kenneth d. fenton p.s. clark county engineer’s office

49
LPA Program Overview LPA Projects Kenneth D. Fenton P.S. Clark County Engineer’s Office

Upload: elfreda-atkinson

Post on 30-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Program OverviewLPA Projects

Kenneth D. Fenton P.S.Clark County Engineer’s

Office

Page 2: Kenneth D. Fenton P.S. Clark County Engineer’s Office

I’m from ODOT and I’m here to help you!

Page 3: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA’s Point of View

Construction of Local Projects

Page 4: Kenneth D. Fenton P.S. Clark County Engineer’s Office

What Works? What Doesn’t? ODOT’s processes are

tried-and-true

LPA conformance to ODOT’s material and construction requirements

Possible changes and improvements

Page 5: Kenneth D. Fenton P.S. Clark County Engineer’s Office

ODOT’s processes are Tried-and-True.def. Tested and

proved to be worthy or goodODOT CMS

Office of Material

Management

LPA Construction

Contract Administrati

on

Page 6: Kenneth D. Fenton P.S. Clark County Engineer’s Office

Put it in writing . . .

Document

Document

Document

Page 7: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Documentation Checklist Documentation should support an audit. If it isn’t documented, it

didn’t happen.  Project Inspection

Daily Diary. The daily diary should be up to date and contain the following information: All work performed by the contractor List of equipment Project personnel and hours worked Pay quantities. Check to see that they match the calculated

values and how the pay quantity is determined. Daily weather conditions (weather affects the majority of work

performed and is needed to determine time extensions based upon weather delays)

Special notes and instructions to the contractor Any unusual events occurring on or adjacent to the project,

even those not related to construction

Page 8: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Documentation Checklist Measurements

Measurements should be shown either in the daily diary or some other form of documentation. The inspector must indicate that the measurement is an actual field measurement. Even if the measurement is a plan dimension, note that the dimension has been field verified.

If the measurements in the diary are transferred from other documentation, has the engineer indicated where to find that documentation?

Calculations Do the calculations use the measured or plan dimensions?

This should be indicated; field verification is required. Note whether a tape is included with the calculations. All calculations should include item of work, location, date

and initials.

Page 9: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Documentation Checklist Tickets

Each tickets must include: JMF, date, location, item and initials

Any sequence of tickets that are not in order or have tickets missing need to have a calculator tape verifying the accumulative total.

Testing and Results Inspections Maintenance of Traffic Document any plan changes 

Material Management Is the inspector getting necessary documentation for the

materials records? Documentation should provide for quality, quantity, and basis for payment.

How is the project manager organizing the materials documentation?

The project engineer must approve all materials and solve any deficiencies.

Page 10: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Documentation Checklist Payment & Reimbursements

Change Orders / Pricing for extra work Claims / Dispute Resolution Schedule and Completion Date / Time Extensions / Liquidated

Damages Timeliness of payments Railroad, Utility Force Account

Prevailing Wage, EEO, DBE (if applicable)

Page 11: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 12: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 13: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 14: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 15: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 16: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 17: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 18: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 19: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 20: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 21: Kenneth D. Fenton P.S. Clark County Engineer’s Office

LPA Conformance to ODOT’s Material and

Construction Requirements

Page 22: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 23: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 24: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 25: Kenneth D. Fenton P.S. Clark County Engineer’s Office

Tracking and

Issuing Payments

Page 26: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 27: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 28: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 29: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 30: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 31: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 32: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 33: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 34: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 35: Kenneth D. Fenton P.S. Clark County Engineer’s Office

Prevailing Wage

Page 36: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 37: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 38: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 39: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 40: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 41: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 42: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 43: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 44: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 45: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 46: Kenneth D. Fenton P.S. Clark County Engineer’s Office
Page 47: Kenneth D. Fenton P.S. Clark County Engineer’s Office

Possible Changes or Improvements

Page 48: Kenneth D. Fenton P.S. Clark County Engineer’s Office

PULL IT ALL TOGETHER

Utilize ODOT’s resources

Share your knowledge

There is always room to improve

Page 49: Kenneth D. Fenton P.S. Clark County Engineer’s Office

Thank You&

Happy Holidays!