June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30, 2010 Workgroups on Service Review, Consumer and Family Control, & Quality Assurance and Algorithm, Assessment, Overall System Funding & Extraordinary and Changed Needs

Upload: patrick-randall

Post on 19-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1

iBudget FloridaStakeholders’ Group Meeting

June 30, 2010

Workgroups on Service Review, Consumer and Family Control, &

Quality Assurance and Algorithm, Assessment, Overall System Funding & Extraordinary and

Changed Needs

Page 2: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 2

Introductions

• Workgroup members

• Staff

• Guests

Page 3: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 3

Review of Minutes from Previous Meeting

Page 4: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 4

Meeting Objectives

• Share information

• Receive input on preferred options, potential improvements, implementation considerations, and other relevant issues

Page 5: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 5

Overall Goals

Simplify the system

Enhance:

– Self-direction

– Sustainability

– Equity

Page 6: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 6

• Needs met through waiver AND state plan, natural supports and community resources

• Waiver Support Coordinators freed to help get other resources

• Service review limited for many consumers, for spending up to individual iBudget maximum amount

• Requests for additional funding require thorough review

iBudget Paradigm

Page 7: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 7

• This is a starting point

– We’ll be testing the system through an initial phase-in.

– Intend to refine system over time

• Are seeking the best solution among the alternatives

– All have pro’s and con’s

Keep in mind . . .

Page 8: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 8

• Waiver submitted by early August

• Draft rules by late July

• Draft operating procedures by late July

• Training developed by late August; begin training in early September

Target Implementation Plan

Page 9: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 9

• Collect baseline data for evaluation by late September

• IT system implemented by early October• Start communicating with phase in area

consumers, WSC’s, providers, and staff upon announcement

Target Implementation Plan

Page 10: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 10

• Completed initial review of rules and operating procedures that need revising and development.

• Phase-in area not final. – Will have a coordinated system of publicizing to

ensure accurate information.

• IT system design progressing; coding beginning soon.

Updates

Page 11: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 11

• Waiver drafting in progress

• Hired iBudget Florida Operations Project Manager.

• Will release RFQ for evaluation soon.

• Initial flowcharting/system design completed

Updates

Page 12: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 12

Overview of Proposed System

• Budgets determined through algorithm • Service array revised to increase flexibility• Waiver Support Coordination better match to family needs, shift to emphasis on service coordination from service approval processing• Service review more limited, focused, & streamlined, focusing on health & safety issues

Page 13: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 13

Overview of Proposed System

• Consumer and family training and tools for managing budgets• Policies for limiting risk of overspending and options for corrective action plans• Reviews for indicators of health & safety, provider manipulation, and fraud• Process for determining budgets for consumers with extraordinary needs

Page 14: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 14

Overview of Proposed System

• Electronic/automated as much as possible—virtually paperless• Phase-in over a reasonable time period—e.g., number of consumers (say by geography) and budget amounts

Page 15: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 15

Topics for Today• Guidelines for budgeting• Notice to providers• Requests for and use of additional

funds• Consumers receiving higher level of

review/limits on flexibility• Service family approval

Page 16: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 16

Topics for Today

• Initial Phase-In Evaluation

• Consumer/family budget tracking

Page 17: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 17

Consumer & Family Control

• Monthly budgeting requirements:– Plan:

• 10% flexible spending (available at beginning of year)

• 5% emergency savings• 85% for monthly allotment

Page 18: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 18

Consumer & Family Control

• Monthly budgeting requirements:– Issues:

• Ensure funds last the entire fiscal year• Provide flexibility as needs vary through

year• Maintain appropriate level of review

Page 19: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 19

Consumer & Family Control

• Monthly budgeting requirements:– How much can consumers deviate from

monthly allotment without area review?• A: Not at all• B: May do so within a range (ex: up to

5% over) but beyond that requires area approval

• C: No restrictions, but area alerted if beyond a range and may review

Page 20: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 20

Consumer & Family Control

• Monthly budgeting requirements:– Should consumers see emergency reserve

line?• A: No.• B: Only when released (10th month).• C: Yes, always.

Page 21: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 21

Consumer & Family Control• Monthly budgeting requirements:

– How do consumers use the 5% emergency reserve?• A: Must specifically request use & get area

approval.• B: Must specifically request use in online

system, but area approval not needed• C: WSC/consumer gets alert that it’s being

used.

Page 22: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 22

Consumer & Family Control

• Monthly budgeting requirements:– When is 5% reserve released if not used?

• A: Never• B: Beginning of May

Page 23: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 23

Consumer & Family Control

• Provider notice:– What notice to providers should be required

or encouraged?

Page 24: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 24

Consumer & Family Control

• Provider notice: What notice to providers should be required or encouraged?– Plan: Did not discuss. Implies full ability to

change providers as desired.

Page 25: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 25

Consumer & Family Control

• Provider notice: What notice to providers should be required or encouraged?– Issues:

• Maximize flexibility for consumers• Allow providers to plan

Page 26: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 26

Consumer & Family Control

• Provider notice: What notice to providers should be required or encouraged?– Current situation:

• Consumers have complete flexibility to change providers

• APD strives to provide notice for system-required changes

Page 27: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 27

Consumer & Family Control

• Provider notice: What notice to providers should be required or encouraged?– A: Require 15 days’ notice unless

health/safety concerns.– B: Encourage 15-30 days’ notice.– C: No guidelines or requirements.

Page 28: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 28

Consumer & Family Control

• Requests for Additional Funds: – Plan allows requests due to:

• Extraordinary need• One-time change• Temporary change• Permanent change

– Law includes guidelines

Page 29: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 29

Consumer & Family Control

• Requests for Additional Funds: – Current situation:

• Requests reviewed through PSA process

Page 30: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 30

Consumer & Family Control

• Requests for Additional Funds: – Required to demonstrate how meet

statutory/rule requirements for receiving additional funds (meet criteria, are unable to accommodate within budget)

– Documentation required; will be able to be submitted via iBudget online system

Page 31: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 31

Consumer & Family Control

• Requests for Additional Funds: – Review every 3-6 months to assess

whether additional funds are still needed– Will be timeframes for area review and

response

Page 32: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 32

Consumer & Family Control

• Handling unused additional funds: – A: Funds unused within 3 months are

“returned” to APD– B: Funds unused within 3 months require

justification for lack of use, demonstration they are still needed, or are “returned”

– C: No review/return of unused funds.

Page 33: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 33

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Issues:

• Ensure health and safety of consumers who are more vulnerable

• Promote wise use of funds• Still provide for self-direction• Simplify processes

Page 34: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 34

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Current situation:

• Nearly all changes that any consumer makes are reviewed through PSA unless it’s a reduction

Page 35: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 35

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Plan: this applies to:

• Consumers with forensic involvement

• Consumers unable to manage own budgets

Page 36: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 36

Consumer & Family Control• Consumers receiving greater review/limited

changes--what flexibility would be available to make changes without review?– A: Require area review/approval of all

changes – B: Require area review/approval of certain

changes with conference/every 6 months– C: Area review/approval of certain changes

(tailor to situation) with optional conference as needed

Page 37: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 37

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Who, and how defined--recommendations:

• Consumers with complex medical needs--based on certain QSI responses or service use

• Consumers with complex behavioral needs--based on certain QSI responses or service use

Page 38: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 38

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Who, and how defined--recommendations:

• Foster children• Consumers transitioning from school—6

months pre- and post-transition

Page 39: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 39

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Who, and how defined--recommendations:

• Consumers transitioning between types of living settings (ICF/DD to waiver; group home to supported living; etc)—for 6 months

Page 40: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 40

Consumer & Family Control

• Consumers receiving greater review and with limitations on flexibility:– Who, and how defined--recommendations:

• Newly-enrolled in the waiver—for 6 months

• Recent alcohol or drug abuse history—for 6 months

Page 41: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 41

Consumer & Family Control

• Service Family Approval:– On what basis should service families be

approved? • When transitioning to iBudget from tier

waivers• When brand-new to waiver

Page 42: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 42

Consumer & Family Control

• Service Family Approval:– Current situation:

• Services approved one-by-one through PSA process

Page 43: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 43

Consumer & Family Control

• Service Family Approval: Basis for Approving Service Families– Recommendations--automatic approval:

• Support Coordination• Life Skills Development• Personal Supports for adults in family

home or supported living

Page 44: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 44

Consumer & Family Control

• Service Family Approval: Basis for Approving Service Families– Recommendations--automatic approval:

• Transportation• Adult dental (requires revising service

families)

Page 45: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 45

Consumer & Family Control

• Service Family Approval: Basis for Approving Service Families– Consider service use for past 2 years—

receive approval for services that consumers had been approved for unless situation has changed

– QSI responses

Page 46: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 46

Consumer & Family Control

• Service Family Approval: Basis for Approving Service Families– After initial transition, area staff will review

requests for service families– Requests (including documentation)

submitted via online system

Page 47: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 47

Initial Phase-In Evaluation

Proposed general elements (primarily based on HB 7225 provisions):• Cost savings or cost avoidance

• Cost containment• Predictability of expenditures

Page 48: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 48

Initial Phase-In Evaluation

Proposed general elements (primarily based on HB 7225 provisions):• Opportunities for self-direction • Quality of care• Access to service

Page 49: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 49

Initial Phase-In Evaluation

General elements (primarily based on HB 7225 provisions):• Satisfaction of consumers, as well as families/guardians of consumers • Simplicity and efficiency of the system

Page 50: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 50

Consumer & Family Control

• Budget Management– What will be consumers & families’

mindsets toward their budgets?– How do we get accurate information on

expenditures within current system?

Page 51: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 51

Consumer & Family Control• Budget Management

– How do we get timely, accurate information on expenditures within current system? • Issues:

–System sustainability requires accurate budget tracking

–Providers are at varying levels of sophistication

Page 52: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 52

Consumer & Family Control

• Budget Management– How do we get timely, accurate information

on expenditures within current system?

• Issues:–APD technology still in development–Will have to rely at minimum on

combination of encumbrances through service authorizations and billing data

Page 53: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 53

Consumer & Family Control

• Budget Management– How do we get timely, accurate information

on expenditures within current system? • Current situation: use a combination of

billing information, service logs, and personal contacts with providers.

Page 54: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 54

Consumer & Family Control

• Budget Management– How do we get timely, accurate information

on expenditures within current system? • Plan: described need for such

information but acknowledged technical challenges

Page 55: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 55

Consumer & Family Control• Budget Management

– How do we get timely, accurate information on expenditures within current system?

• A: Budget on monthly basis; do quarterly service authorizations to balance flexibility with budget control

• B: Do yearly service authorizations; rely on frequency in service authorization to control spending.

Page 56: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 56

Consumer & Family Control

• Budget Management– How do we get timely, accurate information

on expenditures within current system? • A: Rely solely on encumbrances and billing

data (up to a year lag), along w/ telephone contacts

Page 57: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 57

Consumer & Family Control

• Budget Management– How do we get timely, accurate information

on expenditures within current system? • B: Require basic service information to be

submitted within 15 days of quarters’ end (by telephone/IVR, fax of paper to WSC’s, online form, ???)

Page 58: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 58

Consumer & Family Control

• Budget Management– What will be consumers & families’

mindsets toward their budgets?• How do we encourage a mindset of

ownership and cost-effectiveness?

Page 59: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 59

Questions?Suggestions?Comments?

Page 60: June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 1 iBudget Florida Stakeholders’ Group Meeting June 30,

June 30, 2010 iBudget Florida Stakeholders’ Group Workgroup Meeting—For Discussion Purposes Only 60