GreenSoulICT-platform for higher engagement in energy efficiency
among users of public buildings
One of the main sources of unnecessary energy consumption is the misuse of energy consuming devices and systems in
buildings. Making energy consuming devices more efficient is one of the keys in order to achieve the EU 20-20-20 targets.
The GreenSoul project thus focuses on public buildings and aims to achieve a higher energy efficiency by using a novel ICT
platform empowered by a socio-economic and a behavioural model, which will guide and aid more eco-aware practices
on people, devices and buildings.
4ward Energy Research GmbH | Reininghausstraße 13A, 8020 Graz, | Austria
[email protected] | Tel: +43 664 88 500 358 | www.4wardenergy.at
This project has received funding from the European Union’s
Horizon 2020 Research and Innovation programme under grant
agreement No. 696129
E. HUMMER, M. TRAGNER, M. WEISSENBACHER, M. RABENSTEINER
Figure 1: GreenSoul pilot buildings Figure 2: Distribution of energy usage within the pilot areas
6. Intelligent control at device level (- 5%)
5. Manual control due to behavior change (- 4%)
4. Awareness through GreenSoul platform (- 3%)
3. Energy awareness spread to personnel (- 4%)
2. Awareness of building energy manager (- 3%)
1. Smart monitoring (- 2%)
Haywards Heath
Bilbao
Seville
Cambridge
Weiz
Pilea-Hortiatis
Website: www.greensoul-h2020.eu
Twitter: @GreenSoulH2020 Facebook: facebook.com/greensoulproject LinkedIn: linkedin.com/company/10786340
Expected Impact Partners
Pilot Buildings
The GreenSoul project will install an energy monitoring platform at six public
(see Figure 1) buildings to evaluate and impact the way people use energy
consuming shared devices and personal devices.
Pilots evaluation comprises several steps. The first two steps (1) energy audit
and (2) baseline creation build the basis to
• know the current state of the pilots sites (see Figure 2) and
• be able to correctly asses the improvements made by the interventions.
The models created within this phase will be updated after every piloting
phase in order to take into consideration any potential modification of the
behaviour of the building.
Baseline creationKey components
0
50
100
150
200
250
300
350
400
Seville Pilea-Hortiatis Bilbao HaywardsHeath
Cambridge Weiz
Energ
y consum
ption [M
Wh/a
]
Electricity office equipment Electricity ICT-coolingElectricity lighting Electricity building servicesDHW HeatingCooling Ventilation