Placer County Water Agency Middle Fork American River Project AQ 4 – Temperature Modeling (Status Report). June 29, 2009. Outline. Modeling Progress: Middle Fork Below Ralston Rubicon River Revisit Ralston Reservoir Schedule. Middle Fork American River (MFAR) below Ralston: Geometry. - PowerPoint PPT PresentationTRANSCRIPT
1
Placer County Water AgencyPlacer County Water AgencyMiddle Fork American River ProjectMiddle Fork American River Project
AQ 4 –AQ 4 – Temperature ModelingTemperature Modeling(Status Report)(Status Report)
June 29, 2009June 29, 2009
2
OutlineOutline
Modeling Progress:Modeling Progress: Middle Fork Below RalstonMiddle Fork Below Ralston Rubicon RiverRubicon River Revisit Ralston ReservoirRevisit Ralston Reservoir
ScheduleSchedule
3
Middle Fork American River Middle Fork American River (MFAR) below Ralston: Geometry(MFAR) below Ralston: Geometry
Profile (25 meter node spacing)Plan (UTM Coordinates)
4294000
4299000
4304000
4309000
4314000
4319000
4324000
4329000
665000 670000 675000 680000 685000 690000 695000 700000
NFAR confluence
Ralston Res.
140
160
180
200
220
240
260
280
300
320
340
025050075010001250150017502000
Node No.
NFAR confluence
Ralston Res.
4
MFAR below Ralston: Flow Mass MFAR below Ralston: Flow Mass BalanceBalance
Foresthill R11 gage (855:857) 15 min converted to hourly ≈ 849:855 daily converted to hourly + 855 daily accretions converted to hourly+ 847:855 Oxbow Powerhouse hourly (not greater than 980 cfs)+ 845:855 daily converted to hourly
Note: Operation Hydrology Model Mass Balance was left unbalanced if gage flow was greater or smaller than upstream inflows. In the case where the gage was higher than the upstream inflows and operational records show that Ralston Afterbay was spilling, then the inflow to the Foresthill gage was balanced with a commensurate amount of spill over Ralston Afterbay; otherwise, Mass Balance was left unbalanced.
5
MFAR below Ralston: HabitatMFAR below Ralston: Habitat
-
1
2
3
4
5
6
7
- 200 400 600 800 1,000 1,200Wetted Area, ft^2
Stag
e, ft
POOL
RUN
LGR
HGR
Habitat % Habitat BreakHGR 3.7%LGR 9.3%RUN 29.4%
POOL 55.9%CAS* 1.7%
* Cascades were assumed as HGR.
6
MFAR Below Ralston Dam MF5-RM24.6MFAR Below Ralston Dam MF5-RM24.6
Hrly Dly avg Dly min Dly max
0.10 0.10 0.09 0.090.19 0.10 0.09 0.100.22 0.10 0.10 0.122929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, C
0
5
10
15
20
25
30
Flo
w, c
fs
Sim_Node 4Meas_MF5(RM24.6)Sim. Q
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
5
10
15
20
25
30
Flo
w, c
fs
Sim_Node 4Meas_MF5(RM24.6)Sim. Q
7
MFAR below Oxbow PH MF6-RM24.3MFAR below Oxbow PH MF6-RM24.3
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1889Meas_MF6(RM24.3)Sim. Q
Hrly Dly avg Dly min Dly max
0.00 0.00 0.00 0.000.06 0.01 0.01 0.020.08 0.01 0.03 0.032929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1889Meas_MF6(RM24.3)Sim. Q
8
MFAR MF7-RM23.1MFAR MF7-RM23.1
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 101Meas_MF7(RM23.1)Sim. Q
Hrly Dly avg Dly min Dly max
-0.05 -0.05 -0.23 0.210.36 0.13 0.23 0.530.47 0.22 0.38 0.632929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, oC
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 101Meas_MF7(RM23.1)Sim. Q
9
MFAR MF14-RM19.6MFAR MF14-RM19.6
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 330Meas_MF14(RM19.6)Sim. Q
Hrly Dly avg Dly min Dly max
-0.33 -0.33 -1.01 0.150.73 0.40 1.03 0.460.88 0.55 1.13 0.572929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, oC
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 330Meas_MF14(RM19.6)Sim. Q
10
MFAR MF15-RM14.3 (above Otter Cr)MFAR MF15-RM14.3 (above Otter Cr)
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 670Meas_MF15(RM14.3)Sim. Q
Hrly Dly avg Dly min Dly max
0.15 0.15 0.28 0.750.87 0.45 0.46 0.991.07 0.51 0.53 1.16
2929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, oC
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 670Meas_MF15(RM14.3)Sim. Q
11
MFAR MF16-RM11.0 (above Canyon Cr)MFAR MF16-RM11.0 (above Canyon Cr)
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 888Meas_MF16(RM11.0)Sim. Q
Hrly Dly avg Dly min Dly max
-0.10 -0.11 0.19 0.110.81 0.46 0.42 0.771.02 0.60 0.52 0.94
2929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 888Meas_MF16(RM11.0)Sim. Q
12
MFAR MF9-RM8.9MFAR MF9-RM8.9
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1025Meas_MF9(RM8.9)Sim. Q
Hrly Dly avg Dly min Dly max
-0.65 -0.65 -0.70 0.010.95 0.71 0.75 0.821.17 0.95 0.89 1.02
2929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, oC
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1025Meas_MF9(RM8.9)Sim. Q
13
MFAR MF8-RM0.1MFAR MF8-RM0.1
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Tem
pera
ture
, C
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1608Meas_MF8(RM0.1)Sim. Q
Hrly Dly avg Dly min Dly max
-1.50 -1.50 -1.23 -2.251.71 1.52 1.26 2.292.08 1.74 1.42 2.55
2929 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
0
5
10
15
20
25
30
8/1/07 8/4/07 8/7/07 8/10/07 8/13/07 8/16/07 8/19/07 8/22/07
Tem
pera
ture
, oC
0
600
1200
1800
2400
3000
3600
Flo
w, c
fs
Sim_Node 1608Meas_MF8(RM0.1)Sim. Q
14
MFAR Below Ralston: SummaryMFAR Below Ralston: Summary
SummarySummary Effective representation of flow conditions in Effective representation of flow conditions in
peaking reach (i.e., water balance)peaking reach (i.e., water balance) Most locations simulated temperature are Most locations simulated temperature are
representative, additional calibration requiredrepresentative, additional calibration required
In ProgressIn Progress Extending Grid: extend geometry into Folsom Extending Grid: extend geometry into Folsom
ReservoirReservoir Refine travel timeRefine travel time Refine temperature calibration with focus on Refine temperature calibration with focus on
lower riverlower river
15
OutlineOutline
Modeling Progress:Modeling Progress: Middle Fork Below RalstonMiddle Fork Below Ralston Rubicon RiverRubicon River Revisit Ralston ReservoirRevisit Ralston Reservoir
ScheduleSchedule
16
Water temperature Rubicon River mile Water temperature Rubicon River mile 28.828.8
Upstream boundaryUpstream boundary
0
5
10
15
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wat
er te
mpe
ratu
re (
oC)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Obs RR 28.8
Flow rate
0
5
10
15
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wat
er te
mpe
ratu
re (
oC)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Obs RR 28.8
Flow rate
17
Water temperature Rubicon River mile 25.3Water temperature Rubicon River mile 25.3
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 228
Obs - RR 25.3
Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 228
Obs - RR 25.3
Flow rate
RR 25.3 hrly Dly avg Dly min Dly max-0.30 -0.30 -1.02 0.160.79 0.42 1.15 0.541.47 0.58 1.40 0.672927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
18
Water temperature Rubicon River mile 22.7Water temperature Rubicon River mile 22.7
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 397
Obs - RR 22.7
Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 397
Obs - RR 22.7
Flow rate
RR 22.7 hrly Dly avg Dly min Dly max-0.10 -0.10 0.39 -0.330.74 0.40 0.62 0.441.35 0.51 1.08 0.582927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
19
Water temperature Rubicon River mile 22.5Water temperature Rubicon River mile 22.5
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 410
Obs - RR 22.5
Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wat
er te
mpe
ratu
re (o
C)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate (
cfs)
Sim - Node 410
Obs - RR 22.5
Flow rate
RR 22.5 hrly Dly avg Dly min Dly max0.01 0.01 0.51 -0.340.60 0.33 0.64 0.381.00 0.42 1.09 0.492927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
20
Water temperature Rubicon River mile 14.3Water temperature Rubicon River mile 14.3
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 942Obs - RR 14.3Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 942Obs - RR 14.3Flow rate
RR 14.3 hrly Dly avg Dly min Dly max0.95 0.95 1.67 0.101.39 1.06 1.72 0.621.81 1.19 2.08 0.812927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
21
Water temperature Rubicon River mile 5.3Water temperature Rubicon River mile 5.3
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1525
Obs - RR 5.3
Flow rate
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1525
Obs - RR 5.3
Flow rate
RR 5.3 hrly Dly avg Dly min Dly max-0.18 -0.18 -0.32 0.070.65 0.54 0.69 0.601.33 0.71 1.47 0.752927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
22
Water temperature Rubicon River mile 3.7Water temperature Rubicon River mile 3.7
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1629
Obs - RR 3.7Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1629
Obs - RR 3.7Flow rate
RR 3.7 hrly Dly avg Dly min Dly max-0.51 -0.51 -0.71 -0.220.70 0.61 0.94 0.621.29 0.79 1.58 0.782927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
23
Water temperature Rubicon River mile 0.7Water temperature Rubicon River mile 0.7
0
5
10
15
20
25
30
6/1/07 6/21/07 7/11/07 7/31/07 8/20/07 9/9/07 9/29/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1823Obs - RR 0.7Flow rate
0
5
10
15
20
25
30
8/1/07 8/6/07 8/11/07 8/16/07 8/21/07
Date - Time
Wate
r te
mpera
ture
(oC
)
0
20
40
60
80
100
120
140
160
180
200
Flo
w r
ate
(cfs
)
Sim - Node 1823Obs - RR 0.7Flow rate
RR 0.7 hrly Dly avg Dly min Dly max0.21 0.22 -0.07 0.360.88 0.77 0.94 0.862.33 2.13 2.51 2.272927 122 122 122
Mean BiasMean absolute error (MAE)
Root mean squared error (RMSE)COUNT
24
Rubicon River: SummaryRubicon River: Summary
SummarySummary Effective representation of flow conditionsEffective representation of flow conditions Most locations simulated temperature are Most locations simulated temperature are
representativerepresentative
In ProgressIn Progress Refine travel time based on recent dataRefine travel time based on recent data Refine temperature calibration accordinglyRefine temperature calibration accordingly
25
OutlineOutline
Modeling Progress:Modeling Progress: Middle Fork Below RalstonMiddle Fork Below Ralston Rubicon RiverRubicon River Revisit Ralston ReservoirRevisit Ralston Reservoir
ScheduleSchedule
26
Ralston ReservoirRalston Reservoir
1
Oxbow PH
Ralston Afterbay
Middle Fork American River
Rubicon River
Ralston PH
1 Temperature Profile Location
27
RalstonRalston
28
Ralston water levels, 2006Ralston water levels, 2006
Ralston Reservoir observed and simulated water surface elevation, 2006
1150
1160
1170
1180
6/1
6/1
5
6/2
9
7/1
3
7/2
7
8/1
0
8/2
4
9/7
9/2
1
10
/5
Date
Wa
ter
su
rfa
ce
ele
va
tio
n (
ft)
Observed
Simulated
29
Ralston water levels, 2007Ralston water levels, 2007
Ralston Reservoir observed and simulated water surface elevations, 2007
1165
1167
1169
1171
1173
1175
1177
1179
6/1
6/1
5
6/2
9
7/1
3
7/2
7
8/1
0
8/2
4
9/7
9/2
1
Date
Wa
ter
surf
ace
ele
vatio
n (
ft)
Observed
Simulated
30
Ralston water temperature, Ralston water temperature, 20062006
Water temperature (oC)Water temperature (oC)Water temperature (oC)
Ele
vatio
n (f
t)
Ele
vatio
n (f
t)
Ele
vatio
n (f
t)
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
July 06 Aug 08 Sep 30
Tunnel Elevation
Stream Maintenance
Low Level
31
Ralston water temperature, Ralston water temperature, 20072007
Ele
vatio
n (f
t)
Ele
vatio
n (f
t)
Ele
vatio
n (f
t)
Ele
vatio
n (m
)
Ele
vatio
n (f
t)
Water temperature (oC) Water temperature (oC)Water temperature (oC)Water temperature (oC)Water temperature (oC)
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
1181
1164
1148
1132
1115
June 07 July 11 July 31 Sep 06 Sep 25
Low Level
Tunnel Elevation
Stream Maintenance
32
Estimated ScheduleEstimated Schedule
Draft calibration for all system elements Draft calibration for all system elements (Target: July 1)(Target: July 1)
System-wide calibration and draft model System-wide calibration and draft model documentation (Target: August 1)documentation (Target: August 1)
System-wide calibration approach System-wide calibration approach (revisited)(revisited)
33
Model Simulation:Approach
2
4
10
1
3
11
8
6
7
9
5
Reservoir: CE-QUAL-W2
River: RMA-2 and RMA-11
Tunnel: Tunnel Model
34