CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011 Page 1 of 8 REPUBLIC OF KENYA KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO) 220KV RING AROUND NAIROBI METROPOLITAN AREA CONTRACT KETRACO/PT/018/2011 CONSTRUCTION OF NAIROBI RING SUBSTATIONS LOTS A & B MINUTES OF PRE-BID MEETING March 2012

Upload: others

Post on 27-Jan-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 1 of 8

REPUBLIC OF KENYA

KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO)

220KV RING AROUND NAIROBI METROPOLITAN

AREA

CONTRACT KETRACO/PT/018/2011

CONSTRUCTION OF NAIROBI RING SUBSTATIONS

LOTS A & B

MINUTES OF PRE-BID MEETING

March 2012

Page 2: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 2 of 8

Page 3: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 3 of 8

Subject: Minutes of Pre – Bid Meeting Date: Wednesday 29 February 2012 Time: 10:00am Name of Project: 220kV Ring Around Nairobi Metropolitan Area Name of Contract: Construction of Nairobi Ring Substations – Lots A & B Contract Number: KETRACO/PT/018/2011 Venue: Kenya Electricity Transmission Company Limited (KETRACO)

2nd Floor, Capitol Hill Square Chyulu Road Upper Hill Nairobi Kenya.

Attendees for Client/Engineer:

1. Dr. John Mativo Head of Technical Services, KETRACO 2. Engr. Stanley Mutwiri Manager, Electricity Expansion Programme, KPLC 3. Engr. Anthony Musyoka Chief Engineer, KPLC 4. Steven Jacques Chief Substations Engineer, Parsons Brinckerhoff

Attendees of Bidding Companies: Name Company/Firm Email Address Nachiket Shrikhande KEC International Ltd., India [email protected] Muchiri Karari Taikai, Shandong [email protected]

// [email protected] Kevin Shanghai Electric [email protected]

Sunil CTDEC [email protected] Hulewa Hyosung [email protected] Laban CNEEC [email protected] GN Githu Iberdrola [email protected] Alberto Gonzalez Iberdrola [email protected]

Nicholas K. Sambu ABB Ltd. [email protected] Clemencia Ongaki Alstom Grid [email protected] Philip Kags Matelec [email protected] //

[email protected] Gufran Ahmad Adra International Ltd. [email protected] Moses W. Namasake ECI Eng. & Constr. Co.Ltd. [email protected] Daniel Fernandez Isolux Ingenieria S.A. [email protected] Isaac Escartin Isolux Ingenieria S.A. [email protected] Ferdie Wanyama EMC [email protected] Makori Bikundo Techno Electric/Maknes

Consulting [email protected]

Samwel Odila Siemens Ltd. [email protected] // [email protected] // [email protected]

Simon Darlington Alstom Grid [email protected]

Page 4: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 4 of 8

Jean-Charles Couteau Alstom Grid [email protected] Meidi Cocharo Ineo Energie Export [email protected] Jouvin Jean Louis Ineo Energie Export [email protected] Zhao Bin NARI Group Corporation [email protected] //

[email protected] Li Ganshen Henan Electric Designing

Institute [email protected]

Titus K. Biwoss COVEC [email protected] Peter K. Muchiri Micro Tech Pakistan [email protected] //

[email protected] Gicheru Kimani Zhejiang Thermal Power [email protected] //

[email protected] Symphrose Ochieng Daewoo International [email protected] Il Kwoon Daewoo International [email protected] Mina Choi Hyosung Corporation [email protected] Nilesh Pimpalkar Semi / AEE Power [email protected] D Hariharan NCC [email protected] Michael Sigwe Ezeetec Ltd. [email protected] A Swanepoel Consolidated Power Projects [email protected] John Daas Chint Co. Ltd. [email protected] Rajesh Kumar Larsen & Toubro [email protected] // [email protected] Jia Yang Ping Sinohydro Corp. Ltd. [email protected] Wangyingye Sinohydro Corp. Ltd. [email protected] Jin Hua Sinotec Co. Ltd. [email protected] Tu Wei China CAMC Engineering [email protected] Githinji FIW Energy Ltd. [email protected] Nyaga Ian LEEE Co. Ltd. [email protected] //

[email protected] // [email protected]

Simon Desbottes Eiffage Energie [email protected] // [email protected]

Zhang Hao Xian Electric Engineering [email protected] Allan Zhang TBEA Co. Ltd. [email protected] Bengi Eltel [email protected] Jessic Yang COVEC [email protected] Richard Ngalia Powergen Technologies Ltd. [email protected] Davies Okoth ABB Ltd. [email protected] Anne Frances Salcedo ABB AG [email protected] Kennedy Wainaina Matelec [email protected] //

[email protected] ??? TATA Projects [email protected] ??? Effacec [email protected]

Page 5: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 5 of 8

1. Purpose

The purpose of this meeting was to introduce the scope of the project, to clarify any issues and to answer questions raised by the Bidders on the bid document KETRACO/PT/018/2011.

2. General

Dr. John Mativo welcomed the representatives of the bidding companies and expressed his thanks on behalf of KETRACO for attending the Pre-bid meeting. Dr. Mativo introduced KETRACO’s and PB’s project team to the representatives of the bidding companies. Engr. Stanley Mutwiri explained to the potential bidders the importance of following the “Instructions to Bidders” as defined in the bid documents advising that, from past experience, failure to do so has resulted in large numbers of bidders being disqualified. It is imperative that good quality and fully compliant bids are submitted. It was important that all attendees completed the attendance record and, in particular, that the e-mail address for the single point of contact for the bid preparation was legible. Correspondence routines as per the Bid Data Sheet were to be complied to. It was emphasized that no changes from the General Conditions of Contract (GCoC) or the Particular Conditions of Contract, will be accepted and any requests from the bidders to change or deviate from the Contract Conditions will result in the bid being disqualified. No extension of time will be granted for this bid. The bid opening date will be 18 April 2012. The need for a good quality Contractors was emphasized. Following Contract Award, any changes to the proposed Project Managers, Site Managers or named subcontractors will not be allowed. Changes to nominated subcontractors and manufacturers will not be permitted. All references for previous experience and projects will be checked during the bid evaluation. Any references that are found to be falsified will result in the bidder being disqualified from this and future bids with KETRACO. For bidders who intend bidding for both Lots, full compliance with the requirements of the Bid Data Sheet ITB11.1(k) is imperative. The Bid Security for each lot is to be at least 700,000 EUR. KETRACO confirmed that there is to be no Letter of Credit. The contracts are to be fixed price. An addendum is to be issued which changes the Terms of Payment on a CIP basis.

Steven Jacques briefly explained the scope of the project and answered bidders’ questions.

Page 6: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 6 of 8

Addenda and clarification responses will be posted on the KETRACO website. It was emphasized that detailed methodologies for the work to be undertaken are required as part of the bid submissions. In particular, the methodology for the extension works at Dandora substation will be evaluated to ensure that the bidders are experienced in extending existing HV substations. It is critical that outages are minimized and the methodologies are to include detailed construction programmes, indicating the outage requirements. Confirmation of the fault levels for the 220kV and 66kV systems was requested. [Post meeting note : It is confirmed that the system fault levels are 31.5kA / 1s for both the 220kV and 66kV systems.] The HV Cable protection for the Dandora to Koma Rock circuits is to be double differential. The existing telecommunications system information is to be provided to the bidders as an addendum. New control building layouts are to be designed by the Contractors. The earthing design specification is inherent within IEC 61936-1. Technical schedules for surge arresters are to be provided in an addendum. No technical schedules will be provided for the DC Battery Chargers. The bidders shall provide the battery system information in their own format. It was confirmed that the Time for Completion is to be 18 months, up to operational acceptance. Areas of full development for each new substation will be 200m x 170m. For Isinya substation, the bidders shall include costs for installing the DNO supplies to the LVAC system, teeing off from the nearby 33kV overhead line. NEMA approvals will be dealt with by KETRACO. All other municipal/authority/transport costs shall be covered by the Bidder. Access roads from main roads to the sites are not within the scope of the Contracts. However, it is the Contractors responsibility to ensure safe delivery of equipment to the sites under CIP. The Bidders shall ensure compatibility of feeder protections with remote end protections. Following the conclusion of the pre-bid meeting, arrangements were made to visit the sites.

3. Site Visit Following the pre-bid meeting, site visits to the locations of the Athi River and Isinya substations were undertaken. The following day, 1 March 2012, the bidders’ representatives, KETRACO and PB visited the locations of Ngong and Koma Rock substations and Dandora substation. The site visits were accompanied by KETRACO surveyor, Mr. Jillo Madras.

Page 7: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 7 of 8

Attachments: Appendix 1 Pre-Bid Meeting Register

Signed for KETRACO Signed for PB (Consultant) ---------------------------------- ---------------------------------- Dr. John Mativo Steven Jacques Head of Technical Services Chief Substations Engineer KETRACO Parsons Brinckerhoff Date: 12 March 2012

Page 8: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8

CONSTRUCTION OF NAIROBI RING SUBSTATIONS – LOT A AND LOT B CONTRACT KETRACO/PT/018/2011

Page 8 of 8

APPENDIX 1

Pre-Bid Meeting Register

Page 9: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 10: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 11: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 12: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 13: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 14: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 15: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8
Page 16: KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED (KETRACO… · 2012-03-14 · construction of nairobi ring substations – lot a and lot b contract ketraco/pt/018/2011 page 1 of 8