k56 circulated - primeland.co.za · stiffened or cellular raft construction type estimated total...

1
Regional Maximum Flood Regional Maximum Flood 2.3+ IP 1 (2.3) 5m BUFFER 5m BUFFER 5m BUFFER EXTENSION 20 COSMO CITY EXTENSION 22 COSMO CITY COSMO CITY EXTENSION 21 EXTENSION 24 COSMO CITY COSMO CITY EXTENSION 26 EXTENSION 25 COSMO CITY 232 231 230 229 228 227 226 225 224 223 222 221 220 219 218 217 213 212 211 210 209 186 185 208 207 206 205 204 203 202 201 200 199 198 197 196 195 191 190 189 188 187 132 DIMENSION AND SIZES CO-ORDINATES CONTOURS GENERAL NOTES ROADS GEOLOGICAL FLOODWATER 122 123 124 125 126 127 128 129 130 131 133 134 135 136 137 138 139 K56 214 215 216 233 234 235 236 237 238 239 240 241 242 243 K29 PAD Normal <5 C K CONSTRUCTION TYPE ESTIMATED TOTAL HEAVE (mm) SITE CLASS Soil raft Split construction Piled construction 15 - 30 H2 Soil raft Modified normal 7.5 - 15 H1 Normal < 7.5 H/R Stiffened or cellular raft CONSTRUCTION TYPE ESTIMATED TOTAL SETTLEMENT (mm) SITE CLASS Deep strip foundations Compaction of insitu soils below individual footings Soil raft Modified normal 5 - 10 C1 H M C1 z 1RUPDO FRQVWUXFWLRQ VWULS IRRWLQJ RU VODERQWKHJURXQG foundation z *RRG VLWH GUDLQDJH 4,11ha COSMO CITY EXTENSIONS 20-25 FOUNDATION DESIGN AND BUILDING PROCEDURES (Expected damage limited to Category 1) Foundation design, building procedures and precautionary measures for single storey residential structures founded on expansive soil horizons. (NHBRC 1999) z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z 1RUPDO FRQVWUXFWLRQ ZLWK OLJKWO\ UHLQIRUFHG VWULS IRRWLQJV and light reinforcement in masonry if residual movements are <7.5mm, or construction type appropriate to residual movements z 5HPRYH DOO RU QHFHVVDU\ SDUWV RI H[SDQVLYH KRUL]RQ WR 1.0m beyond the perimeter of the building and replace with inert backfill compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content. z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z /LJKW UHLQIRUFHPHQW LQ PDVRQU\ z $UWLFXODWLRQ MRLQWV DW DOO LQWHUQDO H[WHUQDO GRRUV DQG openings z /LJKWO\ UHLQIRUFHG VWULS IRRWLQJV z 6LWH GUDLQDJH DQG VHUYLFH SOXPELQJ SUHFDXWLRQV recommended z 1RUPDO FRQVWUXFWLRQ VWULS IRRWLQJ RU VODERQWKHJURXQG foundation z 6WLIIHQHG RU FHOOXODU UDIW RU DUWLFXODWHG OLJKWO\ reinforced masonry z 3LOHG IRXQGDWLRQV ZLWK VXVSHQGHG IORRU VODEV ZLWK RU without ground beams z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z &RPELQDWLRQ RI UHLQIRUFHG PDVRQU\ DQG IXOO movement joints z 6XVSHQGHG IORRUV RU IDEULF UHLQIRUFHG JURXQG VODEV acting independently from the building z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z $V IRU + Foundation design, building procedures and precautionary measures for single storey residential structures founded on expansive soil horizons. (NHBRC 1999) FOUNDATION DESIGN AND BUILDING PROCEDURES (Expected damage limited to Category 1) z 1RUPDO FRQVWUXFWLRQ ZLWK OLJKWO\ UHLQIRUFHG VWULS footings and light reinforcement in masonry z 5HPRYH LQVLWX PDWHULDO WR P EH\RQG SHULPHWHU RI building to a depth of 1.5 times the widest foundation or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content. z 5HLQIRUFHG VWULS IRRWLQJV z $UWLFXODWLRQ MRLQWV DW VRPH LQWHUQDO DQG DOO H[WHUQDO GRRUV z /LJKW UHLQIRUFHPHQW LQ PDVRQU\ z 6LWH GUDLQDJH DQG SOXPELQJ VHUYLFH SUHFDXWLRQV z 5HPRYH LQVLWX PDWHULDO EHORZ IRXQGDWLRQV WR D GHSWK DQG width of 1.5 times the foundation width or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content. z 1RUPDO FRQVWUXFWLRQ ZLWK OLJKWO\ UHLQIRUFHG VWULS foundations and light reinforcement in masonry z 1RUPDO FRQVWUXFWLRQ ZLWK GUDLQDJH SUHFDXWLRQV Founding on a competent horizon below the problem horizon z )RXQGDWLRQ EHDULQJ SUHVVXUH QRW H[FHHGHG N3D J K1 N P SPECIAL (SECONDARY SCHOOL) L PUBLIC OPEN SPACE 17,15ha 2km 1km U C B A F 2,81ha 0,48ha R S T V W X Z A1 B C F G 1:2 500 D1 E1 F1 B1 A D E Y Cosmo20_25 COSMOPOLITAN C17/03.11.2011 BUSINESS 2,76ha (PRIMARY SCHOOL) SPECIAL PROJECTS JOHANNESBURG (Pty) Ltd. 0,93ha STATION 0,78ha PROPOSED COSMO CITY COSMO CITY EXTENSION 16 PROPOSED EXTENSION 15 CIRCULATED FILLING FILLING STATION Q 8,21ha PUBLIC OPEN SPACE MULTI PURPOSE CENTRE COMMUNITY FACILITY 0,34ha COMMUNITY FACILITY 0,41ha PUBLIC OPEN SPACE 0,87ha 0,24ha 0,23ha 0,09ha (WATER RESERVOIR) 3,02ha (PRIMARY SCHOOL) SPECIAL SPECIAL 1277 DENSIFY ERVEN 0,11ha 0,08ha 0,12ha 0,06ha 0,04ha 0,78ha LION PARK AMENDMENT: YIELD ANALYSIS EXISTING (ESTATE) TYPOLOGY No. OF STANDS PERCENTAGE TOTAL ADDITIONAL (ESTATE) TYPOLOGY No. OF STANDS PERCENTAGE TOTAL COMBINED TOTALS TYPOLOGY PERCENTAGE No. OF STANDS TOTAL PRIVATE OPEN SPACE 0,15ha 0,17ha COMMUNITY FACILITY 0,04ha COMMUNITY 0,52ha FACILITY 0,11ha 0,11ha BUSINESS 0,08ha 0,32ha COMMUNITY FACILITY 0,06ha 0,09ha 2,36ha MUNICIPAL 0,17ha PRIVATE OPEN SPACE PRIVATE OPEN SPACE 0,07ha 0,05ha P.O.S. 0,01ha P.O.S. 0,01ha 1278 PUBLIC SPACE 0,24ha PRIVATE OPEN SPACE OPEN SPACE 1,15ha 0,08ha 0,14ha OPEN PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE PUBLIC OPEN SPACE COSMO CITY EXTENSION 23 PUBLIC OPEN SPACE PUBLIC OPEN SPACE COSMO CITY EXTENSION 20 COSMO CITY EXTENSION 21 COSMO CITY EXTENSION 22 COSMO CITY EXTENSION 24 COSMO CITY EXTENSION 25 COSMO CITY EXTENSION 23 COSMO CITY EXTENSION 26

Upload: duongkien

Post on 12-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Reg

iona

l Max

imum

Flo

od

Reg

iona

l Max

imum

Flo

od

2.3+IP 1

(2.3)

5m BUFFER

5m BUFFER

5m BUFFER

EXTENSION 20

COSMO CITY

EXTENSION 22COSMO CITY

COSMO CITY

EXTENSION 21

EXTENSION 24

COSMO CITY

COSMO CITYEXTENSION 26

EXTENSION 25COSMO CITY

232

231

230

229

228

227

226

225

22422322222

122021

9

218217

213

212

211

210

209

186

185

208

207

206

205

204

203

202

201

200

199

198

197

196

195

191

190

189

188

187

132

DIMENSION AND SIZES

CO-ORDINATES

CONTOURS

GENERAL NOTES

ROADS

GEOLOGICAL

FLOODWATER

122

123

124

125

126

127

128

129

130

131

133

134

135

136

137138

139 K56

214

215216

233

234

235

236

237

238

239 240 241 242 243

K29 PAD

Normal<5C

KCONSTRUCTIONTYPE

ESTIMATEDTOTALHEAVE(mm)

SITECLASS

Soil raft

Split construction

Piled construction

15 - 30H2

Soil raft

Modified normal7.5 - 15H1

Normal< 7.5H/R

Stiffened or cellularraft

CONSTRUCTIONTYPE

ESTIMATEDTOTALSETTLEMENT(mm)

SITECLASS

Deep stripfoundations

Compaction ofinsitu soils belowindividual footings

Soil raft

Modified normal5 - 10C1

H

M

C1

ò Normal construction (strip footing or slab-on-the-ground) foundation

ò Good site drainage

4,11ha

COSMO CITY EXTENSIONS 20-25FOUNDATION DESIGN AND BUILDING PROCEDURES(Expected damage limited to Category 1)

Foundation design, building procedures and precautionarymeasures for single storey residential structures founded onexpansive soil horizons. (NHBRC 1999)

ò Site drainage and plumbing / service precautions

ò Normal construction with lightly reinforced strip footings and light reinforcement in masonry if residual movements are <7.5mm, or construction type appropriate to residual movements

ò Remove all or necessary parts of expansive horizon to 1.0m beyond the perimeter of the building and replace with inert backfill compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.

ò Site drainage and plumbing / service precautions

ò Light reinforcement in masonry

ò Articulation joints at all internal / external doors and openings

ò Lightly reinforced strip footings

ò Site drainage and service / plumbing precautions recommended

ò Normal construction (strip footing or slab-on-the-ground) foundation

ò Stiffened or cellular raft or articulated lightly reinforced masonry

ò Piled foundations with suspended floor slabs with or without ground beams

ò Site drainage and plumbing service precautions

ò Site drainage and plumbing / service precautions

ò Combination of reinforced masonry and full movement joints

ò Suspended floors or fabric reinforced ground slabs acting independently from the building

ò Site drainage and plumbing / service precautions

ò As for H1

Foundation design, building procedures and precautionarymeasures for single storey residential structures founded onexpansive soil horizons. (NHBRC 1999)

FOUNDATION DESIGN AND BUILDING PROCEDURES(Expected damage limited to Category 1)

ò Normal construction with lightly reinforced strip footings and light reinforcement in masonry

ò Remove insitu material to 1.0m beyond perimeter of building to a depth of 1.5 times the widest foundation or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.

ò Reinforced strip footings

ò Articulation joints at some internal and all external doors

ò Light reinforcement in masonry

ò Site drainage and plumbing / service precautions

ò Remove insitu material below foundations to a depth and width of 1.5 times the foundation width or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.

ò Normal construction with lightly reinforced strip foundations and light reinforcement in masonry

ò Normal construction with drainage precautions. Founding on a competent horizon below the problem horizon

ò Foundation bearing pressure not exceeded 50kPa

J

K1

N

P

SPECIAL(SECONDARY SCHOOL)

L

PUBLIC OPEN SPACE17,15ha

2km

1km

UC

BA

F

2,81ha

0,48ha

R

S

T

V

WX

ZA1

B

CF

G

1:2 500

D1E1

F1

B1

A

DE

Y

Cosmo20_25COSMOPOLITAN

C17/03.11.2011

BUSINESS2,76ha

(PRIMARY SCHOOL)

SPECIAL

PROJECTSJOHANNESBURG

(Pty) Ltd.

0,93haSTATION0,78ha

PROPOSED

COSMO CITY

COSMO CITY

EXTENSION 16

PROPOSED

EXTENSION 15

CIRCULATED

FILLING FILLINGSTATION

Q

8,21haPUBLIC OPEN SPACE

MU

LTI PUR

POSE C

ENTR

EC

OM

MU

NITY FAC

ILITY

0,34haCOMMUNITY

FACILITY

0,41ha

PUBLIC

OPEN

SPACE

0,87ha

0,24ha

0,23ha

0,09ha

(WATER RESERVOIR)

3,02ha(PRIMARY SCHOOL)

SPECIAL

SPECIAL

1277

DENSIFY ERVEN

0,11ha

0,08ha0,12ha 0,06ha

0,04ha

0,78ha

LION PARK AMENDMENT: YIELD ANALYSIS

EXISTING (ESTATE)

TYPOLOGY No. OF STANDS PERCENTAGE

TOTAL

ADDITIONAL (ESTATE)

TYPOLOGY No. OF STANDS PERCENTAGE

TOTAL

COMBINED TOTALS

TYPOLOGY PERCENTAGENo. OF STANDS

TOTAL

PRIVATE OPEN SPACE0,15ha

0,17haCOMMUNITY

FACILITY0,04ha

COMMUNITY

0,52ha

FACILITY

0,11ha

0,11ha

BUSINESS0,08ha

0,32haCOMMUNITY

FACILITY0,06ha

0,09ha

2,36ha

MUNICIPAL

0,17ha

PRIVATEOPEN SPACE PRIVATE

OPEN SPACE 0,07ha 0,05ha

P.O.S. 0,01ha

P.O.S. 0,01ha1278

PUBLICSPACE0,24ha

PRIVATE OPEN SPACE

OPEN SPACE

1,15ha

0,08ha

0,14ha

OPEN

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

PUBLICOPENSPACE

COSMO CITYEXTENSION 23

PUBLIC

OPEN

SPACE

PUBLICOPENSPACE

COSMO CITY EXTENSION 20

COSMO CITY EXTENSION 21

COSMO CITY EXTENSION 22

COSMO CITY EXTENSION 24

COSMO CITY EXTENSION 25

COSMO CITY EXTENSION 23

COSMO CITY EXTENSION 26