3 TAC June 3, 2010 List of RAPs needed for 2010** RAP Description Contingency/Overload pair 1Carrollton RAP L: Lewisville Switch (645)-Highland E 138 kV(1970) line C: Lewisville Switch (645)-Highland(664) L: Lewisville Switch (645)-Highland E 138 kV(1970) line C: Highland (664) - Canyon (668) 4Frisco RAP L: Collins (2370) – Frisco (681) 138 kV line C: Denton Steam – Corinth; Teasley to Pockrus 6 Frisco Voltage RAP L: Low voltage at Frisco and Panther Creek C: Collin to Frisco 138 kV line 7 Arco-Krugerville RAP L: Collins (2370) to Frisco (681) 138 kV line After Operation of Carrollton RAP or Lake Pointe RAP based on 2010 SSWG load level and one unit unavailable need for RAPs prior to completion of exit strategy projects will be reviewed each yearTRANSCRIPT
June 3, 2010Technical Advisory Group
RMR Exit for Spencer 5 – Remedial Action Plans
Jay Teixeira
2
Summary
ERCOT staff analysis of the Spencer 5 RMR exit strategy identified the need for several transmission line upgrades as well as transformer and capacitor bank additions.
To allow exit of RMR prior to completion of the identified projects, Remedial Action Plans (RAPs) were developed.
3 TACJune 3, 2010
List of RAPs needed for 2010**
RAPDescription Contingency/Overload pair
1 Carrollton RAP
L: Lewisville Switch (645)-Highland E 138 kV(1970) lineC: Lewisville Switch (645)-Highland(664)
L: Lewisville Switch (645)-Highland E 138 kV(1970) lineC: Highland (664) - Canyon (668)
4 Frisco RAP L: Collins (2370) – Frisco (681) 138 kV lineC: Denton Steam – Corinth; Teasley to Pockrus
6 Frisco Voltage RAP
L: Low voltage at Frisco and Panther CreekC: Collin to Frisco 138 kV line
7 Arco-Krugerville RAP
L: Collins (2370) to Frisco (681) 138 kV lineAfter Operation of Carrollton RAP or Lake Pointe RAP
• based on 2010 SSWG load level and one unit unavailable• need for RAPs prior to completion of exit strategy projects will be reviewed each year
4
Permanent RMR Exit Solutions
ProjectCost
Estimated Completion
Date
1 RD Wells to Hickory 69kV (Denton) $10,167,000* June 2010
2 Upgrade Lewisville Switch to Highland (TNMP) 138 kV line to 290MVA or above $521,170* May 2015
3 Add second 345/138 kV autotransformer at Lewisville switching substation $17,165,150* June 2012
4 Upgrade Collin to Frisco 138 kV line to 326 MVA $981,594* June 2013
5 Upgrade West Denton to Jim Christal to North Denton138 kV line to 250 MVA or above $5,000,000 Summer 2012
6 Additional capacitor banks at Navo and Panther Creek Substations (interim for Mustang capacitor bank) Included in item 7 2011
7 New Mustang Substation and capacitor bank $2,760,500* June 2013
8 Upgrade Arco to Krugerville 138 kV $4,193,381* May 2011
*Planned prior to Spencer NSO
5
Cost Analysis
The estimated annual RMR fixed costs that would be uplifted on an on-going basis are greater than the annual carrying costs of the transmission projects, notwithstanding any additional production cost savings.
Projects planned prior to Spencer NSO not included in transmission project cost.
6
Questions?
7
Details
8
RAP 1 – Carrollton RAP
• Problem 1– Contingent element: Lewisville Switch (645)-Highland(664)– Overload element: Lewisville Switch (645)-Highland E 138
kV(1970) line (Rate A/B/C: 214/214/214)– RAP operation: Open NW Carrollton (2361) – Lewisville Switch
(646) 345 kV and 138 kV lines– Level of overload: 121.2% Rate B (259.4 MVA)– Estimated number of hours RAP could operate in year 2010:
722 hours
9
PL_TENNY
ROANOKE2
ALLIANCE
CRLTN_NW
FB1_8
ELMFK1T_
ELMFKN1_
NLKPMP1T
ELMFK1_8
NLKPMP1_
FBGILS1_
NTHLK_S8
ADSN1_8
CRLTN_NW
ELMFK2T_
CRLTNTAR
ELMFKN2_
ELMFK2_8
CRLTNUF2COPPELTP
MCKAMY_T
MCKAMYRD
COPPELL_
MCKAMY
COPPELL
GRAPEVIN
MOUND
IBM
LEWISVIL
ROANOKE1
LEWISVLS
KIMBALL1
KELLER
STHLAKE1
WROANOKE
EMCS1_8
KLR_MAG1
KLR_MAG2
COLONY_8
HEBRN_P8
ROANOKE
CRLTNFRK
CRLTN_NW
HEBRON
CRLTN_NW
HIGHLAND
LEW_JNS_
CRLTNTAR
CRLTNRMD
CRLTNJSY
CRLTNUF1
TNLWVLST
TNLWVLTI
TNLAKEPN
TNLWVLWE
FLWRMND_
TNHIGHLA
ARGYLE1_
CANYON
TNJONES_
LAKEDALL
PL_TENNY
ADSN1T_8
ADSN2T_8
HIGHL_E_
INDSTRL1
MCPHERSN
MCPHERSO
WAGROBT1
1853
2522
1855
2361
2583
2586
25802590
2588
2582
2569
2362
2587
2558
2581
2589
2014
2025
2024
2015
658
648
555
656
556
660
1854
645
565
2020
2018
2065
2033
2034
2518
2376
640
2519
2360
663
2363
664
1972
2559
2562
2555
2535
37100
37080
37010
37060
2030
37050
1984
668
37030
671
2523
2576
2577
1970
913
1857
679
2075
CROSTIMB661
TNBIOENR37011
LEWISVLS646
AUSRNCH22377
AUSRNCH12378
FLWRMNDS2031
KIMBALRO657
ROANOKE3
ROANOKE1
ROANOKE1 ROANOKE2
ROANOKE1
ROANOKE2
ROANOKE2
WPKELLR12037
WPKELLR22038
CRLTNCC1
HERITAGE
HRTAG1_T HRTAG2_T
KEL_MAG2
KELLER1T
KELLER2_
PL_COMM12568
PL_COMM22570
CORINTHS1983
ELIZCRK11866
1852
1850
1851 1849
1845
1847
1848
629
96 MW 29 Mvar
113 MW 41 Mvar
94 MW 30 Mvar
107 MW 35 Mvar
74 MW 19 Mvar
51 MW 14 Mvar
21 MW 8 Mvar
60 MW 18 Mvar
49 MW 14 Mvar
32 MW 20 Mvar
60 MW 18 Mvar
7 Mvar
15.4 Mvar
99.7 Mvar
15.3 Mvar
15.2 Mvar
36.0 Mvar
108 Mvar
53.2 Mvar
4.9 Mvar
4.9 Mvar
0.0 Mvar
57.1 Mvar
114.9 Mvar
0.0 Mvar 56.4 Mvar
231.8 Mvar
14.6 Mvar 14.6 Mvar
27.8 Mvar
14 Mvar 10 Mvar
229 Mvar
29 Mvar
6%B
Amps
23%B
Amps
29%B
Amps
8%B
Amps
4%B
Amps
AVONDALE
80 MW 20 Mvar
14 MW 4 Mvar
10 MW 2 Mvar
602
26%B
Amps
KRUMW_5
1%B
Amps
1730
38%B
Amps 36%
B
Amps
16%B
Amps
58%B
Amps
RAP 1 – Carrollton RAP cont’d 722 hours
Roanoke
Denton
NW Carrollton
Contingency:Lewisville Switch (645) to Highland E (1970) 138 kV line
Overload element:Lewisville Switch (645) to Highland (664) 138 kV line
RAP action:Open NW Carrollton (2361) – Lewisville Switch (646) 345 kV line
RAP action: Open NW Carrollton (2362) – Lewisville Switch (645) 138 kV line
10
RAP 1 – Carrollton RAP cont’d
• 138 kV Alternative Plan – RAP Operation– Open TNMP Highland – TNMP Lewisville (branch 37050 –
37060) 138 kV line – Collin – Frisco 138kV line is overload, open Arco – Krugerville
138 kV line (Branch 1993-1994).• If Allison – Krum line is in-service, Collins– Frisco 138 kV line
overload can be corrected by Collin Reactive SPS.• If Allison – Krum 138 kV line is not in-service, Lewisville Switch
(645)-Highland E 138 kV(1970) line may still be overloaded after opening Arco - Krugerville. Open Argyle – Corinth 138 kV line (Branch 1984-1985) to correct the problem
11
DN_STEAM
TEASLEY1
POCKRUS1
HIGHLAND
TNLWVLWE
FLWRMND_
TNHIGHLA
ARGYLE1_
CORINTH1
SPNCR_SW
CANYON
LAKEDALL
KINGSROW
HIGHL_E_
WOODROW6
982
664
37060
2030
37050
1984
1985
908
668
671
909
914
1970
901
SPENCER_ SPENCER_
0 MW 0 Mvar
0 MW 0 Mvar
CORINTHS1983
SPNCRINT
POLES315902
POLE_SP1903
POLESPL2904
FTWORTH1919
918
917
981
DN_STEAM956
W_DENT_T984
DN_STSTR1001
80.7 MW 23.5 Mvar
99.6 Mvar
15.6 Mvar
54.2 Mvar
9.5 Mvar
7%B
Amps
5%B
Amps
RAP 1 – Carrollton RAP cont’d
KRUGRVL1
TNKRUGRV
ARCO1_8
ARCO_T_8
DENARCO1
INDSTRL1
1994
37120
1993
983
911
NAVO662
12.4 Mvar
ContingencyLewisville 645 - Highland 664 138 kV line
Overload elementLewisville 645 – Highland 1970 138 kV line
RAP actionOpen Argyle 1984 – Corinth 1985 138 kV line
RAP actionOpen TNMP Highland 37050 – TNMP Lewisville 37060
RAP actionOpen Arco 1993 – Krugerville 1994 138 kV line
12
RAP 1 – Carrollton RAP cont’d
• Hybrid plan– Perform the 345 kV-plan upon initial detection of overload on
the Lewisville Switch (645) to Highland (1970) 138 kV line – Switch to the Alternative 138 kV-plan and put the opened NW
Carrollton – Lewisville 345 and 138 kV circuits back in service .– This allows a quicker response since only 1 TSP is involved in
the implementation of the 345 kV-plan.
13
RAP 4 – Frisco RAP
– Contingent element: Denton Steam – Corinth & Teasley - Pockrus
– Overload element: Collin (2370) to Frisco (681) 138 kV line (Rate A/B/C: 256/256/256)
– RAP operation: • Raise the voltage of the West Denton 138 kV side to 140kV• Place Collin Series Reactor SPS in-service so that it will operate
when the Collin to Frisco line overloads.• If this does not resolve the overload, put all three capacitor banks at
Navo in-service • Verify Argyle and Corinth capacitors are on
– Level of overload: 109% Rate B (278.9 MVA)– Estimated number of hours RAP could operate in year 2010: 278
hours
14
N_DENT_8
DN_STEAM
JMCRSTL1
TEASLEY1
POCKRUS1
N_DENT69
ARGYLE1_
CORINTH1
SPNCR_SW
CANYON
KRUM_P8
LAKEDALL
KINGSROW
HICKORY6
LOCUST69
NLAKES69
WOODROW6
985
982
916
912
1984
1985
908
668
1990
671
909
910
914
915
901
670KRUM
1986KRUM_T8
CORINTHS1983
SPNCRINT
POLESPL2904
FTWORTH1919
918
917
RDWELLS6932
RDWELLS1930
981
N_DENT_T959
DN_STEAM956
W_DENT_T984
BONBRAE6905
DN_STSTR1001
N_DENSTR1009
W_DENSTR1011
W_DENSTR
1012
W_DENT_T
972
80.7 MW
23.5 Mvar
15.6 Mvar
7 Mvar
54.2 Mvar
9.5 Mvar
KRUMW_51730
10%B
Amps
RAP 4 - Frisco RAP cont’d
PL_TENNY
COLLINSS
BRIDGES_
FRISCO
CUSTER
BRIDGES
COLONY_8
HEBRN_P8
LEBNON_P
LEBANON
MCDERMT_
PL_CUSTR2522
2517
681
655
659
25182515
651
2516
COLLIN_1
NAVO662
AUSRNCH22377
AUSRNCH12378
COLLIN1_2364
ROLATER22368
0 MW 0 Mvar
PNTHRCRE649
2370
PL_COMM12568
PL_COMM22570
CUSTER1_2566
CUSTER2_2567
ROMJUARZ2688
ROMANJUA629
2371
CUSTER2653
116 MW 37 Mvar
74 MW 19 Mvar
62 MW 20 Mvar
12.1 Mvar
226.3 Mvar
29.7 Mvar
5%B
Amps
38%B
Amps 37%
B
Amps
58%B
Amps
Contingency:Denton Steam auto-transformer to Corinth &Teasley to Pockrus 138 kV line
Spencer
North DentonCollin
RAP action:Put all three capacitorBanks at Navo in-service
Overload element:Collins (2370) to Frisco (681)138 kV line
RAP action:Raise the voltage of theWest Denton 138 kV sideTo 140 kV
RAP action:Collin Series Reactor SPS OperatesWhen Collin to Frisco line overloads
278 hours
15
RAP 6 - Frisco Voltage RAP
– Contingent element: Collin to Frisco 138 kV line – Low voltage element: Frisco and Panther Creek bus– RAP operation:
• Turn on all 3 capacitor banks at Navo• Raise voltage at West Denton to 1.02~1.05
– Level of problem: • Low voltage at Frisco: 0.89718 p.u.• Lewisville (645) – Highland (1970): 104% [due to the presence of Carrollton
– Lewisville 138 kV line]• Arco (1993) – Krugerville (1994): 106.3%
– Estimated number of hours RAP could operate in year 2010: • <0.92 p.u. – 584 hours (Brazos Criteria)• <0.90 p.u. – 90 hours (ERCOT Criteria)• Arco to Krugerville – 132 hours• Lewisville to Highland – 36 hours
16
PL_TENNY
COLLINSS
BRIDGES_
FRISCO
CUSTER
BRIDGES
COLONY_8LEBNON_P
LEBANON
MCDERMT_
2522
2517
681
655
659
25182515
651
2516
NAVO662
AUSRNCH22377
AUSRNCH12378
0 Mvar
PNTHRCRE649
2370
PL_COMM12568
PL_COMM22570
CUSTER1_2566
CUSTER2_2567
ROMJUARZ2688
ROMANJUA629
CUSTER2653
116 MW 37 Mvar
74 MW 19 Mvar
31.4 Mvar
227.1 Mvar
6%B
Amps
33%B
Amps
66%B
Amps
46%B
Amps
N_DENT_8
DN_STEAM
JMCRSTL1
TEASLEY1
POCKRUS1
N_DENT69
ARGYLE1_
CORINTH1
SPNCR_SW
CANYON
KRUM_P8
LAKEDALL
KINGSROW
HICKORY6
LOCUST69
NLAKES69
WOODROW6
985
982
916
912
1984
1985
908
668
1990
671
909
910
914
915
901
670KRUM
1986KRUM_T8
CORINTHS1983
SPNCRINT
POLESPL2904
FTWORTH1919
918
917
RDWELLS6932
RDWELLS1930
981
N_DENT_T959
DN_STEAM956
W_DENT_T984
BONBRAE6905
DN_STSTR1001
N_DENSTR1009
W_DENSTR1011
W_DENSTR
1012
W_DENT_T
972
80.7 MW
23.5 Mvar
15.6 Mvar
7 Mvar
54.2 Mvar
9.5 Mvar
KRUMW_51730
10%B
Amps
RAP 6 – Frisco Voltage RAP cont’d
Contingency:Collins (2370) to Frisco (681)138 kV line
Spencer
North DentonCollin
Problem:Low voltage at Frisco
RAP action:Raise the voltage of theWest Denton 138 kV sideTo 1.02~1.05 pu
RAP action:Turn on all 3 capacitorbanks at Navo
90 hours
17
RAP 7 – Arco-Krugerville RAP
• Cause– Carrollton RAP
• Overload element: Collin (2370) to Frisco (681) 138 kV line (Rate A/B/C: 256/256/256)
• RAP operation: Open Arco (1993) – Krugerville (1994)138 kV line• Level of overload (Collins – Frisco 138 kV line):
– Carrollton RAP – 345 kV plan• Problem 1 - 115.8% (296.3 MVA) after Carrollton RAP [pre RAP: 103.9%
259.4 MVA Collins Series Reactor SPS would relieve this but not after Carrollton RAP so use Arco RAP instead]
• Problem 2 – 114.2% (292.3 MVA) after Carrollton RAP [pre RAP: 102.1% 261.4 MVA Collins Series Reactor SPS would relieve this but not after Carrollton RAP so use Arco RAP instead]
– Carrollton RAP – 138V plan• Problem 1 – 103.2% (264.2 MVA) after Carrollton RAP [pre RAP: 103.9%
259.4 MVA Collins Series Reactor SPS would relieve this overload]• Problem 2 – 101.5% (292.3 MVA) after Carrollton RAP [pre RAP: 102.1%
261.4 MVA Collins Series Reactor SPS would relieve this overload]
18
RAP 7 – Arco RAP-Krugerville cont’d Same # of hours as Carrollton RAP & Highland RAP
COLLINSS
BRIDGES_
FRISCO
CUSTER
BRIDGES
KRUGRVL1
ARCO1_8
ARCO_T_8
DENARCO1
2517
681
655
659
1994
1993
983
911
NAVO662
PNTHRCRE649
2370
CUSTER1_2566
CUSTER2_2567
ROMJUARZ2688
ROMANJUA629
CUSTER2
12.2 Mvar
226.3 Mvar
Overload element:Collins (2370) to Frisco (681) 138 kV line
Contingency:overload caused by Carrollton RAP
RAP action:Open Arco (1993) – Krugerville (1994)138 kV line Collin
Krugerville
Arco
Navo
Panther Creek