder
Many CPCD sections are still under traffic beyond their design life.
19
![Page 20: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/20.jpg)
Footer Text Date
3. 2014 Memo Criteria for Use of CPCD
20
![Page 21: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/21.jpg)
Footer Text Date
3. Criteria for Use of CPCD
21
For roadways with design traffic of 40 million Equivalent Single Axle Loads or less
For frontage roads where CRCP is difficult to construct due to numerous leave-out sections
For roadways controlled and maintained by another government entity
For parking areas or roadways with crosswalks, adjacent parking, or sidewalks
For railroad crossings, approaches to structures or to widen existing jointed pavement
For intersections and approaches in flexible pavement roadways that are associated with vehicle
braking and acceleration which could cause shoving and rutting of an asphalt pavement
![Page 22: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/22.jpg)
Footer Text Date
Factors Where/When CPCD CRCP
Traffic Level
Heavy Truck Roadway ☺☺☺
Medium Truck Roadway ☺☺
☺☺☺
Low Truck Roadway ☺☺☺
☺
Construction Flexibility Under Traffic
Frontage with Numerous Leave-outs
☺☺☺
Intersection/ Crossings ☺☺☺
Material Sources
Use Local Coarse Aggregates with High COTE for Low/Medium Truck Roadway
☺☺☺
Support Condition
Natural Subgrade with Higher Risk for Heaves
☺☺☺
On Embankment with Higher Risk for Void under Slab
☺☺☺
22
![Page 23: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/23.jpg)
Footer Text Date
Cost Information from Site Manager FY 09 to FY 13
23
Item Description Number of Projects Avg.Bid Price total SYCONC PVMT (CONT REINF-CRCP)(10") 151 53.4 5,836,196 CONC PVMT (CONT REINF-CRCP)(8") 139 56.5 2,809,999 CONC PVMT (CONT REINF-CRCP)(9") 87 49.3 4,264,845 CONC PVMT (CONT REINF-CRCP)(13") 62 58.6 5,909,985 CONC PVMT (CONT REINF-CRCP)(12") 46 52.4 2,118,267 CONC PVMT (CONT REINF-CRCP)(11") 36 46.8 2,153,226 CONC PVMT (CONT REINF-CRCP)(15") 23 53.2 3,927,197 CONC PVMT (CONT REINF-CRCP)(6") 22 67.3 29,764 CONC PVMT (CONT REINF-CRCP)(14") 15 59.3 1,260,931 CONC PVMT (CONT REINF - CRCP)(7") 8 42.7 431,442 CONC PVMT (CONC REINF - CRCP)(11.5") 4 48.8 348,184 CONC PVMT (CONT REINF-CRCP)(10.5") 4 59.1 101,727 CONC PVMT(CONT REINF-CRCP)(7.5") 3 48.6 173,844 CONC PVMT (CONT REINF-CRCP)(9.5) 1 38.3 67,518 CONC PAV (CONT REINF-CRCP)(8.5") 1 45.0 10,284 CONC PAV (CONT REINF - CRCP) (6.5") 1 55.0 1,982
Total Letting CRCP = 603 29,445,391
![Page 24: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/24.jpg)
Footer Text Date
Cost Information from Site Manager FY 09 to FY 13
24
Item Description Number of Projects Avg.Bid Price total SYCONC PVMT (JOINTED-CPCD)(9") 17 58.3 140,984 CONC PVMT (JOINTED-CPCD)(8") 13 56.9 162,680 CONC PVMT (JOINTED-CPCD)(10") 13 63.0 101,249 CONC PVMT (JOINTED-CPCD)(12") 9 60.1 123,774 CONC PVMT (JOINTED-CPCD)(13") 6 88.8 47,632 CONC PVMT (JOINTED-CPCD)(11") 4 44.2 57,649 CONC PVMT (JOINTED)(15IN) 2 35.5 69,832 CONC PVMT (JOINTED-CPCD)(6") 1 35.0 17,396
Total Letting CPCD = 65 721,195
![Page 25: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/25.jpg)
Footer Text Date
Estimated Cost
25
ItemsUnit Quantity Unit Cost Total Cost Quantity Unit Cost Total Cost
Coarse Aggregate for Concrete ton 2,930 $30.05 $88,032 2,930 $30.05 $88,032Concrete w/o Coarse Aggregate yd3 3,499 $45.00 $157,450 3,499 $45.00 $157,450Total Concrete Cost yd3 $245,481 $245,481
Dowel Bar each 7,744 $11.25 $87,120 0 $0.00 $0Sawcutting lane-feet 8,424 $4.96 $41,783 5,280 $4.96 $26,189Joint Clean and Seal lane-feet 8,424 $1.97 $16,595 5,280 $1.97 $10,402Steel Reinforcement (#5, #6, Tie ton 5.50 $1,400 $7,700 193.88 $1,400 $271,432
Labor, Equipment & Overhead yd2 14,080 $15.30 $215,424 14,080 $16.16 $227,533
Total Construction Cost $614,104 $781,037Unit Construction Cost /yd2 $43.62 $55.47
5280 ft x 24 ft 9 in. Slab 0-6681 Project Worksheet
CPCD w/same Coarse Aggregate CRCP w/ Same CoarseAggregate
![Page 26: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/26.jpg)
Footer Text Date
4. 2014 CPCD Statewide Standard
Design concept and structural responses of CPCD and CRCP are quite different. In CPCD, concrete volume changes are allowed to a full extent, and accommodations are made to ensure good load transfer at discontinuities, i.e., transverse contraction joint.
Slab Thickness
Slab Size
Dowel Bar Size
Base Support
26
![Page 27: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/27.jpg)
Footer Text Date
Thickness Design for CPCD
27
AASHTO 1993 Pavement Design Procedure Design Criteria: Performance Period (30 years) Initial and Terminal Serviceability (Difference of 2.0) Design Reliability (95%) Concrete Properties: 28-day Concrete Modulus of Rupture (620 psi) 28-day Concrete Elastic Modulus (5,000,000 psi) Traffic: ADT and one-way total 18-kip ESALs are provided by the Transportation Planning and Programming (TPP) Division. Reliability 90% when ESALs <= 5 million 95% when ESALs > 5 million Load Transfer Coefficient J J = 2.6 for CRCP J = 2.9 for CPCD
![Page 28: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/28.jpg)
Footer Text Date
Base Support for CPCD
Field performance evaluations of concrete pavement have revealed that the soundness of the base is essential to the long-term performance of concrete pavement. If the base underneath the concrete slab does not provide good support, long-term pavement performance will be severely compromised regardless of the concrete slab thickness.
TxDOT recognized this and requires one of the following base layer combinations for concrete slab support:
4 in. of asphaltic concrete pavement (ACP) or asphalt stabilized base (ASB) or
a minimum 1 in. asphalt concrete bond breaker over 6 in. of a cement stabilized base.
28
![Page 29: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/29.jpg)
Footer Text Date
CPCD-14 : Concrete Pavement Contraction Design Standard
29
![Page 30: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/30.jpg)
Footer Text Date
CPCD-14: Slab Size
Right size of CPCD slab will accommodate concrete volume changes and minimize any random cracks.
Slab length to width ratio <1.5, as square as possible
Regular slab length =15 ft.
Regular slab width =
Lane width (12 ft.)
Max.15 ft . width
30
![Page 31: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/31.jpg)
Footer Text Date
CPCD-14: Slab Size
31
![Page 32: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/32.jpg)
Footer Text Date
CPCD-14: Dowel Bar Size
32
![Page 33: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/33.jpg)
Footer Text Date
CPCD-14: Tied Concrete Shoulder
33
![Page 34: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/34.jpg)
Footer Text Date
Website Address for Concrete Pavement Standards
http://www.txdot.gov/inside-txdot/division/design/cad.html
TxDOT website – www.txdot.gov – Select Business
– Scroll to Resources
• Select Statewide Standard CAD Files – Click “I accept”
– Select Roadway Standards
– Scroll to the Pavements
![Page 35: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/35.jpg)
Footer Text Date
5. Summary of Success
Adequate Slab Thickness Uniform and Sufficient Base Support Project Specific Joints Layout Install Dowel Bars Timely Saw-cut at Dowel Bar Locations
and at Longitudinal Joints Use Tied Concrete Shoulder
35
![Page 36: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/36.jpg)
Footer Text Date
CRCP for Heavier Traffic Roadways
Longitudinal Joint
Longitudinal Steel
Transverse Steel Tie Bars
4” ACP Base
CRCP after Concrete Paving
36
CRCP before Concrete Paving
![Page 37: JOINTED PCC PAVEMENTS - Texas A&M UniversityFooter Text Date JOINTED PCC PAVEMENTS – REINVENTING THE OLD APPROACH Hua Chen, P.E . Rigid Pavements and Concrete Materials Branch](https://reader030.vdocument.in/reader030/viewer/2022040917/5e91ff5c06627e63197ffa03/html5/thumbnails/37.jpg)
Footer Text Date
Rigid Pavement and Concrete Materials Branch
Construction Division, TxDOT
Andy Naranjo, P.E. Branch Manager (512) 506-5858
Hua Chen, P.E. (512) 506-5846
37