Joint Polar Satellite System Program 1117_AB_JPSS_GSFC_ContractorsAsn.ppt 1 JPSS Program Overview Presented to Goddard Contractors Association November 17, 2010 Arlin Bartels Deputy Project Manager JPSS Flight Project

Upload: dreama

Post on 02-Feb-2016

94 views

Category:

Documents


0 download

DESCRIPTION

JPSS Program Overview. Presented to Goddard Contractors Association November 17, 2010. Arlin Bartels Deputy Project Manager JPSS Flight Project. JPSS Program Overview. JPSS will be NASA/NOAA’s next generation of polar Earth observing science data satellites - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 1

JPSS Program Overview

Presented to

Goddard Contractors Association

November 17, 2010

Arlin BartelsDeputy Project Manager

JPSS Flight Project

Page 2: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 2

JPSS Program Overview

● JPSS will be NASA/NOAA’s next generation of polar Earth observing science data satellites

– Maintain continuity of climate observations and critical environmental data from the polar orbit

– Increase timeliness and accuracy of severe weather event forecasts

– Provide advanced imaging capability to analyze fires, volcanoes, Gulf oil tracking and other adverse incidents

– Provide advanced atmospheric temperature, moisture and pressure profiles from space

– Direct broadcast data to field terminals at hour scale latencyJPSS 1 Satellite

(NPP-clone)

JPSS Launch Readiness Date JPSS 1 -2015, JPSS 2 - 2018

Program Architecture2 Satellites (JPSS 1 & JPSS 2); 5 year operational design life

Program Operational Life FY 2015 – FY 2026

Program Life-cycle FY 2011 President’s Budget* $11.9 billion

* Program fully funded by DOC/NOAA

Page 3: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 3

JPSS Program Overview (cont’d)

● Administration decision on restructuring NPOESS announced in early February 2010

● NOAA/DOD leadership agree to cooperate to ensure a smooth transition – Acquisition Decision Memorandum signed March 2010

● NOAA/NASA management of JPSS Space Segment (PM Orbit) and shared Ground System with DOD

● Mid and early-AM orbits covered by EUMETSAT and remaining DOD/DMSP platforms

● Agencies will share data from each orbit to meet the national need for weather and climate information

● JPSS Space Segment to deliver most planned NPOESS observations for PM orbit

● Continue plan for operational use of NPP data (PM orbit)

Page 4: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 4

JPSS Program Overview (cont’d)

● GSFC is performing work on a reimbursable basis for NOAA

● JPSS Satellites operate in 13:30 (LTAN) orbital plane only

● Period of development/operations: through FY 2026

● Launch Readiness Dates: FY 2015 and FY 2018

● Maximum Data latency of 80 minutes at IOC and 30 minutes by FOC; 15 minute objective

● International partners provide some space segment components and/or data

Page 5: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 5

DoD option to move to am orbit

Page 6: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 6

JOINT POLAR SATELLITE SYSTEM (JPSS) PROGRAM ORGANIZATIONCode 470

Code 470

JPSS PROGRAM OFFICE

Associate Director/Program Manager for JPSSPreston M. Burch

J. Buswell – Program Secretary

Deputy Associate Director/Deputy Program Manager for JPSSLiz Citrin

Deputy Program Manager/Technical for JPSSMark Brumfield

JPSS Program Business ManagerLinda Greenslade

Deputy Program Business ManagerMargaret Pavlik

Code 472

JPSS FLIGHT PROJECT

Project ManagerC. Tooley

Deputy Project Manager P. Sullivan

Deputy Project Manager A. Bartels

Deputy Project Manager/ResourcesTBD

NOAA-NASA Liaison ManagerJ. Morris

Code 474

JPSS GROUND PROJECT

Project ManagerD. Devito

Deputy Project Manager for O&ST. Zeiler

Deputy Project Manager for Dev/I&TJ. Smith

Deputy Project Manager/ResourcesG. Gaukler

Preston M. Burch, Acting Associate Director/Program Manager for JPSS Date

October 12, 2010

Senior Scientist for JPSS

J. Gleason

Deputy Senior Scientist for JPSS

VACANT

Financial Mgr.

Project Support Mgr.

Command Control Comm. Segment

Mission Operations

Interface Data Proc. Segment Field Terminals

Safety & Mission Assurance Mgr

M. Delmont

Public Affairs Office

C. O’Carroll

Mission System Engineering

S/W Management

Mission Assurance Customer Liaison

Security Mission Management

Data Product Eng. Data Products & Algorithms

Chief EngineerA. Whipple

Procurement Manager

S. Marshall

Resources and Technical Support

VACANT

Chief EngineerT. Trenkle

JPSS-1 Mission SEP. Weinberger

Mission SE & SME Team

MA Lead for Transition

Spacecraft CSO

Instruments CSO

Financial

Project Management

Contracts

Inst. Systems Mgr.

Deputy ISM

JPSS Observatory Mgr

LV Interface Mgr.

CrIS IM OMPS IM

VIIRS IM ATMS IM I&T/Early Flt Ops Mgr.

-- P R E L I M I N A R Y --

Page 7: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 7

JPSS Space Segment

● Designed for operation in afternoon orbit with a 13:30 LTAN

● Launch readiness date of January 2015 and January 2018

● Compatible with existing and future polar ground sites (Svalbard, McMurdo) and Ka ground sites at mid latitudes

● Instrument complement includes– VIIRS, ATMS, CrIS, OMPS, CERES or ERBS

● Spacecraft– Clone of NPP bus

● EELV is launch vehicle– Likely Atlas V or Falcon 9

● JPSS also accommodates:– TSIS Instrument on Free Flyer Spacecraft– SARSAT and A/DCS communication services on Free Flyer Spacecraft

(TBC)

Page 8: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 8

JPSS Space Segment Payload Complement

Sensors for JPSS 1 LRD 1/2015

Sensors for JPSS 2LRD 1/2018

Instruments

VIIRS X X

CrIS X X

ATMS X X

OMPS Limb/Nadir Nadir Only Nadir and Limb

CERES X

ERBS X

TSIS X (TBD Platform) X (TBD Platform)

Services

Search & Rescue X (TBD Platform) ?

Data Collection X (TBD Platform) X (TBD Platform)

Low Rate Broadcast (TBD) X

High Rate Broadcast X X

Sensitive & Pre-Decisional Information

* Note: Maintain as option against future VIIRS development problems

Page 9: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 9

JPSS-1 Based on NPP Design

Page 10: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 10

JPSS Instruments

● Advanced Technology Microwave Sounder (ATMS) and Cross-track Infrared Sounder (CrIS)– Provide profiles of temperature,

moisture, and pressure

● Visible/Infrared Imager Radiometer Suite (VIIRS)– Provides daily high-resolution imagery

and radiometry across the visible to longwave infrared spectrum

● Ozone Mapping and Profiler Suite (OMPS)– UV and IR bands for ozone total

column measurements

● Clouds and the Earth’s Radiant Energy System (CERES)– Supports studies of Earth Radiation

Budget

CrISATMS

OMPS

VIIRS

CERES

Page 11: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 11

JPSS Ground Segment

● Command, Control, Communication Segment (C3S)– Includes MCC at NOAA/NSOF, Svalbard, McMurdo and Ka sites– Deployed for NPP, augmentation required for JPSS satellites– Capacity and flexibility to operate future DOD polar-orbiting satellites in

morning orbit(s)

● Interface Data Processing Segment (IDPS)– Includes all hardware and software to process and disseminate data from

satellites– Provides NPP and JPSS data and products to NOAA and DOD Centrals,

to NOAA’s Archives and to NASA’s SDS (for NPP)• Presently Deployed for NPP at NOAA and AF Centrals, augmentation will be

required for JPSS satellites

• Deployed at Navy Central(s) for JPSS satellites

● Field terminal – Direct Transmission– Develop prototype system (h/w & s/w) for deployment by agencies and

individual users

Page 12: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 12

NPP NPP SpaceSegment

SpaceSegment

NESDISCentral

AFWACentral

GPS

WSCLEO & A Backup T&C

TDRSS

LaunchSupportSegment

LaunchSupportSegment

Direct Broadcast User

Climate UserCommunity

I/F Data Proc

Segment

I/F Data Proc

Segment

InfraInfra

IngestIngest

Pro

cess

Pro

cess

Data DelData Del

InfraInfra

IngestIngest

DQMDQM

Pro

cess

Pro

cess

Data DelData Del

NPP Mission Data Command and TelemetryKey:

Archive & Dist

Segment

Archive & Dist

SegmentIngest

ArchiveInterchange

ArchiverRoboticStorage

Datastore

Inventory

Command,Cntrl & Comm

Segment

Command,Cntrl & Comm

Segment

GSE - SvalbardPrimary T&CNPP SMD

NSOF Mission Mgmt Center

- SuitlandData

HandlingNode

Data Routing & Retrieval

Science Data

Segment

Science Data

Segment

SD3E

LandPEATE

OceanPEATE

OzonePEATE

AtmosPEATE

NICSE

SounderPEATE

I&TSE

Data MgtData Mgt Data MgtData Mgt

CERESInstrumentOps Team /

System - LaRC

CERESInstrumentOps Team /

System - LaRC

GRAVITE / NSIPS

GRAVITE / NSIPS

CERESPEATE

JPSS Mission System Architecture

Page 13: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 13

NOAA Satellite Operations Facility (NSOF)

NOAA Satellite Operations Facility (NSOF)

NSOF Operations Floor occupied for NPOESS State 1

NSOF Operations Floor occupied for NPOESS State 1

SafetyNet™ Ground Network toprovide rapid Mission Data Receipt

SafetyNet™ Ground Network toprovide rapid Mission Data Receipt

NPOESS Satellite T&C Station at Svalbard,

Norway

Black Island, Antarctica Upgrades

for NPOESS data relay

Command, Control, and Communications Segment (C3S)

C3S Segment Features

● Satellite Operations & Mission Management

● Space/Ground Communications

● Global Mission Data Receive Network

● Data Routing/Retrieval

● Enterprise Management

● Builds directly upon the system designed and deployed for State 1

Page 14: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 14

Interface Data Processing/Field Terminal Segments (IDPS/FTS)

● Processes Sensor data into RDRs, SDRs and EDRs

● Delivers data to Users

– 4 Centrals at NESDIS, AFWA, FNMOC, NAVO

– CLASS data archive

● Supports mission requirements with high performance and fast processing to meet operational latency

● Modular, Extensible, Flexible

● State 2/3 adds IDPS deployment to FNMOC and NAVO Centrals in addition to refresh of existing State 1 IDPS at NESDIS and AFWA

● Field Terminal – based on technologies developed by GSFC Direct Readout Laboratory

State 1 IDPS Racks installed at

NESDIS

State 1 IDPS Racks installed at

NESDIS

State 1 IDPS Racks at AFWA

State 1 IDPS Racks at AFWA

Field Terminal Segment

IDPS State 2/3 Builds on State 1

Interface Data Processing Segment

Page 15: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 15

Ground Station Sites

Calculated 5 degree elevation coverage circles of current sites

Page 16: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 16

JPSS Operations and Sustainment

● At NSOF i.e. “NOAA Central”

– Operate NPP, JPSS, and DWSS satellites

– Operations transition from JPSS-led to NOAA-led at start of nominal operations

– Operate future DoD polar-orbiting metsats; deliver raw data to IDPS at DoD Centrals

– Operate and sustain C3S and IDPS for life of program

– Conduct initial and recurring Cal/Val

– Support all NOAA Field Terminal users and maintain the registration data base and key management center for all other users

Page 17: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 17

JPSS Transition Approach

● Acquisition authority delegated to NASA GSFC for PM orbit and ground system– Governance model per NMI 7120.5– NASA becomes the Systems Integrator

● NPOESS PEO/IPO facilitates transition– To date, transition has been as transparent to ongoing work as practical

● Transferred work on Instruments/Ground System via GSFC letter contracts

● Standard contracts now in place for Ground, CrIS, OMPS, and Spacecraft– Remaining: VIIRS, ATMS, and long term 1394 support

● JPSS Program/Project Organizations defined and staffing is underway

● NPP Project will remain with the Earth Sciences Program at GSFC

● JPSS and NPP Organizations are being collocated in GSFC Building 40 (former Greentech IV Building) this week

Page 18: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 18

Summary

● JPSS will be a critical element in maintaining NOAA/NASA climate knowledge continuity from the afternoon orbit

● JPSS will improve weather forecasting and knowledge of transient Earth events

● JPSS will provide time-critical weather information for DoD and other personnel

● On behalf of NOAA, GSFC leads a large team of industrial partners to make this happen

● JPSS will continue to maintain a close collaborative relationship with DoD both during the NPOESS transition and throughout the mission

● To lessen programmatic risk, JPSS-1 is baselined as a clone of NPP

● JPSS provides the ground segment for the DoD DWSS Mission as well as the JPSS satellites

● Although moving offsite to Building 40, JPSS is still a fully-GSFC organization

Page 19: JPSS Program Overview

Joint Polar Satellite System Program

101117_AB_JPSS_GSFC_ContractorsAsn.ppt 19

JPSS Acronym List● AA Associate Administrator

● ADCS Advanced Data Collection System

● AFWA Air Force Weather Agency

● AHRPT Advanced High Resolution Picture Transmission

● AMSR2 Advanced Microwave Scanning radiometer 2

● ATMS Advanced Technology Microware Sounder

● CERES Cloud and Earth Radiant Energy System

● CLASS Comprehensive Large Array Data Stewardship System

● CPD Capabilities Production Document

● CrIS Cross-Track Infrared Sounder

● CS Civil Servant

● C3S Command, Control, and Communications Segment

● DoD Department of Defense

● DUS Deputy Under Secretary

● EDR Environmental Data Record

● ERBS Earth Radiation Budget Suite

● FOC Final Orbital Capability

● FT Field Terminal

● FTEs Full Time Equivalents

● FTS Field Terminal Segment

● GCOM Global Changing Observation Mission

● GOES-N Geostationary Operational Environmental Satellite - N

● GS Ground System

● GSFC Goddard Space Flight Center

● HQ Headquarters

● HRD High Rate Data

● I&T Integration & Test

● ICD Interface Control Document

● IDPS Interface Data Processing Segment

● IOC Initial Orbital Capability

● IORD-II Integrated Operational Requirements Document - II

● JASD Joint Agency Satellite Division

● JPSS Joint Polar Satellite System

● LRD Launch Readiness Date

● LRD Low Rate Data

● MMC Mission Management Center

● MOU Memorandum Of Understanding

● NG Northrop Grumman

● NASA National Aeronautics and Space Administration

● NESDIS National Environmental Satellite, Data, and Information Service

● NGAS Northrop Grumman Aerospace Systems

● NGST Northrop Grumman Space Technology

● NOAA National Oceanic and Atmospheric Administration

● NPOESS National Polar-orbiting Operational Environmental Satellite System

● NPP NPOESS Preparatory Project

● NSOF NOAA Satellite Operations Facility

● OMPS Ozone Mapping and Profiler Suite

● OSD Office of Systems Development

● OSTP Office of Science and Technology Policy

● PMC Program Management Council

● RDR Raw Data Record

● SARSAT Search and Rescue Satellite-Aided Tracking

● SDE Selective Data Encryption

● SDR Science Data Record

● SDS Science Data Segment

● SMA Safety and Mission Assurance

● SMC Space and Missile Systems Center

● SMD Science Mission Directorate

● T&C Telemetry & Command

● TSIS Total Solar and Spectral Irradiance Sensor

● WBS Work Breakdown Structure

● USAF United States Air Force

● VIIRS Visible Infrared Imager Radiometer Suite