Julian Thomas Elementary School
School Description Original Construction: 1857 Building Additions: 2000 Gross Square Footage: 102,540 ft2 Site Acreage: 5.9 acres Demographics Assessment Enrollment (students) 432 Facility Capacity (students) 710 Facility Utilization 61% Project Scope • Create secure vestibule at main entry
• Create STEM lab off library, more colorful and durable hallway finishes • Makers space in library • Masonry repairs • New LED lighting • New clock system • High priority Asphalt and concrete work • Emergency back-up power phone system and IT closets
Julian Thomas Elementary
Educational Adequacy Scorecard Key Program Area Rating Summary
Site
Site Traffic, Safe Routes, Parking Y Separation of parents and buses. Limited parking. Site Size, Outdoor Fields & Greenspace Areas Y Tight site with no field space. Does have greenspace around building.
Gen
eral
Security/Supervision R Don't enter right into office. Stairwell going up immediately upon entry. Community room not separated from the school. Add 6 sets of compartmentalization doors.
ADA Accessibility G Elevators & lift. Building was updated in 2000
Administrative/Nurse/Student Support Spaces G Good spaces and organization. Use community room as a conference room.
Cafeteria/Serving/Kitchen G Cafeteriat is 2,870 sf. Could use accoustical panels to cut down on noise. Don't utilize serving window.
Staff Planning/Collaboration Areas Y No dedicated space but can use community room Restrooms-Student/Staff G Good quantity and ADA accessibility. Support Spaces (Lockers, Book Room, Storage, Receiving, etc.) G One of the few elementaries with a receiving room.. Cubby & coat
rooms for classrooms.
Circulation/Wayfinding Y Interior wayfinding signage could be improved. Digital messaging monument sign for public would be beneficial.
Community or Parent Room G Have community room and a community health clinic.
Building Aesthetics (Interior & Exterior) Y Remodeled in 2003. Main hallways need color and porcelin tile 5' up on walls for durability. Doors in 1855 need replacement.
Inst
ruct
iona
l
Classroom Quantity, Size & Suitability G 4K/K suite is semi-open and additional walls may be desired. Science/STEM Classrooms Y No dedicated space but could repurpose old computer lab by library. Music, Art, Performance Spaces G Very large rooms! Art needs more sinks.
Flexible Learning Spaces, Student Project/Breakout Spaces G
Have small group rooms between classrooms. Have a large group room by library but recommend removing tiered floor for more flexibility. Better furniture for SGIs
Makers Space/FAB Lab/Career & Tech. Ed. Spaces Y Don't have Makers Space but could add within library.
Phy. Ed. & Athletics Spaces G 7,200 sf gym. Gym ceiling needs to be redone. Library/Media Center/Learning Commons G Large, well appointed library with good furniture Special Education Spaces G Additional Reading Core and Schools of Hope space is desired.
Reu
se Facility Condition Index (FCI) G 6.07% FCI
Suitability for Reinvestment/Expansion/Repurposing G
Recent renovation and investments warrant keeping this school in use for decades to come. Very minor enhancements to improve security, durability, and aesthetics are warranted.
G Adequate - Conforms with design best practices and meets District needs for foreseeable future
Y Questionable - Doesn't meet design best practice but may be considered acceptable based on current usage, enrollment, or programs
R Inadequate - Fails to meet District needs and should be considered highest priority for correction
Phas
e 1
Ref
eren
dum
Phas
e 1
Non
-Ref
.
Phas
e 2
BIM # BIM Description
Total Project Budget
Julian Thomas Elementary SchoolArchitectural and Interior Systems
X JTE-INT-1Environmental Remediation Associated with Proposed Renovations 0-5 years $51,000
X JTE-INT-2Flooring - 1855 Classroom, Offices, Corridors and Stairways 5-10 years $198,500
JTE-INT-3Flooring - 2000 Classroom, Kitchen, Library, Large Group, Multipurpose, Offices, Stairways 10-20 years $646,000
X JTE-INT-4Interior Walls - Painting 1855 Building Section, Repair Damaged Walls, Add Corner Guards 5-10 years $35,500
JTE-INT-5Interior Walls - Painting 2000 Addition, Repair Damaged Walls, Add Corner Guards 10-20 years $128,500
X JTE-INT-6Door Hardware - Replacement with Accessible Lever Style 5-10 years $99,000
X JTE-INT-7Ceiling - Replace Ceilings in Classrooms, Corridors and Stairways 5-10 years $65,000
JTE-INT-8 Ceiling - Replace Ceilings in Library 10-20 years $3,500
X JTE-INT-9
Single Toilet Rooms and Student Toilet Rooms - Comply with ADA, Includes Fixtures, Partitions & Finishes 0-5 years $393,500
JTE-INT-10Elevator - Modernize/Replace Controller, Door Operator, Fixtures, Power Unit, and Cylinder 10-20 years $166,500
X JTE-INT-11Specialties - Wall Mounted Items in 1855 Building, Replace Marker Boards, Roller Shades 5-10 years $14,500
JTE-INT-12Specialties - Wall Mounted Items in 2000 Building, Roller Shade Replacement 10-20 years $34,500
Building Envelope Systems
X JTE-BE-1Masonry Repairs - Replace Mortar, Rebuild 1 Chimney & Replace Backer Rod/Sealant 0-5 years $202,000
JTE-BE-2
Roofing Replacement - Roof Areas 1,2,3,4,Remove Entire Roofing System, Install R-30 Insulation, Install 4-Ply Membrane and Metal Flashings 10-20 years $1,342,500
X JTE-BE-3Air Sealing - East/West Attics, Center Attic, General Penetrations, Add Insulation, Seal Holes 0-5 years $117,500
Electrical and Safety Systems
X JTE-EE-1
Lighting - Provide Interior and Exterior LED fixtures, Dimmable Lighting Controls and Occupancy Sensors, Egress Lighting 0-5 years $708,500
X JTE-EE-2Fire Alarm System – Replacement with Monitored Addressable System to Meet Code 5-10 years $394,000
X JTE-EE-3Electronic Door Access Control - Replace Components as Required as System Ages 5-10 years $51,000
X JTE-EE-4Clock System - Provide Wireless GPS Clock System with Battery-Powered Clocks 0-5 years $98,500
X JTE-EE-5
PA/All-call System - Provide New Paging System, Install Ceiling Mounted Speakers if Replaced with Suspended Ceiling 5-10 years $197,000
X JTE-EE-6Video Surveillance System - Provide Cameras to Monitor Interior and Exterior of Building 5-10 years $96,000
JTE-EE-7Emergency Power - Provide Upsized Generator to Backup HVAC Heating Equipment 10-20 years $77,000
X JTE-EE-8Emergency Power - Provide UPS Systems for 2 IT Closets 0-5 years $13,000
Mechanical & Environmental Systems
X JTE-ME-1HVAC Controls Systems - Integrate Existing DDC System onto Common Network Platform 0-5 years $31,500
X JTE-ME-2
Heating Plant - Replace Single Standard Existing Boilers and Pumps with New High Efficiency Boilers, Pumps, VFDs 10-20 years $557,500
X JTE-ME-3Heating Plant - Addition of Glycol & Feed Station for Freeze Protection, Remove Coil Pumps 0-5 years $75,500
JTE-ME-4Cooling Plant - Chiller, Pumps, and VFD Replacement and Integrate with Existing Ice Storage 10-20 years $564,500
JTE-ME-5Condensing Units/Split Systems - Provide Dedicated DX Split System to Serve IT Data Closet 10-20 years $14,500
X JTE-ME-6
Building General Exhaust Systems - Replace Non-Functional, Aged Fans with Efficient Fans, Provide Thermal Equalizers 5-10 years $46,500
X JTE-ME-7Domestic Water Heating Plant - Replace Water Heaters and Recirculation Pump 0-5 years $64,500
X JTE-ME-8Plumbing Fixtures - Provide Electric Water Coolers with Bottle Fillers at all Drinking Fountains 5-10 years $34,000
X JTE-ME-9Mechanical System Retro Cx - Provide Commissioning Services to Test 2015 Systems 0-5 years $51,500
Site/Civil Systems
X JTE-SC-1Asphalt - High Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 0-5 years $48,500
X JTE-SC-2Asphalt - Medium Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 5-10 years $67,500
JTE-SC-3Asphalt - Low Priority Base Patching, Crack Routing & Filling, Seal Coating & Marking 10-20 years $563,000
X JTE-SC-4Concrete - High Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 0-5 years $146,500
JTE-SC-5Concrete - Low Priority - Replace Deteriorated Sidewalks, Pavements, Ramps & Aprons 10-20 years $56,500
X JTE-SC-6Grading & Drainage - High Priority, Provide Drain Basin at East Sidewalk, Connect to Storm 0-5 years $1,000
X JTE-SC-7Grading & Drainage - Medium Priority, Fix Walkway Icing, Remove Excess Soil, Seed 5-10 years $4,000
JTE-SC-8Athletic & Playground Equipment - Low Priority, Replace All Equipment 10-20 years $132,500
X JTE-SC-9
Landscaping & Greenscape - Create Woodchip Area, Restore Damaged Grass Area, Replace Stamped Concrete, Tree Trimming at Fence 0-5 years $70,000
X JTE-SC-10Fencing & Gates - Medium Priority, Replace 10% of Fence Panels 5-10 years $2,500
X JTE-SC-11Utilities - Reconstruct Manhole/Repair Asphalt, Replace Storm Sewer, Lower Cleanouts 0-5 years $59,500
JTE-SC-12Storm Water Management, Provide Basins or Ponds to Comply with DNR for Major Projects 10-20 years $208,500
X JTE-SC-13Life Safety - Provide Concrete Bollards at Dumpster Gate & Replace Loading Dock Bollards 5-10 years $4,500
Julian Thomas Elementary School - Phase 1 - FCA Selected Total: $1,407,000Julian Thomas Elementary School - Phase 2 - FCA Selected Total: $1,788,000
Educational Adequacy
X 0 JTE-EDA-1 New Secure Entry Sequence and Office Reorganization EDA $461,500X 0 JTE-EDA-2 Tile Wainscotting on Corridor Walls for Durability EDA $137,000
X 0 JTE-EDA-3
Create STEM Lab and Maker Space near Library, Remove Tiered Flooring in Band Room for Flexibility, Enclose Kindergarten and 4K Classrooms EDA $483,000
X 0 JTE-EDA-4 Allowance for New Flexible Furniture EDA $127,000Julian Thomas Elementary School - Phase 1 - Educational Adequacy Selected Total: $1,081,500Julian Thomas Elementary School - Phase 2 - Educational Adequacy Selected Total: $0
Julian Thomas Elementary School - Phase 1 Selected Total: $2,488,500Julian Thomas Elementary School - Phase 2 Selected Total: $1,788,000
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36 36
36
36
36
3636
36
3636
36
36
36
36
36
36
36
36
36
36
36
3636
36
36
42
36
36
42
42
36
42
42
36
36
36
36
36
36
36
42
42
36 3636
36
36
36
36
3636
36
36
36
36
36
36
36
36
36 36
36
36
36
36
36
36
36
36
36
36
36
3,067 SF
MODERATE RENOVATION
HEAVY RECONSTRUCTION
- REMOVE TIERS IN FLOORING
1,234 SF
- RENOVATE FOR ADA ACCESS- PROVIDE LIFT FOR ACCESS- RIGHT-SIZING OF SPACES
- RECONFIGURE ADMIN SPACES
GYM
YTH ADV
TT
T
TT
T T
T T
TT
J
J
ST
STSTAGE
CAFE
RECV
KIT
BLDG ENG
PEST
ST
MECH
MUSIC
KK
K
4K
4K
ART
KILN
K1ST1ST1ST
1ST1ST
MECH
TITLE M
BAND
SPEECH SPEECH
DATALMC
SPEECH
BOOK
TITLE
CSLR
STAFF
OFFSPED
INCLUSIONST
ST
EBSC PRIMARY
FAMILYRESOURCE
CENTER
(COMMUNITYROOM)
CO
ATS
CO
ATS
KIT
CO
ATS
CO
ATS
ACTIVITY AREA ACTIVITY AREA
S COATS SGI COATS S S COATS SGI COATS S
S COATS SGI COATS SP
P
ST
ELEC
1,061 SF
- CONVERT TO STEM CLASSROOM
STEM
STAFF PLANNING
971 SF
- NEW MAKER SPACEMAKER SPACE
DN
E
NEW GLASS WALL AND DOOR
NEW GLASS WALL AND DOOR
JULIAN THOMAS ELEMENTARY SCHOOL
FIRST FLOOR PLAN
EDUCATIONAL SPACE ADEQUACY PLAN
Original Construction : 1857
Building Addition(s) : 2000
BUILDING AREA: 102,540 sf
0 20 40 80
SCALE: 1" = 40'
EBSCINTERMEDIATE
(4-5)
5TH
5TH
5TH5TH
SPED INCLUSION4-5
LACTATION
SOCSPED RESOURCE
COATS
DATA
LRN
CO
AC
HE
S
MECH
4TH4TH
4TH4TH3RD3RD
T T
TJ
T
T
AP
2ND
2ND
2ND2ND BL
3RD
3RD
S COATS SGI COATS S S COATS SGI COATS S
SCOATSSGICOATSS
MECH
SGI S
CO
ATS
S
CO
ATS
S
CO
ATS
SGI
CO
ATS
S
S
CO
ATS
SGI
CO
ATS
SC
OA
TSC
OA
TS
STST
MECH
JULIAN THOMAS ELEMENTARY SCHOOL
SECOND FLOOR PLAN
EDUCATIONAL SPACE ADEQUACY PLAN
Original Construction : 1857
Building Addition(s) : 2000
BUILDING AREA: 102,540 sf
0 20 40 80
SCALE: 1" = 40'
MECH
PLANNED ELEVATOR LOCATION TBD
COMMUNITYHEALTH CENTER
JULIAN THOMAS ELEMENTARY SCHOOL
BASEMENT AND THIRD FLOOR PLAN
EDUCATIONAL SPACE ADEQUACY PLAN
Original Construction : 1857
Building Addition(s) : 2000
THIRD FLOOR PLANBASEMENT PLAN
BUILDING AREA: 102,540 sf
0 20 40 80
SCALE: 1" = 40'