k56 circulated - primeland.co.za · stiffened or cellular raft construction type estimated total...
TRANSCRIPT
Reg
iona
l Max
imum
Flo
od
Reg
iona
l Max
imum
Flo
od
2.3+IP 1
(2.3)
5m BUFFER
5m BUFFER
5m BUFFER
EXTENSION 20
COSMO CITY
EXTENSION 22COSMO CITY
COSMO CITY
EXTENSION 21
EXTENSION 24
COSMO CITY
COSMO CITYEXTENSION 26
EXTENSION 25COSMO CITY
232
231
230
229
228
227
226
225
22422322222
122021
9
218217
213
212
211
210
209
186
185
208
207
206
205
204
203
202
201
200
199
198
197
196
195
191
190
189
188
187
132
DIMENSION AND SIZES
CO-ORDINATES
CONTOURS
GENERAL NOTES
ROADS
GEOLOGICAL
FLOODWATER
122
123
124
125
126
127
128
129
130
131
133
134
135
136
137138
139 K56
214
215216
233
234
235
236
237
238
239 240 241 242 243
K29 PAD
Normal<5C
KCONSTRUCTIONTYPE
ESTIMATEDTOTALHEAVE(mm)
SITECLASS
Soil raft
Split construction
Piled construction
15 - 30H2
Soil raft
Modified normal7.5 - 15H1
Normal< 7.5H/R
Stiffened or cellularraft
CONSTRUCTIONTYPE
ESTIMATEDTOTALSETTLEMENT(mm)
SITECLASS
Deep stripfoundations
Compaction ofinsitu soils belowindividual footings
Soil raft
Modified normal5 - 10C1
H
M
C1
ò Normal construction (strip footing or slab-on-the-ground) foundation
ò Good site drainage
4,11ha
COSMO CITY EXTENSIONS 20-25FOUNDATION DESIGN AND BUILDING PROCEDURES(Expected damage limited to Category 1)
Foundation design, building procedures and precautionarymeasures for single storey residential structures founded onexpansive soil horizons. (NHBRC 1999)
ò Site drainage and plumbing / service precautions
ò Normal construction with lightly reinforced strip footings and light reinforcement in masonry if residual movements are <7.5mm, or construction type appropriate to residual movements
ò Remove all or necessary parts of expansive horizon to 1.0m beyond the perimeter of the building and replace with inert backfill compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.
ò Site drainage and plumbing / service precautions
ò Light reinforcement in masonry
ò Articulation joints at all internal / external doors and openings
ò Lightly reinforced strip footings
ò Site drainage and service / plumbing precautions recommended
ò Normal construction (strip footing or slab-on-the-ground) foundation
ò Stiffened or cellular raft or articulated lightly reinforced masonry
ò Piled foundations with suspended floor slabs with or without ground beams
ò Site drainage and plumbing service precautions
ò Site drainage and plumbing / service precautions
ò Combination of reinforced masonry and full movement joints
ò Suspended floors or fabric reinforced ground slabs acting independently from the building
ò Site drainage and plumbing / service precautions
ò As for H1
Foundation design, building procedures and precautionarymeasures for single storey residential structures founded onexpansive soil horizons. (NHBRC 1999)
FOUNDATION DESIGN AND BUILDING PROCEDURES(Expected damage limited to Category 1)
ò Normal construction with lightly reinforced strip footings and light reinforcement in masonry
ò Remove insitu material to 1.0m beyond perimeter of building to a depth of 1.5 times the widest foundation or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.
ò Reinforced strip footings
ò Articulation joints at some internal and all external doors
ò Light reinforcement in masonry
ò Site drainage and plumbing / service precautions
ò Remove insitu material below foundations to a depth and width of 1.5 times the foundation width or to a competent horizon and replace with material compacted to 93% MOD AASHTO density at -1% to +2% of optimum moisture content.
ò Normal construction with lightly reinforced strip foundations and light reinforcement in masonry
ò Normal construction with drainage precautions. Founding on a competent horizon below the problem horizon
ò Foundation bearing pressure not exceeded 50kPa
J
K1
N
P
SPECIAL(SECONDARY SCHOOL)
L
PUBLIC OPEN SPACE17,15ha
2km
1km
UC
BA
F
2,81ha
0,48ha
R
S
T
V
WX
ZA1
B
CF
G
1:2 500
D1E1
F1
B1
A
DE
Y
Cosmo20_25COSMOPOLITAN
C17/03.11.2011
BUSINESS2,76ha
(PRIMARY SCHOOL)
SPECIAL
PROJECTSJOHANNESBURG
(Pty) Ltd.
0,93haSTATION0,78ha
PROPOSED
COSMO CITY
COSMO CITY
EXTENSION 16
PROPOSED
EXTENSION 15
CIRCULATED
FILLING FILLINGSTATION
Q
8,21haPUBLIC OPEN SPACE
MU
LTI PUR
POSE C
ENTR
EC
OM
MU
NITY FAC
ILITY
0,34haCOMMUNITY
FACILITY
0,41ha
PUBLIC
OPEN
SPACE
0,87ha
0,24ha
0,23ha
0,09ha
(WATER RESERVOIR)
3,02ha(PRIMARY SCHOOL)
SPECIAL
SPECIAL
1277
DENSIFY ERVEN
0,11ha
0,08ha0,12ha 0,06ha
0,04ha
0,78ha
LION PARK AMENDMENT: YIELD ANALYSIS
EXISTING (ESTATE)
TYPOLOGY No. OF STANDS PERCENTAGE
TOTAL
ADDITIONAL (ESTATE)
TYPOLOGY No. OF STANDS PERCENTAGE
TOTAL
COMBINED TOTALS
TYPOLOGY PERCENTAGENo. OF STANDS
TOTAL
PRIVATE OPEN SPACE0,15ha
0,17haCOMMUNITY
FACILITY0,04ha
COMMUNITY
0,52ha
FACILITY
0,11ha
0,11ha
BUSINESS0,08ha
0,32haCOMMUNITY
FACILITY0,06ha
0,09ha
2,36ha
MUNICIPAL
0,17ha
PRIVATEOPEN SPACE PRIVATE
OPEN SPACE 0,07ha 0,05ha
P.O.S. 0,01ha
P.O.S. 0,01ha1278
PUBLICSPACE0,24ha
PRIVATE OPEN SPACE
OPEN SPACE
1,15ha
0,08ha
0,14ha
OPEN
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
PUBLICOPENSPACE
COSMO CITYEXTENSION 23
PUBLIC
OPEN
SPACE
PUBLICOPENSPACE
COSMO CITY EXTENSION 20
COSMO CITY EXTENSION 21
COSMO CITY EXTENSION 22
COSMO CITY EXTENSION 24
COSMO CITY EXTENSION 25
COSMO CITY EXTENSION 23
COSMO CITY EXTENSION 26