july 2, 2020 water ridge estates roads phase i · water ridge estates - phase i. 402 cedar street...

2
PE Firm Registration No. 1151 PG Firm Registration No. 50103 RPLS Firm Registration No. 10011900 July 2, 2020 Water Ridge Estates Roads Phase I Addendum No. 1 Attention is called to the following modifications to the referenced Plans, Specifications and Contract Documents for the above referenced project. Barndo Partners, LLC will receive sealed Bids for the Water Ridge Estates Roads Phase I project until 11:00 a.m. local time on Tuesday, July 14, 2020 at the Office of Enprotec/Hibbs & Todd, Inc. located at 402 Cedar St., Abilene, Texas 79601. Bids will be publically opened and read aloud. We hereby modify the documents as follows. BID DATE: Please note the bid date has been moved to Tuesday, July 14, 2020. DRAWINGS: 1. Change to Drawing 7 of 15: The crossing street named of Wooden Bridge Road was mislabeled. The street name has been revised to Water Ridge Drive. REPLACE sheet 7 with the attached sheet 7. This addendum consists of two (2) pages. This addendum becomes a part of the referenced plans and specifications and shall be acknowledged by the bidder and attached to the bid packet submitted. By: Jonathan Baum, P.E. #100982 Project Engineer

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: July 2, 2020 Water Ridge Estates Roads Phase I · WATER RIDGE ESTATES - PHASE I. 402 Cedar Street 325-698-5560 PE Firm Registration No. 1151 Abilene, Texas 79601. E. NPROTEC /H. IBBS

PE Firm Registration No. 1151 PG Firm Registration No. 50103 RPLS Firm Registration No. 10011900

July 2, 2020

Water Ridge Estates Roads Phase I

Addendum No. 1

Attention is called to the following modifications to the referenced Plans, Specifications and Contract Documents for the above referenced project. Barndo Partners, LLC will receive sealed Bids for the Water Ridge Estates Roads Phase I project until 11:00 a.m. local time on Tuesday, July 14, 2020 at the Office of Enprotec/Hibbs & Todd, Inc. located at 402 Cedar St., Abilene, Texas 79601. Bids will be publically opened and read aloud. We hereby modify the documents as follows.

BID DATE:

Please note the bid date has been moved to Tuesday, July 14, 2020.

DRAWINGS:

1. Change to Drawing 7 of 15:The crossing street named of Wooden Bridge Road was mislabeled. The street name has beenrevised to Water Ridge Drive. REPLACE sheet 7 with the attached sheet 7.

This addendum consists of two (2) pages. This addendum becomes a part of the referenced plans and specifications and shall be acknowledged by the bidder and attached to the bid packet submitted.

By: Jonathan Baum, P.E. #100982 Project Engineer

Page 2: July 2, 2020 Water Ridge Estates Roads Phase I · WATER RIDGE ESTATES - PHASE I. 402 Cedar Street 325-698-5560 PE Firm Registration No. 1151 Abilene, Texas 79601. E. NPROTEC /H. IBBS

LOT

11

LOT

8

LOT

9

LOT

10

LOT

1

LOT

2

LOT

7LO

T 8

LOT

9

LOT

10

LOT

11

BL

OC

K C

1027

1028 1028

1027

1026

1025

1024

1023

1029 10

30 1031 10

32 1033

WO

OD

EN

RID

GE

DR

IVE

8+990+00

1+00

2+00

3+00

4+00

5+00 6+00

7+00

8+00

102210

21

1034

1035

1036

1037

1038

1039

1040

1040

1039

1038

GR

EE

N E

LM

RO

AD

ST

A.

0+00

.00

N:

7026

965.

7703

E:

1999

253.

7009

BP S

TA

. 8+

98.7

9N

: 7

0261

59.4

656

E:

199

9615

.238

7E

P

STA. 3+47.77N: 7026666.3266E: 1999420.5596PC

ST

A.

8+59

.53

N:

7026

197.

2973

E:

1999

604.

8400

PC

STA. 2+97.77N: 7026703.4063E: 1999387.0171PT

ST

A.

6+70

.97

N:

7026

381.

7787

E:

1999

565.

7992

PT

STA. 2+61.65N: 7026739.6594E. 1999374.6282PC

STA. 3+31.85N: 7026687.5235E. 1999420.2630PT

STA. 2+65.70N: 7026719.0115E. 1999355.2885PC

STA. 3+31.77N: 7026668.8002E. 1999399.4437PT

STA. 7+70.53N: 7026281.4703E. 1999572.7169PC

ST

A.

8+38

.53

N:

7026

214.

9437

E.

1999

586.

7956

PT

R56

1.37

'

INSTALLTEMPORARYTURNAROUND

60'

RO

W

16'

28'

16'

R20'

TYP

INSTALLTEMPORARYTURNAROUND

R48'

R48'

0+00

1+00

2+00

STA. 2+59.9618" HDPE @ 1.62%WITH 4:1 SLOPED ENDTREATMENTS

STA. 2+63.5318" HDPE @ -1.62%WITH 4:1 SLOPED ENDTREATMENTS

R61

3.5'

R32

8.83

'

R20'

TYP10201019

1038

1039

1027.95

1027.37

1026.85

1026.78

1027.62

1028.19

1028.19

1028.19 1039.19

1039.621039.81

1040.25

WOODEN BRIDGE ROAD

1015

1020

1025

1030

1035

1040

1045

1050

1055

1020

1025

1030

1035

1040

1045

1050

1055-0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+25

-0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+25

1.76%

3.43% -2.29%

2.63%

2.00%

2.52%

PVI STA = 5+00.00PVI ELEV = 1032.71

AD = -0.77K = 65.12

50.00' VC

BV

CS:

4+7

5.00

BV

CE:

103

2.08

EVC

S: 5

+25.

00EV

CE:

103

3.15

PVI STA = 8+26.09PVI ELEV = 1041.39

AD = -5.73K = 21.82

125.00' VC

BV

CS:

7+6

3.59

BV

CE:

103

9.25

EVC

S: 8

+88.

59EV

CE:

103

9.96

HIGH POINT ELEV = 1040.53HIGH POINT STA = 8+38.53

PVI S

TA=

0+00

.00

PVI E

LEV

= 10

20.1

7

PVI S

TA=

8+98

.79

PVI E

LEV

= 10

39.7

3

PVI S

TA=

2+61

.65

PVI E

LEV

= 10

27.0

6

PVI S

TA=

3+31

.85

PVI E

LEV

= 10

28.4

7

PVI STA = 6+50.00PVI ELEV = 1035.35

AD = 1.68K = 44.70

75.00' VC

BV

CS:

6+1

2.50

BV

CE:

103

4.69

EVC

S: 6

+87.

50EV

CE:

103

6.63

1020

.17

CL.

ELE

V.

1022

.81

CL.

ELE

V.

1025

.44

CL.

ELE

V.

1027

.83

CL.

ELE

V.

1030

.19

CL.

ELE

V.

1032

.66

CL.

ELE

V.

1034

.47

CL.

ELE

V.

1037

.06

CL.

ELE

V.

1040

.19

CL.

ELE

V.

1032

.08

CL.

ELE

V.

1033

.15

CL.

ELE

V.

1034

.92

CL.

ELE

V.

1035

.50

CL.

ELE

V.

1036

.22

CL.

ELE

V.

1039

.61

CL.

ELE

V.

1040

.49

CL.

ELE

V.

1040

.50

CL.

ELE

V.

1040

.23

CL.

ELE

V.

LEFT SIDE DITCH

RIGHT SIDE DITCH

RIGHT SIDE DITCH

LEFT SIDE DITCH

EXISTING GRADE

PROPOSED GRADE

A

REVISIONNO.

1DATE

2

B C D

4

3

5

A B C D

E F

DRAWN BY

CHECKED BY

DESIGNED BY

G

06/22/2020

DATE

SCALE

7415

H I

SHEET No.

PROJECT NO.:

OF 15

1

2

E F G

3

4

H I

5

BAR IS ONE INCH ONORIGINAL DRAWING

IF NOT ONE INCH ONTHIS SHEET. ADJUST

SCALES ACCORDINGLY.

0 1

CONSTRUCTION PLANSFOR

WATER RIDGE ESTATES - PHASE IENVIRONMENTAL AND CIVIL ENGINEERING402 Cedar Street325-698-5560 PE Firm Registration No. 1151

Abilene, Texas 79601

ENPROTEC/HIBBS & TODD, INC.

PG Firm Registration No. 50103RPLS Firm Registration No. 10011900

P:\P

roje

cts\

Priv

ate

Dev

elop

ers\

2019

Pro

ject

s\74

15 P

K R

esid

entia

l Dev

elop

men

t\10.

CA

D\7

. CO

NST

\4. S

HEE

TS_R

OA

D\7

415_

RO

AD

- 07

.dw

g

SCALE IN FEET

20 0 50

7WOODEN BRIDGE ROAD

STA. 0+00 TO END

HOR: 1" = 50'VER: 1" = 5'

N

D.B.H.

J.A.B.

J.A.B.

07/02/2020

1 ADDENDM #1 07-02-2020

AutoCAD SHX Text
100982
AutoCAD SHX Text
JONATHAN AARON BAUM
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
X
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
P
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
S