JOB SAFETY ANALYSIS Date: Title of Person Supervisor : Analysis by : Organization : Plant / Location : Department : Reviewed by : Approved by : S.No BASIC JOB STEPS HAZARDS PRECAUTION TO BE TAKEN 1 loading & Shifting of Pipe Stricking object Falling object. * No one will be allowed under suspended load. 2 Accesssibility to the work spot Fall of personnel. Stability of the side wall. * Regular inspection to be done to find out signs of cracks. 3 Welding of pipes Fire & shock 4 Grinding of pipes Fire & shock 5 Cutting of pipes Fire, Burn * The area will be free from Paper, Woods etc to be removed before start the work. Leakage of Gas. 6 Fittup of pipes Pinch * Pipe fittup to be done by only experienced people like Fitter. 7 Electrocution Slip & Trip * Ensure that work area and personnel protective equipment are not wet. 8 Wraping & Coating Fire & Burn, Smoke * Fire extinguisher will placed near working area. Area will be free from paper,wood * Worker will wear special nose mask CALCULATION : Work in night * Proper light will be there for working in night shift. lowering of Pipes. Web siling Cap. - 3MT , 6 mtr or 3 mtr web siling require . Full fitting line -02 Sets D -Shack One end fittup line -01 Sets. Job title: Loading ,Shifting, Fabricating , lowering and fittup o REQUIRED AND RECOMMEND PPE : SAFETY HELMET, SAFETY GOGGLES, SAFETY SHOES, HAND GLOVES,APRON , * Site briefing to be conducted before starting the job. WELDING FACE SHIELD. * Only Rigger will be allowed for rigging operation. * Only third party certified lifting tools and tackles will be allowed . Topple of hydracrane,Failure of hydracrane. * Licenced & authoriesed operator to be confirmed. * Marching of hydra will be done slowly. * Signaling to be done by * Ladder to be used & supported with vertical pipes .Proper width to be maintained for * Slop/benching to be maintain if depth exceeding 1.2 mtr.Only required person will go inside the trench. *Welders should used Welding Helmets, Sleeves, Apron, leather hand Gloves, All the combustible materials near by should be cleared before starts over. * All cables must be in good condition . * Wheel guard is must for grinding machine. * ELCB to be checked before starting the job. * Fire extinguisher are placed near the working area ( welding , cutiing & grinding ) . * Worker will wear hand gloves for cutting job. * The hose pipes are properly checked and if it is damaged that will be replaced before starts the work. Hot works at the time of Monsoon Season. * Inspect all electrical equipments DBs and extension boards. * Proper earthing should be provided. * Protect the machines and cables from water ingress. * Ensure that electrical cables are not in damaged and proper joints are provided in all cables. * Electricians are checked all machines, switch boards and cables before starts the work and ensure that all in well condition, then starts the work. Loaing , Shifting , Fabricating &

Upload: alvin-smith

Post on 28-Nov-2015

1.042 views

Category:

Documents


153 download

DESCRIPTION

job safety analysis

TRANSCRIPT

Page 1: Jsa for Piping and Erection Revised

Sheet 1 of 1

JOB SAFETY ANALYSIS Date:

Title of Person Supervisor : Analysis by :

Organization : Plant / Location : Department : Reviewed by :

Approved by :

S.No BASIC JOB STEPS HAZARDS PRECAUTION TO BE TAKEN

1 loading & Shifting of Pipe Stricking object

Falling object. * No one will be allowed under suspended load.

2 Accesssibility to the work spot Fall of personnel.

Stability of the side wall. * Regular inspection to be done to find out signs of cracks.

3 Welding of pipes Fire & shock

4 Grinding of pipes Fire & shock

5 Cutting of pipes Fire, Burn

* The area will be free from Paper, Woods etc to be removed before start the work.

Leakage of Gas. * The hose pipes are properly checked and if it is damaged that will be replaced before starts the work.

6 Fittup of pipes Pinch * Pipe fittup to be done by only experienced people like Fitter.

7 Electrocution

Slip & Trip

* Ensure that work area and personnel protective equipment are not wet.

8 Wraping & Coating Fire & Burn, Smoke * Fire extinguisher will placed near working area. Area will be free from paper,wood etc.

* Worker will wear special nose mask CALCULATION : Work in night * Proper light will be there for working in night shift.

Loaing , Shifting , Fabricating &

lowering of Pipes. Web siling Cap. - 3MT , 6 mtr or 3 mtr web siling require . Full fitting line -02 Sets D -Shackle -5 MT (2 One end fittup line -01 Sets.

Job title: Loading ,Shifting, Fabricating , lowering and fittup of Pipes

REQUIRED AND RECOMMEND PPE : SAFETY HELMET, SAFETY GOGGLES, SAFETY SHOES, HAND GLOVES,APRON , * Site briefing to be conducted before starting the job. WELDING FACE SHIELD.

* Only Rigger will be allowed for rigging operation. * Only third party certified lifting tools and tackles will be allowed .

Topple of hydracrane,Failure of hydracrane.

* Licenced & authoriesed operator to be confirmed. * Marching of hydra will be done slowly. * Signaling to be done by experienced supervisor only

* Ladder to be used & supported with vertical pipes .Proper width to be maintained for movement of personals.* Slop/benching to be maintain if depth exceeding 1.2 mtr.Only required person will go inside the trench.

*Welders should used Welding Helmets, Sleeves, Apron, leather hand Gloves, All the combustible materials near by should be cleared before starts over.* All cables must be in good condition . * Wheel guard is must for grinding machine. * ELCB to be checked before starting the job.* Fire extinguisher are placed near the working area ( welding , cutiing & grinding ) . * Worker will wear hand gloves for cutting job.

Hot works at the time of Monsoon Season.

* Inspect all electrical equipments DBs and extension boards. * Proper earthing should be provided. * Protect the machines and cables from water ingress.* Ensure that electrical cables are not in damaged and proper joints are provided in all cables.

* Electricians are checked all machines, switch boards and cables before starts the work and ensure that all in well condition, then starts the work.