kcm概況 coal resources development of kushiro coal mine (kcm) resources development... · 2018....
TRANSCRIPT
-
KCM概況
1
Coal Resources Development
of Kushiro Coal Mine (KCM)
~Activity Plan for Local Production for Local
Consumption in KCM~
September 10th 2018
Kushiro Coal Mine Co., Ltd.
Hiroyuki MATSUMOTO
http://ja.wikipedia.org/wiki/%E3%83%95%E3%82%A1%E3%82%A4%E3%83%AB:Coal.jpghttp://ja.wikipedia.org/wiki/%E3%83%95%E3%82%A1%E3%82%A4%E3%83%AB:Coal.jpg
-
Contents of Presentation
1. Outline of Kushiro Coal Mine (KCM)
1-1 History and Outline
1-2 Coal Production and Safety
1-3 The Training Project on Coal Mining Technology
1-4 New Business Development
1-5 Joint Research
2. Eco Park Conception for Resource & Energy
in Kushiro
2-1 Concept of Eco Park Conception
2-2 Coal-Fired Power Plant and Proposal for Training Project
2
-
KUSHIRO
TOKYO
-
HistoryClose of Taiheiyo Coal Mine and
Established as KCM
・ 1920 Established Taiheiyo Coal Mine
・ 1945 Mining under Sea Bed
・ 27 Dec, 2001 Established Kushiro Coal Mine
・ 30 Jan, 2002 Close of Taiheiyo Coal Mine
・ 31 Jan, 2002 Start of Operation of Kushiro Coal Mine
・ 9 April, 2002 Start of First Longwall
4
1-1 History and Outline
-
Business of KCM• Coal Mining and Sales• Government Commissioned Trainee Program
– Start from 2002(NEDO→JOGMEC)– Receive the Trainee and Dispatch of Engineer– Around 150 Trainees Come from Vietnam, China and Indonesia
Annually Recently
• New Business– KCM Cooperation(KCMC)
• Operation of Oversize Refuse Treatment Center • Refuse Collection• Operation of Municipal Solid Waste Incineration Plant • Administration of KCM
– Kushiro Auto Recycle Co., Ltd.– KCM Engineering Co., Ltd.– Kushiro Power Service Co., Ltd.
• Joint Research – Japan Coal Energy Center(JCOAL)– Private Company– Institute, University and Others
5
1-1 History and Outline
-
Production and Manpower
2002 2003 2004 2005 2006 Total
Clean Coal 734 738 741 738 745 3,696
Manpower 505 532 521 520 452
6
2007 2008 2009 2010 2011 Total
Clean Coal 617 536 575 588 543 2,859
Manpower 434 352 359 364 370
2012 2013 2014 2015 2016 Total
Clean Coal 528 529 540 470 529 2,596
Manpower 342 353 332 350 298
*Production (×1000ton)
*Excluding administrator and New business member from 2008 due to KCMC built up
1-2 Coal Production and Safety
-
7
Geological
Column
Haru
tori
Measure
sTe
nn
eru
Con
glo
mera
te
1.5-2.2m
2.6-3.0m
1.0-2.4m
Upper Main Lower
Tertiary- 45Million YBP
Oboro
Co
ng
lom
era
te
Cre
taceous
1-2 Coal Production and Safety
-
8
Mining Lease
Taiheiyo
12km
8km
KCM
1-2 Coal Production and Safety
-
9
Black Line : Jan. 2002
Red Line : Mar. 2017
Preparation Plant
Pit Mouth
Pit Mouth
Pit Mouth
Down
Town
Kushiro
Port
Lake
Harutori
Clean Coal Stock
Yard
Rail
Winder
1-2 Coal Production and Safety
-
Mining Method
10
• SD Method(Longwall)
– Combination of Shield Support and Drum Shearer
– Fully Mechanized Longwall Mining System
– 1-2 Longwall Working Annually Recently
1-2 Coal Production and Safety
-
Joy(KOMATSU)4LS-5 Drum Shearer
Drum Diameter 1,725mm
Haulage Pull 53.5ton
Max. Cutting Height 3,445mm
Cutting Thickness 900mm
Total Power Rating 686kw 3000V
11
Caterpillar
Shield Support
Bearing Power 738ton
Max Height 3000mm
Min Height 1100mm
Width 1500mm
Hydro Pressure 320kg/cm2
1-2 Coal Production and Safety
-
12
Drum Shearer
Shield Support
Main Gate
Tail Gate
Longwall Mining
1-2 Coal Production and Safety
-
VIDEO Longwall Mining
13
1-2 Coal Production and Safety
-
• Roadway Heading– Combination Continuous Miner and Shuttle Car
– Longwall Gate and Butt Level Heading
– 2-3 Units Working Annually
– 4,000-6,000m/year Developed
14Continuous Miner Shuttle Car
Mining Method
1-2 Coal Production and Safety
-
15
Road Heading - Single Entry System
Continuous Miner
Shuttle CarBelt Conveyer
Transportation Sledge
for Providing Heading Materials
1-2 Coal Production and Safety
-
underground Conveyer Belt
to Surface
Coal Preparation plant
To Port by Train Shireto Coal Yard Port
Coal Transportation
1-2 Coal Production and Safety
-
17
1-2 Coal Production and Safety
Safety and Mining Support
Centralized Monitoring System Gas Analysis Mine Rescue Training
Mine Rescue Training roadwayWorkers and Materials Transportation Electric Power Substation
-
The Training Project on Coal Mining Technology
18
Many Asian coal-producing countries have been increasing their domestic consumption of coal so that
they need to expand production and ensure security at coal mines at the same time. In technical transfer
projects, production and security technologies are transferred to coal mine workers in these countries,
utilizing the knowledge and networks of Japan. JOGMEC also has been dispatching Japanese engineers to
coal-producing countries and giving technical guidance based on local requirements. (by JOGMEC HP)
■ 2002~2011 : NEDO
■ 2012~ : JOGMEC
1-3 The Training Project on Coal Mining Technology
-
Receiving
Country2002
~062007
~112012 2013 2014 2015 2016 2017 Total
Vietnam 482 509 143 83 82 84 84 74 1,541
China 481 414 0 58 63 56 54 52 1,178
Indonesia 10 12 20 42
Total 963 923 143 141 145 150 150 146 2,761
1-3 The Training Project on Coal Mining Technology
-
派遣研修事業実績(延べ人数)
国名 2002~09 2010 2011 2012 2013 2014 2015 2016 2017 合計
ベトナム 936 183 374 429 492 457 230 169 185 3,455
中国 158 33 25 0 15 12 4 3 4 254
インドネシア 44 0 0 0 0 0 0 0 0 44
合計 1,138 216 399 429 507 469 234 172 189 3,753
1-3 The Training Project on Coal Mining Technology
Dispatching (cumulative total number)
Country2002
~062007
~112012 2013 2014 2015 2016 2017 Total
Vietnam 325 1,168 429 492 457 230 169 185 3,455
China 89 127 0 15 12 4 3 4 254
Indonesia 44 44
Total 458 1,295 429 507 469 234 172 189 3,753
-
Civic and Cultural Exchange
釧路港舟漕ぎ大会
港祭り市民踊りパレードくしろ市民北海盆踊り
山神篝火・三五四祭り
もちつき大会
パークゴルフ大会
1-3 The Training Project on Coal Mining Technology
-
22
Refuse Incineration Plant
(Maximum 4,400kW Electricity Generated)
Oversize Refuse Treatment Center
Refuse Collecting Vehicle
KCM Cooperation Co.,Ltd.(KCMC)
1-4 New Business Development
-
23
Bird-eye View of KARC
Recover of the Recycle Parts Dice shaped Scrap Metal
Kushiro Auto Recycle Co.,Ltd.(KARC)
Press Machine
1-4 New Business Development
-
24
1-4 New Business Development
KCM Engineering Co.,Ltd.(KCME)
Explosion UnitProof Power
and Control
Explosion Proof Methane Sensor
Management System for Underground
Existence workers
Control Room
Introduced Mao Khe Colliery In Vietnam
-
Joint Research between JCOAL, Institute,
University, MMIJ and Others
■ Joint Researcher・ Japan Coal Energy Center・ Central Research Institute of Electric Power Industry・ National Institute of Advanced Industrial Science and Technology・ Japan Oil, Gas Metals National Corporation ・ Hokkaido University・ Muroran Institute of Technology・ Akita University・ Tokyo University・ Kyoto University・ Kyushu University・ Kumamoto University・ The Mining and Materials Processing Institute of Japan・ Others
■ Contents of Research・ Geology・ Rock Engineering・ Resources Development・ Mineral Processing・ Coal Mine Methane・ Others 25
1-4 Coal Production and Safety
-
Contents of Presentation
26
1. Outline of Kushiro Coal Mine (KCM)
1-1 History and Outline
1-2 Coal Production and Safety
1-3 The Training Project on Coal Mining Technology
1-4 New Business Development
1-5 Joint Research
2. Eco Park Conception for Resource & Energy
in Kushiro
2-1 Concept of Eco Park Conception
2-2 Coal-Fired Power Plant and Proposal for Training Project
-
Characteristics and Advantages of KCM
27
■ Coal Industry
・ Mining Technology as Global Standard
・ World’s Highest Level of Mining Safety
・ Technology of water Treatment and Ash Filling to Mined out areas
■ International Technology Transfer (Training Program)
・ Recieve 2,800 Trainees from Foreign Countries
・ Dispatch 3,700 KCM Engineers to Foreign Countries
■ New Buisiness
・ Waste Treatment Technology
・ Operation of Waste Incineration and Power Generation
■ Joint Research
・ JCOAL, Institute, University, MMIJ and Others
2-1 Concept of Eco Park Conception
-
Assignments and Proposed measures in KCM
28
■ Coal Industry
・ Coal Delivery to Remort Areas
・ Excessive facilities against Present Production
Cost Cut by Local Consumption and Streamlining
■ Training Project on Coal Mining Technology
・ Training Course only for Upstream sector like mining and safety
Extend Project to Downstream Sector like Coal Preparation
and Utilizing Technology Including Electric Power Plant
・ Training Project only for Limited Foreign Countries
Expand Subjects to Domestic Students and Young
Engineers and Others
■ New Business
・ Independent Activity by Sole Corporation
Total Licensing of Technology
2-1 Concept of Eco Park Conception
-
29
Eco Park Conception for Resource & Energy in Kushiro
Training Center
Domestic・ Joint Research・ Training Program
International・ Joint Research・ Technology Transfer
Program
Coal Mining and
Utilization
・ Mining Technology・ Safety Technology・ Coal Preparation・ Electric Powe Plant・ Water Treatment・ Ash Treatment・ C.B.M.・ C.M.M.・ C.C.S.・ Others
Environment and
Recycle
・ Refuse Treatment ・ Refuse Collection・ Coal Preparation・ Solid Waste Incineration ・ E.L.V. Recycle・ Ash Treatment・ Bio Diesel Fuel・ Others
2-1 Concept of Eco Park Conception
-
30
2-2 Coal-Fired Power Plant and Proposal for Training Project
Coal-Fired Electric Power Plant
・ Boiler Type : Circulating Fluidized Bed
・ Maximum Steam Flow :370 t / hr
・ Steam Temperature :560 ℃ / 540 ℃
・ Steam Pressure :17.0 MPaG (Heater Outlet )
3.1 MPaG (Re-heater Outlet)
・ Steam Turbine Type : Re-heat Condensing Turbine
・ Generator Output :112,000 kW
・ Fuel :Coal (70%), Biomass (30%)
Kushiro Power Station Co., Ltd.
Water Treatment Exhaust TowerBoiler Area Building
Turbine Building
Cooling
Tower
-
31
Coexistence between KCM and Power Plant
■ Provide Strong Industrial Area against the Earthquake and Tunami
■ Provide Low Pollution Coal and Local Consumption
■ Provide Clean Mine Water as Cooling Water
■ Receive Warm Drainage Water after Cooling Tower as Coal Preparation Water
■ Receive Ash as Filling Materials for Mined out area
■ Provide Engineers, Qualified Persons and 3 Shift Workers
■ Propose New Training Course of Coal Utilization including Electric Power Plant and Environment for Training Project
■ Others
2-2 Coal-Fired Power Plant and Proposal for Training Project
-
September 10th 2018 Kushiro Coal Mine Co., Ltd.
Thank you very much for your kind attention
32