JOB SAFETY ANALYSIS Doc No: HT/COPI/0002 DATE ISSUED: LAST REVIEWED DATE: Job Description: Cable Disconnect & Termination Area/Unit: Main Deck Area, Control Room and Switchgear room REVIEWED BY: Tag No/Equipment Description: SCU , SPCU , UPS , PHPU and TUTU etc SIGNATURE OF SUPERVISOR. References: Page: 1 OF3. PPE Required doing this Job: STANDARD PPE AND SAFETY HARNESSES AS REQUIRED. IF YOU DON’T MEET THE REQUIREMENTS AS STATED IN THIS PROCEDURE DO NOT PROCEED WITH PERFORMING THE JOB JOB STEP Machine/Equipment/Tool involved in each step Potential Hazard/Loss Risk Level before Mitigate (H,M,L) Control Statement Risk Level after Mitigate Planning & permit Personnel Untrained personnel New personnel Asset Damage Non Certification of people Permits not in place Incorrect information Weather conditions Ensure personnel undergo appropriate HSE Training and PTW training prior to mobilization. Qualified & certified personnel for all tasks. Supervisor to attend daily PTW / tool box meetings. Obtain FM/OIM Approval for critical procedures Raise PTW, JSA’s, & any related documents-:check lists Preparation material and tools. Materials [Cable] Safety harness Hand tools Work vest Safety harness in poor or damaged condition Tools damaged or broken Wrong tool for job Manual handling Unsafe scaffold materials Work vest in poor or damaged condition M M M M Ensure all tools and material safe for use. Correct PPE to be used Ensure that scaffolding safe Use safety harness with double lanyard. Retractor reels can be used if required. Check all your equipment for damage Ensure all tools and material safe for use L L L L

Upload: wendypost73

Post on 09-Nov-2015

2 views

Category:

Documents


0 download

DESCRIPTION

Job safety Analisys

TRANSCRIPT

  • JOB SAFETY ANALYSIS Doc No: HT/COPI/0002

    DATE ISSUED: LAST REVIEWED DATE: Job Description: Cable Disconnect & Termination

    Area/Unit: Main Deck Area, Control Room and Switchgear room REVIEWED BY:

    Tag No/Equipment Description: SCU , SPCU , UPS , PHPU and TUTU etc SIGNATURE OF SUPERVISOR.

    References: Page: 1 OF3.

    PPE Required doing this Job: STANDARD PPE AND SAFETY HARNESSES AS REQUIRED.

    IF YOU DONT MEET THE REQUIREMENTS AS STATED IN THIS PROCEDURE DO NOT PROCEED WITH PERFORMING THE JOB

    JOB STEP Machine/Equipment/Tool involved in each step Potential Hazard/Loss

    Risk Level before

    Mitigate (H,M,L)

    Control Statement Risk Level after

    Mitigate

    Planning & permit Personnel

    Untrained personnel New personnel Asset Damage Non Certification of people Permits not in place Incorrect information Weather conditions

    Ensure personnel undergo appropriate HSE Training and PTW training prior to mobilization.

    Qualified & certified personnel for all tasks.

    Supervisor to attend daily PTW / tool box meetings.

    Obtain FM/OIM Approval for critical procedures

    Raise PTW, JSAs, & any related documents-:check lists

    Preparation material and tools.

    Materials [Cable] Safety harness Hand tools Work vest

    Safety harness in poor or damaged condition

    Tools damaged or broken Wrong tool for job Manual handling Unsafe scaffold materials Work vest in poor or damaged

    condition

    M M M M

    Ensure all tools and material safe for use.

    Correct PPE to be used Ensure that scaffolding safe Use safety harness with double

    lanyard. Retractor reels can be used if required.

    Check all your equipment for damage

    Ensure all tools and material safe for use

    L L L L

  • Cable Pulling Cable dressing Working over the side. Working at height Replaced MCT

    Manual labor Hand tools Safety harness

    Falling from height Unauthorized Access to Site Sprains & strains, pinch points Damage to plant Poor access/ egress Working in live plant Falling objects No scaffold tag Man overboard.

    M M M M M M

    Barricade area as required put up signage

    Beware of loose objects or tools falling use restraints if at all possible

    Be aware of working around live equipment watch small Stainless Steel tubing

    Have good access/ egress Use scaffold tags All personnel over the side to wear

    Work Vest. Ships master informed and location

    workboats informed in case rescue required.

    Standby person on watch at all times.

    L L L L

    Cable glanding Cable termination Cable insulation resistance

    check Cable continuity test Working at height

    Manual labor Hand tools Megger Continuity tester Safety harness

    Electrical shock Falling from height Unauthorized Access to Site Sprains & strains, pinch points Damage to plant Poor access/ egress Working in live plant Falling objects No scaffold tag

    M M M M

    Barricade area as required put up signage

    Beware of loose objects or tools falling use restraints if at all possible

    Have good access/ egress Use scaffold tags All personnel over the side to wear

    Work Vest. Standby person on watch at all times.

    L L L

  • House keeping area Manual labour Chain block Scaffold trolley

    Tripping hazards Waste materials laying around Clips left at height on ledges Tools left at height on ledges

    M M

    Transfer material using correct lifting techniques

    help one another Clean & tidy area Good housekeeping and clear path to

    & from work site. Check around site for tools &

    equipment left sitting on ledges Follow waste management procedures

    L

    L

    WORK LEADER AND WORK TEAM TO CONFIRM PJSM, JSA REVIEW HAS BEEN HELD, DISCUSSED AND UNDERSTOOD Work Permit Duration max 8 periods Work Team Member Signature (1) Start Date 2 3 4 5 6 7 8 Form No. COPI-HS-FR-00016 Rev. 2 Issue Sept. 200