just in time
DESCRIPTION
TRANSCRIPT
JUST - IN - TIMEJUST - IN - TIME
A philosophy of production based on A philosophy of production based on
planned elimination of planned elimination of allall waste and waste and
continuous improvement of productivity.continuous improvement of productivity.
JUST - IN - TIME GOALSJUST - IN - TIME GOALS
Zero Defects Zero Defects
Zero Setup TimeZero Setup Time
Zero Lot ExcessesZero Lot Excesses
Zero HandlingZero Handling
Zero SurgingZero Surging
Zero BreakdownsZero Breakdowns
Zero Lead TimeZero Lead Time
JIT IS JIT IS NOTNOT
Business as usualBusiness as usual Doing today as yesterdayDoing today as yesterday A management programA management program A project with a start & finishA project with a start & finish A cost reduction programA cost reduction program A capital investment projectA capital investment project Only for operationsOnly for operations
WASTEWASTE
It can usually be found in:
defectives overproduction waiting transportation processing inventory
INVENTORY WASTEINVENTORY WASTE
Buy EarlyBuy Early
Buy ExtraBuy Extra
Build EarlyBuild Early
Build ExtraBuild Extra
Early CompletionEarly Completion
JUST - IN - TIMEJUST - IN - TIME
Uniform Plant LoadingUniform Plant Loading
Group TechnologyGroup Technology
Quality Control at the SourceQuality Control at the Source
Minimized Setup TimesMinimized Setup Times
Kanban Type PC SystemsKanban Type PC Systems
PRODUCT STRUCTUREPRODUCT STRUCTURE
PRODUCT
C - 1 A - 1 C - 2
C - 3 C - 4
MANUFACTURING CYCLE TIMEMANUFACTURING CYCLE TIME
SETUP TIME - prepare for operationSETUP TIME - prepare for operation
PROCESS TIME - perform operationPROCESS TIME - perform operation
WAIT TIME - after operation endsWAIT TIME - after operation ends
MOVE TIME - move to next operationMOVE TIME - move to next operation
QUEUE TIME -before operations beginsQUEUE TIME -before operations begins
MANUFACTURING CYCLE TIMEMANUFACTURING CYCLE TIME
Setuptime
Processtime
Movetime
Waittime
Queue time
SETUP TIME REDUCTIONSETUP TIME REDUCTION
Eliminate setup timeEliminate setup time
Convert internal to external Convert internal to external
Reduce internalReduce internal
Setup Time
Internal(machine stopped)
External (machine running)
JOB SHOP CONFIGURATIONJOB SHOP CONFIGURATION
M1M1M1M1M1M1M1
M2M2M2M2
M3M3M3M3M3
M4M4M4
M5M5
M6
WC # 1
WC # 2
WC # 3
WC # 4
WC # 5
WC # 6
GROUP TECHNOLOGY CELLGROUP TECHNOLOGY CELL
Family 1(20 parts)
Lathe Press
Grinder
HeatTreat
PaintTo
Assembly
JIT QUALITY DIRECTIONSJIT QUALITY DIRECTIONS
Enhance Quality Assurance
Small Lot Production
Expose QualityProblems
Fast DetectionFast Correction
Further LotSize Reductions
Quality ProblemElimination
Waste Prevention Waste Reduction
Improved JIT PerformanceImproved Quality
JIT ELEMENTSJIT ELEMENTS HousekeepingHousekeeping Quality FocusQuality Focus Flexible ChangeoversFlexible Changeovers Lost Size of OneLost Size of One Balanced FlowBalanced Flow Skill DiversificationSkill Diversification Visibility ControlVisibility Control Preventive MaintenancePreventive Maintenance Compact Plant LayoutCompact Plant Layout Supplier NetworkingSupplier Networking Workforce ParticipationWorkforce Participation Cellular ManufacturingCellular Manufacturing Pull SystemPull System
KANBANS
Production is driven by demand (not capacity),so it balances supply with demand. They
• prevents overproduction• provides production information• provides pickup/transport information• prevents excessive transport• serves as a work order attached to material• detects defects and their source quickly• maintains inventory control
CONTINUAL IMPROVEMENT FRAMEWORKCONTINUAL IMPROVEMENT FRAMEWORK
IdentifyConstraints
OptimizeThroughput
Expand theConstraints
NewConstraints
Emerge
IncreasedMarket Demand
Market
Expansion
INVENTORY REALITIESINVENTORY REALITIES
Consumes capitalConsumes capital
Requires storage spaceRequires storage space
Incurs taxesIncurs taxes
Requires insuranceRequires insurance
Can become lost, stolen, damaged, outdated, or obsoleteCan become lost, stolen, damaged, outdated, or obsolete
Must be counted, sorted, verified, stored, retrieval, Must be counted, sorted, verified, stored, retrieval, moved, issued, and protectedmoved, issued, and protected
CONVENTIONAL VS. JIT ATTITUDESCONVENTIONAL VS. JIT ATTITUDES
CONVENTIONALCONVENTIONALSome defects are acceptableSome defects are acceptableLarge lots are efficient Large lots are efficient (more is better)(more is better)Faster production is efficientFaster production is efficient (the sooner the better)(the sooner the better)Inventory provides safetyInventory provides safetyInventory smoothes productionInventory smoothes productionInventory is an assetInventory is an assetQueues are necessaryQueues are necessarySuppliers are adversariesSuppliers are adversariesMultiple supply sourcesMultiple supply sourcesBreakdown maintenanceBreakdown maintenanceLong lead time is betterLong lead time is betterSetup time is givenSetup time is givenManagement by edictManagement by edict
JUST - IN - TIMEJUST - IN - TIMEZero defects are necessary and attainableZero defects are necessary and attainableIdeal lot size is one Ideal lot size is one (less is better)(less is better)Balanced production is efficient Balanced production is efficient (faster production is a waste)(faster production is a waste)Safety stock is a wasteSafety stock is a wasteInventory is undesirableInventory is undesirableInventory is a liabilityInventory is a liabilityEliminate all queuesEliminate all queuesSuppliers are partnersSuppliers are partnersFewer sources of supplyFewer sources of supplyPreventive maintenancePreventive maintenanceKeep lead time shortKeep lead time shortDrive setup time to zeroDrive setup time to zeroManagement by consensusManagement by consensus
JIT SUGGESTIONSJIT SUGGESTIONS
1. Avoid interrupted work flow1. Avoid interrupted work flow– decrease setup timedecrease setup time– control quality at sourcecontrol quality at source– eliminate machine breakdownseliminate machine breakdowns
2. Eliminate material handling and stocking2. Eliminate material handling and stocking– arrange equipment to product flowarrange equipment to product flow– reduce space between operationsreduce space between operations– eliminate stocking pointseliminate stocking points
3. Synchronize production3. Synchronize production– cross train operatorscross train operators– uniform plant loadinguniform plant loading– schedule only what is neededschedule only what is needed– eliminate queues and bankseliminate queues and banks– frequent vendor deliveryfrequent vendor delivery
4. Pull Scheduling4. Pull Scheduling– only make what is usedonly make what is used
CONTINUAL IMPROVEMENTCONTINUAL IMPROVEMENT
Identify Constraints
Optimize Constraint Output
Subordinate All DecisionsTo Constraint Optimization
Expand the Constraint
IsConstraint
Still Active?YES NO