kangra coal annexes
TRANSCRIPT
Annex A
Curriculum Vitaes
Max Clark Partner Impact Assessment and Planning (IAP)
The world’s leading sustainability consultancy
Max Clark is a Partner and the lead of ERM’s Impact Assessment and Planning practice in South Africa, based in the Johannesburg office. Max has more than 25 years of broad-ranging experience in the environmental sector. For much of the period he has focused on environmental planning and assessment of major capital projects in the infrastructure, mining and power sectors. Max has directed or managed major environmental scoping and feasibility studies; environmental and social impact assessments (ESIA); environmental management plans (EMPs); stakeholder engagements; and projects related to due diligence, compliance, monitoring and auditing. Through his involvement with Engineering, Procurement and Contract Management (EPCM) companies and major projects Max has a thorough understanding of integrating sustainability principals and environmental and socio-economic objectives into capital project development through the project lifecycle. Furthermore, Max is a specialist in sustainable port development and has been involved in a range of port developments, including port master planning, the development of terminals for containers, break bulk, coal, manganese, iron ore, LNG and RoRo for vehicles, harbour entrance widening and dredging studies. Apart from his work on projects in African countries, Max has worked on projects in Paraguay and the Solomon Islands. He has also provided strategic support to teams working in Canada, Chile, Peru, Brazil, Russia and Australia.
Fields of Competence
Project Management
Engineering, Procurement and Construction Management (EPCM)
Environmental Impact Assessments (EIAs)
Environmental Management Programmes (EMPs) and Systems
Environmental Policy and Legislation
Sustainable Port Development
Due Diligence Studies
Strategic Planning and Integration with Sustainable Development
Professional Affiliations & Registrations
South African Council for Natural Scientific Professions as a Professional Natural Scientist in Ecological, Environmental and Zoological Science (Registration Number: 400333/04)
International Association of Impact Assessment (IAIAsa)
Fellow of the Royal Entomological Society
Education
PhD, University of Cape Town, 1989
MSc, Rhodes University, 1984
BSc (Hons), Rhodes University, South Africa, 1980
BSc, Rhodes University, South Africa, 1978
Languages
English
Afrikaans
Key Industry Sectors
Mining and Minerals Processing
Power
Infrastructure
Oil and Gas
05.09.16 MAX CLARK
Selected Project Experience
Projects at ERM Gas to Power Programme, South Africa, Department of
Energy, 2015
Providing advice on environmental issues and permitting
processes, for the Gas to Power Programme in South
Africa, covering short and medium term options in
Richards Bay, Coega and Saldanha. These include floating
power plants (short term) and land based power plants
linked to LNG importation facilities in the powers
(medium term).
Horn of Africa Pipeline Project, Ethiopia and Djibouti,
Black Rhino, ESIA Project Director, 2015 – Ongoing
ESIA for a 550 km multi-product pipeline from Djibouti to
Awash near Addis Ababa, including the marine
importation infrastructure.
Mining Right Application, South Africa, Kangra Coal
(Pty) Ltd, 2015 – Ongoing
Mining Right Application for a new underground mine
and amendments to their existing EMP for current
operations.
ESIA: Macuse Rail and Port Project, Mozambique,
ItalThai Development, 2014 – Ongoing
ESIA for a proposed new rail line from Macuse to a new
port at the coast of Mozambique.
Effluent disposal permit application, South Africa, Shell
Rocky Drift, 2015
Effluent disposal permit application.
Basic Assessment, South Africa, Distell Group Limited,
2015
Basic Assessment Report for the installation of Carbon
Dioxide and Ethanol storage tanks.
EMP Audit, South Africa, Vodacom, 2014
Section 24 G application for the installation of tanks at their
site and EMP Audit.
Section 24 G application, South Africa, Prominent Paints,
2014
Section 24 G application for the installation of tanks at their
site.
Kusipongo Coal Reserve Scoping and EIA, South Africa,
Kangra Coal, 2014 - 2015
Kangra Coal submitted a mining right application to
expand their current mining operations outside Piet Retief,
Mpumalanga, South Africa. Environmental and public
participation manager responsible for the development of
the scoping report as well as the public consultation
processes involved with the scoping and the EIA phases.
Implementation Oversight for the Malawi Compact
Millennium Challenge Corporation, Malawi, MCC, 2014
– ongoing
Providing oversight support to the MCC in all areas
related to Compact implementation ranging from review
of project designs and cost; preparation of terms of
reference for studies; drafting of tenders for procuring
materials, products and services; developing sound and
realistic technical assistance packages; critiquing work
done by other consultants and contractors, and proposing
improvements, etc.
Panda Hill Niobium Project, Tanzania, Cradle Resources,
2014 – 2015
ERM was responsible for the quality control of an ESIA of
a proposed Niobium mine. The ESIA was conducted by
MTL Consulting.
Environmental approvals for the installation of
underground storage tanks, South Africa, Shell, 2014 -
ongoing
Directed a programme of works to apply for
Environmental Approvals for the installation of new
underground storage tanks at over 20 retail service
stations.
Biodiversity Management Plan (BMP), Zambia,
Copperbelt Energy Corporation, 2015
A BMP was compiled for the Kabompo Gorge
Hydroelectric Project in northern Zambia. Various
Environmental Impact Statements (EIS) reports were
independently compiled for each of the project
components and a BMP was requested by international
lenders to demonstrate how the project will comply with
the IFC standards with emphasis on Performance Standard
6. ERM’s studies for the BMP included site assessments,
stakeholder engagement, comprehensive management
measures and a review of the feasibility of implementing
an offset to compensate for residual biodiversity impacts.
Due Diligence of a mine, West Africa, confidential
mining client, 2014
Due Diligence for a proposed mine, rail and port facility on
behalf of a potential purchaser of the mine requiring an
understanding of the Environmental Impact Assessment
(EIA) process, legal requirements and International
Finance Corporation (IFC) Guidelines.
05.09.16 MAX CLARK
Pertama Ferroalloys Smelter, Malaysia, confidential
mining client, 2013 - 2014
Environmental contribution to finalisation of feasibility
study review as Lenders' Independent Engineer for a
greenfield ferroalloys smelter to be constructed in
Malaysia. The project was undertaken in accordance with
Equator Principles and IFC Performance Standards.
Due Diligence review of mining project, Guinea,
Confidential mining client, 2013
Managed a team of environmental and social specialists to
review a mining project with associated infrastructure
against country legal requirements, Equator Principles and
IFC Performance Standards.
EIAs for the upgrade of two power stations, Zimbabwe,
Zimbabwe Power Corporation, 2012 – 2013
Supervision of the team undertaking the EIA using local
consultants.
Projects prior to joining ERM
National multi-products Pipeline, South Africa,
Transnet, 2012 - 2013
Construction of a multi-products pipeline from Durban to
Pretoria, South Africa. Monitored progress and quality of
the environmental practice in the implementation of the
environmental authorisation and permits and the EMP, in
accordance with relevant South Africa environmental
legislation.
Development of Sustainable Development (SD)
Management content for Navigator, South Africa, Kumba
Iron Ore and Anglo American, 2012 - 2013
Project Sponsor
The project entailed the development of SD management
processes and supporting guidance documentation for
high value and high complexity capital projects within the
client’s Asset Development Methodology (ADM)
Navigator. The resulting processes and guidance
documents guide from the client’s capital project teams in
achieving both clients’ governance and corporate
commitment requirements within the framework of the
client’s Project Way and other applicable standards such as
the second client’s Environment Way, Social Way and
SEAT Tools, and the Mine Closure Toolbox. This entailed
the development of processes, guidance notes and
guidelines, and templates for SD management that are
fully integrated into the client’s ADM Navigator project
management and key knowledge area processes.
EIAs for Sumitomo Nickel Project, Solomon Islands,
mining client, 2011 - 2013
Environmental Impact Statement (EIS) Manager
Two environmental impact assessments of two proposed
nickel mining projects (including mining, staff villages,
mining industrial areas, ports, waste management
facilities, sewage treatment facilities and rehabilitation) on
the islands of Choiseul and Santa Isabel in the Solomon
Islands.
Environmental & Social (E&S) studies for Iron and Steel
Plant including power plant, South Africa and
Mozambique, IDC, 2012
Sponsor
Sponsor for the Environment Team that managed all E&S
studies required for the pre-feasibility study. Project sites
spanned across numerous provinces in South Africa and
included a site in Mozambique. The project included
developing an environmental permitting strategy for the
different project components to determine what listed
activities would require authorisation, to identify what
other environmental permits would be required and to
scope the environmental and social studies that would be
necessary.
Due Diligence for a coal mine, Mozambique, mining
client, 2012
Environmental Lead
Due Diligence for a proposed coal mine on behalf of a
potential purchaser of the mine requiring an
understanding of the EIA process, legal requirements and
international best practice.
Highlands Wind Power Project, Lesotho, Harrison &
White, 2012
Sponsor
Environmental work stream coordination and
management of the integration of environmental and social
requirements, into design and management of the
Environmental, Health and Social Impact Assessment
(ESIA) consultants.
Transnet Port and Rail Infrastructure Upgrade, South
Africa, Transnet, 2006 – 2011
Programme Manager: Environmental and Sustainable
Development
Responsible for environmental management on a suite of
over 40 projects, undertaken in the six commercial ports
and on major freight rail corridors throughout South
Africa. Established a team of environmental managers and
specialists and managed all facets of the programme
related to environmental management from pre-feasibility,
EIAs, compilation of Environmental Management
Programmes (EMPs), construction through to
commissioning. In addition, took responsibility for
ensuring that these major infrastructure projects met the
requirements of the National Environmental Management
Act (NEMA) and that all necessary environmental
05.09.16 MAX CLARK
authorisations and environmental permits were obtained
and that final design and construction met the
requirements of these permits.
In particular:
Port of Richards Bay:
o Environmental and sustainability inputs to port
master planning covering a range of possible
future development options for the port;
o Container terminal development strategy for next
30 to 40 years;
o Eastern Corridor Development Project linking port
and rail development between Richards Bay,
Durban and Gauteng;
o Screening study for upgrade to the coal line to the
coal terminal;
o Expansion of the multipurpose terminal;
o Permitting for geotech work in along the edge of
the bay.
o An additional study was a high level
environmental review of the Bayside Smelter
property for possible acquisition by Transnet.
Port of Durban
o Environmental and sustainability inputs to port
master planning covering a range of possible
future development options
o Environmental monitoring for the widening of the
port entrance
o Feasibility and environmental studies for a
proposed new Bayhead container terminal
o Expansion of existing container terminal facilities
o Expansion of the vehicle export terminal
o Environmental screening studies for the proposed
Digout Port at the old Durban International
Airport
Port of Cape Town
o Expansion of the container terminal
Ports of Ngqura and Port Elizabeth
o Environmental and sustainability inputs to port
master planning covering a range of possible
future development options for the two ports
o Eastern Corridor Development Project linking port
and rail development from Port Elizabeth and
Ngqura to the interior of the country at De Aar
and further northwards.
o Refurbishment and expansion of the manganese
export terminal at Port Elizabeth
o Container terminal development at Ngqura
o Study of development of a manganese export
terminal at Ngqura
o New rail link to Ngqura
Port of Saldanha:
o Environmental and sustainability inputs to port
master planning covering a range of possible
future development options for the port;
o Western Corridor Development Project linking
port and rail development between Saldanha,
Cape Town and the hinterland;
o Permitting and studies for the expansion of the
iron ore terminal to 42 mtpa;
o Permitting and studies for the expansion of the
iron ore terminal to 60 mpta;
o Permitting and studies for the expansion of the
iron ore terminal to 120 mtpa;
o Studies and ESIA for the development of a reverse
osmosis plant;
o Screening and planning for a manganese export
terminal;
o Environmental management for construction
activities at the port for the expansion of the iron
ore terminal, a new reverse osmosis plant and rail
upgrades.
o Various rail upgrade projects for rail servicing the
port;
o Container terminal development.
Port studies involved extensive specialist studies
including marine ecology; erosion modelling; marine
dispersion modelling; air quality studies and
atmospheric dispersion modelling; sediment studies;
dredging and dumping studies; archaeological and
heritage studies; ship collision studies; noise studies;
socio-economic studies and economic studies.
Power generation facility, South Africa, Richards Bay
Minerals, 2010
Environmental planning for a power generation facility at
the RBM mine.
Gold Regional Mining and Closure Strategy for the
Witwatersrand Gold Mining Area with the CSIR, Mintek
and Council for Geosciences, South Africa, the
Department of Minerals and Energy, 2005
Project Manager
The project aimed to develop strategic guidelines to
improve the contribution of the gold mining industry in
the region to sustainable development.
Granite Regional Mining and Closure Strategy with the
CSIR, South Africa, the Department of Minerals and
Energy, 2005
Project Manager
Several strategic and directed environmental research
initiatives, for the Sustainability through Mining
Programme, on improving the contribution of the mining
industry to sustainable development for the Brits and
05.09.16 MAX CLARK
Rustenburg areas in South Africa. Miningtek (CSIR) project
for the Department of Minerals and Energy.
Environmental reports review, South Africa, mining
client, 2004
Review of environmental reports on the impacts of open
cast mining on rare species in the Bronberg east of Pretoria,
Gauteng Province in South Africa.
Environmental Planning, South Africa, Developer, 2004
Environmental planning for a development adjacent to an
estuary with a population of rare sea horses, near
Plettenberg Bay in South Africa.
Ecotourism EIA, South Africa, Inyoni Park, 2004
Environmental sensitivity analysis and environmental
impact assessment of a proposed ecotourism development
at Inyoni Park in Ekurhuleni, Gauteng.
EMP and H&S Programme, South Africa, Mondi, 2003 -
2004
Developed and managed the implementation of the
Environmental Management Programme and Health and
Safety programmes during construction in Richards Bay,
South Africa.
EMP & EHS programme development, South Africa,
Mondi, 2003 - 2004
EHS Manager
Development of the EMP and Environmental, Health and
Safety (EHS) Programme for the R2.4 billion expansion of
the client in Richards Bay, South Africa, and management
of the implementation of the programmes.
Coastal Zone application, South Africa, Private
Developer, 2003
Sensitive Coastal Zone application for a development on a
coastal dune system.
Risk Management for expansion project, South Africa,
Mondi, 2003
Compiled a Risk Management assessment for a R2.4 billion
(RB 720) expansion project in Richards Bay, South Africa.
EHS management of expansion project, South Africa,
Indian Ocean Fertilizers, 2000 - 2003
EHS Manager
Consulted as the EHS Manager and a member of the
management team of the R1.1 Billion expansion project for
the client in Richards Bay, South Africa. Activities included
the development and coordination of the implementation
of the EMP, the Health and Safety Management
Programme, auditing the EMP and the management of
relevant project personnel in implementing the
programmes.
Training on ISO 14001, South Africa, Foscor, 2002
Training on the ISO 14001 Environmental Management
System to the management and implementation teams of
Foskor, Richards Bay.
Biodiversity research activities included the following:
Design of a three-year research programme on
assessing invertebrate biodiversity hotspots in the
Eastern Arc Mountains and coastal forests of Tanzania
and Kenya, for the Critical Ecosystem Partnership Fund
(CEPF) and the Conservation International Foundation.
(2005).
Three year research programme into the impacts of
development in the urban and rural landscape on
invertebrate biodiversity, for E Oppenheimer & Son.
(2004 – 2006).
Two year study of the life history and population
monitoring of a rare and endangered lycaenid butterfly
in the Coega Industrial Development Zone, for the
Coega Development Corporation. (2004 – 2005)
Review of status of research on pollinators and their
impact on biodiversity in South Africa, for the Food
and Agriculture Organisation (Rome) (2004).
Kate Hamilton Senior Consultant
Impact Assessment and Planning
The world’s leading sustainability consultancy
Kate Hamilton is a Senior Consultant within ERM’s Impact Assessment and Planning (IAP) team based in Johannesburg, South Africa. Kate’s fields of competence include environmental planning and management, Environmental Impact Assessments (EIAs), and on-site management as an Environmental Control Officer (ECO). Kate has gained substantial experience in report writing, project management, specialist coordination, and research. Kate also has considerable experience liaising with a broad range of stakeholders and government authorities. Kate has more than 10 years of experience in producing and implementing Environmental Management Plans as a consultant and on-site ECO, largely in the mining sector. She also has four years of UK experience working with London Borough Town Planning where she was responsible for liaising with clients and planning assessments.
Fields of Competence
Environmental & Social Management Programmes (ESMPs)
EIAs
Basic Assessments Professional Affiliations & Registrations
International Association for Impact Assessment South Africa (IAIAsa)
Education
Honour’s Degree (Environmental & Geographical Science), University of Cape Town, South Africa, 1998
Bachelor of Science Degree (Zoology and Environmental and Geographical Science), University of Cape Town, South Africa, 1995-1997
Key Industry Sectors
Mining
Ports and harbour developments
Oil and gas Languages
English
Afrikaans
German (basic)
05.09.16 KATE HAMILTON
Key Projects
Kangra Coal (Pty) Ltd, South Africa, 2015 – ongoing
Mining Right Application for a new underground mine
and amendments to their existing EMP for current
operations.
Shell Rocky Drift, South Africa, 2015
Effluent disposal permit application.
Distell Group Limited, South Africa, 2015
Basic Assessment Report for the installation of Carbon
Dioxide and Ethanol storage tanks.
Vodacom Midrand Ltd, South Africa, 2014
Section 24 G application for the installation of tanks at their
site and EMP Audit.
Prominent Paints, South Africa, 2014
Section 24 G application for the installation of tanks at their
site.
Engen Petroleum Ltd, South Africa, 2013-2014
Basic Assessment Application for a new service station and
associated bridge widening.
Venetia Diamond Mine, South Africa, 2013-2014
Full EIA process to license waste areas and obtain a Water Usel License for their mining operations. Included co-ordination of specialists and report writing.
Western Cluster Limited, Liberia, 2012 - 2013 Scoping and ESIA/ ESMP for three new mines, two brownfields and one greenfields. Letseng Diamond Mine, Lesotho, 2012 ESIA and ESMP for the proposed new Plant 3 and associated expansions. Venetia Diamond Mine, South Africa, 2011
Scoping and EIA/EMP, including stakeholder engagement, for the proposed new underground mine and EMP consolidation for existing mining activities. Included co-ordination of specialists and report writing. Graftech, South Africa, 2011 – 2012 Air Emissions License Applicastion under NEMAQA for current activities. Barloworld Motors Environmental Authorisation Compliance, South Africa, 2010 Audit of Environmental Authorisation and EMP. Engen AST Installation at Copper Motors, South Africa, 2009-2010
Compilation of an EIA and EMP report.
Chevron AST Installation at Waltloo Terminal, South Africa, 2009-2010
Compilation of an EIA and EMP report.
Chevron S24G Rectification Applications for installation
of above ground additive storage tanks, South Africa,
2009-2010
Client and authority liaison, site visits, public participation
process and report writing.
SC Johnson & Sons AST Installation, South Africa, 2009-2010 Basic Assessment and EMP Reports for the installation of ASTs. Zambeze Mine, Mozambique, 2009
Scoping Phase for a new coal mine near Tete Town.
AFROX S24G Rectification Applications for installation
of above ground Argon storage tanks, 2009
Client and authority liaison, site visits, public participation
process and report writing.
Chevron AST Installation at Kroonstad Depot, South Africa, 2009 Compilation of an EIA and EMP report. Transnet freight Rail Yard Lighting Upgrades, South Africa, 2008 Compilation of Basic Assessment and EMP Reports for six Transnet sites. Amendment to an Environmental Management Plan for the installation of above ground storage tanks at Anglo Platinums’ Lebowa Platinum Mine, South Africa, 2008-2010 Compilation of an EIA and EMP report. Mmamabula Energy Project: ESHIA for Proposed coal mine and power station, Botswana, 2006 - 2009
The Mmamabula Energy Project involved the development of a coal mine, power station and associated infrastructure in southern Botswana. ERM was appointed to undertake various stakeholder consultations for the project. Social and Environmental Scan at Anglo Platinums’ Twickenham Platinum Mine, South Africa, 2008
To identify environmental and social sensitivities at the potential temporary tailings dam sites. Amendment to an Environmental Management Plan for the installation of emergency power generators and associated diesel storage at Goldfields Kloof, South Deep and Driefontein Gold Mines, South Africa, 2008-2009
Compilation of an EIA and EMP report.
05.09.16 KATE HAMILTON
Shell NEMA Rectification Applications for above and under ground fuel storage tanks, 2007
Kate was involved in the undertaking of site visits, report writing and the submission of Rectifications reports for the Western Cape Province. The role entailed the coordination of site visits and reporting requirements, project database management, quality control of report deliverables, authority liaison and submission of the required deliverables.
Environmental and social review of key issues affecting
port and rail corridor planning for Transnet Capital
Project, South Africa, 2007 - 2008 Pre-feasibility investigations to identify key environmental and social issues and fatal flaws that may impact on future port and rail planning in South Africa.
Environmental review of the Durban International Airport site for redevelopment into a container port, South Africa, 2007
Compilation of a report to identify potential environmental
and social restrictions associated with future development
of the site. Issues considered included historical soil and
groundwater contamination, biodiversity considerations
and social issues such as resettlement of existing land
users. Cost estimates to address both environmental site
liabilities as well as cost to meet legislative requirements in
terms of the EIA regulations were provided.
Copper Resources Corporation, Philippines, 2006-2007 Based on site in the Central Western Philippines, the role included managing the environmental programme in preparation for the Bankable Feasibility Study and facilitating public participation processes.
Alan N. Cochran Senior Consultant Impact Assessment & Planning
The business of sustainability
Alan Cochran is a Senior Consultant within ERM based in Johannesburg. Alan has 10 years of experience in the field of Environmental Consulting. Early on in his career, he worked as a specialist and project manager in the field of biodiversity where he has developed core competencies in the following areas: environmental management, project management and coordination, environmental monitoring, ecology, biodiversity offsets, and ecosystem goods and services. In the latter half of his career, Alan has moved into broader project management of environmental impact-related projects. Alan has worked on projects throughout the project lifecycle from exploration through pre-feasibility to feasibility, to operation and closure. This includes conducting screening and scoping exercises, baseline studies, impact assessments, monitoring, and management planning and implementation. Alan has strong experience in the SADC region as well as in East and West Africa (see project experience map). This includes work such as specialist (wetland) baseline and impact assessments; the design and implementation of monitoring programmes (ecological, air quality, ground and surface water); management of scoping studies, impact assessment, ESIAs and EMPs; and public consultation processes.
Fields of Competence
Project management and logistics;
Environmental management and impact assessments;
Environmental monitoring;
Biodiversity and ecosystem services;
Site selection and constraints analysis; and
GIS , remote sensing, data capture and analysis.
Alan’s project experience map
Professional Affiliations & Registrations
Member of the IAIA
Education
B.A. Hons (Geography and Environmental Management), University of Johannesburg, South Africa, 2004
B.A. (Geography and Environmental Studies) University of Johannesburg, South Africa, 2003
Languages
English, native speaker
Afrikaans
Swedish
Key Industry Sectors
Infrastructure
Mining
05.09.16 ALAN N. COCHRAN
Selected Key Projects
Environmental and Social Support for ESIA upgrade to
IFC PS, QIPP Gas Fired Power Plant and Transmission
Line, Nigeria, BlackRhino, 2016 – ongoing
Project management and development of supplementary
documentation as well as updated RAP and SEP.
Supplementary studies include Air Quality, Noise,
Biodiversity, Gender & Human Rights, Cultural Heritage
and Ecosystem Goods and services. Additionally the
provision of support to BlackRhino during lender
interactions.
Multi-products Pipeline Screening study and EIA,
Ethiopia & Djibouti, BlackRhino, 2015 – ongoing
Project management and development of a screening study
and Environmental and Social Impact Assessment (ESIA)
in Ethiopia and Djibouti for the BlackRhino MOGS (BRM)
multi-products fuel pipeline from Djibouti to Awash in
Ethiopia.
Solar PV Fatal Flaw Assessment, Mozambique, Regius
Resources (ltd), 2015
Design and implementation of an environmental and
social constraints assessment using spatial analysis of
remote sensing data.
Oil and Gas Fatal Flaw Assessment, Kenya, Confidential
Client, 2015
Project management of a rapid environmental and social
fatal flaw assessment of potential oil and gas exploration
sites for a confidential client. Alan made use of a multi-
criteria spatial analysis to provide the client with a rapid
assessment of the potential environmental and social
constraints to operating.
IFC PS Level Audit, Zambia, DEG, 2014
Audit for DEG of the environmental components against
IFC Performance Standards of the EIA for the Handymans
Ltd proposed limestone quarry and cement factory.
Mining Right Application, South Africa, Kangra Coal
Mine, 2014 – ongoing
Project management of all aspects of a multiple permit
application process for a mining right in a highly sensitive
area. Included the permitting of a 5 km overland conveyor
and access adit.
Macuse Port ESIA, Mozambique, ItalThai, 2014 –
ongoing
Project manager for the ESIA process for the permitting of
a deepwater coal terminal in Mozambique near the town of
Quelimane.
Bomi Hills Iron Ore Mine ESIA, Liberia, Vedanta
(Western Cluster Limited), 2012 - 2013
Project management of all aspects for the completion of
ESIAs for an Iron Ore Mine, Road/Rail corridor, and Port
Facility.
ESIA IFC Upgrade & Rail Screening Study, Angola,
AEMR Kassinga Iron Ore, 2013 Project management of an upgrade to an existing mine and
Port ESIA to IFC standards. Project included a screening
study for a 600 km railway line.
Estima Coal Project ESIA, Mozambique, ENRC, 2012 Management of the EIA process on behalf of ENRC. Responsibilities included reporting, budget control, invoicing, management of specialist studies, interfacing with the client and project engineers, and public consultation.
Mantra Mkuju Uranium Mine ESIA and World Heritage
Site Boundary Modification Application, Tanzania, 2011
- 2012
Responsibilities included the coordination and facilitation
of specialist studies, collection of noise and visual impact
field data. Additionally, Alan was responsible for all GIS
and mapping (over 70 maps produced) for the ESIA as
well as report compilation.
Perkoa Zinc Mine ESIA Addendum, Burkina Faso,
Nantou Mining, 2011 - 2012
Project management of all aspects for the completion of an
addendum to the existing ESIA for the expansion of the
mining footprint and waste disposal areas.
Bokai Platinum Mine ESIA Addendum, Zimbabwe,
Todal Mining, 2011
Review of specialist studies, impact assessment and
management plan (EMP). Conducted baseline socio-
economic studies for input into the ESIA Addendum.
Moatize Small Mammals Monitoring Programme,
Mozambique, Vale, 2010 - 2011
Responsible for the design and implementation of the
small mammals monitoring programme. This included the
selection of sites, monitoring methodologies, and
monitoring protocols.
Ecological Baseline and Impact Assessment, South
Africa, Exxaro, 2010
Project management of ecological baseline and impact
assessment for the proposed Exxaro Belfast coal mine.
Assessment of ecosystem goods and services supplied by
the wetlands to the local people. Design of Biodiversity
Action Plan and monitoring program. Participation in
public meetings.
05.09.16 ALAN N. COCHRAN
Moatize Small Mammals Monitoring Programme,
Mozambique, Vale, 2009 - 2010
Design and implementation of a Small Mammals
Monitoring Programme for the Vale Moatize Coal Mine.
Wetland Management and Monitoring Plan, South
Africa, Matla Coal Mine, 2008 - 2009
Compilation of a Wetland Management and Monitoring
Plan for Matla Colliery.
Environmental Impact Assessment, Mozambique,
Riversdale Benga, 2008 - 2009
Wetland delineation, characterisation and impact
assessment for proposed coal mine and power station.
Assessment of ecosystem good and services and
livelihoods dependence on wetland habitats for input into
Resettlement Action Plan (RAP).
Wetland Assessment, South Africa, Tormin Mineral
Sands, 2008
Assessment of ecosystem goods and services supplied by
wetlands to local people. Wetland delineation and impact
assessment for proposed mineral sands project.
Baseline Studies, South Africa, Lonmin, 2007 - 2008 Project co-ordination and logistics of all specialist
components for the baseline studies for the proposed
Lonmin Akanani Platinum Mine, all GIS.
ESIA, Madagascar, Sherrit Ambatovy Nickel Mine and
Pipeline, 2007
Spatial analysis of aquatic habitats and selection of survey
sites for a 220 km slurry pipeline, as well as survey
planning and coordination.
Annex B
MR209 Acceptance Letter
Annex C
MR133 Acceptance Letter
Annex D
Stakeholder Engagement
Preliminary Documents
NOTICE OF PUBLIC COMMENT PERIOD AND DOCUMENT
AVAILABILITY FOR THE EXPANSION OF THE KANGRA COAL (PTY)
LTD SAVMORE COLLIERY, DRIEFONTEIN
ERM Ref: 0354781
OVERVIEW OF THE PROJECT
Kangra Coal (Pty) Ltd proposes to expand their current mining operations facility at the Savmore Colliery,
near Piet Retief in Mpumalanga. Kangra Coal intends to extend the current operations under the Consoli-
dated EMPr (MP 30/5/1/2/2/133MR ). The new activities applied for as part of this Section 102 Amend-
ment application are (these activities have been subject to previous public consultation activities in
2015/2016 and are now further being applied for as part of the S102 Amendment and EMPr Consolida-
tion):
• The Central Discard Dump at Maquasa East operations;
• The Maquasa West Extension (MWE) underground workings;
• The new Adit 5 to access the MWE underground workings; and
• An overland conveyor and service road connecting Adit 5 with the existing Maquasa West operational
area.
Existing facilities at Maquasa West and Maquasa East will be utilised for coal processing. The development
and operation of this infrastructure requires authorisation by the Mpumalanga Department of Mineral Re-
sources (DMR) in terms of the Mineral and Petroleum Resources Development Act (Act No. 28 of 2002), as
amended and the National Environmental Management Act (Act 107 of 1998), as amended, and associated
Regulations (2014).
Environmental Resources Management Southern Africa (Pty) Ltd (ERM) has been appointed as the Inde-
pendent Environmental Assessment Practitioner (EAP) to undertake these processes in terms of the regula-
tions. You are hereby informed of the availability of the Draft Scoping Report for your review and com-
ment. Please note that the commenting period commences on 9 September 2016 and concludes on 9 Octo-
ber 2016 (30 days commenting period, accounting for public holidays).
The Draft Scoping Report for the Section 102 Amendment Application for MP 30/5/1/2/2/133MR is avail-
able for comment and can be viewed at the following locations:
If you would like to register as an Interested and Affected Party (I&AP) and receive information and pro-
vide comment on the project and associated processes, please contact Ms Lisa Otten via telephone, post,
fax or email:
ERM Reference: 0276091
Piet Retief Library Retief Street, Piet Retief
Driefontein Community Centre Corner Store Street, Driefontein
ERM Website: http://www.erm.com/kangracoal
ERM Southern Africa Tel: 011 798 4300
Postnet Suite 624, Fax2Email: 086 688 2569
Private Bag X29, Email: [email protected]
Gallo Manor, 2052
ISAZISO SESIKHATHI SOKUTHI UMPHAKATHI UPHAWULE KANYE
NOKUTHOLAKALA KWAMADOKODOI OKUNWETSHWA KWE-
KANGRA COAL (PTY) LTD SAVMORE COLLIERY, E-DRIEFONTEIN
IREFURENSI YE-ERM : 0354781
KAFUSHANE NGOMKLAMO
• Abakwa-Kangra Coal (Pty) Ltd bacabanga ukunweba izindawo zabo zokusebenzela e-Savmore Col-
liery, eduze nase-Piet Ritief eMpumalanga. Abakwa-Kangra Coal bahlose ukunweba izindawo zabo
zokusebenzela ngaphansi kwe-EMP ehlanganisiwe (MP 30/5/1/2/2/133MR ). Imisebenzi emisha
ifakelwe isicelo njengengxenye yalesi sigaba 102. Izicelo ezichitshiyelwe yilezi (lemisebenzi ike yenza
izinqubo zokuxhumana nomphakathi nokubonisana ngonyaka wezi-2015 / 2016 kanti manje ifakelwa
isicelo njengengxenye yesigaba 102 esiChitshiyelwe kanye neEMPr Consolidation:
• Indawo yokulahla udoti emaphakathi nendawo yokusebenzela i-Maquasa East;
• Izindawo zokusebenzela ezingaphansi komhlaba zase-Maquasa West Extention (MWE);
• Indawo entsha yokungena ngaphansi kwezindawo zokusebenzela ze-MWE eyaziwa nge-Adit 5; kanye
• Nebhande elihambisa amalahle elihamba ngaphezu komhlaba kanye nomgwaqo osebenzayo oxhu-
manisa i-Adit 5 nendawo esikhona vele yokusebenzela i-Maquasa West .
Izindawo ezivele zikhona zaseMaquasa esentshonalanga nesempumalanga zizosetshenziselwa izinqubo zoku-
lungisa amalahle. Ukuthuthukiswa kanye nokusebenza kwale ngqalasizinda kudinga imvume ezophuma
eMnyangweni wezeNgcebo nokuMbiwa phansi (DMR) wasesifundazweni saseMpumalanga ngokoMthetho
wokuThuthukiswa kweNgcebo yokuMbiwa phansi kanye noWoyela ongahluziwe (uMthetho nombolo 28 we-
zi-2002), njengoba uchitshiyelwe kanye noMthetho wokuPhathwa kwezeMvelo kuZwelonke (uMthetho 107
wezi-1998), njengoba uchitshiyelwe, kanye neMithethonqubo ehambisana nalokhu (2014).
AbokuPhathwa kweNgcebo yeMvelo eNingizimu ne-Afrika i- Environmental Resource Management
Southern Africa (Pty) Ltd (i-ERM) baqokwe njengabaHloli Abazimele beMvelo (i-EAP) ukuze baphathe
lenqubo ngokwemithethonqubo. Ngalokhu waziswa ukuthi usungawuthola umBiko wokuHlaziya ukuze
uwubukeuphinde uphawule. Sicela uqaphele ukuthi isikhathi sokuphawula sizoqala mhla ziyi-9 kuMan-
dulo 2016 bese siphela mhla ziyi-9 kuMfumfu wezi-2016 (isikhathi sokuphawula siyizinsuku ezingama-30,
kulandisa namaholide omphakathi).
Uhlaka lomBiko wokuHlaziya weSigaba 102 wokuSebenza okuchitshiyelwe we- MP 30/5/1/2/2/133MR
uyatholakala ukuze kuphawulwe uphinde ubuyekezwe kulezi zindawo ezilandelayo:
Uma ufisa ukubhalisa njengelungu elinentshisekelo nelithintekayo (i-I&AP) bese uthola ulwazi kanye
nokuphawula ngomklamo kanye nezinqubo eziphathelene nawo, sicela uxhumane noNksz Lisa Otten
ngocingo, ngeposi, ngefek’si noma nge-imey’li:
ERM Reference: 0276091
Umtapowolwazi wase-Piet Retief Retief Street, Piet Retief
Driefontein Community Centre Corner Store Street, Driefontein
Isizindalwazi se-ERM : http://www.erm.com/kangracoal
ERM Southern Africa Inombolo yocingo : 011 798 4300
Postnet Suite 624, Fax2Email: 086 688 2569
Private Bag X29, I-imey’li : [email protected]
Gallo Manor, 2052
KENNISGEWING VAN TYDPERK VIR OPENBARE KOMMENTAAR EN
DOKUMENTBESKIKBAARHEID VIR DIE UITBREIDING VAN DIE KAN-
GA COAL (EDMS) BPK SAVMORE-STEENKOOPMYN, DRIEFONTEIN
ERM Ref: 0354781
PROJEKOORSIG
Kangra Coal (Edms) Bpk beplan om hulle huidige mynboubedrywighede-fasiliteit by die Savmore-
steenkoolmyn naby Piet Retief in Mpumalanga uit te brei. Kangra Coal beplan om die huidige bedry-
wighede uit te brei onder die Gekonsolideerde Omgewingsbestuurprogram EMPr (MP
30/5/1/2/2/133MR). Die nuwe aktiwiteite waarvoor aansoek gedoen word as deel van hierdie Skedule
102-wysigingaansoek is aktiwiteite wat aan vorige openbare konsulteringaktiwiteite in 2015-2016 onder-
worpe was, en as deel van die S102-wysiging en EMPr-konsolidasie word verder vir die volgende aktiwite-
ite aansoek gedoen:
• Die sentrale afvalstortingsterrein by die Maquasa-Oos-bedrywighede;
• Die Maquasa-Wes-uitbreiding (MWU) ondergrondse delfplekke;
• Die nuwe hoofingangstonnel (horisontale mynskag) om toegang te kry tot die MWU ondergrondse
delfplekke; en
• ʼn bogrondse vervoerder en dienspad wat die hoofingangstonnel (horisontale mynskag) met die
bestaande Maquasa-Wes operasionele gebied sal verbind.
Bestaande geriewe by Maquasa-Wes en Maquasa-Oos sal gebruik word vir steenkoolprosessering. Die ontwik-
keling en bedryf van hierdie infrastruktuur vereis magtiging deur die Mpumalanga Departement van Minerale
Hulpbronne (DMR) ingevolge die Wet op Mineraal- en Petroleumbronne (WMPB) (Wet 28 van 2002), soos
gewysig, en die Wet op Nasionale Omgewingsbestuur (WNOB) (Wet 107 van 1998), soos gewysig, en geasso-
sieerde regulasies (2014).
Environmental Resources Management Suider-Afrika (Edms) Bpk (ERM) is aangestel as die onafhanklike
omgewingskonsultant (EAP) om hierdie prosesse te onderneem ingevolge die regulasies. Hiermee word u
ingelig van die beskikbaarheid van die konsep-omvangbepalingsverslag vir u insae en kommentaar. Let
asseblief daarop dat die kommentaartydperk ’n aanvang neem op 9 September 2016 en op 9 Oktober 2016
ten einde loop (30 dae kommentaartydperk, openbare vakansiedae in ag geneem).
Die konsep-omvangbepalingsverslag vir die Skedule 102-wysigingsaansoek vir MP 30/5/1/2/2/133MR is
vir kommentaar beskikbaar en kan besigtig word by die volgende plekke:
Indien u as ’n geïnteresseerde en geaffekteerde party (RGG&GP), wil registreer, inligting wil kry en kom-
mentaar wil lewer ten opsigte van die projek en gepaardgaande prosesse, kontak asseblief me Lisa Otten
per telefoon, pos, faks of e-pos.
ERM Reference: 0276091
Piet Retief Biblioteek Retiefstraat, Piet Retief
Driefontein Gemeenskapsentrum Corner Store-straat, Driefontein
ERM webwerf : http://www.erm.com/kangracoal
ERM Southern Africa Tel: 011 798 4300
Postnet Suite 624, Fax2Email: 086 688 2569
Private Bag X29, Email: [email protected]
Gallo Manor, 2052
Annex E
Kangra Coal Environmental Policy