  • 7/31/2019 JS MoP Visit

    1/104

    1

    Presentation

    to

    Joint Secretary,

    Minister of Power

    June,27, 2003

    New Delhi

    Power Grid Corporation of India Ltd.

  • 7/31/2019 JS MoP Visit

    2/104

    OBJECTIVES OF POWERGRID

    The Corporation has set following objectives in line with itsMission and its status as Central Transmission Utility:

    - Undertake transmission of energy through Inter-State

    transmission system.

    - Discharge all functions of planning and coordinationrelating to Inter-State transmission system

    - Exercise supervision and control over the Inter-State

    transmission system.

    - Efficient Operation and Maintenance of Transmission

    systems.

    - Establish / augment and operate all Regional Load Despatch

    Centres and Communication facilities.

    Contd/-

  • 7/31/2019 JS MoP Visit

    3/104

    - To facilitate private sector participation in transmission systemthrough Independent Private Transmission Company / Joint

    Ventures.

    - To assist various SEBs and other utilities in upgradation of

    skills & sharing of expertise by organising regular conferences,

    tailor-made training workshops directed towards specific

    technological and O&M areas and extending laboratory

    facilities for testing purposes etc.

    - Restoring power in quickest possible time in the event of any

    natural disasters like super cyclone, flood etc. through

    deployment of Emergency Restoration Systems.

    - To provide consultancy services at national and international

    level in transmission sector based on the in- house expertise

    developed by the organisation.

    - To participate in long distance trunk telecommunication

    business ventures.

    OBJECTIVES OF POWERGRIDContd/-

  • 7/31/2019 JS MoP Visit

    4/104

    ORGANISATIONAL

    STRUCTURE OF POWERGRID

    Corporate Centre

    RHQ (7 No.)

    Lines/ Sub-Stations

    NLDC

    RLDC(5 No.)

    SLDC

    RTU

  • 7/31/2019 JS MoP Visit

    5/104

    Incorporated in October, 1989.

    Commenced commercial operation from

    April 1, 1992.

    Notified as Central Transmission Utility in Dec 98.

    One of the largest and best managed transmission

    utility in the World with EHV network of over

    46,000 ckm, wheeling more than 200 billion units

    (worth Rs. 40,000 Crore) per year - 40% of totalgenerated power in the country.

    Sustained high system availability - about 99%.

    Consistently profit making.

    POWERGRIDToday

  • 7/31/2019 JS MoP Visit

    6/104

    6

    POWERGRIDToday Rated EXCELLENT against MOU with MOP since

    1993-94. Received The Prime Ministers MOU Award consecutively

    for 3 years since 1998-99.

    First ISO 9001 company in Indian Power Sector.

    Rated at the highest bracket by domestic credit ratingagencies.

    During the FY 2002-2003, POWERGRID

    commissioned projects worth Rs 5,300 Crore. These

    projects were completed at a cost lesser by Rs 820Crore than the GoI approved cost and ahead of

    schedule.

  • 7/31/2019 JS MoP Visit

    7/104

    1992-93 2002-03 Growth(%)Physical Performance

    No. of Sub-stations 39 79 102

    MVA capacity 13,200 44,836 240

    Circuit kms 23,000 46,245 101

    Inter-regional transfer 500 8,000 1500capacity (MW)

    Financial Performance (Rs Cr.)

    Net profit 236 650 175

    Turnover 634 2,419 282

    No. of employees 5,725 6,339* 11

    * Excluding 586 employees transferred from CEA (with RLDCs) and

    from NTPC (with HVDC)

    POWERGRIDGrowth Profile

  • 7/31/2019 JS MoP Visit

    8/104

    The Electricity Laws (Amendment) Act, 1998

    provided for:

    Transmission as a distinct activity.

    A new concept of Central Transmission

    Utility (CTU) at the National level / StateTransmission Utilities (STUs) at the State

    level for ensuring centralized planning, co-

    ordination and control.

    CTU / STUs kept under Govt. ownership.Granted ApexBody status to RLDCs.

  • 7/31/2019 JS MoP Visit

    9/104

    RLDCs/SLDCs to be operated by CTU/STUs

    respectively, unless specified otherwise by

    Central Government.

    CTU/STUs to be actively involved in private

    investment in transmission.Appropriate Commissions to issue the

    Transmission License to private parties upon the

    approval by CTU/STUs.

    Govt. used to give directions to POWERGRID toestablish, operate & maintain Transmission

    System under Section 18A of 1948 Act.

  • 7/31/2019 JS MoP Visit

    10/104

    Separate Companies for NLDC, RLDCs andSLDCs.

    Roles, responsibilities and functions of RLDCs /

    RPCs.

    Responsibility of short term planning oftransmission system.

    Functions of CTU and its privatisation.

    Role of CTU in Private Investment in

    transmission. Usage of transmission assets for telecom

    purposes.

    Open access to transmission system

  • 7/31/2019 JS MoP Visit

    11/104

    The Act, under clauses 26(3), 27(2) and31(2), envisages formation of separateGovernment companies for the operationof NLDC, RLDCs and SLDCs.

    In line with the worldwide trends, the maintransmission agency should beresponsible for system operation

    functions on permanent basis, i.e., CTUshall operate NLDC and RLDCs, whileSTUs shall operate respective SLDCs, inline with the current practice.

  • 7/31/2019 JS MoP Visit

    12/104

    The Act under clause 2(55) and clause 28(1)

    defines the roles of REBs/RPCs as a facilitator forintegrated operation of power system, and that ofRLDCs as an agency responsible for integratedoperation of power system in that region. The Act

    has only changed the name of the body i.e. fromREB to RPC.

    Roles and responsibilities of RLDCs / RPCs need

    to be clearly demarcated by specifying theirrespective functions.

  • 7/31/2019 JS MoP Visit

    13/104

    As per the Act under clause 73(a), CEA has been

    mandated to formulate short term & perspectiveplan for power development in the country.

    In line with the statutory function of CTU for

    planning and coordination, the short term

    planning of inter-state transmission system

    should have been entirely left to CTU under the

    overall long term Electricity Plan developed by

    CEA.

  • 7/31/2019 JS MoP Visit

    14/104

    The Act under clause 38(1) provide for a

    Government Company to be CTU. However, theAct under third para of clause 38(1), providesfurther that the Central Government maytransfer, and vest any property, etc., of CTU, toa company or companies to be incorporatedunder the Companies Act, 1956 to function as atransmission licensee, through a transferscheme.

    This provision militates against the veryconcept of having a Government-owned CTU.

  • 7/31/2019 JS MoP Visit

    15/104

    The 1910 Act under clause 27C(2) provides for

    licensee to work under direction, supervision

    and control of CTU.

    The 2003 Act under clauses 12 & 14 has placedCTU at par with other Transmission Licensees.

    CTU, being a statutory authority, should not

    be referred to as a Transmission Licensee. Itsrole should have remained as envisaged in the

    earlier Acts.

  • 7/31/2019 JS MoP Visit

    16/104

    The 1910 Act under clause 27C(4) states that nolicense application shall be entertained by CERC

    unless the applicant has obtained the approval of CTU.The 2003 Act under clause 15(3) states that any personcan apply directly to CERC for the License, with a copyto CTU for recommendations. However, suchrecommendations of CTU shall not be binding onCERC.

    CTU, being a statutory authority, no application for alicense should be entertained by CERC, unless thesame is approved by CTU, in line with the existingprovisions.

  • 7/31/2019 JS MoP Visit

    17/104

    The Act under clause 41 empowers CERC tolook into the question of using transmission

    assets for any other purposes where as the

    existing Acts are silent on this issue.

    Duties of generating companies include

    dedicated transmission lines also. Captive

    generating plants may also set up dedicated

    transmission lines.

    Directions corresponding to 18A of 1948 Act

    needed.

  • 7/31/2019 JS MoP Visit

    18/104

    CTU & RLDC not to engage in generation and

    trading of electricity.

    CTU to provide non-discriminatory open access

    to its transmission system for use by anylicensee, generating company or consumer

    (clause 38-2-d).

    Guidelines for determining tariff through aprocess of bidding shall be issued by the

    Central Government (clause 63).

  • 7/31/2019 JS MoP Visit

    19/104

    Undertake transmission of electricity through

    inter- state transmission system.

    Discharge all functions of planning and co-

    ordination relating to inter state transmission

    system.Ensure development of an efficient,

    coordinated & economical inter state

    transmission system.

    Provide non-discriminatory open access to its

    transmission system

  • 7/31/2019 JS MoP Visit

    20/104

    POWERGRID was anyway performing

    almost all the functions, which the earlieramended statute & the Electricity Act 2003bestowed upon the CTU. NotifyingPOWERGRID as CTU is thus a natural and

    logical step.Objectives of POWERGRID and the

    Statutory Role and Responsibilities of CTUgo hand in hand and they are so much inter-

    mingled that they can not be separated.

  • 7/31/2019 JS MoP Visit

    21/104

    ACTION PLAN FOR 2003-04

    (In Rs. Crores)

    Budget Estimate (2003 - 04) : 2750

    Scheme-wise break-up: BE(2003-04)

    Ongoing Schemes - 2028.73

    New Schemes - 563.74

    Completed Schemes - 13.88

    Telecom - 143.65---------

    TOTAL : 2750

    Utilisation of Budget under the new schemes (Rs. 563.74Crore) would largely depend on availability of investmentapproval of major projects like Sipat-I, Sipat-II, and TalaTransmission projects (about Rs. 343 Crore) - GoIsapproval is awaited.

  • 7/31/2019 JS MoP Visit

    22/104

    ACTION PLAN FOR 2003-04

    Funding Plan for BE 2003-04

    Internal Resources 578

    Development Surcharge 250

    Bonds/Domestic Loans 1127

    Foreign Borrowings 715

    IEBR 2670Net Budgetary Support 80

    Total 2750

  • 7/31/2019 JS MoP Visit

    23/104

    Action Plan for

    next 10 years

    24

    P Pl

  • 7/31/2019 JS MoP Visit

    24/104

    24

    POWERGRIDPerspective Plan Addition of 60,000 ckm of Transmission Network

    with an investment of Rs. 71,000 crores toevacuate additional 1,00,000 MW by 2011-12

    Mobilising adequate financial resources (includingprivate participation) for the implementation of the

    plan, while maintaining sound financial health ofthe company POWERGRIDs own investment Rs. 50,000 Crore and

    balance Rs. 21,000 Crore from Private Sector

    Creation of National Grid and enhancing inter-regional transfer capacity from the existing levelof 8,000 MW to 30,000 MW by 2012

  • 7/31/2019 JS MoP Visit

    25/104

    POWERGRIDPerspective PlanInvestment Program

    X Plan XI Plan Total

    Private Sectorparticipation

    9,710 11,185 20,895

    POWERGRIDsOutlay

    21,370 28,258 49,628

    Total Central Sector(Transmission + Telecom)

    31,080 39,443 70,523

    Rs/Crs.

    P Pl

  • 7/31/2019 JS MoP Visit

    26/104

    POWERGRIDPerspective PlanEstimate of Funds to be Mobilised

    A. Identified Funds : X Plan XI Plan Total

    Internal Resources 2,938 5,081 8,019

    Development Surcharge 1,216 1,867 3,083

    Net Budgetary Support 1,000 0 1,000

    Committed ECB 5,500 5,500

    Domestic Fund tied up 810 810

    Total (A) 11,464 6,948 18,412B. Funds to beMobilised:

    9,906 21,310 31,216

    Total(A+B) 21,370 28,258 49,628

  • 7/31/2019 JS MoP Visit

    27/104

    Investment andFundingStrategy

    Future Funding Option Assumed

    20%

    10%

    70%

    Multilateral

    Suppliers' Credit

    Domestic

  • 7/31/2019 JS MoP Visit

    28/104

    Diversification

    into

    Telecom

  • 7/31/2019 JS MoP Visit

    29/104

    POWERGRID diversifying into Telecom to

    utilize spare telecommunication capacity ofULDC schemes and maximize return on its

    transmission infrastructure

    Through an incremental investment

    In a limited manner and without affecting the

    core business

    Foray into telecom recommended by reputed

    international consultants viz. IVO Power

    Engineering, Finland along with

    PricewaterhouseCoopers, UK

    POWERGRIDs DIVERSIFICATION INTO TELECOM

  • 7/31/2019 JS MoP Visit

    30/104

    POWERGRIDs DIVERSIFICATION INTO TELECOM

    POWERGRID has implemented /is implementingULDC projects for Real Time Power System

    Management in all five Regions

    Dedicated Telecom links under ULDCSchemes

    Region Status/Completion OFC (Km)Northern Completed 830

    Southern Completed 613

    North Eastern Completed 961

    Eastern By Mar 03 887

    Western By Aug 03 1,431

    NLDC By 2005 941

    Total 5,663

  • 7/31/2019 JS MoP Visit

    31/104

    Fiber Optic Backbone Network of 14,000 Km,which will interconnect 60 major cities

    OFC under ULDC/ LDC schemes 5,663 Km

    Incremental Network required 8,437 KmTotalproject cost Rs. 934 cr.

    Investment approval accorded by GoI in

    March 2002Target Completion by 2004-05

    POWERGRIDs DIVERSIFICATION INTO TELECOM

  • 7/31/2019 JS MoP Visit

    32/104

    Obtained IP-II license in January 2001

    Delhi-Mumbai Link was prioritised and

    commissioned in a record time of 9

    months

    Links under commercial operation

    Delhi-Chandigarh;

    Delhi-Lucknow-Mumbai;

    Delhi- Jaipur;

    POWERGRIDs DIVERSIFICATION INTO TELECOM

    Facilitating Distribution Sector

  • 7/31/2019 JS MoP Visit

    33/104

    Facilitating Distribution SectorReforms (APDRP)

    Appointed Advisor-cum-Consultant : 105 circles

    Direct Advisor-cum-Consultant : 37 circles (15 States)Co-ordinator : 14circles in 5 States

    (assigned to NPC, WAPCOS,ERDA).

    54 circles (developed by SEBs)

    Ist Phase is over and cumulative projects worthRs16,000 Crore already approved in the country.

    Projects worth Rs 5587 Crore approved, where

    POWERGRID was associated

    In addition APDRP program undertaken on turnkey andbilateral basis in three States namely Assam, Goa,Bihar.

  • 7/31/2019 JS MoP Visit

    34/104

    Perspective Plan

    - Development of

    National Power Grid

    Need of National Grid

  • 7/31/2019 JS MoP Visit

    35/104

    Need of National Grid

    Uneven disposition of energy resources Major Hydro resources in NER & NR

    Coal reserves mostly in Jharkhand / Orissa / West Bengal Cost of power transmission lower than cost of fuel transportation

    Transmission is more environment friendly than load centre basedgeneration

    Growth disparity

    ER surplus (Load did not grow as expected) Other regions deficit (Demand outstripped Gen. Cap. addition)

    Optimization of generation capacity addition Utilising time and seasonal diversity Spinning reserve optimisation Utilisation of operational surpluses

    Flexibility of adding IPPs along the National Grid

    Conservation of Right-of-Way -- especially in areas with scarcity ofROW viz. area near hydro projects, chicken - neck area, forest area,towns etc.

    D l t f N ti l G id

  • 7/31/2019 JS MoP Visit

    36/104

    Development of National Grid :

    Strategy Development in a phased manner commensurate with

    generation / load growth. Flexible Plan to accommodate change in load-generation

    pattern.

    Detailed studies carried out in consultation with CEA to

    evolve system elements Existing ER surplus and operational surpluses in the time

    frame of 2006 - 07 are to be transmitted over National Grid

    Uncertainty in generation capacity addition can be fine

    tuned from time to time including impact of time & costoverruns, if any.

    National Load Dispatch Center envisaged by 2005 - 06 for

    coordinated operation of National Grid

    P Pl

  • 7/31/2019 JS MoP Visit

    37/104

    POWERGRIDPerspective PlanNational Grid, Phase-I

    Interconnection of Regional Grids through HVDC

    Back-to-Back and AC links

    to take care of widely varied operational

    parametersDevelopment of phase-I of National Grid completed

    when Sasaram HVDC B/B Link between ER and NR

    was commissioned in Sept. 2002.

    Cumulative Inter-Regional Transfer Capacity

    estableshed at the end of Phase-I : 5,000 MW

    O E G D P ti Pl

  • 7/31/2019 JS MoP Visit

    38/104

    POWERGRIDPerspective PlanNational Grid, Phase-II (by 2007)

    Strategy: High capacity Inter-Regional Transmission Highways

    envisaged along with major generation projects Hybrid HVAC and HVDC interconnection planned Development of Phase-II of National Grid has already

    commenced - 3000 MW capacity added 2000 MW HVDC bi-pole between Talcher-Kolar (Asias

    largest HVDC Bi-pole) 1000 MW 400 kV AC link between Rourkela and Raipur

    (Facilitate Interconnection of ER/WR & NER Cumulative Inter-regional transfer capacity at the end of

    2002-03 8000 MW

    By the end of Phase-IICumulative Inter-regional Capacity - 23,500 MW

    P Pl

  • 7/31/2019 JS MoP Visit

    39/104

    POWERGRIDPerspective Plan

    National Grid, Phase-III(by 2012)

    Strengthening of inter-regional links to have a ring

    of 765 kV lines, inter-connecting Northern, Western

    and Eastern Regions synchronously

    ER inter-connection with SR to be strengthened

    through HVDC bi-pole links (Asynchronous link)

    After Phase-IIICumulative Inter-regional Capacity - 30,000 MW

  • 7/31/2019 JS MoP Visit

    40/104

    Private Sector

    Participation

    P i t S t P ti i ti

  • 7/31/2019 JS MoP Visit

    41/104

    Private Sector Participation Two routes identified

    Joint Venture (JV) route

    Independent Private Transmission Company(IPTC) route

    JV route

    Major transmission lines associated with

    Tala HEP in Bhutan, estimated to cost aboutRs. 1,100 Crore,

    M/s Tata Power selected as JV partner

    Shareholders Agreement initialled atmanagement level

    IA/ TSA initialled at working level

    PIB approval obtained in Dec02. CCEAawaited (investment approval + approval ofcreating a JV company)

    Private Sector Participation

  • 7/31/2019 JS MoP Visit

    42/104

    Private Sector Participation

    IPTC Route Identified Project : 400 KV D/C Bina-Nagda-Dehgam Transmission line

    Estimated cost : Rs. 450 crore.

    Consortium of TNB & Kalpataru, the onlybidder

    Tariff quoted is 77% higher compared to if the

    project to be undertaken by POWERGRID

    Petition submitted by POWERGRID to CERC

    seeking direction

    Hearing held on 25 June03, order awaited

  • 7/31/2019 JS MoP Visit

    43/104

    Assistance

    Sought

  • 7/31/2019 JS MoP Visit

    44/104

    Payable Outstanding as on May, 2003 - Rs.429 Crore

    Includes Interest Rs. 171 Crore

    Major DefaultersBIHAR Rs. 102 crore

    DVB Rs. 283 CroreMPEB Rs. 67 CroreManipur Rs. 51 CroreMaharashtra Rs. 17 CroreArunachal Rs. 10 Crore

    Tripura Rs. 9 Crore

    Madhya Pradesh, Maharashtra, Orissa, Delhi, Tripura,Arunachal Pradesh, Mizoram and Manipur have not signedthe TPA for POWERGRID.

  • 7/31/2019 JS MoP Visit

    45/104

    POWERGRID sought a budgetary support of Rs. 4,907

    crore for an investment programme of Rs. 30,143 crore(considering Debt:Equity ratio of 70:30)

    Planning Commission scaled down the investment to Rs.

    21,370 crore with Net budgetary support to Rs. 1,000 crore.

    (Debt:Equity ratio of 80:20)

    Taking up the future incremental investment in the limiting

    debt-equity norm of 80:20 would create problems for the

    Corporation for fund mobilization

    Further equity support of Rs 1257 Crore to maintain D:Eratio as 70:30.

    NBS to be made available in the form of Equity and not as

    Grant.

    Contd

  • 7/31/2019 JS MoP Visit

    46/104

    POWERGRIDs losses due to pegging of the tariff @35 paise/unit as per Unified Common PoolTransmission Tariff (UCPTT)Rs. 1012 cr. till 2006-07

    To cover this loss to the extent of only 50%, MoPrecommended:

    One time upfront grant of Rs. 385 crores and

    Equated annual installment of Rs. 33.46 cr. during Xthplan period from 2002-03 to 2006-07 (or additionalupfront grant of Rs. 120.60 cr.)

    The proposal is being considered by PlanningCommission.

    Some clarification on existing assets was sought byPlanning Commission which has since been

    furnished.

  • 7/31/2019 JS MoP Visit

    47/104

    Accordance of Mega Power Project status for thetransmission System associated with Mega GenerationProject. Sipat project of NTPC already granted this status.

    Associated transmission project to be granted Mega Power

    Project Status. It meets the criteria which are comparable tothose specified for Mega Power Projects:- System forms part of National grid

    Catering power needs of more than one state

    Introduction of 800 kV state-of-the-art technology

    Involvement of huge investment Transmission of large block of power thus reducing ROW

    requirements

    Economy of scale on account of lower T&D losses

    To keep the tariff low for financially poor states

  • 7/31/2019 JS MoP Visit

    48/104

    CCEA may approve a basket of projects, while

    individual project approval may be delegated to

    MoP.

    Pre-PIB limits to be raised from Rs. 500 Crore to

    Rs. 1500 Crore. PIB Memo may be circulated while circulating the

    FR itself.

    Investment approval for projects involving cost up

    to Rs. 1000 cr. may be delegated to Board ofDirectors of POWERGRID.

  • 7/31/2019 JS MoP Visit

    49/104

    Review of depreciation norms in transmission tariff

    CERC through their notification reduced rate of depreciation from6.12% to 2.91%, which is adversely affecting the financial position

    of the company

    Payment of FERV on pass through basis

    CERC insists that FERV be capitalized and recovered as tariff by

    spreading it over the years.

    This is putting extra financial burden on POWERGRID due to

    mismatch in inflow and outflow, which will have direct impact on

    internal resources and capability to add capacity.

    Fixation of availability of transmission system at 95%instead of 98%

    CEA has recommended 98% availability of transmission system

    to ensure grid stability and this norm should not be used for

    recovery of transmission charges.

    Contd

  • 7/31/2019 JS MoP Visit

    50/104

    Utilisation of Development SurchargeCERC has not notified Dev. Surcharge in revisedtariff notification for Rihand-Dadri Line (1st case)

    Applicability of Depreciation Adversely affects the

    Financial ratios because of no RoE on DevelopmentSurcharge

    Implication of Income Tax on DevelopmentSurcharge

    Its utilisation on National Level may be allowed instead of Regional level

  • 7/31/2019 JS MoP Visit

    51/104

    The funding of Chandrapur HVDC B/B project

    includes ODA grant of about Rs 322 CrsCERC, through its Tariff Order, has not allowed

    the ROE and Depreciation on Grant portion.

    As POWERGRID has to maintain the asset andkeep provision for its wear and tear, at least

    tariff components like Depreciation, O&M

    expenses and Interest on Working Capital maybe allowed.

    GOI may notify the Tariff Policy at the earliest

  • 7/31/2019 JS MoP Visit

    52/104

    Penal Interest @24% on cash equivalent ofDeemed Export Benefits (Rs. 265 Crore)

    being refunded for Talcher-II project may

    be waived off by GOI to reduce the projectcost.

    The proposal for declaring POWERGRID

    as Navratna, under consideration ofDPE, may be expedited.

  • 7/31/2019 JS MoP Visit

    53/104

  • 7/31/2019 JS MoP Visit

    54/104

    FORMATION OF POWERGRID

    Prior to formation of POWERGRID, various

    Central Sector Generating Companies e.g.NTPC, NHPC, NLC, THDC, NEEPCO,NJPC, NPC etc. were responsible fordevelopment of generation facility and the

    associated transmission system to deliver thepower to the beneficiaries at their sub-stations.

    As the capital outlay of generating plants was

    much more in comparison to associatedtransmission system, all the generatingcompanies were giving more importance togeneration facilities which led to bottling ofpower in some pockets.

  • 7/31/2019 JS MoP Visit

    55/104

    FORMATION OF POWERGRID

    These Generating companies were makingefforts towards establishing generationfacilities and associated evacuation systems,and no efforts were made by them tostrengthen/augment Regional Grids/National

    GridThe transmission system not linked with thegeneration facilities were getting totallyneglected

    To surmount these problems, CentralGovernment in 1989 took a decision toestablish POWERGRID for development ofRegional/ National Grids

    FORMATION OF POWERGRID

  • 7/31/2019 JS MoP Visit

    56/104

    FORMATION OF POWERGRID

    MANDATE

    Build, Operate & Maintain EHV AC andHVDC Transmission Systems including LoadDispatch Facilities under Central Sector.

    MISSION

    Establishment and operation of Regional

    and National Power Grids to facilitatetransfer of power within and across theregions with Reliability, Security andEconomy, on sound commercial principles.

    F t r Fi i l O tl k

  • 7/31/2019 JS MoP Visit

    57/104

    Future Financial Outlook

    2419 48188559

    650 1420 312510418

    31953

    54325

    1458724645

    7300

    Present 2006-07 2011-12

    Turnover PAT Capital Employed Net Worth

    OPERATIONAL PERFORMANCE

  • 7/31/2019 JS MoP Visit

    58/104

    OPERATIONAL PERFORMANCE

    Sustained high system availability - over 98%

    for last 10 years despite limited / noredundancy in the network, through adoption

    oflatest techniques including:

    Hot Line MaintenanceEmergency Restoration System

    Regular Preventive Maintenance

    Thermo-vision ScanningCondition Monitoring of Equipment

    Gas & Insulating Oils Testing Facilities.

    Stringent Quality Control Measures

    HOT LINE MAINTENANCE

  • 7/31/2019 JS MoP Visit

    59/104

    HOT LINE MAINTENANCE

  • 7/31/2019 JS MoP Visit

    60/104

    Technological

    Excellence

    Technological Excellence

  • 7/31/2019 JS MoP Visit

    61/104

    Application of Series Compensation to improvepower transfer capacity (Kishenpur-Pampore,

    Kanpur-Ballabgarh, Panki-Muradnagar, Rourkela-Raipur etc.)

    Upgrading of Lower Voltage Lines to HigherVoltage - 66 to 132 KV, 132 KV to 220 & 400 KV,220 KV to 400 KV, 400 kV to 800 kV

    Uprating of transmission lines by enhancingConductor Temperature Limit - From 75C to 85

    C resulting in approx 30% increase in powercapacity with approx. 1% increase in cost of line

    Composite Long Rod Insulators for betterperformance

    g

    Technological Excellence

  • 7/31/2019 JS MoP Visit

    62/104

    Flexible AC transmission systems

    Multi Conductor Bundle, Multi CircuitTransmission Lines

    Controlled shunt reactors (developed in

    association with BHEL)

    Sub-station automation

    Compact Air Insulated Sub-stations / Gas

    Insulated Sub-stations

    Inhouse standardisation of towers and

    foundation design

    g

    TOWARDS GREEN ENVIRONMENT

  • 7/31/2019 JS MoP Visit

    63/104

    POWERGRID developed Environmental and Social

    Policy & Procedures (ESPP)First PSU to develop such policy

    The key principles of ESPP are Avoidance,

    Minimisation and MitigationPolicy developed through detailed interaction

    with the Public, NGOs, Project Affected

    Persons, Financial Institutions, Governmentagencies, etc.

    Being strictly adhered to in all transmission

    projects

    TOWARDS GREEN ENVIRONMENT

    TOWARDS GREEN ENVIRONMENT

  • 7/31/2019 JS MoP Visit

    64/104

    TOWARDS GREEN ENVIRONMENT

    TOWARDS GREEN ENVIRONMENT

  • 7/31/2019 JS MoP Visit

    65/104

    DISASTER MANAGEMENT

  • 7/31/2019 JS MoP Visit

    66/104

    Evolved most effective Disaster Management System to

    minimize the impact of natural calamities like floods,

    cyclones, Earthquake etc. Quick restoration of power supply through Emergency

    Restoration System

    Gujarat cyclone in 1998, restored within a week

    Orissa Cyclone in October, 1999, restored within 11

    days

    Gujarat earthquake in January, 2001

    Restored power supply within one week

    Reconstructed 10 damaged Sub-stations within a

    record time of 3 months, dedicated to the Nation by

    the Honble Prime Minister

  • 7/31/2019 JS MoP Visit

    67/104

  • 7/31/2019 JS MoP Visit

    68/104

    Erection of ERS by Helicopter

  • 7/31/2019 JS MoP Visit

    69/104

    Accolades

    Comments of the World Bank

  • 7/31/2019 JS MoP Visit

    70/104

    The availability of POWERGRID system is high(over 98%); System expansion is progressing

    at a fast pace and POWERGRIDs largestongoing projects are being implemented in a

    highly satisfactory manner-The World Bank, Oct. 96

    POWERGRIDs institutional development andgrowth has been impressive. It hasamalgamated staff into a surprisinglyhomogenous team

    - The World Bank, Oct. 96

    Engineering Specifications, Contract andProject Management, Contract documents has

    been of excellent quality- International Consultants to The World Bank, Nov. 96

    Comments of the World Bank

    Comments of the World Bank

  • 7/31/2019 JS MoP Visit

    71/104

    Our mid-term review highlighted theimpressive performance growth ofPOWERGRID since the approval of PSDP-I inMarch, 1993 and then had to express theBanks deepening concern about the loss ofdirection since mid-1995.

    The World Bank mission was very pleasedand impressed to discover the start of aturnaround. The backlog at the Board hasbeen cleared and project implementation isbeing accelerated. Staff morale is improvingand POWERGRID is recovering the sense ofurgency and direction that used tocharacterize its efforts to improve.

    - The World Bank, Dec 1996

    Comments of the World Bank

    Comments of the World Bank

  • 7/31/2019 JS MoP Visit

    72/104

    Evolution of innovative Dispute Resolution Panelproved to be very useful and disputes in the single

    problem project have been resolved - We greatlyappreciate the reactivation of 800 kV Kishenpur-Moga Project

    -The World Bank, Nov. 98 Some of the POWERGRIDs largest on-going

    projects are funded under World Bank loans and arebeing implemented in a highly satisfactory manner.Projects are on schedule and reflect POWERGRIDscompetence in inter-national competitive bidding

    -The World Bank, Nov. 98

    Although there is frustration on the part of Cobra, areview of the issues does not indicate unfairness ormismanagement on the part of POWERGRID. Thiscontract is properly managed by POWERGRID withno evidence of unfairness.

    - International Consultants to The World Bank

    Comments of the World Bank

    Comments : Others

  • 7/31/2019 JS MoP Visit

    73/104

    POWERGRID represents an excitingmechanism to centralise Indian Powerstructure on a national basis. ADB welcomesPOWERGRID and look forward to workingwith it in the future. Imagination is needed inplanning POWERGRIDs future and its

    management appears to be truly abreast ofthem.- Asian Development Bank, Feb. 2000

    Here is an organization that meets its

    commitments and values time. I wish thereare more organizations with a similaroutlook

    - Dr. Shankar Sen, Former Vice Chancellor, JadhavpurUniversity & The former Power Minister, WB Govt.

    Comments : Others

    POWERGRIDPerspective Plan

  • 7/31/2019 JS MoP Visit

    74/104

    Future Investment Programme X and XI Plan

    (Rs Crore)

    Central Sector Investment 70,523 Private Sector Investment 20,895

    POWERGRID Investment 49,628

    Funding Plan

    Internal Resources 8,019

    Dev. Surcharge 3,083Multilateral/ECB 14,607Bonds/Domestic loans/NBS 23,919

    Total 49,628

    P p P

    -

    eTransmission Organization

  • 7/31/2019 JS MoP Visit

    75/104

    Incorporated in 1989, mandated withEstablishment, Operation & Maintenance ofRegional & National Power Grids including LoadDispatch CentersStarted operation on management basis w.e.f.

    August, 1991 for the assets owned by NTPC/NHPC/ NEEPCO etc

    Tr. Assets of above companies transferredalongwith manpower as per Presidential Ordinance& commencement of commercial operation since1992-93.Notified as Central Transmission Utility, the statutory

    body in December 1998 through Amendment ofElectricity (supply) Act, 1948, to discharge thefollowing functions related with inter-statetransmission Undertake Inter-state Transmission of energy

    Planning and co-ordination for inter-state trans.

    Transmission Organization

    BUDGET UTILISATION

  • 7/31/2019 JS MoP Visit

    76/104

    BUDGET UTILISATION(In Rs. Crores)

    Budget Estimate (2002 - 03) : 3352

    Revised Estimate (2002- 03) : 2687RE Actual

    (2002-03) (2002-2003)

    On Going &

    Completed Schemes - 2408 2445New Schemes - 151* 50

    Telecom - 128* 66--------- -----------

    TOTAL : 2687 2561

    * Shortfall for want of Investment Approval for Tala & Sipattransmission projects and delayed approval of TelecomProject & Raipur-Chandrapur Trans. Sys.. BPTA for Raipur-Chandrapur is yet to be signed as SR beneficiaries went

    back on their commitments.

    OBJECTIVES OF POWERGRID

  • 7/31/2019 JS MoP Visit

    77/104

    OBJECTIVES OF POWERGRIDThe Corporation has set following objectives in line with itsMission and its status as Central Transmission Utility:

    -Undertake transmission of energy through Inter-Statetransmission system.

    -Discharge all functions of planning and coordination relatingto Inter-State transmission system with

    (i) State Transmission Utilities;

    (ii) Central Government;

    (iii) State Governments;

    (iv) Generating companies;

    (v) Regional Electricity Boards;

    (vi) Authority;

    (vii) Licensees;

    (viii) Transmission licensees;

    (ix) Any other person notified by the Central

    Government in this behalf.Contd/-

    MAJOR ON

    GOING PROJECTS

  • 7/31/2019 JS MoP Visit

    78/104

    Cost in Rs. Cr. Ant. Commn.Appd. Ant.

    Meramundali - Jeypore 167 143 May03 Series Compensation on 26 26 Aug03

    Panki Muradnagar Tehri Trans. System 702 702 Line I - Sep03 *

    Line II- Dec03 * ULDC Scheme in NER 264 264 Jun03 Bihar Grid Strengthening 163 163 Jan04 Madurai Trivandrum 196 196 Mar04 KahalgaonBshariff (II Ckt) 136 136 Apr04 Tala-Siliguri 232 232 Dec04** ULDC Scheme in ER 397 397 Dec04

    * Clearance regarding Rajaji National Park obtained from SupremeCourt in Oct02.

    ** Matching with Tala HEP

    Contd

    MAJOR ON-GOING PROJECTS

    MAJOR ON-GOING PROJECTS

  • 7/31/2019 JS MoP Visit

    79/104

    Cost in Rs. Cr. Ant. Commn.Appd. Ant.

    Aug. of Gajuwaka B/B

    Project (Gajuwaka-II) 769 769 Jan05

    Dhauliganga Trans. System 151 151 Jan05

    System strengthening Scheme 110 110 Jan05

    in Western Region

    Ramagundam- III 390 390 Aug05

    Tarapur 3 & 4 Trans. System 237 237 Sep05

    Rihand-II Trans. System 1044 1044 Aug05

    ULDC

    WR 262 235 Mar

    06 Dulhasti Combined Tr. System 567 567 Jul06

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    80/104

    FutureInvestment Requirements

    X Plan XI Plan Total

    A. Transmission 28,840 39,183 68,023

    Generation Linked Projects 12,340 9,219 19,634

    Grid StrengtheningProjects

    3,192 5,420 3,192

    Inter-regional /Inter CountryLinks

    12,005 22,525 41,875

    ULDC Projects 1,016 1,016

    Investments in JV 204 204

    Others 83 2,019 2,102B. Telecom 2,240 260 2,500

    Base Network 1,004 1,004

    Equity in NLDO & JV 1,236 260 1,496

    Total (A+B) 31,080 39,443 70,523

    Rs/Crs

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    81/104

    Investment and Funding Strategy

    Alternative Options (If Pvt. Investmentfails)If the Private Participation fails POWERGRIDfunding will increase to that tune.

    Total POWERGRID investment up to Rs 70,523 Crs

    To achieve Debt : Equity Ratio of 80:20 additionalequity support of Rs 2,100 crs from external sourcesis necessary

    Additional equity requirement may be provided byGOI as NBS. So total NBS could become Rs 3,100Crs.

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    82/104

    g gy

    ImprovedRevenueRealization

    Revenue Realization may be improved to100% (as per Ahluwalia Committeerecommendations) Internal resource

    generated will be Rs 16,302 Crs andDevelopment Surcharge will be at Rs 3,627Crs as estimated.

    In such a case External equity injection of Rs2,100 Crs will not be required.

    The Equity contribution 30% of the required

    investment (including the Rs 1000 Crs NBS).

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    83/104

    Cess/Infrastructure Status/Diversification/IPO

    Creation of National Power Grid Fundthrough imposition of Cess on consumers inthe Power Sector or Through additionalTaxation through Fiscal Policy

    According Mega Power benefits toTransmission will reduce the cost of theprojects

    Leveraging Transmission Investment bysurplus from Diversification

    By tapping the Domestic Capital Markets bymeans of an Initial Public Offer (IPO).

    Investmentand Funding Strategy

  • 7/31/2019 JS MoP Visit

    84/104

    g gy

    Funding Scenario If Pvt. Investment Fails

    POWERGRID FUNDING X & XI Plan

    Internal Resources 7039

    Development Surcharge 3966Bonds/Domestic Loans 39493

    Foreign Borrowings 16925

    IEBR 67423

    Net Budgetary Support 1000

    Equity From External Source 2100

    Total 70523

    ACTION PLAN FOR 2003 04

  • 7/31/2019 JS MoP Visit

    85/104

    ACTION PLAN FOR 2003-04

    Projects to be Commissioned in 2003-04

    1. Series Compensation on Panki-Muradnagar2. Meerut-Stabdinagar

    3. LILO Of Panki-Naubasta (Feroz Gandhi Unchahar TL-II)

    4. Mehramundali-Jeypore

    5. ICT at Biharshariff (Bihar Grid Strengthening)6. Ranganadi-Ziro TL

    7. Bongaigaon-Malda at Purnea

    8. Purnea-Dhalkhola

    9. ULDC North-Eastern Region already commissioned

    Stringing to be completed (CKM.) - 1369

  • 7/31/2019 JS MoP Visit

    86/104

    Diversification

    into

    Distribution

    87

    POWERGRIDDiversification

  • 7/31/2019 JS MoP Visit

    87/104

    Diversifying into Distribution

    MOP assigned 37 circles in 15 states toPOWERGRID as advisor-cum-consultant under

    APDRP

    Also entrusted co-ordination of other 14 circlesassigned to NPC, WAPCOS and ERDA & 54

    circles being developed by SEBs.

    Separate Subsidiary Companies beingcontemplated for:

    Sub-transmission system

    Distribution system

    POWERGRIDDiversification

  • 7/31/2019 JS MoP Visit

    88/104

    fBenefits to SEBs :

    Improvement in Reliability and Reductionin outages

    Increase in Revenue

    Remote metering for HT consumers

    Average billing for domestic consumers

    followed by six monthly reconciliation

    Increased no. of collection centres

    Use of IT for Energy accounting

    Enforcement of stringent Anti-theft Laws

    POWERGRID Diversification

  • 7/31/2019 JS MoP Visit

    89/104

    POWERGRIDDiversificationPOWERGRIDs Strategy is based on

    High growth potential in the business in line withthe core competence.

    Commitment of Govts. for reforms with fundallocation under APDRP scheme.

    Association with SEBs as AcC in 33 circles in 16

    States under APDRP scheme. Leveraging its vast human resources and

    knowledge base Leveraging its rapport with GOI and SEBs Leveraging its strong Balance Sheet as comfort

    to lenders, who are shying away from SEBs Leveraging its IT enabled infrastructure for better

    management of distribution network Employees participation as equity stake holders

    to the extent of 26% in the Subsidiary Company

    POWERGRID Diversification

  • 7/31/2019 JS MoP Visit

    90/104

    POWERGRIDDiversification Reputed Domestic consultant appointed to

    formulate the business strategy

    Recommendations of the consultant : Separate subsidiaries for Sub-Transmission

    and Distribution business and strategicalliance with SEBs

    Business Models for TransmissionBuild - and TransferBuild Lease Operate and TransferContract Add - and OperateRehabilitate Operate and Transfer

    Business Models for Distribution Licensing Agreement with Tariff based onfixed rate of return

    Licensing Agreement with Performancebased Tariff

    Energy Performance Contracting

    POWERGRIDPerspective Plan

  • 7/31/2019 JS MoP Visit

    91/104

    pResourceMobilization

    X Plan XI Plan Total

    Internal Resources 2,938 5,081 8,019

    Development Surcharge 1,1216 1,867 3,083

    Bonds/Domestic Loans 8,002 14,917 22,919

    Foreign Borrowings 8,214 6,393 14,607

    IEBR 20,370 28,258 48,628Net Budgetary Support 1,000 0 1,000

    Total 21,370 28,258 49,628

    POWERGRIDPerspective Plan

  • 7/31/2019 JS MoP Visit

    92/104

    pPOWERGRIDs Investment

    X Plan XI Plan Total

    A. Transmission 19,130 27,999 47,129

    Generation Linked Projects 7,436 5,945 11,456

    Grid Strengthening Projects 3,192 5,420 3,192

    Inter-regional /Inter CountryLinks 7,199 14,615 29,159

    ULDC Projects 1,016 1,016

    Investments in JV 204 204

    Others 83 2,019 2,102

    B. Telecom 2,240 260 2,500

    Base Network 1,004 1,004

    Equity in NLDO 1,236 260 1,496

    Total (A+B) 21,370 28,258 49,628

    Rs/Crs

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    93/104

    Future Funding

    Foreign Currency Debt

    Current Funding from World Bank, ADB,JBIC, European Investment Bank, KfW

    etc. to the tune of US $ 1,500 MillionPresently outstanding loan from IFI is 50-55% of Total BorrowingFunding from Multilateral agency to go

    down due to their policy not to fund Gen.Linked projects.Future Funding envisaged at Rs. 9,400Crore (about 30% of funding gap)

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    94/104

    Resource Mobilisation

    Internal Resource (IR)Past Trend 1997-98 to 2002-03

    Investment : Rs 11,000 CrIR : Rs 1580 Cr (14%) : Projects are being implementedwith High Leverage pulling down the profit

    Reasons for Low IRNo return on a portion of equity (Rs 603 Cr) Aberrationin previous tariff normsTariff pegged @35 paise in NER No return on assetworth about Rs 1000 CroreCERC disallows even O&M and Depreciation on grant

    High levels of Sundry DebtorsBullet Repayment in the Year 1998-99 and 2001-02 Nil IR

    To minimise the future risk capital structure forprojects need to be at least 70:30

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    95/104

    Resource Mobilisation

    Internal Resource (IR)Future Projection X Plan

    Investment : Rs 21,370 CrIR : Rs 2938 Cr (14%)Planning commission has fixed the outlay with D:E ratio of 80:20adding Dev. Surcharge and NBS of Rs1000 Cr to IR

    Strings attached to Dev. SurchargeTherefore to maintain D:E ratio of 70:30:

    Investment may have to be scaled down OREquity Support from GoI

    Future Projection XI Plan

    Investment : Rs 28,258 CrIR : Rs 5081 Cr (18%)

    If Securitisation Scheme operates in true letter andspirit, IR may go up to

    Rs 5,000 Cr( 24 % of Investment) in X Plan

    Rs 8,500 Cr (30 % of Investment) in XIPlan

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    96/104

    Resource Mobilization

    Development SurchargeCERC has not notified Dev. Surchargein Project specific tariff notification -

    Rihand-Dadri LineApplicability of Depreciation

    Adversely affects the Financial ratios

    because of no RoEApplicability of Income Tax

    Contd.

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    97/104

    Resource Mobilisation

    Net Budgetary Support (NBS)

    Resource Mobilisation by POWERGRIDfor X Plan falls short in achieving a Debt:

    Equity ratio of 80:20

    NBS by Planning commission to bridgethis gap is Rs1000 Cr

    NBS to flow as Equity instead of Grant

    Investment and Funding StrategyR M bili ti

  • 7/31/2019 JS MoP Visit

    98/104

    Resource Mobilization

    Domestic Bond/ LoanFuture Funding envisaged as Rs. 22,000 Crs

    (about 70% of funding gap)

    During 2001-2002 fund mobilization fromdomestic markets was Rs. 2400 crs.

    Average annual fund raising : @ Rs 2200 Crs (to raise Rs. 22000 Crs in 10 years )

    Revenue From TelecomHigher growth in telecom to supplement

    transmission sector Income from NLDObusiness has been assumed to flow from 2007-08 onwards

    Assumed Revenue Rs 663 Cr in X Plan and Rs

    2078 Cr in XI Plan

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    99/104

    Resource Mobilization

    Net Budgetary Support (NBS)

    Resource mobilization by POWERGRID for

    X plan falls short in achieving a Debt :Equity ratio of 80:20

    NBS sanctioned by Planning Commision to

    bridge this gap is Rs. 1000 CrsNo necessity of NBS during the XI plan

    Contd.

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    100/104

    Resource Mobilization

    International Financial InstitutionsCurrent Exposer from IFIs viz, World Bank,

    ADB, JBIC, EIB, WMB, KfW etc. to the tuneof US $ 1,500 million.

    IFI funding is about 50-55% of TotalBorrowing by POWERGRID

    Future funding commitment from IFI Rs.

    6000 CrsWorld Bank has put conditionality in fundingGeneration Linked Projects

    Contd.

    Investment and Funding Strategy

  • 7/31/2019 JS MoP Visit

    101/104

    Resource Mobilization

    Domestic FundingFuture Funding from the Domestic Market envisaged

    at Rs. 22,000 Crs (about 70% of funding gap)

    During 2001-2002 fund mobilization from domestic

    markets was Rs. 2400 crs.Average annual fund raising @ Rs 2200 Crs to raiseRs. 22000 Crs in 10 years

    Revenue From Telecom

    Higher growth in telecom business can be generatedwhich will supplement transmission sector needs.

    Income from NLDO business has been assumed toflow from 2007-08 onwards

    DEVELOPMENT OF NATIONAL GRID

  • 7/31/2019 JS MoP Visit

    102/104

    NER

    ER

    NR

    WR

    SR

    EXISTING

    500MW

    500MW

    MW1000

    MW500

    GAZUWAKA

    CHANDRAPUR

    VINDHYACHAL

    SASARAM

    UNDERCONST.

    EXISTING

    400 kV

    220 kV

    BONGAIGAON

    BIRPARAMALDA

    KORBA BUDHIPADAR

    KOLHAPUR

    BELGAUM

    U.SILERU

    BALIMELA

    DEHRISAHUPURI

    MALANPUR

    AURAIY A

    PHASE-I

    ANDAMAN&

    NICOBAR

    LAKSHADWEEP

    (By 2002)

    Back

    DEVELOPMENT OF NATIONAL GRID

  • 7/31/2019 JS MoP Visit

    103/104

    ROURKELA

    RAIPURHIRMA

    TALCHER

    JAIPUR

    NER

    ERWR

    NR

    SR

    B'SHARIF

    ALLAHAB AD

    SIPAT

    GAZUWAKA

    JEYPORECHANDRAPUR

    SINGRAULI

    VINDHYA-

    2000MW

    3000MW

    1000MW

    500MW

    LUCKNOW

    CHICKEN NECK

    KRISHNA

    TEESTA

    MISA

    KATHAL-GURI

    LEGEND

    765 KV LINES

    400 KV LINES

    HVDC B/B

    HVDC BIPOLE

    EXISTING/ X PLAN

    ZERDA

    HISSAR

    BONGAIGAON

    KOLHAPUR

    NARENDRA

    KAIGA

    MANGALORE

    PONDA

    IX PLAN

    MARIANI

    N.K.

    KAHALGAON

    RANGANADI

    SEONI

    CHEGAON

    BHANDARA

    DEHGAM

    KARAD

    LONIKAND

    VAPI

    GANDHAR/

    TALA

    BANGLA

    BALLABGARH A'PUR(DELHI RING)

    BANGALORE

    KOZHIKODE

    COCHIN

    KAYAMKULAM

    TRIVANDRUM

    PUGALUR

    KAYATHAR

    KARAIKUDI

    CUDDALORE

    SOUTH CHENNAI

    KRISHNAPATNAM

    CHITTOOR

    VIJAYAWADA

    SINGARPET

    PIPAVAV

    LIMBDI

    KISHENPUR

    DULHASTI

    WAGOORA

    MOGA

    URI

    BHUTAN

    RAMAGUNDAM

    RAVI

    JULLANDHAR

    DESH

    NAGAR

    VARANASI

    /UNNAO

    M'BAD

    PURNEA

    KORBA

    NAGDA

    SILIGURI/BIRPARA

    NICOBAR

    ANDAMAN

    AND

    LAKSHADWEEP

    TEHRI

    MEERUT

    BHIWADI

    BINA SATNA

    MALANPURSHIROHI

    KAWAS

    PHASE - II(By 2007)

    SIRSI

    CHAL

    JETPURAMRELI

    BOISARPADGHE

    DHABOL

    KOYNA

    /BARH

    G'PUR

    HOSUR

    Back

  • 7/31/2019 JS MoP Visit

    104/104