kcm概況 coal resources development of kushiro coal mine (kcm) resources development... · 2018....

32
KCM概況 1 Coal Resources Development of Kushiro Coal Mine (KCM) Activity Plan for Local Production for Local Consumption in KCMSeptember 10 th 2018 Kushiro Coal Mine Co., Ltd. Hiroyuki MATSUMOTO

Upload: others

Post on 09-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • KCM概況

    1

    Coal Resources Development

    of Kushiro Coal Mine (KCM)

    ~Activity Plan for Local Production for Local

    Consumption in KCM~

    September 10th 2018

    Kushiro Coal Mine Co., Ltd.

    Hiroyuki MATSUMOTO

    http://ja.wikipedia.org/wiki/%E3%83%95%E3%82%A1%E3%82%A4%E3%83%AB:Coal.jpghttp://ja.wikipedia.org/wiki/%E3%83%95%E3%82%A1%E3%82%A4%E3%83%AB:Coal.jpg

  • Contents of Presentation

    1. Outline of Kushiro Coal Mine (KCM)

    1-1 History and Outline

    1-2 Coal Production and Safety

    1-3 The Training Project on Coal Mining Technology

    1-4 New Business Development

    1-5 Joint Research

    2. Eco Park Conception for Resource & Energy

    in Kushiro

    2-1 Concept of Eco Park Conception

    2-2 Coal-Fired Power Plant and Proposal for Training Project

    2

  • KUSHIRO

    TOKYO

  • HistoryClose of Taiheiyo Coal Mine and

    Established as KCM

    ・ 1920 Established Taiheiyo Coal Mine

    ・ 1945 Mining under Sea Bed

    ・ 27 Dec, 2001 Established Kushiro Coal Mine

    ・ 30 Jan, 2002 Close of Taiheiyo Coal Mine

    ・ 31 Jan, 2002 Start of Operation of Kushiro Coal Mine

    ・ 9 April, 2002 Start of First Longwall

    4

    1-1 History and Outline

  • Business of KCM• Coal Mining and Sales• Government Commissioned Trainee Program

    – Start from 2002(NEDO→JOGMEC)– Receive the Trainee and Dispatch of Engineer– Around 150 Trainees Come from Vietnam, China and Indonesia

    Annually Recently

    • New Business– KCM Cooperation(KCMC)

    • Operation of Oversize Refuse Treatment Center • Refuse Collection• Operation of Municipal Solid Waste Incineration Plant • Administration of KCM

    – Kushiro Auto Recycle Co., Ltd.– KCM Engineering Co., Ltd.– Kushiro Power Service Co., Ltd.

    • Joint Research – Japan Coal Energy Center(JCOAL)– Private Company– Institute, University and Others

    5

    1-1 History and Outline

  • Production and Manpower

    2002 2003 2004 2005 2006 Total

    Clean Coal 734 738 741 738 745 3,696

    Manpower 505 532 521 520 452

    6

    2007 2008 2009 2010 2011 Total

    Clean Coal 617 536 575 588 543 2,859

    Manpower 434 352 359 364 370

    2012 2013 2014 2015 2016 Total

    Clean Coal 528 529 540 470 529 2,596

    Manpower 342 353 332 350 298

    *Production (×1000ton)

    *Excluding administrator and New business member from 2008 due to KCMC built up

    1-2 Coal Production and Safety

  • 7

    Geological

    Column

    Haru

    tori

    Measure

    sTe

    nn

    eru

    Con

    glo

    mera

    te

    1.5-2.2m

    2.6-3.0m

    1.0-2.4m

    Upper Main Lower

    Tertiary- 45Million YBP

    Oboro

    Co

    ng

    lom

    era

    te

    Cre

    taceous

    1-2 Coal Production and Safety

  • 8

    Mining Lease

    Taiheiyo

    12km

    8km

    KCM

    1-2 Coal Production and Safety

  • 9

    Black Line : Jan. 2002

    Red Line : Mar. 2017

    Preparation Plant

    Pit Mouth

    Pit Mouth

    Pit Mouth

    Down

    Town

    Kushiro

    Port

    Lake

    Harutori

    Clean Coal Stock

    Yard

    Rail

    Winder

    1-2 Coal Production and Safety

  • Mining Method

    10

    • SD Method(Longwall)

    – Combination of Shield Support and Drum Shearer

    – Fully Mechanized Longwall Mining System

    – 1-2 Longwall Working Annually Recently

    1-2 Coal Production and Safety

  • Joy(KOMATSU)4LS-5 Drum Shearer

    Drum Diameter 1,725mm

    Haulage Pull 53.5ton

    Max. Cutting Height 3,445mm

    Cutting Thickness 900mm

    Total Power Rating 686kw 3000V

    11

    Caterpillar

    Shield Support

    Bearing Power 738ton

    Max Height 3000mm

    Min Height 1100mm

    Width 1500mm

    Hydro Pressure 320kg/cm2

    1-2 Coal Production and Safety

  • 12

    Drum Shearer

    Shield Support

    Main Gate

    Tail Gate

    Longwall Mining

    1-2 Coal Production and Safety

  • VIDEO Longwall Mining

    13

    1-2 Coal Production and Safety

  • • Roadway Heading– Combination Continuous Miner and Shuttle Car

    – Longwall Gate and Butt Level Heading

    – 2-3 Units Working Annually

    – 4,000-6,000m/year Developed

    14Continuous Miner Shuttle Car

    Mining Method

    1-2 Coal Production and Safety

  • 15

    Road Heading - Single Entry System

    Continuous Miner

    Shuttle CarBelt Conveyer

    Transportation Sledge

    for Providing Heading Materials

    1-2 Coal Production and Safety

  • underground Conveyer Belt

    to Surface

    Coal Preparation plant

    To Port by Train Shireto Coal Yard Port

    Coal Transportation

    1-2 Coal Production and Safety

  • 17

    1-2 Coal Production and Safety

    Safety and Mining Support

    Centralized Monitoring System Gas Analysis Mine Rescue Training

    Mine Rescue Training roadwayWorkers and Materials Transportation Electric Power Substation

  • The Training Project on Coal Mining Technology

    18

    Many Asian coal-producing countries have been increasing their domestic consumption of coal so that

    they need to expand production and ensure security at coal mines at the same time. In technical transfer

    projects, production and security technologies are transferred to coal mine workers in these countries,

    utilizing the knowledge and networks of Japan. JOGMEC also has been dispatching Japanese engineers to

    coal-producing countries and giving technical guidance based on local requirements. (by JOGMEC HP)

    ■ 2002~2011 : NEDO

    ■ 2012~ : JOGMEC

    1-3 The Training Project on Coal Mining Technology

  • Receiving

    Country2002

    ~062007

    ~112012 2013 2014 2015 2016 2017 Total

    Vietnam 482 509 143 83 82 84 84 74 1,541

    China 481 414 0 58 63 56 54 52 1,178

    Indonesia 10 12 20 42

    Total 963 923 143 141 145 150 150 146 2,761

    1-3 The Training Project on Coal Mining Technology

  • 派遣研修事業実績(延べ人数)

    国名 2002~09 2010 2011 2012 2013 2014 2015 2016 2017 合計

    ベトナム 936 183 374 429 492 457 230 169 185 3,455

    中国 158 33 25 0 15 12 4 3 4 254

    インドネシア 44 0 0 0 0 0 0 0 0 44

    合計 1,138 216 399 429 507 469 234 172 189 3,753

    1-3 The Training Project on Coal Mining Technology

    Dispatching (cumulative total number)

    Country2002

    ~062007

    ~112012 2013 2014 2015 2016 2017 Total

    Vietnam 325 1,168 429 492 457 230 169 185 3,455

    China 89 127 0 15 12 4 3 4 254

    Indonesia 44 44

    Total 458 1,295 429 507 469 234 172 189 3,753

  • Civic and Cultural Exchange

    釧路港舟漕ぎ大会

    港祭り市民踊りパレードくしろ市民北海盆踊り

    山神篝火・三五四祭り

    もちつき大会

    パークゴルフ大会

    1-3 The Training Project on Coal Mining Technology

  • 22

    Refuse Incineration Plant

    (Maximum 4,400kW Electricity Generated)

    Oversize Refuse Treatment Center

    Refuse Collecting Vehicle

    KCM Cooperation Co.,Ltd.(KCMC)

    1-4 New Business Development

  • 23

    Bird-eye View of KARC

    Recover of the Recycle Parts Dice shaped Scrap Metal

    Kushiro Auto Recycle Co.,Ltd.(KARC)

    Press Machine

    1-4 New Business Development

  • 24

    1-4 New Business Development

    KCM Engineering Co.,Ltd.(KCME)

    Explosion UnitProof Power

    and Control

    Explosion Proof Methane Sensor

    Management System for Underground

    Existence workers

    Control Room

    Introduced Mao Khe Colliery In Vietnam

  • Joint Research between JCOAL, Institute,

    University, MMIJ and Others

    ■ Joint Researcher・ Japan Coal Energy Center・ Central Research Institute of Electric Power Industry・ National Institute of Advanced Industrial Science and Technology・ Japan Oil, Gas Metals National Corporation ・ Hokkaido University・ Muroran Institute of Technology・ Akita University・ Tokyo University・ Kyoto University・ Kyushu University・ Kumamoto University・ The Mining and Materials Processing Institute of Japan・ Others

    ■ Contents of Research・ Geology・ Rock Engineering・ Resources Development・ Mineral Processing・ Coal Mine Methane・ Others 25

    1-4 Coal Production and Safety

  • Contents of Presentation

    26

    1. Outline of Kushiro Coal Mine (KCM)

    1-1 History and Outline

    1-2 Coal Production and Safety

    1-3 The Training Project on Coal Mining Technology

    1-4 New Business Development

    1-5 Joint Research

    2. Eco Park Conception for Resource & Energy

    in Kushiro

    2-1 Concept of Eco Park Conception

    2-2 Coal-Fired Power Plant and Proposal for Training Project

  • Characteristics and Advantages of KCM

    27

    ■ Coal Industry

    ・ Mining Technology as Global Standard

    ・ World’s Highest Level of Mining Safety

    ・ Technology of water Treatment and Ash Filling to Mined out areas

    ■ International Technology Transfer (Training Program)

    ・ Recieve 2,800 Trainees from Foreign Countries

    ・ Dispatch 3,700 KCM Engineers to Foreign Countries

    ■ New Buisiness

    ・ Waste Treatment Technology

    ・ Operation of Waste Incineration and Power Generation

    ■ Joint Research

    ・ JCOAL, Institute, University, MMIJ and Others

    2-1 Concept of Eco Park Conception

  • Assignments and Proposed measures in KCM

    28

    ■ Coal Industry

    ・ Coal Delivery to Remort Areas

    ・ Excessive facilities against Present Production

    Cost Cut by Local Consumption and Streamlining

    ■ Training Project on Coal Mining Technology

    ・ Training Course only for Upstream sector like mining and safety

    Extend Project to Downstream Sector like Coal Preparation

    and Utilizing Technology Including Electric Power Plant

    ・ Training Project only for Limited Foreign Countries

    Expand Subjects to Domestic Students and Young

    Engineers and Others

    ■ New Business

    ・ Independent Activity by Sole Corporation

    Total Licensing of Technology

    2-1 Concept of Eco Park Conception

  • 29

    Eco Park Conception for Resource & Energy in Kushiro

    Training Center

    Domestic・ Joint Research・ Training Program

    International・ Joint Research・ Technology Transfer

    Program

    Coal Mining and

    Utilization

    ・ Mining Technology・ Safety Technology・ Coal Preparation・ Electric Powe Plant・ Water Treatment・ Ash Treatment・ C.B.M.・ C.M.M.・ C.C.S.・ Others

    Environment and

    Recycle

    ・ Refuse Treatment ・ Refuse Collection・ Coal Preparation・ Solid Waste Incineration ・ E.L.V. Recycle・ Ash Treatment・ Bio Diesel Fuel・ Others

    2-1 Concept of Eco Park Conception

  • 30

    2-2 Coal-Fired Power Plant and Proposal for Training Project

    Coal-Fired Electric Power Plant

    ・ Boiler Type : Circulating Fluidized Bed

    ・ Maximum Steam Flow :370 t / hr

    ・ Steam Temperature :560 ℃ / 540 ℃

    ・ Steam Pressure :17.0 MPaG (Heater Outlet )

    3.1 MPaG (Re-heater Outlet)

    ・ Steam Turbine Type : Re-heat Condensing Turbine

    ・ Generator Output :112,000 kW

    ・ Fuel :Coal (70%), Biomass (30%)

    Kushiro Power Station Co., Ltd.

    Water Treatment Exhaust TowerBoiler Area Building

    Turbine Building

    Cooling

    Tower

  • 31

    Coexistence between KCM and Power Plant

    ■ Provide Strong Industrial Area against the Earthquake and Tunami

    ■ Provide Low Pollution Coal and Local Consumption

    ■ Provide Clean Mine Water as Cooling Water

    ■ Receive Warm Drainage Water after Cooling Tower as Coal Preparation Water

    ■ Receive Ash as Filling Materials for Mined out area

    ■ Provide Engineers, Qualified Persons and 3 Shift Workers

    ■ Propose New Training Course of Coal Utilization including Electric Power Plant and Environment for Training Project

    ■ Others

    2-2 Coal-Fired Power Plant and Proposal for Training Project