1 July 24, 2015 SANTA FE COUNTY IFB#2015-0364-FD/IC Glorieta Fire Station ADDENDUM 4 Dear Proponents, This addendum is issued to reflect the following immediately. It shall be the responsibility of interested bidders to adhere to any changes or revisions to the IFB as identified in this Addendum No. 3. This documentation shall become permanent and made part of the departmental files. ATTACHMENT: MANDATORY PRE-BID SIGN IN SHEET ATTACHMENT: REVISED BID SHEETS ATTACHMENT: SPECIFICATIONS AND ATTACHMENTS A-H Listed below are clarifications of the IFB and questions received via email concerning the above referenced IFB. Question# 1- What will the duration be for the use of a generator and water? Answer# 1- Arrangements will need to be made with the Glorieta Baptist Conference Center for water (and a meter). The water well may be drilled prior to construction starting. Temporary water and temporary power will be allowances. See new section 01210, Allowances, attached. Question# 2- What is the size of the lot? Answer# 2- This is shown on the Survey, Sheet 2 of 36. Question# 3- Are the plans ready? Answer# 3- Yes, they are available at the Construction Reporter. Henry P. Roybal Commissioner, District 1 Kathleen Holian Commissioner, District 4 Miguel M. Chavez Commissioner, District 2 Liz Stefanics Commissioner, District 5 Robert A. Anaya Commissioner, District 3 Katherine Miller County Manager

Upload: others

Post on 03-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

1

July 24, 2015

SANTA FE COUNTY

IFB#2015-0364-FD/IC

Glorieta Fire Station

ADDENDUM 4

Dear Proponents,

This addendum is issued to reflect the following immediately. It shall be the responsibility of

interested bidders to adhere to any changes or revisions to the IFB as identified in this

Addendum No. 3. This documentation shall become permanent and made part of the

departmental files.

ATTACHMENT: MANDATORY PRE-BID SIGN IN SHEET

ATTACHMENT: REVISED BID SHEETS

ATTACHMENT: SPECIFICATIONS AND ATTACHMENTS A-H

Listed below are clarifications of the IFB and questions received via email concerning the

above referenced IFB.

Question# 1- What will the duration be for the use of a generator and water?

Answer# 1- Arrangements will need to be made with the Glorieta Baptist Conference

Center for water (and a meter). The water well may be drilled prior to

construction starting. Temporary water and temporary power will be

allowances. See new section 01210, Allowances, attached.

Question# 2- What is the size of the lot?

Answer# 2- This is shown on the Survey, Sheet 2 of 36.

Question# 3- Are the plans ready?

Answer# 3- Yes, they are available at the Construction Reporter.

Henry P. Roybal

Commissioner, District 1

Kathleen Holian

Commissioner, District 4

Miguel M. Chavez

Commissioner, District 2 Liz Stefanics

Commissioner, District 5

Robert A. Anaya

Commissioner, District 3 Katherine Miller

County Manager

2

Question# 4- Is there a Geo testing report?

Answer# 4- This was provided in Addendum no. 3

Question# 5- Where is the property located?

Answer # 5- See Vicinity Map on Cover Sheet, A0.0.

Question# 6- Is there a water department in the area?

Answer # 6- There is not a water department, but there will be water available at the

Glorieta Baptist Conference Center hydrant. See question no. 1.

Question# 7- What is the budget?

Answer # 7- Santa Fe County is not releasing that information.

Question# 8- What are the four alternates? Will the bid sheets be revised?

Answer# 8- The alternates are shown on the Cover Sheet, A0.0 and Spec Section

01230, Alternates.

Question# 9- Is the well a separate contract?

Answer# 9- Yes.

Question# 10- Where will the 15,000 gallon tank be located?

Answer# 10- This is shown on Sheet 3-36, Sheet 4-36 and Sheet A1.0.

Question# 11- Is the County requiring an insulated/not insulated or poly?

Answer# 11- The tank is not insulated.

Question# 12- What direction does the drainage run?

Answer# 12- See Grading and Drainage Plan, Sheet 3-36.

3

Question# 13- Are we responsible for relocating the ground hogs/gofers?

Answer# 13- If groundhogs are discovered on site the County will make arrangements

to have the animals relocated separate from this contract.

Question# 14- Is there a bench mark?

Answer# 14- This is shown on the survey, Sheet 2 of 36

Question# 15- Will Domestic Material be required for this project?

Answer# 15- Yes.

Question# 16- What Entity or Agency is Funding this project?

Answer# 16- This project is being funded by Santa Fe County.

Question# 17- Sheet 4-36 calls a 4” Waterline from Cistern Tanks to the building “Dry

Well Pit”. Please detail the connection to the “Dry Well Pit”

Answer# 17- The 4" PVC line connects to a Fire Pump in the pump room. The pump is

per the Fire Protection contractor. Connections shall be coordinated with

the Fire Protection Control.

Question# 18- Sheet 4-36 calls a 4” Waterline from the Cistern Tanks to the building

“Dry Well Pit”. Will this line require an isolation valve?

Answer# 18- Yes, an isolation valve is required inside the building. This valve shall be

braced as required.

Question# 19- Sheet M 2.2 indicates 1” Water Line as well as a Fire Protection line.

Note reads “see civil” for each line. On the civil drawings nothing seems

to match these indicated lines. Please clarify.

Answer# 19- See Attachment E.

Question# 20- Sheet 4-36 shows 2 ea. Lines from the proposed well house to the cistern

tanks. The detail on the same sheet shows only one with no pipe sizes.

Please clarify.

4

Answer# 20- See Attachment E.

Question 21- Will we be required to provide the special inspections for Steel and

Masonry testing?

Answer# 21- See Attachment G: “Quality Assurance Plan and Statement of Special

Inspection.”

Question# 22- Please provide a detail on the required oil separator. Shall it be poured in

place or be a steel tank or something else?

Answer# 22- The oil separator is specified on sheet M3.1. It is precast concrete.

Question# 23- Please also provide a detail on the 2000 gallon holding tank behind the oil

separation sediment trap.

Answer# 23- Norwesco Model No. 42559, 2000 gallon holding tank, or approved equal.

Provide all piping as required from oil separator/sediment trap.

Question# 24- Please clarify landscaping requirements. We conclude from the notes on

the Tree and Vegetation Survey sheet A0.2 that the requirements for trees

and shrubs have already been met. However, spec section 02930 indicates

that there are landscaping requirements. This spec section refers to the

Irrigation section 02810, which is missing. There is no landscaping

drawing included in the bid set.

Answer# 24- No new trees are required. The tree and vegetation survey shows existing

trees and trees to be removed only. Landscaping requirements are shown

on A1.0, Site Plan. Landscaping consists of shrubs (see keyed note 00017)

and reseeding (see 02920-A). Irrigation is not required.

Question# 25- Please verify the structural detail 4/s4.01, the depth of the masonry

foundation is 2’ below the floor requiring a partial block.

Answer# 25- Minimum embedment depth for all foundations is 24” per the geotechnical

recommendations. Contractor has the option to embed footings to 28” to

allow for the use of full blocks. Embedment depth on the details is shown

as a minimum.

Question# 26- Confirm that the cost of the well, which is referenced on sheet 4-36 is not

included in this project.

5

Answer# 26- The well will be constructed under a separate contract.

Listed below are changes and clarifications of The Specifications and Drawings.

PROJECT MANUAL, TECHNICAL SPECIFICATIONS

Section 00 3000 - Instructions for Bidders

Change:

Contract time : the number of days for completion shall be 270 days not 180 days.

Section 01100 - Summary

Clarification:

The well is being installed as a separate contract; it is not known when it will be completed.

Section 01210 - Allowances

Add:

Add this section, attached.

Section 01500 - Temporary Facilities and Controls

Add:

The Contractor shall be responsible for temporary utilities (including but not limited to water

and electricity) as needed. See section 01210 for Allowances.

Section 07620 - Sheet Metal Flashing and Trim

Change:

Section 2.3, Downspouts, A.3

Size is 4x6 not 6x6.

DRAWINGS

Sheet 3-36 - Grading and Drainage Plan

Add:

12"x12" catch basin in sidewalk under front portal downspout on northeast corner of building

(see 1/A1.0). Pipe under sidewalk to rip-rap (river rock) swale.

Sheet 4-36 - Utility Plan

Add:

Attachment E showing the water connection.

Sheet 7-36 - Cistern Details

Add:

Depth of Cistern Collar is 12".

mcmartinez
Typewritten Text

6

Sheet S1.01

Change:

Provide pit with metal grate top, see Attachment F. Pit depth as required by fire pump;

coordinate with fire protection contractor and provide credit to owner if pit is less deep than

specified.

Sheets A0.0

Add General Note:

If a keyed note is missing from Keyed Notes but can be found elsewhere in the Drawings, use

the definition from the Keyed Notes list in which it appears, even if it is on a different sheet.

Alternates:

Alternate no. 3 - split-rail fence - will angle to wind around trees. This will add some length

to the split rail fence. Do not cut or trim any trees to install the fence.

Sheet A1.0

Detail 2, Site Plan

Add:

Add river rock (keyed note 39) to line pond.

Add river rock (keyed note 39) as shown in Attachment A.

Clarification:

See General Note 11 - all trees shall remain and be protected by the Contractor.

Clarification:

Keyed note 16100-A is alternate no. 4 not alternate no. 3.

Add:

Contractor to rake smooth all areas that have been disturbed. Use a magnet to pick up metal

objects including but not limited to offcuts from metal roof and all fasteners.

Add:

Detail 3 - Berming of Cistern, see Attachment B.

Add:

Detail 4 - Layout and Split Rail Fence Limits, see Attachment C.

Change:

Keyed note 40 on Roof Plan and Details Keyed Notes: 6x6 Downspout; provide 12"x12"

catch basin under downspout, see Civil, provide PVC pipe under sidewalk and outlet to river

rock rip-rap.

Clarification:

Striping on concrete apron is labeled but not shown. For extent of exterior concrete apron

striping (keyed notes 02511-C and 09912-B) see 1/A7.0.

Add:

Provide recycled concrete bumper at disabled accessible parking space; install per owner

instructions.

Add to Detail 1:

7

For Alternate no. 1 - Standing Seam roof, also change type of snowguards to match standing

seam type roof and change other roof mounted specialties/details as required for standing

seam roof type.

Change:

Keyed note 17 for Demo/Site Plan: Butterfly bush shall be Three Leaf Sumac and Russian

Sage shall be New Mexico Privet.

Change:

Keyed not 07620-J shall be a 4x6 metal downspout rather than 6x6.

Sheet A1.1

Change:

See Attachment D, revisions to Reflected Ceiling Plan: Add a fixture in Pump Room 109 and

provide 4 spot fixtures in Classroom/Meeting Room 105 per Lighting Plan E3.1.

Sheet A2.0

Change:

Keyed note 40 on Roof Plan and Details Keyed Notes: 6x6 Downspout; provide 12"x12"

catch basin under downspout, see Civil, provide PVC pipe under sidewalk and outlet to river

rock rip-rap.

Sheet A7.0

Change:

Detail 3/A6.0 should read 3/A7.0.

Keyed Notes:

There are two keyed notes 06651-A. The 06651-A note should be the counter and the

backsplash should be 06651-B.

Change Detail 6:

Keyed note 06651-A (counter) should be 06651-B (backsplash). Also provide 06651-A

(counter).

Change Detail 5:

Also provide side splash 06651-B.

Sheet M2.2

Add to General Note D:

Fire pump shall be provided as part of sprinkler system. Fire pump shall be sized and

provided and installed by fire protection contractor as part of this contract.

Shop drawings for fire protection (with requirements for pit) shall be submitted prior to

submitting shop drawings for building foundation.

Sheet E2.1

Detail 1 - Electrical Power Plan:

8

Outlets in Apparatus Bay and other rooms with CMU base shall be above CMU base. Any

outlets or devices in CMU base shall be recessed in CMU; no surface mounting of any items

on CMU.

Add General Note:

Provide all power as required for bay doors (including but not limited to operation of the

doors, photoeyes and traffic lights).

Sheet E3.1

Add Note:

For exact location of all light fixtures, ceiling registers, return air grilles and other

mechanical/electrical devices refer to architectural sheets including but not limited to A1.1

(Reflected Ceiling Plan) and A4.0 (Interior Elevations) and A2.0 (Exterior Elevations). See

Exterior elevations for exact location of W fixtures on either side of apparatus bay doors.

Add General Note:

Color/finish of all light fixtures to be selected by Architect during the Submittal process from

manufacturer's full range of colors (standard and premium).

Clarification:

B12 fixtures are suspended to a height of 9' from finish floor to bottom of fixture. See

Reflected Ceiling Plan, A1.1.

Change:

In Hall (Room 100), eliminate F fixtures and replace with three H fixtures. See Reflected

Ceiling Plan A1.1 for locations.

Sheet E4.1

Add Note:

Contractor shall provide conduit, Owner IT to provide terminations and wiring.

The Contractor shall be responsible for all material testing including but not limited to

testing of all concrete, backfill, asphalt, base course and sub grade. Special testing is

covered in another part of this addendum. The contractor shall be responsible for

special testing including coordination.

Please add this Addendum #4 to the original bid documents and refer to bid documents, hereto

as such. This and all subsequent addenda will become part of any resulting contract

documents and have effects as if original issued. All other unaffected sections will have their

original interpretation and remain in full force and effect.

Responders are reminded that any questions or need for clarification must be addressed to

Maricela Martinez, Senior Procurement Specialist at [email protected].

BID SHEET

IFB# 2015-0364-FD/IC CONSTRUCTION SERVICES FOR THE GLORIETA FIRE STATION

Please offer your best price for the work required for the construction of the Glorieta Fire

Station. The lump sum base bid must include pricing for materials, equipment, labor, travel,

incidentals and fees for any required permitting. Be advised that award may be made without

discussion with bidders on offers received.

Item Description

1. Construction Services for the Glorieta Fire Station

Lump Sum Base Bid: ______________________________________________________

Written in Words (Base Bid):

2. Additive Alternate #1 – Standing metal roof instead of R-panel

Lump Sum Base Bid: ______________________________________________________

Written in Words (Base Bid):

3. Additive Alternate #2- Flagpole

Lump Sum Base Bid: ______________________________________________________

Written in Words (Base Bid):

4. Additive Alternate #3 – Split rail fence at property line

Lump Sum Base Bid: ______________________________________________________

Written in Words (Base Bid):

Note: Lump sum base bid is exclusive of New Mexico Gross Receipts Tax

BID FORMS 00 4000- 5

SECTION 00 5000 –CONTRACT FORMS, BONDS, AND CERTIFICATES

mcmartinez
Typewritten Text
REVISED
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text
mcmartinez
Typewritten Text

5. Additive Alternate #4 – Ground mounted PV system

Lump Sum Base Bid: ______________________________________________________

Written in Words (Base Bid):

Note: Lump sum base bid is exclusive of New Mexico Gross Receipts Tax

BID FORMS 00 4000- 5

SECTION 00 5000 –CONTRACT FORMS, BONDS, AND CERTIFICATES

Santa Fe County Fire Department - Glorieta Fire Station no. 2 7/20/14

ALLOWANCES 01210 - 1

SECTION 01210 - ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements governing allowances.

1. Certain materials and equipment are specified in the Contract Documents by allowances. In some cases, these allowances include installation. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order.

B. Types of allowances include the following:

1. Lump-sum allowances.

C. Related Sections include the following:

1. Division 1 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders.

2. Division 1 Section "Quality Requirements" for procedures governing the use of allowances for testing and inspecting.

D. Allowances do not include General Contractor overhead and profit.

1.3 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work.

B. At Architect's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.

1.4 SUBMITTALS

A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.

B. Show all receipts and backup information to substantiate costs for these allowances. Any amounts over the allowance shall be approved by the Owner in writing prior to any costs incurred; if the costs are approved they shall be a change order. Any amounts remaining unspent from the allowance shall be returned to the owner in the form of a change order.

Santa Fe County Fire Department - Glorieta Fire Station no. 2 7/20/14

ALLOWANCES 01210 - 2

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCES

A. Allowance No. 1: Include $3000 (not including New Mexico Gross Receipts Tax) for Temporary Power (generator or other as required) until a temporary pole or permanent electricity has been put in place by the owner/utility.

B. Allowance No. 2: Include $3000 (not including New Mexico Gross Receipts Tax) for temporary water (including cost to obtain water and tank to hold water) until the well has been installed by the owner.

END OF SECTION 01210

user
Text Box
ATTACHMENT A PORTION OF A1.0
user
Text Box
ATTACHMENT B NEW DETAIL 3/A1.0
user
Text Box
ATTACHMENT C NEW DETAIL 4/A1.0
user
Text Box
ATTACHMENT D PORTION OF A1.1 REFLECTED CEILING
user
Text Box
ATTACHMENT E

3/4" = 1'-0"

TYPICAL STEPPED FOOTING

S4.02

4

NOTE: ALL "ADDED" BARS TO

MATCH STANDARD FOOTING BARS

BOTTOM OF FOOTING TO BE A MINIMUM

OF 24" BELOW ADJACENT GRADE

FOOTING REINFORCING

- PER PLAN AND DETAILS

MATCH Z-BARS WITH STANDARD

HOOK AT EACH END (TYP)

1'-4" M

AX

VA

RIE

S

1'-0"

MIN.

30°

7-5/8"

3" C

LR

3" CLR

1'-0"

4" CONCRETE SLAB w/ #3 BARS @ 16" O.C.E.W.,

ADD #4 BARS @ 16" O.C., LAP w/ VERT WALL

REINFORCING, TYP.

GRATING CAPABLE OF SUPPORTING FLOOR LIVE

LOADING = 40 psf

GALV. ANGLE w/ EPOXY GROUT ANCHORS INTO

CONC. BOND BEAM PER MANUFACTURER

CONCRETE BOND BEAM w/ (2) #5 BAR CONT.

MIRADRAIN OVER WATERPROOF BITUMINOUS

MEMBRANE, TYPICAL BELOW GRADE

8" CMU STEM WALL w/ #4 VERT DOWELS w/ STD 90

DEG HOOK @ 16" O.C., SOLID GROUT, AND

DUR-O-WALL LADUR TYPE REINFORCING @ EVERY

COURSE

4" DIA. PERFORATED PIPE w/ 1 CF. PER FOOT

DRAIN ROCK AND FILTER FABRIC. DRAIN TO

DAYLIGHT

12" CONC. SLAB w/ #4 BARS @ 9" O.C.E.W. TOP &

BOTTOM

3/4" = 1'-0"

8" CMU STEM WALL AT FIRE PUMP PIT

S4.02

1

F.F.E. -5'-6"

F.F.E. 0'-0"

3/4" = 1'-0"

8" CMU STEM WALL AT FIRE PUMP PIT

S4.02

2

7-5/8"

3" C

LR

3" CLR

1'-0"

REFER TO DETAIL 10/S4.01 FOR EXTERIOR WALL

SPECIFICATIONS

GRATING CAPABLE OF SUPPORTING FLOOR LIVE

LOADING = 40 psf

GALV. ANGLE w/ EPOXY GROUT ANCHORS INTO

CONC. BOND BEAM PER MANUFACTURER

CONCRETE BOND BEAM w/ (2) #5 HORIZONTAL

BARS AT TOP, CONTINUOUS, TYP.

MIRADRAIN OVER WATERPROOF BITUMINOUS

MEMBRANE, TYPICAL BELOW GRADE

8" CMU STEM WALL w/ #4 VERT BARS @ 16" O.C.,

AND DUR-O-WALL LADUR TYPE REINFORCING @

EVERY COURSE

RIGID INSULATION, RE: ARCH

4" DIA. PERFORATED PIPE w/ 1 CF./ LIN FT. DRAIN

ROCK AND FILTER FABRIC. DRAIN TO DAYLIGHT, TYP.

#4 DOWELS @ 16" O.C. w/ STD 90 DEG HOOK

12" CONC. SLAB w/ #4 BARS @ 9" O.C.E.W.

TOP & BOTTOM

F.F.E. -5'-6"

F.F.E. 0'-0"

INTERIOR EXTERIOR WALL

1 1/16"

1-1/2" C

LR

1-1/2" C

LR

3-13/16"

3-13/16"

3/4" = 1'-0"

8" CMU STEM WALL AT FIRE PUMP PIT

S4.02

3

INTERIOR WALL

7-5/8"

3" C

LR

3" CLR

1'-0"

6" CONCRETE SLAB w/ #4 BARS @ 16" O.C.E.W., ADD #4

BARS @ 16" O.C., LAP w/ VERT WALL REINFORCING, TYP.

GRATING CAPABLE OF SUPPORTING

FLOOR LIVE LOADING = 40 psf

GALV. ANGLE w/ EPOXY GROUT ANCHORS INTO

CONC. BOND BEAM PER MANUFACTURER

CONCRETE BOND BEAM w/ (2) #5 BAR CONT.

MIRADRAIN OVER WATERPROOF BITUMINOUS

MEMBRANE, TYPICAL BELOW GRADE

8" CMU STEM WALL w/ #4 VERT DOWELS w/ STD 90 DEG

HOOK @ 16" O.C., SOLID GROUT, AND DUR-O-WALL

LADUR TYPE REINFORCING @ EVERY COURSE

4" DIA. PERFORATED PIPE w/ 1 CF. PER FOOT DRAIN

ROCK AND FILTER FABRIC. DRAIN TO DAYLIGHT

12" CONC. SLAB w/ #4 BARS @ 9" O.C.E.W.

TOP & BOTTOM

F.F.E. -5'-6"

F.F.E. 0'-0"

1-1/2" C

LR

REF DET.

1/S4.01

1'-0" 1'-0" 1'-0"

RISKIN ASSOCIATES ARCHITECTURE

227 E. Palace Avenue, Suite C

Santa Fe, New Mexico 87501

tel 505.983.0722 fax 773.913.0722

www.riskinassociates.com

ENGINEER'S SEAL

Eric D. Trujillo, PE

New Mexico License

Number 21656

LTSE JOB # 1042

user
Text Box
ATTACHMENT F

ADMINISTRATION

MECH/ELECTRICAL

APPARATUS BAY

STORAGE

6" CONC. SLAB w/ #4 BARS @ 16" O.C.E.W.,

4,000 PSI CONCRETE @ 28 DAYS

6" CONC. SLAB w/ #4 BARS @ 16" O.C.E.W.,

4,000 PSI CONCRETE @ 28 DAYS

3

S4.01

4" CONC. SLAB w/ #3 BARS @ 16" O.C.E.W.

w/ 6% AIR, 4,000 PSI CONCRETE @ 28 DAYS

39'-0 7/8" 7'-0"

76

'-6

1

/2

"

52

'-1

7

/8

"

5'-0

1

5/1

6"

12

'-0

"3

'-0

"1

2'-0

"3

'-0

"1

2'-0

"5

'-0

1

5/1

6"

24

'-4

5

/8

"

7'-3

1

/1

6"

3'-4

"1

3'-9

9

/1

6"

5'-6

9

/1

6"

5'-8

1

/2

"5

'-8

1

/2

"5

'-8

1

/2

" 1'-8

5

/8

"

1'-7 1/16"

3'-4"

2'-0 15/16"

5'-6"

52

'-7

3

/4

"2

3'-1

0 3

/4

"

25

'-9

9

/1

6"

4'-4

"1

0'-1

0 7

/1

6"

36'-1 7/8"9'-11"

9

S4.01

2

S4.01

3

S4.02

2

S4.01

2

S4.01

2

S4.01

4

S4.01

4

S4.01

4

S4.01

4" CONC. SLAB w/ #4 BARS @ 16" O.C.E.W.,

4,000 PSI CONCRETE @ 28 DAYS

5

S4.01

6

S4.01

7

S4.01

7

S4.01

7

S4.01

8

S4.01

8

S4.01

8

S4.01

8"

21'-11 5/16"

8"

15'-1 9/16"

8"

C.J. C.J.C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

C

.

J

.

PUMP ROOM

11

'-7

3

/4

"

10

S4.01

2

S4.01

SIM

6

S4.01

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

2

S4.01

SIM

3

S4.01

4" CONC. SLAB w/

#4 BARS @ 16" O.C.E.W.,

4,000 PSI CONCRETE @ 28 DAYS

4" CONC. SLAB w/ #4 BARS @

16" O.C.E.W., 4,000 PSI

CONCRETE @ 28 DAYS

48"X48"X12" SUPPORT

FOOTING. STRIP FOOTING

REINFORCING CONT. ADD (2)

#4 LONGITUDINAL BARS AT

SUPPORT FOOTING

9

S4.01

72"X48"X12" SUPPORT

FOOTING. STRIP FOOTING

REINFORCING CONT. ADD (2)

#4 LONGITUDINAL BARS AT

SUPPORT FOOTING

72"X48"X12" SUPPORT

FOOTING. STRIP FOOTING

REINFORCING CONT. ADD (2)

#4 LONGITUDINAL BARS AT

SUPPORT FOOTING

48"X48"X12" SUPPORT

FOOTING. STRIP FOOTING

REINFORCING CONT. ADD (2)

#4 LONGITUDINAL BARS AT

SUPPORT FOOTING

2

S4.01

2

S4.01

9

S4.01

9

S4.01

1

S4.01

1

S4.01

24"X24"X12" SPOT FOOTING

1

S4.01

ADD #4 X 3' BARS FOR

CRACK WIDTH CONTROL

(2) #4 x 3'

1'-6"

1'-6"

1'-6"

8"

1'-6"

8"

1'-6"

8"

1'-6"

8"

1'-6"

8"

1'-6"

8"

2'-6"

8"

2'-6"

8"

1'-6"

(2) #4 x 3'

(2) #4 x 3'

(2) #4 x 3'

10

S4.01

TOF = -1'-0"

FFE = 0'-0"

12" CONC. SLAB w/ #4 BARS

@ 9" O.C.E.W. T&B

4'-6

"

FFE = -5'-6"

TOF = -1'-0"

TOF = -1'-6"

TOF = -2'-10"

TOF = -4'-2"

TOF = -5'-6"

1

S4.02

1

S4.02

2

S4.02

SIM

FOOTING STEPS

FOR FIRE PUMP PIT

FOOTING STEPS

FOR FIRE PUMP PIT

TOF = -4'-2"

TOF = -2'-10"

TOF = -1'-6"

TOF = -1'-0"

TOF ELEV CALL OUTS ARE SAME

AT CORRESPONDING STEPPED

FOOTINGS AT OPPOSITE WALL

TOF ELEV CALL OUTS ARE SAME

AT CORRESPONDING STEPPED

FOOTINGS AT OPPOSITE WALL

FFE = 0'-0"

FFE = 0'-0"

TOF = -1'-0"

TOF = -1'-0"

TOF = -1'-0"

TOF = -1'-0"

FFE = 0'-0"

FFE = 0'-0"

FFE = 0'-0"

1

S4.01

1'-0

"1

'-0

"

1'-0" 1'-0"

1

1/4" = 1'-0"

FOUNDATION PLAN

ENGINEER'S SEAL

Eric D. Trujillo, PE

New Mexico License

Number 21656

LTSE JOB # 1042

RISKIN ASSOCIATES ARCHITECTURE

227 E. Palace Avenue, Suite C

Santa Fe, New Mexico 87501

tel 505.983.0722 fax 773.913.0722

www.riskinassociates.com

user
Text Box
ATTACHMENT F

ATTACHMENT G

I. QUALITY ASSURANCE PLAN AND STATEMENT OF SPECIAL INSPECTION

A. The contractor shall engage independent inspectors to implement special inspection. Special inspection shall conform to the IBC 2009, section 110 and chapter 17.

B. After each inspection and test, promptly submit copy of laboratory report to owner, architect/engineer, and to contractor. Report shall include:

1. Date issued, Project title and number, Name of inspector, Date and time of sampling or inspection, Identification of project specifications section, Location of project, Type of inspection or test, Date of tests, Results of tests, Conformance with contract documents

C. Required inspections:

1. Soils – as outlined in Outline Specifications Section titled “Foundation Notes”

2. Concrete – as outlined in the Outline Specifications Section titled “Structural Concrete”

a) Installation of embedded bolts and plates supporting structure

b) Reinforcing steel placement

c) Field bending of reinforcing steel

d) Reinforcing couplers

e) Anchored rebar or threaded rods into hardened concrete

3. Wood & Cold-Formed Metal Framing

a) Holdown anchors/strap ties

b) Shear wall/diaphragm fastening

c) Metal connectors

4. Steel – as outlined in Outline Specifications Section titled “Structural Steel”

D. Special inspection is to be provided in addition to inspections conducted by the building department and shall not be construed to relieve the owner or his authorized agent from requesting the period and called inspections required by section 1704 of the International Building Code.

1. Periodic inspection is defined as the part-time or intermittent observation of work requiring inspection by an approved inspector who is present in the area where the work has been or is being performed at the completion of work.

2. Special inspection is required for the following:

a) Steel construction

(1) High strength bolts...……………………………………………………..…..….periodic

(2) Welding………………………………………………………………………..……periodic

(3) Structural Steel & Cold-Formed Steel Deck…………………………………..periodic

b) Concrete construction

(1) Reinforcing steel…………………………………………………………….…...periodic

(2) Bolts installed prior to and during concrete placement…………………….periodic

(3) Mix design(S)……………………………………………………………..………periodic

(4) At the time fresh concrete is sampled………………………………………...periodic

(5) Inspection of concrete placement…………………………………………..…periodic

(6) Inspection for maintenance of specified curing techniques…………….....periodic

c) Special case

(1) Expansion or adhesive anchor………………………………………………....periodic

 

Tarleton Engineering, Inc. Page 1 of 1

DATE: July 17, 2015

PROJECT: Glorieta Fire Station #2 ARCHITECT: Riskin Associates

DISCIPLINE: Plumbing Moen in lieu of American Standard

Moen in lieu of Elkay Moen in lieu of Fiat

Watts in lieu of Amtrol Watts in lieu of J.R. Smith

Watts in lieu of Zurn

The manufacturers listed above would be acceptable.

Please understand that prior approval is not direct approval for the actual equipment. At time of construction a complete submittal package should be sent from the sub-contractor. The submittal package shall identify the meeting or exceeding of the performance specifications listed in the construction documents (drawings and specifications). This includes all substituted equipment from the construction documents.

While we may accept substitutions to promote competitive pricing, add performance or help decrease lead times, we will not re-specify the equipment. It is up to the sub-contractor and/or supplier to show that his/her substituted equipment meets or exceeds the specified equipment listed in the construction documents and specifications.

user
Text Box
ATTACHMENT H