COUNTY YEAR OFSIX-YEAR PLAN
KYTC PROJECTIDENTIFICA TIONNUMBER
ROUTE LENGTH(MILES)
DESCRIPTIONOF PROJECT
STAGE OF PROJECTDEVELOPMENT
FISCAL YEAR IN WHICH PHASE ACTIVITY SHOULD COMMENCE. FOR EXAMPLE, FY-2019BEGINS JULY 1, 2018 AND ENDS JUNE 30, 2019FOR STATE PROJECTS. FOR FEDERAL-AID.PROJECTS, FY 2019 BEGINS OCTOBER 1, 2018AND ENDS SEPTEMBER 30, 2019.
P=PRELIMINAR Y ENG./EARLY PUBLIC COORD.D=DESIGNR=RIGHT OF WAYU=UTILITY RELOCATIONC=CONSTRUCTION
BEGINNING AND ENDING MILEPOINTS(State Primary Roadway System)
TYPE OF PRIORITY / TYPE OF WORK
PHASE COST ORTOTAL COST INSCHEDULED YEARDOLLARS
Purpose and Need: ASSET MANAGEMENT / AM-BRIDGE (P)
Milepoints: Fr om: 11.905 To: 11.913
FUNDING PHASE YEAR AMOUNT
BRBR
DC
20192020
$175,000$490,000
Total $665,000
ADAIR 2018 08 - 1068.00
Parent No.:
2018
KY-704 0.008
YEAR OF SIX-YEAR HIGHW AY PLAN & ITEM NUMBER FROMWHICH ABOVE ITEMNUMBER WAS DERIVED.
EXAMPLE:
08 - 1068.00
ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK (001B00078N)(SD)
TYPE OF FUNDS TO BE UTILIZED FOR THE PROJECT, ABBREVIA TED AS FOLLOWS:
BR
BR2
CM
FH
HPP
KYD
BRIDGE PROGRAM
JP2 BRAC BOND PROJECTS SECOND PROGRAM
FEDERAL CONGESTION MITIGATION
FEDERAL FOREST HIGHW AY
HIGH PRIORITY PROJECTS
FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY
NH
RRP
SAF
SHN
SLO
SLX
SNK
SAH
SPP
STP
TE
FEDERAL NATIONAL HIGHW AY SYSTEM
SAFETY-RAILROAD PROTECTION
FEDERAL HIGHWAY SAFETY
FEDERAL STP FUNDS DEDICATED TO HENDERSON
FEDERAL STP FUNDS DEDICATED TO LOUISVILLE
FEDERAL STP FUNDS DEDICATED TO LEXINGT ON
FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY
FEDERAL STP FUNDS DEDICATED TO ASHLAND
STATE CONSTRUCTION HIGH PRIORITY PROJECTS
FEDERAL STATEWIDE TRANSPORTATION PROGRAM
FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM
PM PREVENTATIVE MAINTENANCE
KEY TO INTERPRETING THE INFORMATION PRESENTED FORHIGHWAY PLAN PROJECTS
![Page 2: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/2.jpg)
![Page 3: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/3.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 1
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK.(001B00078N)(SD)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 43.02 TO MILEPOINT 57.79
KY 55 NEW TURNING LANE AT BETTY'S OK COUNTRY COOKING(18CCN)
IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTIONIMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EASTOF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR)(18CCN)
IMPROVE KY-100 (OLD GALLATIN ROAD) FROM SOUTH OF KY-2160 TO KY-980.(06CCN)
WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTIONFROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETY. MP 11.800-12.700 (14CCN)(18CCN)
IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD INSCOTTSVILLE. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK. (002B00004N)
1.100
.341
.900
ADAIR
ADAIR
ADAIR
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
KY-704
LN-9008
KY-55
KY-100
KY-100
KY-100
-
KY-3499
$665,000
$4,400,000
$250,000
$15,180,000
$1,250,000
$5,330,000
$300,000
$700,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
R
U
C
C
D
R
U
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2023
2023
2020
2020
2021
2023
2018
2021
2022
2023
2024
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$490,000
$400,000
$4,000,000
$250,000
$1,880,000
$1,300,000
$12,000,000
$1,250,000
$480,000
$380,000
$670,000
$3,800,000
$300,000
$175,000
$525,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
03
03
03
03
03
1068.00
20000.00
80003.00
320.00
8305.00
8802.00
8901.00
10000.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
03
03
03
03
03
1068.00
20000.00
80003.00
320.00
8305.00
8802.00
8901.00
10000.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2012
2006
2014
2016
2018
2018
2018
2018
2012
2006
2014
2016
2018
11.905
43.02
15.9
3.1
14.1
11.8
1.412
11.913
48.15
16
4.2
14.441
12.7
1.422
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 4: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/4.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 2
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 585 BRIDGE OVER MIDDLE FORK DRAKESCREEK. (002B00021N)
CONSTRUCT A NEW TURN LANE ON US 231 AT JOHNSON ROAD TO IMPROVEACCESS TO INDUSTRIAL PARK(18CCN)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 58.3 TO MILEPOINT 61.84
IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END OF BRIDGEOVER KENTUCKY RIVER AT TYRONE(18CCN)
PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR)(18CCR).
PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR)(18CCR).
IMPROVE US-60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OFDENIS JONES ROAD. (02CCR)
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION. (004B00021N)(SD)(18CCR)
3.700
3.700
1.800
.970
ALLEN
ALLEN
ANDERSON
ANDERSON
BALLARD
BALLARD
BALLARD
BALLARD
KY-585
US-231
BG-9002
US-62
US-60
US-60
US-60
US-51
$1,067,500
$250,000
$1,650,000
$19,800,000
$6,000,000
$2,500,000
$4,270,000
$53,100,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
D
C
D
R
U
C
R
U
R
R
U
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2024
2024
2020
2021
2022
2023
2020
2021
2021
2024
2024
2020
2023
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
PM
PM
SPP
SPP
SPP
SPP
NH
NH
NH
NH
NH
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$245,000
$822,500
$250,000
$150,000
$1,500,000
$1,200,000
$3,300,000
$4,000,000
$11,300,000
$2,500,000
$3,500,000
$2,500,000
$2,370,000
$1,900,000
$2,500,000
$1,000,000
$100,000
$49,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
07
07
01
01
01
01
10011.00
80004.00
20001.00
80001.00
115.00
115.01
118.00
1140.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
SIMPSON
MCCRACKEN
MCCRACKEN
03
03
07
07
01
01
01
01
10011.00
80004.00
20001.00
80001.00
115.00
115.00
118.00
1140.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
1998
2006
2000
2018
2018
2018
2018
2018
1998
1998
2000
2018
0
7.6
58.3
20.493
13.62
13.62
11.815
7.327
.002
7.7
61.84
22.78
16.937
16.937
13.615
8.297
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
SAFETY / SPOT IMPROVEMENTS(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
8.326
0
0
8.354
.385
.385
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 5: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/5.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 3
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.(SD)(18CCR)
PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVERFALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)
PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVERFALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)
LOUIE B NUNN PKWY (LN-9008) BRIDGE PAINTING, CLEANING, AND MINORREPAIRS ON BRIDGE OVER I-65 IN BARREN CO. KY. 005B00067R, 005B00067L(2016BOP)
IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS),AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)
IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS),AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)
ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET. (005B00058N)
.970
4.217
4.217
.100
1.721
1.721
BALLARD
BALLARD
BALLARD
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
US-51
US-51
US-51
KY-90
KY-90
LN-9008
KY-1297
KY-1297
US-31EX
$56,000,000
$20,000,000
$3,025,000
$3,950,000
$9,210,000
$500,000
$4,250,000
$4,250,000
$1,190,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
D
C
C
C
C
R
U
R
U
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2024
2021
2020
2020
2022
2023
2018
2022
2022
2023
2023
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
PM
PM
STP
STP
NH
STP
STP
STP
STP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$6,500,000
$49,500,000
$20,000,000
$275,000
$2,750,000
$3,950,000
$9,210,000
$500,000
$2,250,000
$2,000,000
$2,250,000
$2,000,000
$245,000
$945,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
03
03
03
03
03
03
1140.02
1140.03
20000.00
108.50
108.51
195.00
8821.00
8821.01
10001.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
03
03
03
03
03
03
1140.02
1140.03
20000.00
108.00
108.51
195.00
8821.00
8821.00
10001.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2000
2018
2016
2016
2018
2018
2018
2018
2018
2000
2018
2016
2016
2016
2018
7.327
7.327
4.873
17.758
17.758
0
11.085
11.085
1.582
8.297
8.297
7.3
21.975
21.975
.1
12.806
12.806
1.586
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(P)
ASSET MANAGEMENT / AM-BRG PAINTING(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 6: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/6.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 4
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-65 BOTH DIRECTION(S) FROM MILEPOINT42.89 TO MILEPOINT 43.307.
ADDRESS PAVEMENT CONDITION OF I-65 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 45.935 TO MILEPOINT 46.881.
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 16.117 TO MILEPOINT 20.1
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 20.1 TO MILEPOINT 22.357
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 9.375 TO MILEPOINT 14.85
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 0.00 TO MILEPOINT9.70
ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 16.95 TOMILEPOINT 23.16
9.700
6.210
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
I-65
I-65
LN-9008
LN-9008
LN-9008
US-68X
US-68
US-68
$550,000
$550,000
$3,520,000
$1,980,000
$4,840,000
$4,400,000
$1,180,000
$920,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2024
2024
2019
2019
2021
2021
2021
2021
2021
2021
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$50,000
$500,000
$50,000
$500,000
$320,000
$3,200,000
$180,000
$1,800,000
$440,000
$4,400,000
$400,000
$4,000,000
$1,180,000
$920,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
20000.00
20001.00
20003.00
20004.00
20005.00
20006.00
20020.00
20021.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
20000.00
20001.00
20003.00
20004.00
20005.00
20006.00
20020.00
20021.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
42.89
45.935
16.117
20.1
9.375
1.692
0
16.95
43.307
46.881
20.1
22.357
14.85
2.523
9.7
23.16
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 7: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/7.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 5
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
NEW INTERCHANGE ON THE LOUIE NUNN CUMBERLAND PARKWAY AT KY-249 INGLASGOW(18CCN)
IMPROVE SAFETY AND EFFICIENCY AT THE KY-211 AND US-60 INTERSECTION INSALT LICK. (14CCN)
ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK. (006B00069N)
ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAK CREEK.(006B00076N)
ADDRESS DEFICIENCIES OF KY 211 BRIDGE OVER COW CREEK. (006B00043N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK.(007B00071N)
ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK.(007B00072N)
.200
BARREN
BATH
BATH
BATH
BATH
BATH
BELL
BELL
LN-9008
US-60
KY-1106
KY-1944
KY-211
US-60
KY-2011
KY-2011
$12,250,000
$1,000,000
$2,853,000
$1,488,000
$1,032,500
$410,000
$616,000
$966,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
D
C
D
C
D
C
D
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2024
2020
2019
2020
2019
2020
2019
2020
2019
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
STP
BR
BR
BR
BR
BR
BR
PM
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,500,000
$2,000,000
$750,000
$8,000,000
$1,000,000
$595,000
$2,258,000
$473,000
$1,015,000
$315,000
$717,500
$410,000
$175,000
$441,000
$175,000
$791,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
09
09
09
09
09
11
11
80002.00
8813.00
10000.00
10001.00
10017.00
20001.00
10000.00
10001.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
09
09
09
09
09
11
11
80002.00
8813.00
10000.00
10001.00
10017.00
20001.00
10000.00
10001.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2014
2018
2018
2018
2018
2018
2018
2018
2014
2018
2018
2018
2018
2018
2018
12.8
16.3
3.291
2.701
8.166
6.35
6.395
7.534
13
16.5
3.327
2.715
8.178
7.724
6.399
7.54
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 8: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/8.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 6
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH. (007C00003N)
ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER GREASY CREEK. (007B00040N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT, SCHOOL BUS SAFETYISSUE. (CCR)
ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 0.90 TOMILEPOINT 2.86
CONSTRUCT A NEW ROADWAY ON PAGE SPUR RD.(18CCN)
IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)(18CCR)
IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)(18CCR)
ADD AUXILIARY LANES ON I-71/75 FROM KY-536 TO US-42 (NB & SB) AS PER THEINTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)
IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).(18CCR)
1.960
.686
.686
2.067
BELL
BELL
BELL
BELL
BELL
BOONE
BOONE
BOONE
BOONE
CR-1041
KY-92
KY-2012
US-25E
-
I-75
I-75
I-75
I-275
$788,000
$665,000
$671,000
$1,391,000
$650,000
$10,430,000
$17,080,000
$11,060,000
$15,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
C
U
C
C
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2019
2022
2021
2018
2021
2022
2018
2024
2019
2020
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
SPP
NH
NH
NH
NH
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$193,000
$595,000
$175,000
$490,000
$61,000
$610,000
$1,391,000
$650,000
$5,430,000
$5,000,000
$17,080,000
$1,060,000
$10,000,000
$3,000,000
$4,000,000
$3,000,000
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
06
06
06
06
10002.00
10038.00
20000.00
20021.00
80050.00
14.00
14.02
14.50
78.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
06
06
06
06
10002.00
10038.00
20000.00
20021.00
80050.00
14.00
14.02
14.01
78.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2004
2008
2008
2018
2018
2018
2018
2018
2018
2004
2008
2006
2018
.091
3.142
0
.9
177.659
178.033
178.039
7.2
.097
3.148
1.95
2.86
178.345
178.133
180.106
8.9
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
NEW ROUTES / NEW ROUTE(O)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)
![Page 9: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/9.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 7
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD). (18CCR)
IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THEJUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.
REDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THEINTERCHANGE OF I-75 AND KY-14 IN WALTON.
MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON US-25(DRY RIDGE-FLORENCE ROAD) AT MUBEA.
IMPROVE MOBILITY AT THE INTERSECTION OF KY-842 AND US-42.(12CCR)(16CCN)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
.374
.263
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
I-275
I-75
I-75
US-25
US-42
-
-
-
-
$14,000,000
$2,000,000
$500,000
$1,100,000
$2,500,000
$414,000
$44,000
$44,000
$44,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
C
D
P
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2019
2021
2019
2018
2018
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
SPP
STP
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,000,000
$10,000,000
$2,000,000
$500,000
$1,100,000
$2,500,000
$414,000
$44,000
$44,000
$44,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
78.01
79.00
80.00
351.45
367.00
400.03
400.14
400.15
400.16
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
06
06
78.01
79.00
80.00
351.00
367.00
400.03
400.14
400.15
400.16
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2016
2016
2004
2014
2014
2016
2018
2018
2018
1996
2016
2004
2014
2014
2016
7.2
184.148
171
8.468
12.803
8.9
185.34
171.8
8.842
13.066
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MINOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
![Page 10: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/10.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 8
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
N KY PLANNING FY18 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)
N KY PLANNING FY 2019 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
-
-
-
-
-
-
-
-
$44,000
$280,000
$56,000
$56,000
$56,000
$56,000
$150,000
$150,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
P
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2018
2019
2020
2021
2022
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$44,000
$280,000
$56,000
$56,000
$56,000
$56,000
$150,000
$150,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
400.17
401.09
401.14
401.15
401.16
401.17
401.18
401.19
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
06
400.17
401.09
401.14
401.15
401.16
401.17
401.00
401.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2008
2014
2014
2016
2016
2016
2016
2016
2008
2014
2014
2016
2016
2004
2004
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
From:From:
![Page 11: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/11.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 9
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
N KY PLANNING FY 2020 AIR QUALITY, FIAM, LAND USE, RIDESHARE.
N KY PLANNING FY 2021 AIR QUALITY, FIAM, LAND USE, RIDESHARE.
INCREASE THROUGH LANE CAPACITY ON KY 237 FROM I-275 RAMPS TOCARDINAL WAY AND IMPROVE WORLDWIDE BLVD WITH TWO-WAY LEFT TURNAND ADDITIONAL RIGHT TURN TO SB KY 237. (2012BOP)(ADM. BY KYTC)
RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD ANDLONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD.(2012BOP)
CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ONFROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM.BY KYTC)
IMPROVE SAFETY ALONG KY 717 AT THE 90 DEGREE BEND NEAR THE CIN/NKYAIRPORT, 0.337 MI N OF KY 1017. (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP) (2014BOP)
WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM DOERING DRIVE TO KY 1017(AERO PARKWAY) TO PROVIDE A TWO-WAY LEFT TURN LANE TO IMPROVETRAFFIC FLOW FOR FUTURE DEVELOPMENT (2016BOP)
CONSTRUCT A MULTI-MODAL PATH ALONG KY 237 FROM STEPHENSELEMENTARY SCHOOL NORTH TO KY 20/PETERSBURG ROAD (2016BOP).
.450
.558
.450
.300
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
-
-
KY-237
CR-1002
KY-3060
KY-717
KY-3159
KY-237
$150,000
$150,000
$3,000,000
$524,640
$1,520,000
$2,750,000
$1,000,000
$1,786,400
Total
Total
Total
Total
Total
Total
Total
Total
P
P
C
C
R
U
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$150,000
$150,000
$3,000,000
$524,640
$200,000
$120,000
$1,200,000
$1,500,000
$250,000
$1,000,000
$1,000,000
$1,786,400
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
401.20
401.21
415.00
422.00
423.00
433.00
439.00
440.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
06
401.20
401.21
966.02
966.02
966.02
966.04
966.05
966.05
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2012
2012
2012
2014
2016
2016
2018
2018
2004
2004
2004
2006
2008
2008
10.9
2.1
1.5
.7
.119
6.617
11.35
2.658
1.95
1
.652
9.418
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
From:From:
From:From:
![Page 12: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/12.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 10
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE LANES AND RETAINING WALLSALONG DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC BLVD IN THE CITY OFERLANGER. (2016 BOP)
ADD A LEFT TURN LANE ON SB CAMP ERNST ROAD AT LONGBRANCH ROAD(2016BOP).
IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-236 (DONALDSONROAD) FROM KY-842 (HOUSTON ROAD) TO KY-3076 (MINEOLA PIKE). (18CCR)
IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON KY-3076 (MINEOLAPIKE) FROM KY-236 TO I-275. (18CCR)
PROVIDE EAST-WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY-237(PLEASANT VALLEY ROAD) THRU KY-842 (HOPEFUL CHURCH ROAD) TO MALLROAD/I-75 INTERCHANGE. (18CCR)
IMPROVE MOBILITY AND REDUCE CONGESTION ON US-25 FROM WINNINGCOLORS DRIVE TO THE NORFOLK SOUTHERN RAILROAD CROSSING SOUTH OFKY-1829 (INDUSTRIAL ROAD); EXCLUDES GRADE SEPARATION AT KY-536.
SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FORAMAZON DEVELOPMENT. (18CCR)
SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FORAMAZON DEVELOPMENT. (ADDITIONAL FUNDING FOR 6-937.00) (18CCR)
1.594
1.050
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
KY-3076
CR-1001
KY-236
KY-3076
US-42
US-25
-
-
$1,856,000
$931,080
$8,000,000
$6,250,000
$1,500,000
$3,300,000
$2,000,000
$2,000,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
P
D
R
D
R
U
D
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2018
2018
2019
2019
2020
2023
2019
2022
2023
2020
2023
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
STP
STP
STP
STP
STP
STP
NH
STP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$80,000
$200,000
$1,576,000
$400,000
$69,271
$461,809
$2,000,000
$5,000,000
$1,000,000
$1,500,000
$4,000,000
$750,000
$1,500,000
$3,300,000
$2,000,000
$2,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
441.00
442.00
444.00
445.00
446.00
447.00
937.00
937.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTON
KENTONCAMPBELL
KENTON
06
06
06
06
06
06
06
06
966.05
966.05
444.00
445.00
446.00
447.00
937.00
937.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2018
2018
2018
2018
2008
2008
2018
2018
2018
2018
2018
2018
.825
2.168
0
0
12.508
5.085
1.554
2.169
1.594
1.05
13.489
9.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BIKE/PED FACIL(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
RELIABILITY / PREFINANCD CONVRSN(O)
0
2.684
.883
2.801
Milepoints:
Milepoints:Milepoints:
Milepoints:
To:
To:To:
To:
From:
From:From:
From:
![Page 13: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/13.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 11
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
-
-
-
-
-
-
-
$35,140,000
$9,100,000
$9,200,000
$9,200,000
$9,200,000
$9,200,000
$9,200,000
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2021
2022
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$35,140,000
$9,100,000
$9,200,000
$9,200,000
$9,200,000
$9,200,000
$9,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
966.00
966.07
966.08
966.09
966.10
966.11
966.12
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
KENTONCAMPBELL
06
06
06
06
06
06
06
966.00
966.07
966.08
966.09
966.10
966.11
966.12
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2002
2014
2014
2016
2016
2018
2018
2002
2014
2014
2016
2016
2018
2018
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
From:From:
From:From:
![Page 14: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/14.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 12
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON RICHARDSONROAD (KY 842) 0.14 MI E OF US 25 NEAR INDEPENDENCE (008B00092N)
PHASE II: IMPROVE INTERSECTION OPERATIONS AT THE INTERSECTIONS OFIDLEWILD RD. (KY-338)/JEFFERSON ST./TEMPERATE ST. AND IMPROVEPEDESTRIAN SAFETY ALONG IDLEWILD RD. AND JEFFERSON ST. (AS PERAGREEMENT WITH COUNTY) (SEE 6-3019.00 PHASE I) (2012BOP)
IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO ROGERS LANE. (14CCR)
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT69.89 TO MILEPOINT 77.724.
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT169.439 TO MILEPOINT 183.08.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-75 BOTHDIRECTION(S) FROM MILEPOINT 183.08 (182.9 NON-CARDINAL) TO MILEPOINT183.312.
ADDRESS PAVEMENT CONDITION OF I-275 BOTH DIRECTION(S) FROMMILEPOINT 13.076 TO MILEPOINT 13.7
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 1.58 TO MILEPOINT 7.25
.074
.189
3.119
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
KY-842
KY-338
KY-237
I-71
I-75
I-75
I-275
I-275
$7,130,000
$500,000
$22,180,000
$7,150,000
$23,980,000
$1,100,000
$550,000
$9,350,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2022
2018
2018
2024
2024
2020
2020
2021
2021
2021
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
STP
STP
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$480,000
$2,800,000
$350,000
$3,500,000
$500,000
$22,180,000
$650,000
$6,500,000
$2,180,000
$21,800,000
$100,000
$1,000,000
$50,000
$500,000
$850,000
$8,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
1087.00
3019.10
8001.21
20001.00
20002.00
20004.00
20005.00
20006.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
1087.00
3019.00
8001.00
20001.00
20002.00
20004.00
20005.00
20006.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2004
2018
2018
2018
2018
2018
2018
2010
2000
2018
2018
2018
2018
2018
.094
26.661
2.251
69.89
169.439
183.08
13.08
1.58
.141
26.85
5.37
77.724
183.08
183.312
13.7
7.25
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 15: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/15.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 13
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 7.25 TO MILEPOINT 13.08 (13.56 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT.
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT.
ADDRESS PAVEMENT CONDITION ON US-42 FROM MILEPOINT 8.71 TO MILEPOINT11.63
RECONSTRUCT GUNPOWDER RD. FROM US-42 TO KY-536. (18CCN)
EXPANSION OF ROUNDABOUTS ALONG KY-237 AT CARDINAL COVE AND GRAVESRD(18CCN)
INCREASE CAPACITY AND REDUCE CONGESTION ON US 42 AT I 71/75(18CCN)
PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-1455 ATCARLISLE (SECTION 3). (08CCR)(12CCR)(14CCR)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7MILE NORTH OF US 460 AT NORTH MIDDLETOWN (BRIDGE IMPROVEMENTS).(03KYDN)(2012BOP) (16CCN)
2.920
4.400
.100
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOURBON
BOURBON
I-275
KY-18
KY-237
US-42
KY-237
KY-237
US-42
US-68
KY-3364
$7,150,000
$2,475,000
$3,520,000
$438,000
$1,000,000
$1,000,000
$650,000
$17,000,000
$1,568,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
D
D
R
U
D
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2024
2019
2019
2021
2021
2023
2019
2019
2019
2019
2019
2021
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
SPP
NH
KYD
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$650,000
$6,500,000
$225,000
$2,250,000
$320,000
$3,200,000
$438,000
$1,000,000
$500,000
$250,000
$250,000
$650,000
$17,000,000
$1,568,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
07
07
20007.00
20008.00
20009.00
20047.00
80000.00
80001.00
80003.00
310.30
365.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
NICHOLAS
06
06
06
06
06
06
06
07
07
20007.00
20008.00
20009.00
20047.00
80000.00
80001.00
80003.00
310.01
365.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2000
2018
2018
2018
2018
2018
2018
2018
2018
1996
2002
7.25
15.256
9.5
8.71
0
11.84
13.802
5.389
13.08
16.632
10.3
11.63
1.588
11.92
14.16
5.489
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
Milepoints: To:From:
![Page 16: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/16.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 14
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH ROAD BRIDGE OVER HOUSTONCREEK. (009C00031N)
ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER CSX RR. (009R00605N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT.
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
6.302
6.302
BOURBON
BOURBON
BOURBON
BOURBON
BOURBON
BOYD
BOYD
BOYD
US-460
US-460
CR-1205
CR-1320
US-68X
-
-
-
$7,620,000
$10,410,000
$469,000
$738,500
$2,750,000
$6,265,000
$1,200,000
$1,200,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
D
C
D
C
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2021
2021
2021
2023
2019
2020
2019
2020
2019
2019
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
STP
STP
BR
BR
BR
BR
PM
PM
SAH
SAH
SAH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$1,000,000
$5,620,000
$2,030,000
$1,500,000
$6,880,000
$143,500
$325,500
$220,500
$518,000
$250,000
$2,500,000
$6,265,000
$1,200,000
$1,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
09
09
09
8705.00
8705.01
10007.00
10008.00
20002.00
208.04
208.05
208.06
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GREENUP
GREENUP
GREENUP
07
07
07
07
07
09
09
09
8705.00
8705.00
10007.00
10008.00
20002.00
208.04
208.05
208.06
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2018
2018
2018
2014
2014
2014
2012
2012
2018
2018
2018
2014
2014
2014
1.394
1.394
1.566
4.983
0
7.696
7.696
1.574
4.99
2.772
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 17: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/17.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 15
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2023.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2024.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PLANNING STUDY/ENVIRONMENTAL ASSESSMENT FOR RUSH OFF ROAD(2016BOP)
IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTIONAT CANNONSBURG. (08CCN) (10CCR)(12CCR)
IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTIONAT CANNONSBURG. (08CCN) (10CCR)(12CCR)
SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET -CATLETTSBURG. (14CCN)
ADDRESS DEFICIENCIES ON 12TH STREET BRIDGE OVER THE OHIO RIVER.JOINT PROJECT WITH OHIO. (010B00040N)(BSBP)
3.820
3.820
.100
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
-
-
-
-
-
US-60
US-60
US-23
US-23S
$1,600,000
$1,600,000
$1,600,000
$1,600,000
$48,000
$5,000,000
$15,000,000
$920,000
$1,750,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2024
2018
2020
2021
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SAH
SAH
SAH
SAH
SAH
SPP
SPP
SPP
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,600,000
$1,600,000
$1,600,000
$1,600,000
$48,000
$5,000,000
$15,000,000
$920,000
$1,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
09
208.07
208.08
208.09
208.10
404.00
8400.00
8400.01
8801.00
10014.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GREENUP
GREENUP
GREENUP
GREENUP
09
09
09
09
09
09
09
09
09
208.07
208.08
208.09
208.10
208.02
8400.00
8400.00
8801.00
10014.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2016
2008
2018
2014
2018
2016
2016
2018
2018
2014
2008
2008
2014
2018
.2
.2
14.458
.048
4.02
4.023
14.558
.48
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
From:
From:
From:
From:
![Page 18: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/18.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 16
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
PAINTING AND PREVENTIVE MAINTENANCE ON CATLETTSBURG KENOVABRIDGE ON 35TH ST. OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO.(010B00062N)(BSBP)
ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG SANDYRIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L AND 010B00046R)(SD)
ADDRESS DEFICIENCIES OF KY 854 BRIDGE OVER GARNER CREEK. (010B00045N)
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT180.812 TO MILEPOINT 183.95.
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT183.95 TO MILEPOINT 191.507.
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.67 TOMILEPOINT 16.95
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 2.92 TO MILEPOINT10.67
ADDRESS DEFICIENCIES OF US 68 AND US 150 BRIDGE OVER CHAPLIN RIVER,PERRYVILLE. (SEE 7-242.01 FOR HPP FUNDS)(2005HPP-KY134)(011B00042N)(SD)
REPLACE US 68 AND US 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COSTOF $1,790,000).(SD)
6.280
7.760
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYD
BOYLE
BOYLE
US-60
I-64
KY-854
I-64
I-64
US-23
US-23
US-68
US-68
$1,200,000
$1,500,000
$1,610,000
$2,750,000
$6,600,000
$2,365,000
$4,288,000
$1,253,000
$487,797
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
D
C
D
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2019
2020
2019
2019
2023
2023
2022
2023
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
BR
HPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$1,500,000
$525,000
$1,085,000
$250,000
$2,500,000
$600,000
$6,000,000
$2,365,000
$4,288,000
$1,253,000
$487,797
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
07
07
10015.00
10016.00
10018.00
20002.00
20003.00
20015.00
20016.00
242.00
242.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
92
09
09
07
07
10015.00
10016.00
10018.00
20002.00
3.00
20015.00
20016.00
242.00
242.01
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2010
2018
2018
2018
2018
2018
2018
2018
2010
12.636
191.404
7.068
180.812
183.95
10.67
2.92
6.4
6.4
12.88
191.507
7.076
183.95
191.507
16.95
10.67
6.418
6.418
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / AM-BRIDGE (P)
![Page 19: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/19.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 17
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION ON US-127B FROM MILEPOINT 0.00 TOMILEPOINT 5.27
CONSTRUCT A NEW CONNECTOR ROAD ON THE EAST SIDE OF DANVILLECONNECTING KY-34 AND US-150 BYPASS(18CCN)
OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)
OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)
OPERATION OF AUGUSTA FERRY FOR FY 2021.
OPERATION OF AUGUSTA FERRY FOR FY 2022.
OPERATION OF AUGUSTA FERRY FOR FY 2023.
OPERATION OF AUGUSTA FERRY FOR FY 2024.
ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER HOLTS CREEK AT FOSTER.(012B00004N)
ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 13.95 TOMILEPOINT 18.99
5.270
5.040
BOYLE
BOYLE
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
BRACKEN
US-127B
-
KY-8
KY-8
KY-8
KY-8
KY-8
KY-8
KY-8
KY-8
$2,301,000
$1,500,000
$190,000
$190,000
$190,000
$190,000
$190,000
$190,000
$3,780,000
$552,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
C
C
C
C
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2021
2019
2020
2021
2022
2023
2024
2019
2020
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,301,000
$1,500,000
$190,000
$190,000
$190,000
$190,000
$190,000
$190,000
$455,000
$3,325,000
$552,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
06
06
06
06
06
06
06
06
20024.00
80000.00
355.21
355.22
355.23
355.24
355.25
355.26
10008.00
20048.00
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
06
06
06
06
06
06
06
06
20024.00
80000.00
355.21
355.22
355.23
355.24
355.25
355.26
10008.00
20048.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2014
2014
2016
2016
2018
2018
2018
2018
2018
2018
2014
2014
2016
2016
2018
2018
2018
2018
0
13.1
13.1
13.1
13.1
13.1
13.1
1.202
13.95
5.27
13.2
13.2
13.2
13.2
13.2
13.2
1.25
18.99
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 20: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/20.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 18
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-205 FROM NORTH OF KY-1812 TO SOUTH OF PEGGS FORK RD.
IMPROVE KY-15 FROM THE INTERSECTION OF NEW KY-15/30 TO INTERSECTIONOF KY-1812.
ADDRESS DEFICIENCIES OF BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OFKY 1812. (013B00050N)
ADDRESS DEFICIENCIES OF MORRIS FORK ROAD BRIDGE OVER BURTON FORK.(013C00050N)
ADDRESS DEFICIENCIES OF LITTLE BUCKHORN ROAD BRIDGE OVER BUCKHORNCREEK. (013C00016N)(SD)
ADDRESS DEFICIENCIES OF KY 1812 BRIDGE OVER JOHNSON FORK. (013B00007N)
ADDRESS DEFICIENCIES OF BIG BRANCH ROAD BRIDGE OVER BIG BRANCHCREEK. (013C00008N)
ADDRESS DEFICIENCIES OF BRIDGE OVER SINKING CREEK ON DENTS BRIDGEROAD (CR 1021) 1.4 MI W OF KY 333 (014C00003N)
2.150
1.150
.028
.020
BREATHITT
BREATHITT
BREATHITT
BREATHITT
BREATHITT
BREATHITT
BREATHITT
BRECKINRIDGE
KY-205
KY-15
KY-378
CR-1233
CR-1124
KY-1812
CR-1104
CR-1021
$2,030,000
$13,050,000
$735,000
$455,000
$490,000
$682,500
$560,000
$406,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
D
R
U
C
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2023
2019
2021
2022
2023
2020
2019
2020
2019
2020
2019
2020
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
NH
NH
NH
NH
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$1,030,000
$1,500,000
$2,900,000
$1,150,000
$7,500,000
$735,000
$140,000
$315,000
$140,000
$350,000
$175,000
$507,500
$175,000
$385,000
$406,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
04
375.00
376.00
1110.00
10000.00
10001.00
10010.00
10011.00
1090.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
10
04
375.00
376.00
1110.00
10000.00
10001.00
10010.00
10011.00
1090.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2014
2018
2018
2018
2018
2014
2018
2018
2014
2018
2018
2018
2018
2014
7.804
16.75
.672
.034
.779
14.28
.809
1.42
9.954
17.9
.7
.04
.787
14.286
.815
1.44
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 21: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/21.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 19
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74. (18CCN)
MINOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60. (16CCN)(18CCN)
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 0.00 TO MILEPOINT2.78
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 3.45 TO MILEPOINT12.74
SECTION 5 - FROM US-31EX TO US-31E BYPASS. (2008BOPC).
NEW TURN LANES IN FRONT OF BULLITT EAST HIGH SCHOOL. (BREAKOUTFROM 347.50) (18CCN)
WIDEN CEDAR GROVE ROAD (KY-480) FROM CEDAR GROVE ELEMENTARYSCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FORINTERCHANGE IMPROVEMENTS)
IMPROVE OPERATIONAL PERFORMANCE OF THE I-65/KY-480 INTERCHANGEINCLUDING RAMP IMPROVEMENTS AND TURNING LANES.(12CCR)(14CCR)(2014BOP)(16CCR)
2.780
9.290
.500
1.200
.830
.500
BRECKINRIDGE
BRECKINRIDGE
BRECKINRIDGE
BRECKINRIDGE
BULLITT
BULLITT
BULLITT
BULLITT
KY-261
KY-992
US-60
US-60
KY-44
KY-44
KY-480
KY-480
$550,000
$580,000
$642,000
$1,739,000
$3,100,000
$1,720,000
$6,240,000
$5,970,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
C
D
R
U
D
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2022
2022
2021
2022
2022
2019
2024
2024
2019
2020
2021
2022
2022
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$25,000
$25,000
$400,000
$580,000
$642,000
$1,739,000
$1,000,000
$1,550,000
$550,000
$500,000
$100,000
$545,000
$575,000
$6,240,000
$5,970,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
05
05
05
05
8902.00
8904.00
20025.00
20026.00
150.50
347.51
391.20
391.30
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
05
05
05
05
8902.00
8904.00
20025.00
20026.00
150.01
347.50
391.00
391.20
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2008
2008
2006
2014
2016
2016
2018
2018
2006
1998
2006
2006
15.73
12
0
3.45
22.8
23.6
2.01
.8
15.75
13.822
2.78
12.74
23.25
23.7
2.84
1.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / DRAINAGE IMPROVE(P)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 22: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/22.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 20
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY-480 AND KY-245.
INSTALLATION OF NEW SIDEWALKS AND REHABILITATION OF EXISTINGSIDEWALKS TO FIX GAPS IN THE PEDESTRIAN NETWORK ALONG KY 44 FROMFRANK E. SIMON DRIVE (CITY PARK DRIVE) EAST TO KY 61 IN SHEPHERDSVILLE. KY 44 MILEPOINTS FROM 11.75 TO 12.25.(2016BOP)
WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61 (PRESTON HIGHWAY) IN LEBANONJUNCTION TO I-265 (GENE SNYDER FREEWAY)
STUDY NEW CONNECTION BETWEEN I-65 IN BULLITT COUNTY TO I-64 IN SHELBYCOUNTY TO I-71 IN OLDHAM COUNTY.
WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE.(08CCN)(10CCR)(14CCR)(16CCR)
SOUND BARRIERS ON EAST SIDE OF I-65 BETWEEN MP 117.4 AND MP 117.8.(14CCN)(16CCR)(18CCN)
ADDRESS PAVEMENT CONDITION ON KY-480 FROM MILEPOINT 0.00 TOMILEPOINT 5.14
ADDRESS PAVEMENT CONDITION ON KY-245 FROM MILEPOINT 0.00 TOMILEPOINT 7.18
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)
.500
18.392
1.990
.400
5.140
7.180
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BULLITT
BUTLER
I-65
KY-44
I-65
-
KY-245
I-65
KY-480
KY-245
KY-269
$18,720,000
$340,000
$7,720,000
$2,000,000
$12,640,000
$2,000,000
$910,000
$1,094,000
$157,200
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
P
D
P
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2018
2019
2020
2022
2019
2022
2022
2022
2023
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
SLO
SLO
SLO
NH
NH
STP
STP
SPP
PM
PM
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$18,720,000
$60,000
$60,000
$220,000
$250,000
$7,470,000
$2,000,000
$12,640,000
$2,000,000
$910,000
$1,094,000
$157,200
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
03
538.00
544.00
550.00
564.00
8509.00
8856.00
20036.00
20037.00
125.14
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JEFFERSON
SPENCERSHELBYOLDHAM
05
05
05
05
05
05
05
05
03
538.00
965.15
550.00
564.00
8509.00
8856.00
20036.00
20037.00
125.14
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2008
2014
2018
2018
2014
2016
2008
2018
2018
2008
2014
2018
2018
2014
113.5
11.75
104.788
4.425
117.4
0
0
1.544
115
12.25
123.18
6.415
117.8
5.14
7.18
1.644
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW INTERCHANGE(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MAJOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / FERRY OPERATION(P)
123.18 124.7Milepoints:
Milepoints:Milepoints:Milepoints:
To:
To:To:To:
From:
From:From:From:
![Page 23: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/23.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 21
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2023.
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2024.
I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAYFROM I-65 INTERCHANGE (EXIT 2) EXTENDING NORTH TO THE BUTLER-OHIOCOUNTY LINE. (2016BOP)
I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE(EXIT 36). (2016BOP)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2019.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2020.(12CCR)
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
KY-269
KY-269
KY-269
KY-269
KY-269
WN-9007
WN-9007
KY-369
KY-369
$157,200
$157,200
$157,200
$157,200
$157,200
$18,250,000
$6,750,000
$157,200
$157,200
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2023
2024
2019
2021
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
NH
NH
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$157,200
$157,200
$157,200
$157,200
$157,200
$18,250,000
$6,750,000
$157,200
$157,200
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
03
125.15
125.16
125.17
125.18
125.19
2042.10
2042.30
8504.09
8504.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WARREN
OHIO
OHIO
03
03
03
03
03
03
03
03
03
125.15
125.16
125.17
125.18
125.19
2042.00
2042.00
8504.09
8504.10
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2018
2018
2016
2016
2014
2014
2014
2016
2016
2018
2018
2016
2016
2014
2014
1.544
1.544
1.544
1.544
1.544
20.246
35.7
.526
.526
1.644
1.644
1.644
1.644
1.644
37.143
36.1
.626
.626
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
2.079
0
0
20.246
.067
.067
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 24: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/24.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 22
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2021.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2022.(12CCR)
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2023.
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2024.
ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER PANTHER CREEK. (016B00019N)
ADDRESS DEFICIENCIES OF WAVERLY SCHOOL ROAD BRIDGE OVER LITTLEBULL CREEK. (016C00031N)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 87.544 TO MILEPOINT 88.433
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 21.78 TO MILEPOINT 28.5 (26.42 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 28.50 (26.42 NON-CARDINAL) TO MILEPOINT34.72
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
BUTLER
KY-369
KY-369
KY-369
KY-369
KY-70
CR-1008
WK-9001
WN-9007
WN-9007
$157,200
$157,200
$157,200
$157,200
$1,134,000
$423,500
$770,000
$5,940,000
$7,425,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2024
2019
2020
2019
2020
2021
2021
2022
2022
2024
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$157,200
$157,200
$157,200
$157,200
$245,000
$889,000
$157,500
$266,000
$70,000
$700,000
$540,000
$5,400,000
$675,000
$6,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
03
8504.11
8504.12
8504.13
8504.14
10003.00
10004.00
20007.00
20008.00
20009.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OHIO
OHIO
03
03
03
03
03
31
03
03
03
8504.11
8504.12
8504.13
8504.14
10003.00
4.00
20007.00
20008.00
20008.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2018
2018
2018
2018
2018
2016
2016
2018
2018
2018
2018
2018
2018
.526
.526
.526
.526
4.19
3.903
87.544
21.78
28.5
.626
.626
.626
.626
4.204
3.909
88.433
28.5
34.72
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
0
0
.067
.067
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 25: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/25.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 23
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON WILLIAM H. NATCHERPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO MILEPOINT 37.143
NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSEROAD (KY-293) NORTHEAST OF PRINCETON.(06CCR)(10CCR)(12CCR)(14CCR)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF KY-126 BRIDGE OVER DREEN CREEK. (017B00023N)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 BOTHDIRECTION(S) FROM MILEPOINT 54.842 TO MILEPOINT 57.389
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT82.934 TO MILEPOINT 86.344.
MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION 1;FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)
IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITYSECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)
IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITYSECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)
2.400
1.000
5.700
5.700
BUTLER
CALDWELL
CALDWELL
CALDWELL
CALDWELL
CALLOWAY
CALLOWAY
CALLOWAY
WN-9007
-
KY-126
I-24
I-69
US-641
US-641
US-641
$2,640,000
$19,000,000
$1,557,500
$2,750,000
$4,400,000
$6,040,000
$22,000,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
U
C
D
C
D
C
D
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2021
2023
2024
2019
2020
2022
2022
2021
2021
2018
2018
2019
2019
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
SPP
SPP
SPP
BR
BR
PM
PM
PM
PM
SPP
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$240,000
$2,400,000
$3,000,000
$2,000,000
$14,000,000
$245,000
$1,312,500
$250,000
$2,500,000
$400,000
$4,000,000
$6,040,000
$2,000,000
$2,000,000
$3,000,000
$15,000,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
02
02
02
02
01
01
01
20010.00
153.00
10000.00
20000.00
20004.00
314.10
314.20
314.21
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
02
02
02
02
01
01
01
20010.00
153.00
10000.00
20000.00
20004.00
314.00
314.00
314.20
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2002
2018
2018
2018
2000
2000
2018
2018
2002
2018
2018
2018
1996
1996
2000
34.724
2.26
54.842
82.934
5.666
0
0
37.143
2.36
57.389
86.344
6.666
5.666
5.666
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 26: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/26.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 24
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 280 BRIDGE OVER PANTHER CREEK. (018B00054N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT.
ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 10.51 TOMILEPOINT 14.08
ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 0.00 TOMILEPOINT 10.51
ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 13.11 TOMILEPOINT 24.21
REDUCE CONGESTION ALONG THE I-471 CORRIDOR FROM US-27 TO OHIO STATELINE.
STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY,KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)
BRIDGE REHABILITATION ON EXISTING COMBS HEHL BRIDGE CARRYING I-275OVER THE OHIO RIVER. 019B00040L/R (LET BY ODOT) (2016BOP)(BSBP)
ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET(US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.
NEWPORT RIVERFRONT COMMONS - CONSTRUCT TWO NEWPEDESTRIAN/BICYCLE BRIDGES TO CONNECT BOTH SIDES OF THE TAYLORSOUTHGATE BRIDGE TO THE TRAILS ON TOP OF THE LEVEE (2016BOP)
3.570
10.510
11.100
5.016
.173
CALLOWAY
CALLOWAY
CALLOWAY
CALLOWAY
CALLOWAY
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
KY-280
KY-1327
KY-121
KY-121
KY-94
I-471
I-471
I-275
KY-1892
-
$875,000
$1,925,000
$635,000
$1,872,000
$1,977,000
$4,500,000
$1,439,840
$4,500,000
$1,005,052
$1,097,427
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
P
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2019
2023
2023
2023
2024
2018
2019
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
PM
PM
NH
HPP
BR
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$140,000
$735,000
$175,000
$1,750,000
$635,000
$1,872,000
$1,977,000
$4,500,000
$1,439,840
$4,500,000
$1,005,052
$1,097,427
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
06
06
06
06
06
10008.00
20001.00
20024.00
20025.00
20026.00
81.00
183.00
369.00
427.00
434.00
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
06
06
06
06
06
10008.00
20001.00
20024.00
20025.00
20026.00
81.00
183.00
369.00
427.00
966.04
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2004
2018
2014
2016
2018
2018
2018
2018
2018
2018
2004
2018
2014
2006
11.015
0
10.51
0
13.11
0
0
73.557
2.395
11.027
2.035
14.08
10.51
24.21
5.016
5.016
73.061
2.568
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 27: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/27.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 25
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADD LANE ON US 27 TO PROVIDE THREE CONTINUOUS SOUTHBOUND THROUGH-LANES FROM MARSHALL LANE TO JOHNS HILL ROAD (KY 3490). (2016BOP)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275 INTERCHANGE WITHKY-9 (AA HWY.)
SOUTH MONMOUTH PHASE 1. IMPROVE/ADD SIDEWALKS, ACCESSMANAGEMENT, STREET LIGHTING, IMPROVE SAFETY FROMNEWPORT/SOUTHGATE CITY LIMITS TO CAROTHERS ROAD.
US 27 SOUTH MONMOUTH UNDERPASS. IMPROVE FOR PEDESTRIANS BYREPLACING OBSOLETE STAIRS/WALKWAY WITH 10' SIDEWALK, LIGHTING BUSSTOPS AT THE UNDERPASS OF THE CSX RAILROAD BRIDGE BETWEEN 11THSTREET AND 13TH STREET.
RIVERFRONT COMMONS. CONSTRUCT A 15' WIDE CONCRETEBICYCLE/PEDESTRIAN TRAIL AND CONDUIT FOR FUTURE LIGHTING FROMBERRY STREET TO FOURTH AVENUE. PART OF 11.5 MILE PROJECT.
ADDRESS DEFICIENCIES OF BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI NOF NEISES ROAD (CR 1009). (019B00003N)
ADDRESS DEFICIENCIES OF BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVERTRIBUTARY TO TAYLOR CREEK. 019C00069N
TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)
.054
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
US-27
KY-9
US-27
US-27
-
KY-8
CR-1363
I-275
$800,000
$700,000
$3,212,560
$1,754,400
$886,000
$2,700,000
$752,500
$690,401
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
P
D
R
U
C
D
R
U
C
D
C
R
U
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2021
2018
2019
2019
2020
2020
2020
2020
2021
2019
2020
2019
2019
2020
2019
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
NH
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
BR
BR
BR
BR
BR
HPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$100,000
$500,000
$700,000
$454,960
$61,600
$1,496,000
$1,200,000
$378,400
$32,000
$24,000
$1,320,000
$126,000
$760,000
$50,000
$150,000
$2,500,000
$122,500
$630,000
$690,401
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
443.00
448.00
451.00
452.00
453.00
1085.00
1095.00
8105.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
966.05
448.00
451.00
452.00
453.00
1085.00
1095.00
8105.01
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2018
2018
2004
2008
2018
2018
2018
2018
2018
2018
2004
16.333
17.525
20.623
21.32
18.017
.045
16.507
17.978
21.209
21.463
18.071
.051
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / BIKE/PED FACIL(O)
RELIABILITY / BIKE/PED FACIL(O)
RELIABILITY / BIKE/PED FACIL(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW ROUTE(O)
![Page 28: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/28.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 26
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY,KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)
ADDRESS DEFICIENCIES OF GIBSON ROAD BRIDGE OVER THREEMILE CREEK.(019B00060N)
SAFETY CABLE REPAIR AND PREVENTIVE MAINTENANCE ON TAYLORSOUTHGATE BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO.(019B00076N)(BSBP)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 73.061 TO MILEPOINT 77.58
ADDRESS PAVEMENT CONDITION OF I-471 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 4.75
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT.
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
CAMPBELL
-
KY-2238
US-27
I-275
I-471
KY-8
KY-9
KY-1892
US-27
$1,439,840
$458,500
$250,000
$7,425,000
$6,325,000
$2,475,000
$2,475,000
$2,750,000
$3,025,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2018
2024
2024
2024
2024
2021
2021
2021
2021
2021
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
HPP
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,439,840
$140,000
$318,500
$250,000
$675,000
$6,750,000
$575,000
$5,750,000
$225,000
$2,250,000
$225,000
$2,250,000
$250,000
$2,500,000
$275,000
$2,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
8105.03
10000.00
10007.00
20010.00
20011.00
20012.00
20013.00
20014.00
20015.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
191.00
10000.00
10007.00
20010.00
20011.00
20012.00
20013.00
20014.00
20015.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2018
2018
2018
2018
2018
2018
2018
2018
2004
2018
2018
2018
2018
2018
2018
2018
2018
1.682
22.363
73.061
0
5.033
20.392
1.47
16.748
1.69
22.764
77.58
4.75
7.814
21.85
2.1
18.6
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 29: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/29.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 27
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 15.97 TOMILEPOINT 19.36
CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONTST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESSISSUES.(12CCR)(18CCN)
ADDRESS PAVEMENT CONDITION ON US-51 FROM MILEPOINT 7.86 TO MILEPOINT12.66. (18CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER KENTUCKY RIVER ON US 42 INPRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)
ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER MAJORS RUN CREEK.(021B00019N)
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT50.808 TO MILEPOINT 53.433.
ADDRESS PAVEMENT CONDITION ON KY-467 FROM MILEPOINT 0.00 TOMILEPOINT 4.52
3.390
.100
4.800
.250
4.520
CAMPBELL
CAMPBELL
CAMPBELL
CARLISLE
CARLISLE
CARROLL
CARROLL
CARROLL
CARROLL
US-27
US-27
KY-8
US-51
US-51
US-42
KY-55
I-71
KY-467
$825,000
$825,000
$583,000
$250,000
$746,000
$20,871,000
$1,120,000
$3,025,000
$365,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
D
R
U
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2021
2021
2024
2020
2020
2019
2020
2020
2022
2019
2020
2024
2024
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
SPP
PM
BR
BR
BR
BR
BR
BR
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$75,000
$750,000
$75,000
$750,000
$583,000
$250,000
$746,000
$1,460,000
$1,218,000
$476,000
$17,717,000
$140,000
$980,000
$275,000
$2,750,000
$365,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
01
01
06
06
06
06
20016.00
20017.00
20049.00
333.00
20027.00
1084.00
10009.00
20020.00
20050.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
01
01
06
06
06
06
20016.00
20017.00
20049.00
333.00
20027.00
1084.00
10009.00
20020.00
20050.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2012
2018
2018
2018
2018
2018
2018
2018
2018
2012
2018
2018
2018
2018
2018
19.4
8.831
15.97
7.8
7.86
5.697
4.614
50.808
0
19.85
10.517
19.36
7.9
12.66
5.947
4.62
53.433
4.52
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 30: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/30.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 28
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE MOBILITY AND REDUCE CONGESTION AT THE KY 1/I-64 WESTBOUNDOFF-RAMP INTERSECTION.
IMPROVE KY-7/KY-1 (CAROL MALONE BLVD.) FROM LITTLE SANDY RIVERBRIDGE TO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)
SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT.
SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL FUNDINGFOR 9-397.00)
SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FORINDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FORBRAIDY INDUSTRIES ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL FUNDINGFOR 9-397.00)
ADDRESS DEFICIENCIES OF BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK;.75 MI E OF JCT KY 1662; 022B00037N
IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR)
.200
.980
.100
.410
CARTER
CARTER
CARTER
CARTER
CARTER
CARTER
CARTER
I-64
KY-7
KY-67
KY-67
KY-67
US-60
KY-1
$740,000
$3,120,000
$9,000,000
$5,000,000
$5,000,000
$693,000
$3,210,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
D
R
U
C
C
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2019
2021
2018
2019
2019
2020
2021
2023
2018
2020
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
SPP
NH
NH
NH
NH
STP
STP
BR
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$80,000
$80,000
$80,000
$500,000
$3,120,000
$2,000,000
$2,500,000
$2,500,000
$2,000,000
$5,000,000
$5,000,000
$693,000
$720,000
$490,000
$2,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
62.00
144.00
397.00
397.01
397.02
1075.00
8311.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GREENUPBOYD
GREENUPBOYD
GREENUPBOYD
09
09
09
09
09
09
09
62.00
144.00
397.00
397.01
397.02
1075.00
8311.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
1998
2018
2018
2018
2010
2006
2018
1998
2018
2018
2018
2010
2006
171.6
10.318
4.061
9.83
171.8
10.865
4.161
10.24
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
SAFETY / SAFETY(P)
SAFETY / PREFINANCD CONVRSN(O)
SAFETY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
Milepoints:Milepoints:
Milepoints:Milepoints:
Milepoints:Milepoints:
To:To:
To:To:
To:To:
From:From:
From:From:
From:From:
![Page 31: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/31.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 29
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REPLACEMENT OF TWO TRUSS BRIDGES ON KY 773 OVER THE LITTLE SANDYRIVER. (022B00074N)(022B00075N)
ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER POWELL BRANCH. (022B00006N)
ADDRESS DEFICIENCIES OF KY-182 BRIDGE OVER SINKING CREEK. (022B00140N)
ADDRESS PAVEMENT CONDITION
ADDRESS PAVEMENT CONDITION
ADDRESS PAVEMENT CONDITION
IMPROVE US-60 GEOMETRY BEGINNING TERMINI AT NEW CONSTRUCTION ATOLIVE HILL MP 12.4 EXTENDING 1.1 MILES TO I-64 EXIT 161.(18CCN)
REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (023C00029N)
CARTER
CARTER
CARTER
CARTER
CARTER
CARTER
CARTER
CASEY
KY-773
KY-1
KY-182
KY-9
KY-9
KY-9
US-60
CR-1169
$5,019,000
$1,540,000
$2,240,000
$3,520,000
$1,650,000
$3,850,000
$14,450,000
$707,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
C
D
C
D
C
D
C
D
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2020
2019
2020
2021
2021
2021
2021
2021
2021
2022
2024
2024
2024
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,019,000
$525,000
$1,015,000
$490,000
$1,750,000
$320,000
$3,200,000
$150,000
$1,500,000
$350,000
$3,500,000
$1,900,000
$2,750,000
$2,300,000
$7,500,000
$175,000
$532,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
08
8506.00
10002.00
10003.00
20006.00
20007.00
20008.00
80050.00
1067.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
08
8506.00
10002.00
10003.00
20006.00
20007.00
20008.00
80050.00
1067.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2018
2018
2018
2018
2018
2018
2018
2008
2018
2018
2018
2018
2018
2018
2018
1
6.915
2.206
0
14.98
6.98
12.4
.051
1.3
6.919
2.22
6.98
18.262
14.985
13.5
.067
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 32: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/32.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 30
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)(16CCR)(18CCN)
RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP2.8.(12CCN)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF KY-2310 BRIDGE OVER LUTTRELL CREEK.(023B00066N)
ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER BR OF BRUSH CREEK.(023B00061N)
ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER LONG BRANCH. (023B00062N)
ADDRESS DEFICIENCIES OF KY 3270 BRIDGE OVER HOWE BRANCH. (023B00077N)
ADDRESS PAVEMENT CONDITION
EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OFHOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS). (16CCR) (18CCN)
IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR).
1.500
1.000
4.000
1.835
CASEY
CASEY
CASEY
CASEY
CASEY
CASEY
CASEY
CHRISTIAN
CHRISTIAN
KY-70
KY-49
KY-2310
KY-1552
KY-1552
KY-3270
KY-70
KY-1682
KY-911
$4,980,000
$3,610,000
$1,120,000
$336,000
$336,000
$304,500
$4,125,000
$1,000,000
$2,530,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
D
R
U
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2023
2019
2023
2024
2019
2020
2019
2020
2019
2020
2019
2020
2019
2019
2024
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
SPP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,560,000
$3,420,000
$1,250,000
$1,320,000
$1,040,000
$192,500
$927,500
$70,000
$266,000
$70,000
$266,000
$70,000
$234,500
$375,000
$3,750,000
$1,000,000
$2,530,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
08
08
08
02
02
8703.00
8704.00
10000.00
10006.00
10007.00
10008.00
20001.00
136.00
180.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
08
08
08
08
02
02
8703.00
8704.00
10000.00
10006.00
10007.00
10008.00
20001.00
136.00
180.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2018
2018
2018
2018
2018
2000
2006
2012
2012
2018
2018
2018
2018
2018
2000
2006
10.4
1.8
.178
.12
1.218
3.475
0
0
11.9
2.8
.19
.126
1.224
3.479
4
1.835
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 33: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/33.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 31
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR)
RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD INHOPKINSVILLE.(12CCR)(14CCR)(16CCR)(18CCN)
CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY115 SOUTH OF PEMBROKE. (16CCR)(18CCN)
RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTHOF HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPURPROJECT) (16CCR)(18CCN)
ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 INHOPKINSVILLE. (18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR0.04 MILE E OF US 41 024C00034N
ADDRESS DEFICIENCIES OF BRIDGE OVER CSX RR ON WALNUT STREET (US 41A)IN HOPKINSVILLE 475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N)
ADDRESS DEFICIENCIES OF BRIDGE OVER N FORK LITTLE RIVER ONMILBROOKE DRIVE (CS 1262) 500 FT SW OF KAREN DRIVE (CS 1268) 024C00081N
1.835
1.724
2.500
.910
.032
.038
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
KY-911
KY-1007
US-41
EB-9004
US-68
CR-1116
US-41A
CS-1262
$5,910,000
$14,500,000
$14,000,000
$7,250,000
$9,950,000
$880,000
$2,387,000
$1,470,000
Total
Total
Total
Total
Total
Total
Total
Total
C
U
C
D
R
U
C
D
R
U
C
D
R
U
C
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2020
2022
2020
2022
2022
2023
2019
2020
2021
2023
2021
2023
2023
2024
2018
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
SPP
SPP
SPP
SPP
SPP
SPP
NH
NH
NH
NH
SPP
SPP
SPP
SPP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,910,000
$3,250,000
$11,250,000
$1,000,000
$300,000
$700,000
$12,000,000
$250,000
$1,000,000
$1,000,000
$5,000,000
$1,200,000
$1,750,000
$1,500,000
$5,500,000
$880,000
$385,000
$2,002,000
$1,470,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
180.01
227.00
381.00
898.00
899.00
1085.00
1089.00
1094.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
180.00
227.00
381.00
898.00
899.00
1085.00
1089.00
1094.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2016
2016
2016
2018
2018
2018
2006
2012
2016
2016
2016
2018
2018
2018
0
.785
11.6
9.22
.019
15.386
.372
1.835
2.509
11.78
10.13
.059
15.418
.41
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 34: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/34.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 32
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-107 FROM GATEWAY LANE TO KY-380.(12CCN)(14CCR)
IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTHOF PEMBROKE (MP 9.625)(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-189 BRIDGE OVER BRANCH OF BUCK FORK.(024B00064N)
ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER NORTH FORK LITTLE RIVER.(024B00005N)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.719
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 12.13 TO MILEPOINT 16.5 (16.7NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 4.719 TO MILEPOINT 6.77
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 CARDINALDIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 76.142.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 NON-CARDINALDIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 81.83.
.346
2.755
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
KY-107
KY-115
KY-189
US-41
EB-9004
EB-9004
EB-9004
I-24
I-24
$5,350,000
$1,000,000
$1,277,500
$210,000
$4,400,000
$4,120,000
$1,925,000
$3,575,000
$6,600,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
D
C
D
C
D
C
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2023
2024
2021
2019
2020
2019
2020
2019
2020
2020
2023
2023
2022
2022
2024
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,280,000
$1,530,000
$2,540,000
$1,000,000
$245,000
$1,032,500
$35,000
$175,000
$400,000
$4,000,000
$4,120,000
$175,000
$1,750,000
$325,000
$3,250,000
$600,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
02
8703.00
8953.00
10001.00
10022.00
20005.00
20006.00
20008.00
20010.00
20011.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
02
8703.00
8953.00
10001.00
10022.00
20005.00
20006.00
20008.00
20010.00
20011.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2018
2018
2018
2018
2018
2018
2018
2012
2016
2018
2018
2018
2018
2018
2018
2018
16.823
6.87
3.179
15.333
0
12.13
4.719
69.83
69.83
17.169
9.625
3.187
15.347
4.719
16.5
6.77
76.142
81.83
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 35: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/35.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 33
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-24 CARDINAL DIRECTION(S) FROMMILEPOINT 76.142 TO MILEPOINT 85.563.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 BOTHDIRECTION(S) FROM MILEPOINT 85.563 TO MILEPOINT 92.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-41 FROM MILEPOINT 14.79 TOMILEPOINT 31.57
RESURFACING ON KY 115 FROM CARNEAL LANE TO US 41. (18CCN)
US 41A NEW TURNING LANE NORTHBOUND AT EXISTING MEDIAN CROSSOVERNEAR MILEPOST 11.4. CITY TO CONSTRUCT AND BE REIMBURSED. (18CCN)
RESURFACING ON KY 1026 FROM GRACEY SINKING FORK ROAD TO SHURDANCREEK ROAD(18CCN)
EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89)TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)(18CCN)
EXTEND FULTON ROAD. (BY COUNTY)(10CCN)(18CCN)
16.780
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CHRISTIAN
CLARK
CLARK
I-24
I-24
US-68
US-41
KY-115
US-41A
KY-1026
KY-1958
-
$5,225,000
$7,150,000
$825,000
$1,635,000
$730,000
$75,000
$200,000
$30,250,000
$1,410,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
C
D
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2023
2023
2022
2022
2021
2021
2022
2019
2019
2019
2019
2019
2020
2022
2024
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
PM
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$475,000
$4,750,000
$650,000
$6,500,000
$75,000
$750,000
$1,635,000
$730,000
$8,000
$67,000
$200,000
$250,000
$7,000,000
$11,000,000
$12,000,000
$1,410,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
07
07
20012.00
20013.00
20016.00
20046.00
80000.00
80001.00
80002.00
8401.00
8639.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
07
07
20012.00
20013.00
20016.00
20046.00
80000.00
80001.00
80002.00
8401.00
8639.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2008
2010
2018
2018
2018
2018
2018
2018
2018
2008
2010
76.142
85.563
10.93
14.79
3.137
11.35
85.563
92
11.563
31.57
10.662
11.4
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / RESURFACING(P)
RELIABILITY / NEW INTERCHANGE(O)
ASSET MANAGEMENT / RESURFACING(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
![Page 36: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/36.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 34
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN CLARKCOUNTY (MP 14.210)) TO 500 FEET WEST OF SEWELL SHOP ROAD (MP17.032).(16CCN)(18CCN)
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT89.48 TO MILEPOINT 94.7.
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT94.65 TO MILEPOINT 98.1.
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT98.1 TO MILEPOINT 101.78.
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 9.45 (5.311 NON-CARDINAL) TOMILEPOINT 11.913
ADDRESS DEFICIENCIES OF BRIDGE OVER OTTER CREEK ON OTTER CREEKROAD (CR 1160) AT JUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)
IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO KY-149 (LOCKARTS CREEKROAD). (00CCN)(10CCR)(12CCR)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER CURRY BRANCH ROAD IN CLAYCOUNTY.(12CCN)
IMPROVE GEOMETRICS ON THE S-CURVE FROM NORTHEAST OF KY-3135(COLLEGE STREET) TO NORTHEAST OF PR-1006 (MULBERRYSTREET).(14CCN)(18CCR)
.016
3.223
.040
.600
CLARK
CLARK
CLARK
CLARK
CLARK
CLAY
CLAY
CLAY
CLAY
US-60
I-64
I-64
I-64
KY-9000
CR-1160
US-421
CR-1263
KY-66
$55,000,000
$6,930,000
$5,775,000
$4,730,000
$5,830,000
$469,000
$20,000,000
$960,000
$405,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
C
D
C
D
C
D
C
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2024
2024
2024
2022
2022
2022
2022
2020
2020
2021
2021
2019
2020
2020
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
PM
PM
PM
PM
PM
PM
PM
PM
BR
BR
SPP
BR
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$6,000,000
$10,500,000
$36,500,000
$630,000
$6,300,000
$525,000
$5,250,000
$430,000
$4,300,000
$530,000
$5,300,000
$105,000
$364,000
$20,000,000
$960,000
$405,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
11
11
11
11
8952.00
20004.00
20005.00
20006.00
20007.00
1099.00
8003.00
8711.00
8856.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
11
11
11
11
8952.00
20004.00
20005.00
20006.00
20007.00
1099.00
8003.00
8711.00
8856.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2014
2000
2012
2014
2016
2018
2018
2018
2018
2014
2000
2012
2014
14.21
89.48
94.65
98.1
9.45
2.01
13.692
.281
32.9
17.032
94.7
98.1
101.78
11.913
2.026
16.915
.321
33.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / AIR QUALITY(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 37: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/37.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 35
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) ANDITS INTERSECTION WITH KY 3476. (14CCN)(18CCN)
IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDINGINTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)(18CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LAUREL LINE TO MANCHESTER (JUST PAST EXIT 20 ATBRIDGE OVER KY 80/US 421), MP 10.593 TO MP 21.498 (SEGMENT 7). (16CCN)(18CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929(SEGMENT 8) (16CCN)(18CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929(SEGMENT 8.) (18CCN)
ADDRESS DEFICIENCIES OF KY-1850 BRIDGE OVER PHILLIPS FORK. (026B00087N)
ADDRESS DEFICIENCIES OF KY-577 BRIDGE OVER LITTLE SEXTON CREEK.(026B00093N)
ADDRESS DEFICIENCIES OF CR-1055 BRIDGE OVER WILES BRANCH. (026C00010N)
.400
3.067
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
KY-638
CR-1286
HR-9006
HR-9006
HR-9006
KY-1850
KY-577
CR-1055
$2,740,000
$6,100,000
$125,000,000
$131,000,000
$30,900,000
$770,000
$599,000
$575,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
D
R
U
C
D
R
U
C
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2021
2021
2021
2022
2023
2024
2021
2022
2023
2024
2024
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$650,000
$1,840,000
$6,100,000
$1,000,000
$15,000,000
$11,000,000
$98,000,000
$1,000,000
$18,000,000
$13,000,000
$99,000,000
$30,900,000
$175,000
$595,000
$175,000
$424,000
$175,000
$400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
8861.00
8864.00
8910.00
8911.00
8911.01
10003.00
10004.00
10005.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
8861.00
8864.00
8910.00
8911.00
8911.00
10003.00
10004.00
10005.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2018
2018
2018
2018
2014
2014
2016
2016
2016
2018
2018
2018
6.7
0
10.593
21.498
21.498
2.754
6.991
.006
7.1
3.067
28.4
35.929
35.929
2.764
6.999
.012
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 38: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/38.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 36
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF ARNETTS FORK ROAD BRIDGE OVER DOUBLECREEK. (026C00018N)
ADDRESS DEFICIENCIES OF OTTER CREEK ROAD BRIDGE OVER GOOSE CREEK.(026C00032N)
ADDRESS DEFICIENCIES OF CR-1255 BRIDGE OVER HORSE CREEK. (026C00070N)
ADDRESS DEFICIENCIES OF OLD HIGHWAY 66 BRIDGE OVER RED BIRD RIVER.(026C00099N)
ADDRESS DEFICIENCIES OF US 421 BRIDGE OVER BRANCH OF ISLAND CREEK.(026B00002N)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 13.93 TO MILEPOINT 15.958
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 15.958 TO MILEPOINT 19.527
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 19.527 TO MILEPOINT 28.4
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CLAY
CR-1117
CR-1160
CR-1255
CR-1118
US-421
HR-9006
HR-9006
HR-9006
$504,000
$770,000
$546,000
$2,527,000
$822,500
$880,000
$1,650,000
$3,850,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2022
2022
2023
2023
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$140,000
$364,000
$175,000
$595,000
$175,000
$371,000
$350,000
$2,177,000
$175,000
$647,500
$80,000
$800,000
$150,000
$1,500,000
$350,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
10006.00
10007.00
10008.00
10009.00
10039.00
20001.00
20002.00
20003.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
10006.00
10007.00
10008.00
10009.00
10039.00
20001.00
20002.00
20003.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.073
.062
.074
.087
21.204
13.9
15.958
19.527
.079
.068
.08
.103
21.21
16
19.527
28.4
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
![Page 39: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/39.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 37
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 28.4 TO MILEPOINT 31
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT 35.08
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 35.08 TO MILEPOINT 39
REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X.(027B00011N)(SR=31.5)
RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 ANDMANTOWN INTERSECTION. (SEE 8-108 & 8-115 FOR PE&ENV)(12CCR)(14CCR)
RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 ANDMANTOWN INTERSECTION. (SEE 8-108 & 8-115 FOR PE&ENV)(12CCR)(14CCR)
RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND OLD US-127INTERSECTION, EXTENDING NORTHERLY TO NORTH OF THE KY-3063 AND OLDUS-127 INTERSECTION. (SEE 8-108 AND 8-115 FOR PE&ENV)(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)
.010
21.300
21.300
3.855
CLAY
CLAY
CLAY
CLINTON
CLINTON
CLINTON
CLINTON
CRITTENDEN
CRITTENDEN
HR-9006
HR-9006
HR-9006
KY-738
US-127
US-127
US-127
KY-91
KY-91
$1,100,000
$1,760,000
$1,650,000
$700,000
$10,060,000
$11,070,000
$1,600,000
$402,000
$402,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2019
2022
2022
2019
2020
2023
2024
2024
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
BR
BR
NH
NH
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$1,000,000
$160,000
$1,600,000
$150,000
$1,500,000
$175,000
$525,000
$10,060,000
$11,070,000
$1,600,000
$402,000
$402,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
08
08
08
08
01
01
20004.00
20005.00
20006.00
1062.00
8601.26
8601.28
8601.30
326.16
326.17
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
RUSSELL
RUSSELL
11
11
11
08
08
08
08
01
01
20004.00
20005.00
20006.00
1062.00
8601.26
8601.26
8601.30
326.16
326.17
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2012
2014
2012
2014
2014
2018
2018
2018
2018
2012
2012
2012
2014
2014
28.4
31
35.08
6.478
11.017
11.017
16.135
11.162
11.162
31
35.08
39
6.488
20.967
20.967
19.99
11.262
11.262
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
0
0
11.4
11.4
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 40: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/40.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 38
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2023.
OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2024.
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH028C00053N
ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER CROOKED CREEK. (028B00021N)
ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVERON KY 61 0.1 MI N OF COLD SPRINGS ROAD (CR 1204).(029B00012N)
ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVERON KY 90 0.27 MI SE OF KY 61 AT THE SCL OF BURKESVILLE. (029B00027N)
IMPROVE KY-90 FROM NORRIS BRANCH ROAD EXTENDING WESTERLY TO PADUERSON ROAD NEAR MARROWBONE. (14CCN)(18CCR)
.140
.360
5.250
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
CRITTENDEN
CUMBERLAND
CUMBERLAND
CUMBERLAND
KY-91
KY-91
KY-91
KY-91
CR-1085
KY-91
KY-61
KY-90
KY-90
$402,000
$402,000
$402,000
$402,000
$756,000
$1,225,000
$3,640,000
$5,200,000
$3,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
C
D
C
C
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2024
2019
2020
2019
2020
2020
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$402,000
$402,000
$402,000
$402,000
$210,000
$546,000
$245,000
$980,000
$3,640,000
$5,200,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
08
08
08
326.18
326.19
326.20
326.21
1159.00
10000.00
1060.00
1061.00
8852.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
01
08
08
08
326.18
326.19
326.20
326.21
1159.00
10000.00
1060.00
1061.00
8852.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2018
2018
2018
2018
2014
2016
2016
2018
2018
2018
2018
2018
2018
2014
11.162
11.162
11.162
11.162
.044
.678
9.945
14.127
5.182
11.262
11.262
11.262
11.262
.052
.694
10.085
14.459
10.432
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
![Page 41: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/41.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 39
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF WHETSTONE ROAD BRIDGE OVER BIG WHETSTONECREEK. (029C00057N)
ADDRESS DEFICIENCIES OF KY 379 BRIDGE OVER BIG WILLIS CREEK.(029B00005N)
RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298.(12CCR) (16CCR)(18CCN)
RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESSFLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT(14CCR)(18CCN)
I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAYFROM THE OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE US-60 INTERCHANGE(MP 72.264) IN OWENSBORO. (2016BOP)
IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTONROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTONROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVERALLGOOD DITCH. (14CCN) 030C00016N
EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)
.100
.592
5.580
5.580
.004
.636
CUMBERLAND
CUMBERLAND
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
CR-1012
KY-379
KY-298
US-60
WN-9007
KY-54
KY-54
CR-1053
KY-81
$731,500
$1,081,500
$1,800,000
$2,000,000
$4,950,000
$50,290,000
$17,940,000
$619,500
$3,750,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
R
C
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2019
2018
2020
2019
2022
2024
2021
2023
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
SPP
STP
NH
NH
SPP
SPP
SPP
SPP
SPP
BR
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$556,500
$129,500
$952,000
$1,800,000
$2,000,000
$200,000
$4,750,000
$10,540,000
$5,750,000
$34,000,000
$4,520,000
$13,420,000
$619,500
$3,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
02
02
02
02
02
02
02
10001.00
10009.00
229.00
237.00
2092.10
8300.00
8300.01
8813.00
8851.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OHIO
08
08
02
02
02
02
02
02
02
10001.00
10009.00
229.00
237.00
2092.00
8300.00
8300.01
8813.00
8851.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2012
2014
2016
2006
2018
2018
2014
2018
2018
2012
2014
2016
2006
2018
2018
2014
1.767
3.285
7.7
5.69
61.557
2.47
2.47
1
11.08
1.779
3.315
7.8
6.282
72.264
8.003
8.003
1.014
11.716
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MINOR WIDENING(O)
37.143 61.557Milepoints: To:From:
![Page 42: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/42.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 40
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN)
ADDRESS DEFICIENCIES OF ROCKPORT FERRY RD BRIDGE OVER KELLY CREEK.(030C00021N)
ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE OVER BR OF N FK PANTHERCREEK. (030C00029N)
ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S BRIDGE OVER FLAT LICKCREEK. (030C00069N)
ADDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO RIVER. JOINTPROJECT WITH INDIANA. (030B00118N)(BSBP)
ADDRESS DEFICIENCIES WITH NATCHER BRIDGE OVER OHIO RIVER. JOINTPROJECT WITH INDIANA. (030B00164N)(BSBP)
ADDRESS DEFICIENCIES OF KY 764 BRIDGE OVER UNNAMED STREAM.(030B00111N)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
1.129DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
KY-3143
CR-1068
CR-1129
CR-1257
KY-2262
US-231
KY-764
KY-81
$6,790,000
$822,500
$822,500
$892,500
$2,450,000
$10,175,000
$420,000
$2,750,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2024
2024
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$680,000
$2,730,000
$3,380,000
$175,000
$647,500
$175,000
$647,500
$175,000
$717,500
$200,000
$2,250,000
$175,000
$10,000,000
$70,000
$350,000
$250,000
$2,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
8854.00
10002.00
10003.00
10004.00
10020.00
10021.00
10023.00
20017.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
8854.00
10002.00
10003.00
10004.00
10020.00
10021.00
10023.00
20017.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2018
2018
2018
2018
2018
2018
2018
2014
2018
2018
2018
2018
2018
2018
2018
1.829
.073
3.547
.703
.699
13.99
2.261
11.891
2.958
.08
3.552
.709
1.494
14.844
2.271
13.32
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 43: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/43.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 41
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC & AC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 61.553 TO MILEPOINT 66.08
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 66.08 TO MILEPOINT 72.26
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 23.77 TOMILEPOINT 27.54
RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE ATBROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CCR)(18CCN)
ADDRESS DEFICIENCIES OF KY 743 BRIDGE OVER BEAVER DAM CREEK.(031B00004N)
ADDRESS PAVEMENT CONDITION OF I-65 BOTH DIRECTION(S) FROM MILEPOINT43.307 TO MILEPOINT 43.6
ADDRESS PAVEMENT CONDITION OF I-65 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 43.6 TO MILEPOINT 45.935.
3.770
.900
DAVIESS
DAVIESS
DAVIESS
DAVIESS
DAVIESS
EDMONSON
EDMONSON
EDMONSON
EDMONSON
KY-331
KY-2155
WN-9007
WN-9007
US-60
KY-259
KY-743
I-65
I-65
$550,000
$1,650,000
$4,238,000
$5,768,000
$1,609,000
$8,490,000
$560,000
$440,000
$1,100,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
R
U
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2019
2019
2020
2020
2022
2019
2020
2021
2019
2020
2019
2019
2024
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
BR
BR
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$50,000
$500,000
$150,000
$1,500,000
$4,238,000
$5,768,000
$1,609,000
$1,540,000
$1,470,000
$5,480,000
$157,500
$402,500
$40,000
$400,000
$100,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
03
03
03
03
20018.00
20019.00
20020.00
20021.00
20047.00
7030.10
10012.00
20011.00
20012.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
03
03
03
03
20018.00
20019.00
20020.00
20021.00
20047.00
7030.00
10012.00
20011.00
20012.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2004
2018
2018
2018
2018
2018
2018
2018
2018
1998
2018
2018
2018
0
0
61.553
66.08
23.77
11.676
7.028
43.307
43.6
.435
1.991
66.08
72.26
27.54
12.096
7.034
43.6
45.935
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 44: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/44.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 42
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TOMILEPOINT 8.00
IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEARNEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)(14CCR)(16CCR)(18CCR)
RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(16CCR)(18CCN)
RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND.(PRIORITY SECTION I). (10CCR)(16CCN)(18CCN)
IMPROVE KY-7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARD WRIGLEY.(12CCR)(16CCR)(18CCR)
KY-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.(14CCN)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF CR 1206 BRIDGE OVER LITTLE SANDY. (030C00032N)
IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON KY-82 FROM KY-89 IN ESTILL CO. TO NEW CONSTRUCTION LOCATED NORTH OF HUDSON MILLROAD IN ESTILL COUNTY.
8.000
6.656
6.656
6.956
1.000
4.100
EDMONSON
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ELLIOTT
ESTILL
US-31W
KY-32
KY-32
KY-32
KY-7
KY-32
CR-1206
KY-82
$1,301,000
$24,400,000
$19,320,000
$15,500,000
$31,420,000
$10,360,000
$2,118,000
$1,500,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
C
C
D
R
U
C
D
R
U
C
D
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2021
2022
2023
2021
2022
2023
2021
2022
2023
2024
2021
2022
2023
2024
2019
2020
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
STP
STP
STP
STP
STP
STP
STP
STP
STP
STP
STP
STP
STP
STP
BR
BR
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,301,000
$3,900,000
$5,000,000
$15,500,000
$3,820,000
$15,500,000
$15,500,000
$2,890,000
$6,620,000
$6,490,000
$15,420,000
$220,000
$480,000
$320,000
$9,340,000
$455,000
$1,663,000
$1,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
09
09
09
09
09
09
10
20022.00
192.01
192.02
192.03
228.00
8802.00
10004.00
205.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
ROWAN
MORGAN
03
09
09
09
09
09
09
10
20022.00
192.00
192.02
192.03
228.00
8802.00
10004.00
205.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2006
2016
2016
2012
2014
2018
2018
2018
2006
2016
2016
2012
2014
2018
2018
0
2
2
0
0
9.2
.902
0
8
8.656
8.656
2
6.956
10.2
.942
4.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
16.619
7.887
21.636
11.121
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 45: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/45.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 43
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE SAFETY ON KY-2459 (CARHARTT AVE.) FROM KY-89 TO THE RAILROADBRIDGE.(18CCR)
IMPROVE GEOMETRICS ON KY-89 IN ESTILL COUNTY FROM KY-1886 TO THEESTILL/CLARK COUNTY LINE.
IMPROVE SAFETY AND MOBILITY ON KY-1645 (KIRKLAND AVE) NEAR CR-1087(LOCK 12 ROAD).
ADDRESS DEFICIENCIES OF KY 794 BRIDGE OVER WHITE OAK CREEK.(033B00038N)
IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWNROAD. (12CCR)(14CCR)(18CCR)
IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWNROAD. (12CCR)(14CCR)
CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG)(CONSTRUCTION SEQU. 2) (SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL. (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP)
.373
2.622
.400
1.000
1.000
1.900
ESTILL
ESTILL
ESTILL
ESTILL
FAYETTE
FAYETTE
FAYETTE
FAYETTE
KY-2459
KY-89
KY-1645
KY-794
KY-4
KY-4
CS-4174
-
$750,000
$1,200,000
$570,000
$980,000
$14,580,000
$1,500,000
$12,900,000
$49,200,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
D
D
R
U
C
D
C
R
U
C
U
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2021
2019
2020
2020
2020
2019
2020
2021
2021
2024
2021
2019
2019
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
STP
STP
STP
STP
BR
BR
NH
NH
NH
NH
SLX
SLX
SLX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$250,000
$250,000
$1,200,000
$100,000
$100,000
$50,000
$320,000
$245,000
$735,000
$1,300,000
$1,500,000
$11,780,000
$1,500,000
$1,900,000
$11,000,000
$49,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
07
07
07
07
206.00
207.00
208.00
10012.00
113.02
113.03
224.10
227.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JESSAMINE
10
10
10
10
07
07
07
07
206.00
207.00
208.00
10012.00
113.00
113.02
224.00
227.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2014
2018
2000
2018
2018
2018
2018
2018
2006
2014
2000
2018
0
19.806
1.7
.298
7.26
7.26
0
.373
22.428
2.1
.308
8.26
8.26
2.01
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SPOT IMPROVEMENTS(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MATCHED FED FUNDS(O)Milepoints: To:From:
![Page 46: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/46.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 44
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2018. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2019. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2020. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2021. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
-
-
-
-
-
-
-
-
-
$730,000
$756,000
$756,000
$12,400,000
$8,000,000
$8,200,000
$8,200,000
$8,200,000
$756,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2018
2019
2020
2021
2022
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLX
SLX
SLX
SLX
SLX
SLX
SLX
SLX
SLX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$730,000
$756,000
$756,000
$12,400,000
$8,000,000
$8,200,000
$8,200,000
$8,200,000
$756,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
227.07
227.08
227.09
227.10
227.13
227.14
227.15
227.16
227.17
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JESSAMINE
JESSAMINE
JESSAMINE
07
07
07
07
07
07
07
07
07
227.07
227.08
227.09
227.10
227.13
227.14
227.15
227.16
227.17
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2004
2004
2012
2014
2014
2016
2016
2018
2004
2004
2004
2012
2014
2014
2016
2016
2018
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 47: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/47.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 45
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2022. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2023. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) FOR FY 2024. (LOCAL MATCH) (ALLWORK BY LFUCG) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)
SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPHBRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE(ALL WORK BY LFUCG). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).
SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE,EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITOPARK.(LOCAL MATCH)(DESIGN BY LFUCG)(ALL WORK BYLFUCG)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).
IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)(18CCR)
IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)
.300
.300
1.750
1.750
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
-
-
-
-
-
-
-
KY-922
KY-922
$756,000
$756,000
$756,000
$8,200,000
$8,200,000
$400,000
$625,000
$9,950,000
$10,050,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2023
2024
2023
2024
2018
2018
2019
2019
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLX
SLX
SLX
SLX
SLX
SLX
SLX
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$756,000
$756,000
$756,000
$8,200,000
$8,200,000
$400,000
$625,000
$2,000,000
$3,000,000
$4,950,000
$10,050,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
227.18
227.19
227.20
227.21
227.22
229.20
229.30
252.00
252.02
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
227.18
227.19
227.20
227.21
227.22
229.00
229.00
252.00
252.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2002
2004
2000
2018
2018
2018
2018
2018
2018
2000
2000
2000
2000
1.47
1.47
3.22
3.22
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 48: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/48.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 46
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)(18CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)(18CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2023.
OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2024.
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE.(2002BOPC)(2004BOPP)(10CCR)(12CCR)(14CCR)(18CCR)
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)(18CCR)
REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGEAND TYPICAL SECTION ON US 27 (NORTHBROADWAY)(12CCR)(14CCR)(16CCR)(18CCN)
CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).
1.300
1.300
.126
.100
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
KY-169
KY-169
KY-169
KY-169
KY-169
KY-169
KY-4
KY-4
US-27
CS-4524
$330,000
$330,000
$180,000
$180,000
$180,000
$180,000
$10,000,000
$22,300,000
$16,030,000
$262,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2023
2024
2020
2021
2020
2021
2023
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
NH
NH
SPP
SPP
SPP
SLX
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$330,000
$330,000
$180,000
$180,000
$180,000
$180,000
$10,000,000
$22,300,000
$2,440,000
$1,550,000
$12,040,000
$262,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
07
357.16
357.17
357.18
357.19
357.20
357.21
366.00
366.02
412.00
428.00
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
07
07
07
07
07
07
07
07
07
07
357.16
357.17
357.18
357.19
357.20
357.21
996.08
366.00
412.00
428.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2012
2018
2018
2002
2016
2012
2014
2014
2014
2016
2012
2018
2018
1998
2002
2012
2014
0
0
0
0
0
0
8.731
8.731
8.324
12.736
.1
.1
.1
.1
1
1
10.015
10.015
8.45
12.836
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
12.411
12.411
12.411
12.411
12.411
12.411
12.449
12.449
12.449
12.449
12.449
12.449
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
![Page 49: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/49.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 47
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REDUCE CONGESTION ON KY-4 (NEW CIRCLE RD) FROM TRADE CENTER DR TOWOODHILL DR.
NEW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION FROM US-68(HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE SEGMENTS 2A & 2B INAUGUST, 1998 ADVANCE PLANNING STUDY.
ADDRESS DEFICIENCIES OF BRIDGE ON US 421 OVER FORK OF TOWN BRANCH ATINTERSECTION OF US 421 AND BRACKTOWN RD (CS 4008) (034B00018N)(SD)
ADDRESS DEFICIENCIES OF BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCHHICKMAN CREEK AT JCT WITH TATES CREEK ROAD (KY 1974) 034C00038N
ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF NORTH ELKHORN CREEKON HUME ROAD (CR 1001) 0.7 MI NW OF US 60 (034C00001N)
REPLACE DETERIORATED WEST BOUND LANE BRIDGE SECTION OF WILSONDOWNING ROAD BRIDGE ACROSS WEST HICKMAN CREEK.
SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOURLANES. (06CCN)(12CCR)(18CCN)
COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANEAND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)(LET BY CITY)
SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)(18CCN)
SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (18CCN)
1.313
2.111
.040
.040
.900
1.219
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
KY-4
KY-4
US-421
CS-3605
CR-1001
CS-7038
US-60
CS-2548
KY-4
KY-4
$2,000,000
$2,200,000
$800,000
$427,000
$945,000
$350,000
$280,000
$1,600,000
$2,300,000
$2,300,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
D
C
C
D
C
D
C
P
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2024
2019
2018
2019
2020
2018
2018
2021
2018
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
BR
BR
BR
BR
SLX
SLX
SPP
SLX
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$2,200,000
$800,000
$427,000
$210,000
$735,000
$75,000
$275,000
$280,000
$1,600,000
$2,300,000
$2,300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
07
438.00
439.00
1129.00
1132.00
1141.00
1145.00
8340.00
8507.00
8801.00
8801.10
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
07
438.00
439.00
1129.00
1132.00
1141.00
1145.00
8340.00
8507.00
8801.00
8801.00
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2006
2008
2014
2018
2018
2018
2018
2018
2018
2018
2006
2008
2014
2014
13.195
2.224
4.426
1.656
1.6
1.667
12.5
17.778
18.03
14.508
4.335
4.466
1.696
1.64
1.675
13.4
18.997
19.012
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 50: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/50.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 48
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROADAND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)(18CCR)
IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROADAND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)
REDUCE CONGESTION ON I-64/I-75 FROM THE C&O RAILROAD BRIDGE TO THENORTHERN SPLIT (SECTION 1). (16CCN)(18CCR)
ADDRESS DEFICIENCIES OF MCCALLS MILL RD BRIDGE OVER BOGGS FORK.(034C00009N)
ADDRESS PAVEMENT CONDITION OF I-64 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 71 TO MILEPOINT 73.94
ADDRESS PAVEMENT CONDITION OF I-64 CARDINAL DIRECTION(S) FROMMILEPOINT 73.94 TO MILEPOINT 74.729
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-64 BOTHDIRECTION(S) FROM MILEPOINT 81.037 TO MILEPOINT 82.19
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT82.19 TO MILEPOINT 89.48. (18CCR)
1.145
1.145
6.665
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
KY-1927
KY-1927
I-75
CR-1121
I-64
I-64
I-64
I-64
$8,920,000
$5,900,000
$30,000,000
$518,000
$4,290,000
$3,030,000
$1,925,000
$9,570,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
D
R
U
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2024
2021
2023
2021
2021
2021
2022
2019
2020
2022
2022
2019
2019
2023
2023
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
STP
NH
NH
NH
NH
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$1,730,000
$6,190,000
$3,300,000
$2,600,000
$3,000,000
$1,000,000
$1,000,000
$25,000,000
$157,500
$360,500
$390,000
$3,900,000
$30,000
$3,000,000
$175,000
$1,750,000
$870,000
$8,700,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
8902.00
8902.01
8909.00
10009.00
20008.00
20009.00
20010.00
20011.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
8902.00
8902.01
8909.00
10009.00
20008.00
20009.00
20010.00
20011.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2016
2018
2018
2018
2018
2018
2016
2018
2016
2018
2018
2018
2018
2018
0
0
111
.708
71
73.94
81.037
82.19
1.145
1.145
117.665
.72
73.94
74.729
82.19
89.48
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
NEW ROUTES / MAJOR WIDENING(O)
NEW ROUTES / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 51: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/51.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 49
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT107.453 TO MILEPOINT 110.213
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT110.264 TO MILEPOINT 111.82
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT111.82 TO MILEPOINT 120.792.
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-25 FROM MILEPOINT 19.10 TOMILEPOINT 22.29
ADDRESS PAVEMENT CONDITION ON KY-1974 FROM MILEPOINT 7.50 TOMILEPOINT 11.55
ADDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILESW OF CRAINTOWN RD (CR 1302)035B00038N
ADDRESS DEFICIENCIES OF BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI NOF KY 156. (035B00016N)(EBRP)
ADDRESS DEFICIENCIES OF BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD(CR 1240) AT THE JCT WITH PIKE BLUFF (CR 1305)(035C00065N)
3.190
4.050
.040
.020
.024
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FAYETTE
FLEMING
FLEMING
FLEMING
I-75
I-75
I-75
US-421
US-25
KY-1974
KY-32
KY-111
CR-1240
$3,630,000
$2,090,000
$11,880,000
$550,000
$1,440,000
$2,748,000
$560,000
$2,590,000
$725,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
C
C
D
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2022
2022
2020
2020
2019
2019
2022
2023
2020
2019
2020
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$330,000
$3,300,000
$190,000
$1,900,000
$1,080,000
$10,800,000
$50,000
$500,000
$1,440,000
$2,748,000
$560,000
$455,000
$2,135,000
$75,000
$50,000
$600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
09
09
09
20013.00
20014.00
20015.00
20016.00
20025.00
20026.00
1084.00
1091.00
1092.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
09
09
09
20013.00
20014.00
20015.00
20016.00
20025.00
20026.00
1084.00
1091.00
1092.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2016
2018
2018
2012
2014
2014
2018
2018
2018
2016
2018
2018
2012
2014
2014
107.453
110.264
111.82
6.935
19.1
7.5
7.76
11.84
2.04
110.213
111.82
120.792
7.3
22.29
11.55
7.8
11.86
2.064
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 52: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/52.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 50
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RESTORATION OF GRANGE CITY COVERED BRIDGE LOCATED ON KY-111BETWEEN FLEMINGSBURG AND GRANGE CITY. (14CCN) (16CCR)(18CCN)
IMPROVE ACCESS AND RESPONSE TIMES FOR THE FLEMINGSBURG FIREDEPARTMENT TO THE BYPASS AT MP 11.574. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-111 BRIDGE OVER BR OF HILLSBORO CREEK.(035B00018N)
ADDRESS DEFICIENCIES OF KY-367 BRIDGE OVER JOHNSON CREEK. (035B00074N)
ADDRESS DEFICIENCIES OF KY 2508 BRIDGE OVER TOWN BRANCH. (035B00030N)
ADDRESS DEFICIENCIES OF KY 111 BRIDGE OVER DAVIS BRANCH. (035B00075N)
ADDRESS DEFICIENCIES OF KY 681 BRIDGE OVER DELANEY CREEK. (035B00103N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
FLEMING
KY-111
KY-11
KY-111
KY-367
KY-2508
KY-111
KY-681
KY-32
$1,200,000
$80,000
$1,470,000
$1,355,000
$1,190,000
$1,067,500
$1,137,500
$13,750,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
TE
SPP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$80,000
$455,000
$1,015,000
$375,000
$980,000
$315,000
$875,000
$315,000
$752,500
$315,000
$822,500
$1,250,000
$12,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
8804.00
8902.00
10005.00
10006.00
10019.00
10020.00
10021.00
20009.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
09
8804.00
8902.00
10005.00
10006.00
10019.00
10020.00
10021.00
20009.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2018
2018
2018
2018
2018
2018
2014
2016
2018
2018
2018
2018
2018
2018
11.5
7.568
.999
.081
3.863
1.545
13
11.6
7.576
1.007
.087
3.866
1.555
28.29
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REHAB(P)
RELIABILITY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 53: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/53.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 51
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE SAFETY AND SIGHT DISTANCE ON KY-32 BEGINNING AT 0.4 MILESWEST OF FLEMING/ROWAN CO LINE AND ENDING 0.3 MILES EAST OF THELINE.(18CCN)
IMPROVE SAFETY AND ACCESS ON US-23 BETWEEN KY-80 AND KY-3384.(12CCR)
SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)
SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)
IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TOTHE MOUTH OF TACKETT CREEK (ALT.3BSEC.2)(08CCN)(10CCR)(12CCR)(14CCR)(18CCR)
IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TOTHE MOUTH OF TACKETT CREEK (ALT.3BSEC.2)(08CCN)(10CCR)(12CCR)(14CCR)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100 OVER LITTLE PAINT CREEKNEAR FLOYD/JOHNSON COUNTY LINE 036B00002N
ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23IN JUSTELL. (036B00040N)
1.000
1.561
1.179
2.800
2.800
.146
FLEMING
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
KY-32
US-23
KY-979
KY-979
KY-680
KY-680
KY-1100
KY-2557
$9,600,000
$2,820,000
$5,540,000
$2,370,000
$13,310,000
$19,970,000
$322,000
$3,535,000
Total
Total
Total
Total
Total
Total
Total
Total
P
D
R
U
C
R
U
C
C
C
C
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2023
2023
2024
2019
2019
2021
2022
2023
2021
2022
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
NH
NH
NH
SPP
SPP
SPP
SPP
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$50,000
$800,000
$1,000,000
$750,000
$7,000,000
$420,000
$520,000
$1,880,000
$5,540,000
$2,370,000
$13,310,000
$19,970,000
$322,000
$525,000
$3,010,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
12
12
12
12
12
12
12
80051.00
191.00
195.00
195.01
301.20
301.22
1111.00
1119.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
12
12
12
12
12
12
12
80051.00
191.00
195.00
195.00
301.00
301.20
1111.00
1119.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2012
2018
1998
2018
2012
2014
2018
2012
2012
2012
1996
1998
2012
2014
27.893
12.775
12.398
12.389
5.231
.152
28.293
13.775
13.95
13.95
5.271
.298
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 54: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/54.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 52
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER BRUSH CREEK ON KY 550 AT JCTWITH KY 850. (036B00015N)(EBRP)
CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURNLANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL.(02CCN)(12CCR)(18CCN)
IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATENECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUNDLANES. MP 1.527 TO MP 1.827 (12CCN)(18CCN)
ADDRESS DEFICIENCIES OF BRYANT BRANCH LEFT FORK OF CLEAR CREEKROAD BRIDGE OVER LEFT FK OF BEAVER CREEK. (036C00017N)
ADDRESS DEFICIENCIES OF KY 466 BRIDGE OVER LEFT FORK BEAVER CREEK.(036B00032N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.18 TOMILEPOINT 15.79
CONSTRUCT NEW INTERSECTION ON US-23 AT THE ENTRANCE TO BETSY LANEHIGH SCHOOL(18CCN)
IMPROVE SAFETY, TRUCK MOBILITY, AND REDUCE CONGESTION ALONG I-64FROM DIRECTLY EAST OF US-127 TO US-60 SOUTH OF FRANKFORT.
.040
.100
.300
5.610
4.750
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FLOYD
FRANKLIN
KY-550
KY-122
KY-80
CR-1253
KY-466
KY-80
US-23
US-23
I-64
$1,260,000
$3,950,000
$3,500,000
$559,000
$414,750
$13,475,000
$2,557,000
$250,000
$4,300,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
R
C
D
C
D
C
D
C
C
D
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2021
2022
2019
2020
2019
2020
2019
2019
2023
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
PM
SPP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$1,050,000
$3,950,000
$500,000
$3,000,000
$175,000
$384,000
$140,000
$274,750
$1,225,000
$12,250,000
$2,557,000
$250,000
$4,300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
05
1121.00
8100.00
8703.00
10000.00
10014.00
20000.00
20004.00
80000.00
551.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
05
1121.00
8100.00
8703.00
10000.00
10014.00
20000.00
20004.00
80000.00
551.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2002
2012
2018
2018
2018
2018
2018
2018
2014
2002
2012
2018
2018
2018
2018
2018
2018
2.03
18.5
1.527
.158
2.588
2.5
10.18
3.1
53.11
2.07
18.678
1.827
.168
2.592
8.656
15.79
3.2
57.86
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
RELIABILITY / CONGESTION MITIGTN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 55: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/55.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 53
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGEIN FRANKFORT.
ADDRESS DEFICIENCIES OF BRIDGE OVER BENSON CREEK ON CRAB ORCHARDROAD (CR 1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N)(EBRP)(16CCR)
WIDEN I-64 TO 6 LANES FROM KY-151 TO WEST OF THE KY-420 BRIDGE.(2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)
ADDRESS DEFICIENCIES OF KY 420 BRIDGE OVER CEDAR RUN CREEK.(037B00011N)
ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER TRIB TO N. ELKHORN CREEK.(037B00034N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 11.90 TOMILEPOINT 19.00
IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE LINE TOSOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDORIMPROVEMENT)(2012BOP)
IMPROVE THE PURCHASE PARKWAY FROM SOUTHWEST OF THE US-51INTERCHANGE TO CARDINAL ROAD NEAR MAYFIELD INCLUDING THE KY-339INTERCHANGE IN WINGO, KY. (I-69 CORRIDOR IMPROVEMENT) (2012BOP)
.025
6.050
7.100
1.660
19.099
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FRANKLIN
FULTON
FULTON
KY-3506
CR-1230
I-64
KY-420
KY-1689
US-60
US-127
JC-9003
JC-9003
$300,000
$738,500
$20,570,000
$560,000
$542,500
$2,200,000
$1,228,000
$2,500,000
$1,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
R
U
C
D
C
D
C
D
C
C
R
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2018
2019
2022
2022
2024
2019
2020
2019
2020
2021
2021
2022
2024
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
NH
NH
NH
BR
BR
BR
BR
PM
PM
PM
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$300,000
$105,000
$633,500
$120,000
$120,000
$20,330,000
$210,000
$350,000
$210,000
$332,500
$200,000
$2,000,000
$1,228,000
$2,500,000
$1,000,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
01
01
805.00
1078.00
2035.70
10000.00
10001.00
20001.00
20038.00
25.00
26.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
HICKMANGRAVES
05
05
05
05
05
05
05
01
01
805.00
1078.00
2035.00
10000.00
10001.00
20001.00
20038.00
25.00
26.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2016
2018
2018
2018
2018
2012
2008
2016
2014
2004
2018
2018
2018
2018
2012
2008
.111
.04
47.7
1.948
3.581
8.475
11.9
0
1.2
.15
.065
53.75
1.956
3.587
10.667
19
1.66
3.434
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
3.4348.352
8.35220.299
Milepoints:Milepoints:
To:To:
From:From:
![Page 56: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/56.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 54
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2023.
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2024.
SAFETY IMPROVEMENT AT INTERSECTION OF KY-1099 AND KY-125.(14CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY 1909 BRIDGE OVER LITTLE BAYOU DE CHIEN CR.(038B00075N)
ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.78
.038
FULTON
FULTON
FULTON
FULTON
FULTON
FULTON
FULTON
FULTON
FULTON
KY-1354
KY-1354
KY-1354
KY-1354
KY-1354
KY-1354
KY-1099
KY-1909
JC-9003
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$2,740,000
$665,000
$1,925,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
R
U
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2022
2023
2024
2021
2021
2023
2019
2020
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$126,000
$126,000
$126,000
$126,000
$126,000
$126,000
$500,000
$780,000
$1,460,000
$175,000
$490,000
$175,000
$1,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
01
01
01
320.16
320.17
320.18
320.19
320.20
320.21
8853.00
10009.00
20002.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
01
01
01
01
320.16
320.17
320.18
320.19
320.20
320.21
8853.00
10009.00
20002.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2016
2016
2018
2018
2014
2018
2018
2014
2014
2016
2016
2018
2018
2014
2018
2018
0
0
0
0
0
0
2.25
.794
0
.1
.1
.1
.1
1
1
2.288
.802
1.78
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
![Page 57: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/57.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 55
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
STUDY NEW CORRIDOR BETWEEN I-71 IN GALLATIN COUNTY AND AA HIGHWAYIN CAMPBELL COUNTY. (18CCR)
IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN)(18CCR)
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT53.433 TO MILEPOINT 56.763
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT59.673 TO MILEPOINT 69.89
IMPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34. (2006BOPC)(16CCN)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39; 040B00034N
ADDRESS DEFICIENCIES OF BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI EOF CRAB ORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(EBRP)
ADDRESS DEFICIENCIES OF KY 1972 BRIDGE OVER BRANCH OF GILBERTSCREEK. (040B00025N)
1.200
5.132
.100
.010
GALLATIN
GALLATIN
GALLATIN
GALLATIN
GARRARD
GARRARD
GARRARD
GARRARD
-
I-71
I-71
I-71
US-27
KY-563
KY-1972
KY-1972
$2,000,000
$4,200,000
$5,500,000
$11,275,000
$57,500,000
$406,000
$857,500
$591,500
Total
Total
Total
Total
Total
Total
Total
Total
P
D
R
U
D
C
D
C
D
R
U
C
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2022
2022
2024
2024
2022
2022
2019
2020
2021
2022
2018
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
NH
NH
NH
PM
PM
PM
PM
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$2,200,000
$1,500,000
$500,000
$500,000
$5,000,000
$1,025,000
$10,250,000
$500,000
$10,000,000
$9,000,000
$38,000,000
$406,000
$210,000
$647,500
$175,000
$416,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
07
07
07
07
458.00
8910.00
20021.00
20022.00
196.30
1122.00
1138.00
10010.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
GRANTPENDLETONKENTONCAMPBELL
06
06
06
06
07
07
07
07
458.00
8910.00
20021.00
20022.00
196.01
1122.00
1138.00
10010.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2016
2018
2018
2016
2018
2018
2018
2018
2016
2018
2018
2004
2018
2018
2018
62.8
53.433
59.673
5.199
3.84
1.76
2.099
64
56.763
69.89
10.331
3.915
1.77
2.105
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / RELOCATION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
Milepoints:Milepoints:Milepoints:Milepoints:
To:To:To:To:
From:From:From:From:
![Page 58: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/58.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 56
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3MILES NORTHEAST OF US 25. 041C00012N (12CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF BLANCHET ROAD 0.2MILES SOUTHEAST OF THE JUNCTION WITH US 25. 041C00014N (12CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILENORTH OF THE JUNCTION WITH US 25. 041C00016N (12CCN)
ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER CLARKS CRK+BATON ROUGE R.(041B00011N)
ADDRESS DEFICIENCIES OF KY-22 BRIDGES OVER EAGLE CREEK (041B00014N)AND RATTLESNAKE CREEK (041B00013N).
ADDRESS DEFICIENCIES OF CYNTHIANA ROAD BRIDGE OVER COOPERTOWNCREEK. (041C00008N)
ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER CLARKS CRK+BATON ROUGE R.(041B00011N)
ADDRESS PAVEMENT CONDITION OF I-75 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 143.239 TO MILEPOINT 145.5
ADDRESS PAVEMENT CONDITION OF I-75 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 145.5 TO MILEPOINT 152.122
.050
.070
.050
GRANT
GRANT
GRANT
GRANT
GRANT
GRANT
GRANT
GRANT
GRANT
CR-1138
CR-1138
CR-1142
KY-22
KY-22
CR-1108
KY-22
I-75
I-75
$1,141,000
$2,604,000
$2,240,000
$1,942,500
$4,742,500
$542,500
$3,360,000
$990,000
$3,025,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2019
2020
2019
2020
2019
2020
2019
2020
2020
2020
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,141,000
$2,604,000
$2,240,000
$210,000
$1,732,500
$577,500
$4,165,000
$175,000
$367,500
$420,000
$2,940,000
$90,000
$900,000
$275,000
$2,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
8714.00
8715.00
8716.00
10001.00
10002.00
10003.00
10010.00
20023.00
20024.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
8714.00
8715.00
8716.00
10001.00
10002.00
10003.00
10010.00
20023.00
20024.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.28
1.95
.02
6.594
3.371
3.007
6.594
143.239
145.5
.33
2.02
.07
6.64
3.431
3.013
6.64
145.5
152.122
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 59: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/59.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 57
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT152.112 TO MILEPOINT 157.7
ADDRESS PAVEMENT CONDITION OF I-75 BOTH DIRECTION(S) FROM MILEPOINT162.52 TO MILEPOINT 164.4
ADDRESS PAVEMENT CONDITION OF I-75 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 164.4 TO MILEPOINT 166.263
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)(18CCR)
MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER PANTHER CREEK ON MCKENDREECHURCH RD (CR 1088) 0.3 MI E OF KY 301 042C00010N
REPLACE KY-1890 BRIDGE OVER LITTLE MAYFIELD CREEK. (042B00191N)
ADDRESS DEFICIENCIES OF MARTIN ROAD BRIDGE OVER BRANCH-OBIONCREEK. (042C00250N)
2.800
2.800
.100
GRANT
GRANT
GRANT
GRANT
GRAVES
GRAVES
GRAVES
GRAVES
GRAVES
I-75
I-75
I-75
KY-22
KY-80
KY-80
CR-1088
KY-1890
CR-1214
$10,670,000
$2,420,000
$1,375,000
$522,500
$7,280,000
$7,280,000
$833,000
$647,500
$623,500
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2019
2023
2023
2021
2021
2020
2021
2019
2022
2019
2020
2019
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$970,000
$9,700,000
$220,000
$2,200,000
$125,000
$1,250,000
$47,500
$475,000
$7,280,000
$7,280,000
$280,000
$553,000
$140,000
$507,500
$200,000
$423,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
01
01
01
01
01
20025.00
20027.00
20028.00
20029.00
181.50
181.51
1157.00
10001.00
10002.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
01
01
01
01
01
20025.00
20026.00
20028.00
20029.00
181.30
181.50
1157.00
10001.00
10002.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2000
2018
2018
2018
2018
2018
2018
2018
2018
1998
2000
2018
2018
2018
152.112
162.52
164.4
10.748
.3
1.718
.555
157.7
164.4
166.236
11.544
.4
1.768
.563
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 60: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/60.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 58
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 1485 BRIDGE OVER TERRAPIN CREEK.(042B00136N)
ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22 TO MILEPOINT 34.49
ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 10.49 TOMILEPOINT 15.78
ADDRESS PAVEMENT CONDITION ON KY-339 FROM MILEPOINT 6.04 TOMILEPOINT 13.40
IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY 3155) TO JUST EAST OF BEEHIVECURVE. CONSTRUCTION SEGMENT 1.
IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY 3155) TO JUST EAST OF BEEHIVECURVE. CONSTRUCTION SEGMENT 1.
IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY 224.CONSTRUCTION SEGMENT 2.
EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERNINTERSECTION AT KY 259 WESTERLY TO KY 54. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF HORNTOWN RD BRIDGE OVER ROCK CREEK.(043C00011N)
5.300
7.360
GRAVES
GRAVES
GRAVES
GRAVES
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GRAYSON
KY-1485
JC-9003
KY-94
KY-339
US-62
US-62
US-62
KY-3155
CR-1161
$1,085,000
$2,000,000
$825,000
$1,274,000
$2,000,000
$2,000,000
$5,000,000
$19,500,000
$320,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
C
C
D
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2022
2022
2022
2023
2020
2021
2024
2019
2021
2021
2022
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
PM
STP
STP
STP
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$875,000
$1,000,000
$1,000,000
$825,000
$1,274,000
$2,000,000
$2,000,000
$5,000,000
$1,000,000
$2,500,000
$1,500,000
$14,500,000
$100,000
$220,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
04
04
04
04
04
10010.00
20004.00
20028.00
20029.00
8502.10
8502.11
8502.20
8954.00
10000.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
04
04
04
04
04
10010.00
20004.00
20028.00
20029.00
8502.00
8502.00
8502.00
8954.00
10000.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2016
2018
2018
2018
2018
2018
2008
2008
2008
2016
2018
2.532
22
10.49
6.04
23
23
24.2
2.945
2.519
34.49
15.78
13.4
24.3
24.3
25.5
2.953
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 61: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/61.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 59
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 108.00 TO MILEPOINT 111.25(110.50 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 111.25 TO MILEPOINT112.48
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 112.4 TO MILEPOINT 114.8
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 114.8 TO MILEPOINT116.95
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 88.433 TO MILEPOINT 91.2
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY NON-CARDINAL DIRECTION(S) FROM MILEPOINT 91.2 TO MILEPOINT95
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 14.49 TOMILEPOINT 20.79
US 68 IMPROVEMENTS FROM T DAVIS RD TO CLOVER LICK CREEK (MP 6.425 TO11.744) AS PER 3-203 SCOPING STUDY (SPOT IMPROVEMENTS #11,12 & 13). (DESIGNUNDER 4-397)(2014BOP)(16CCN)(18CCN)
6.290
5.319
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GRAYSON
GREEN
WK-9001
WK-9001
WK-9001
WK-9001
WK-9001
WK-9001
US-62
US-68
$2,530,000
$550,000
$2,090,000
$1,100,000
$2,590,000
$1,650,000
$999,000
$13,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
D
C
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2022
2022
2021
2021
2023
2023
2020
2020
2020
2024
2021
2022
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$230,000
$2,300,000
$50,000
$500,000
$190,000
$1,900,000
$100,000
$1,000,000
$2,590,000
$150,000
$1,500,000
$999,000
$2,000,000
$2,000,000
$9,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
04
20000.00
20001.00
20002.00
20003.00
20004.00
20006.00
20027.00
397.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BUTLER
04
04
04
04
04
04
04
04
20000.00
20001.00
20002.00
20003.00
20004.00
20006.00
20027.00
397.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2016
2018
2018
2018
2018
2018
2018
2018
2012
108
111.25
112.4
114.8
88.433
91.2
14.49
6.425
111.25
112.48
114.8
116.95
91.2
95
20.79
11.744
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
87.544 88.433Milepoints: To:From:
![Page 62: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/62.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 60
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUESALONG US 68 FROM 1600 FEET WEST OF SOUTH THURLOW RD (MP 9.682)EXTENDING TO THE RUSSELL CREEK BRIDGE (MP 10.775) (3-203.00 STUDYRECOMMENDATION #11)(DESIGN UNDER 4-397)(2016BOP)(18CCN)
CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EASTOF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535NORTH OF GREENSBURG.(SEE ITEM #8-8711)(12CCN)(14CCR)(16CCR)(18CCN)
IMPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK BRIDGE TODOC WARD RD (CR 1314). (12CCN)(14CCR)(16CCR)
SPOT IMPROVEMENTS & IMPROVE EXISTING ALIGNMENT ON KY 88 FROM 0.20MILES WEST OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232).(14CCN)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF JONES SCHOOL RD BRIDGE OVER BRUSH CREEK.(044C00023N)
ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER GREASY CREEK. (044B00013N)
RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP17.2)(08CCN)(14CCR)(16CCR)(18CCN)
1.093
2.980
2.236
4.000
GREEN
GREEN
GREEN
GREEN
GREEN
GREEN
GREENUP
US-68
-
KY-61
KY-88
CR-1347
US-68
KY-2
$3,710,000
$7,000,000
$10,750,000
$7,400,000
$303,000
$507,500
$45,450,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
D
R
U
R
U
C
D
R
U
C
D
C
D
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2020
2021
2023
2024
2022
2023
2024
2021
2022
2023
2024
2019
2020
2019
2020
2021
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$720,000
$2,740,000
$2,000,000
$3,000,000
$2,000,000
$2,000,000
$2,750,000
$6,000,000
$500,000
$2,900,000
$1,000,000
$3,000,000
$100,000
$203,000
$105,000
$402,500
$6,070,000
$3,380,000
$36,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
09
397.12
398.00
8712.00
8853.00
10001.00
10009.00
132.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
08
08
04
04
04
09
397.00
8711.00
8712.00
8853.00
10001.00
10009.00
132.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2012
2012
2014
2018
2018
1998
2012
2012
2012
2014
2018
2018
1998
9.682
11.113
8.996
.045
2.995
13.2
10.775
14.093
11.232
.051
3.003
17.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / PE & ENVIRONMENTAL(O)
![Page 63: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/63.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 61
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT SIDEWALKS-PHASE B ALONG GESLING RD (CS-3060) FROMINTERSECTION OF CARDINAL RD (CS-3061) & SEATON DR (KY-750) TO KENWOODDR (CS-3054/KY-1093) & PHASE C ALONG KENWOOD DR BEGINNING AT GESLINGRD & ENDING AT CARDINAL RD. (2014BOP)
DESIGN AND CONSTRUCTION OF SIDEWALKS ALONG POWELL LANE (KY-750) INFLATWOODS, KY BEGINNING AT END OF THE EXISTING SIDEWALK AT MP 1.74AND EXTENDING APPROXIMATELY 0.7 MILES EAST TO THE INTERSECTION OFKY-750 WITH KY-1172 (RED DEVIL LANE).(2014BOP)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD;.05 MI N.E. OF JCT US 23; 045B00039N (16CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER POND RUN ON WILLIAMS AVE (CS4041) IN RACELAND 250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N)
IMPROVE KY-207 FROM THE INDUSTRIAL PARKWAY TO THE KY-693INTERSECTION IN FLATWOODS.(08CCN)(16CCR)
ADDRESS DEFICIENCIES OF KY-503 BRIDGE OVER INDIAN RUN CREEK.(045B00033N)
ADDRESS DEFICIENCIES OF SMITH BRANCH RD BRIDGE OVER LEFT FK SMITHBRANCH. (045C00114N)
ADDRESS DEFICIENCIES OF MUSKETEER DRIVE BRIDGE OVER SLASH BRANCH.(045C00150N)
.100
.016
4.948
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
GREENUP
CS-3060
KY-750
KY-244
CS-4041
KY-207
KY-503
CR-1018
LA-1000
$612,000
$466,000
$11,655,000
$1,085,000
$2,000,000
$998,000
$875,000
$545,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
C
D
C
D
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2019
2018
2018
2018
2018
2019
2020
2024
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SAH
SAH
SAH
SAH
SAH
SAH
SAH
BR
BR
BR
STP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$68,000
$20,000
$80,000
$444,000
$32,000
$64,000
$370,000
$11,655,000
$245,000
$840,000
$2,000,000
$245,000
$753,000
$280,000
$595,000
$245,000
$300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
401.00
402.00
1073.00
1094.00
8509.00
10007.00
10008.00
10009.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
09
09
09
09
09
208.02
208.02
1073.00
1094.00
8509.00
10007.00
10008.00
10009.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2010
2014
2008
2018
2018
2018
2014
2014
2010
2014
2008
2018
2018
2018
0
1.74
0
.05
10.932
5.328
2.221
.055
.225
1.81
.207
.066
15.88
5.336
2.227
.059
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MATCHED FED FUNDS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 64: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/64.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 62
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER LOST CREEK. (045B00006N)
IMPROVE THE WESTBOUND LANES OF US-60 FROM KY-1957 TO 0.2 MILE WEST OFKY-6106. (12CCR)(14CCR)(18CCR)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
KY 251 IMPROVEMENTS FROM KY 3005 TO KY 434.
IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-31WB TOCS-2255 (WILSON ROAD). (10CCR)(12CCR)
WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT PARKWAY (MP 10.598) AND THEBULLION BOULEVARD CONNECTOR (MP 14.534). (2016BOP)
ADDRESS DEFICIENCIES OF BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO36.8 IN WEST POINT) (047B00007N).(16CCR)
IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON US-62 FROM I-65 TO UPPERCOLESBURG ROAD (CR-1038)
6.267
3.607
3.936
.400
3.247
GREENUP
HANCOCK
HANCOCK
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
KY-1
US-60
US-60
KY-251
US-31W
KY-313
US-31W
US-62
$1,365,000
$7,140,000
$5,775,000
$12,900,000
$11,500,000
$12,750,000
$10,500,000
$1,500,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
U
C
D
C
U
C
D
R
U
C
U
C
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2021
2022
2022
2019
2021
2021
2024
2024
2024
2019
2020
2019
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
SPP
SPP
PM
PM
BR2
BR2
SPP
SPP
SPP
SPP
BR2
BR2
BR
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$350,000
$1,015,000
$90,000
$960,000
$6,090,000
$525,000
$5,250,000
$4,200,000
$8,700,000
$500,000
$1,000,000
$1,000,000
$9,000,000
$750,000
$12,000,000
$10,500,000
$1,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
02
02
04
04
04
04
04
10022.00
226.00
20022.00
153.01
154.00
170.00
199.00
442.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
02
02
04
04
04
04
04
10022.00
226.00
20022.00
153.00
154.00
170.00
199.00
442.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2018
2008
2008
2016
2012
2018
2018
2012
2018
2008
2008
2016
2012
2018
1.146
1.933
1.933
2.681
18.827
10.598
36.4
20.104
1.152
8.2
9.4
6.288
28.355
14.534
36.8
23.351
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / PHASE I DESIGN(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
![Page 65: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/65.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 63
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER ROLLING FORK AT THEHARDIN-NELSON CO LINE. 047B00023N
RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W.(98CCN)(06CCR)(REMAINING FUNDS FOR AGREEMENT)(12CCR)(LET BY KYTC)
IMPROVE SAFETY, GEOMETRICS, DRAINAGE AND MAINTENANCE ISSUES ALONGKY-1357 (ST. JOHNS RD) FROM US-31W BYPASS TO KY-3005 (RING ROAD). (14CCN)
ADDRESS DEFICIENCIES OF KY 220 BRIDGE OVER MARTINS BRANCH CREEK.(047B00080N)
ADDRESS DEFICIENCIES OF KY 2212 BRIDGE OVER PAWLEY CREEK. (047B00134N)
ADDRESS DEFICIENCIES OF KY 2800 BRIDGE OVER SANDY CREEK. (047B00137N)
ADDRESS DEFICIENCIES OF BEWLEY HOLLOW RD BRIDGE OVER MILL CREEK.(047C00014N)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 5.82 TO MILEPOINT 8.837
.139
.200
1.678
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
US-62
KY-361
KY-1357
KY-220
KY-2212
KY-2800
CR-1100
BG-9002
$3,381,000
$2,500,000
$14,500,000
$280,000
$297,500
$294,000
$318,500
$2,640,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2020
2021
2024
2019
2020
2019
2020
2019
2020
2019
2020
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR2
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,381,000
$2,500,000
$3,000,000
$2,500,000
$9,000,000
$87,500
$192,500
$91,000
$206,500
$87,500
$206,500
$91,000
$227,500
$240,000
$2,400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
04
1093.00
7020.00
8801.00
10010.00
10011.00
10012.00
10013.00
20007.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
NELSON 04
04
04
04
04
04
04
04
1093.00
7020.00
8801.00
10010.00
10011.00
10012.00
10013.00
20007.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
1998
2014
2018
2018
2018
2018
2018
2016
1998
2014
2018
2018
2018
2018
2018
28.157
0
14.614
5.071
2.705
3.689
1.046
5.82
28.194
.5
16.292
5.077
2.711
3.695
1.052
8.837
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
0 .103Milepoints: To:From:
![Page 66: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/66.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 64
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION
ADDRESS PAVEMENT CONDITION
ADDRESS PAVEMENT CONDITION
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 119.649 TO MILEPOINT 120.649
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 120.93 (120.65 NON-CARDINAL)TO MILEPOINT 132.4 (130.95 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 132.4 TO MILEPOINT134.923
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 134.923 TO MILEPOINT 135.923
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 9.57 TO MILEPOINT13.77
4.200
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
HARDIN
US-31W
US-31W
US-31W
US-31WB
WK-9001
WK-9001
WK-9001
WK-9001
US-62
$6,050,000
$2,750,000
$3,575,000
$275,000
$1,100,000
$10,120,000
$2,200,000
$1,100,000
$689,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2019
2021
2021
2020
2020
2024
2024
2021
2021
2019
2019
2024
2024
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$550,000
$5,500,000
$250,000
$2,500,000
$325,000
$3,250,000
$25,000
$250,000
$100,000
$1,000,000
$920,000
$9,200,000
$200,000
$2,000,000
$100,000
$1,000,000
$689,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
04
04
20011.00
20012.00
20013.00
20014.00
20015.00
20016.00
20018.00
20019.00
20028.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
04
04
04
04
04
20011.00
20012.00
20013.00
20014.00
20015.00
20016.00
20018.00
20019.00
20028.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
17.677
19.5
27.732
0
119.65
120.93
132.4
134.92
9.57
19.5
20.432
29.5
.25
120.65
132.4
134.92
135.92
13.77
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 67: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/67.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 65
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILESOUTH OF SCL OF WALLINS CREEK. (048B00047N)
ADDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLANCOUNTY, KY. 048B00126N
ADDRESS DEFICIENCIES OF BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVERAGES BRANCH. 048C00072N
ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00046N)
ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00048N)
ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER CLOVER FK CUMBERLAND RVR.(048B00095N)
ADDRESS DEFICIENCIES OF KY-179 BRIDGE OVER FUGETT CREEK. (048B00097N)
ADDRESS DEFICIENCIES OF KY-3451 BRIDGE OVER EWING CREEK. (048B00146N)
.020
.118
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
KY-219
US-119
CR-1328
KY-219
KY-219
KY-72
KY-179
KY-3451
$685,000
$6,020,000
$630,000
$665,000
$542,500
$1,155,000
$787,500
$700,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$510,000
$560,000
$5,460,000
$175,000
$455,000
$175,000
$490,000
$175,000
$367,500
$245,000
$910,000
$175,000
$612,500
$175,000
$525,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
1097.00
1101.00
1107.00
10010.00
10011.00
10012.00
10013.00
10014.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
1097.00
1101.00
1107.00
10010.00
10011.00
10012.00
10013.00
10014.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2018
2018
2018
2018
2018
2014
2016
2016
2018
2018
2018
2018
2018
1.033
34.787
.171
1.475
.325
11.773
.081
1.521
1.053
34.905
.179
1.485
.333
11.821
.087
1.527
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 68: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/68.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 66
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-2007 BRIDGE OVER WALLINS CREEK. (048B00179N)
ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE OVER POOR FK CUMBERLANDRVR. (048C00008N)
ADDRESS DEFICIENCIES OF BLUE LN BRIDGE OVER PATH FK OF PUCKETTCREEK. (048C00043N)
ADDRESS DEFICIENCIES OF KENTUCKY AV BRIDGE OVER MARTINS FKCUMBERLAND RV. (048C00067N)
ADDRESS DEFICIENCIES OF PRICE LN BRIDGE OVER CLOVER FK CUMBERLANDRVR. (048C00094N)
ADDRESS DEFICIENCIES OF BANNER FORK RD BRIDGE OVER WALLINS CREEK.(048C00138N)
ADDRESS DEFICIENCIES OF KY 1601 BRIDGE OVER JONES CREEK. (048B00073N)
IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIALHOSPITAL IN CYNTHIANA.(12CCR)(18CCN)
REPLACE BRIDGE ON OLD LAIR RD (CR-1124) (0.071) OVER S. FORK LICKINGRIVER. (SR=14.2) 049C00035N (16CCR)(18CCN)
.200
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARLAN
HARRISON
HARRISON
KY-2007
CR-1020W
CR-1218U
CS-1041
CR-1082D
CR-1253
KY-1601
KY-32
CR-1124
$661,500
$822,500
$756,000
$822,500
$791,000
$602,000
$915,600
$2,290,000
$500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$192,500
$469,000
$192,500
$630,000
$175,000
$581,000
$175,000
$647,500
$192,500
$598,500
$175,000
$427,000
$175,000
$740,600
$2,290,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
06
06
10015.00
10016.00
10017.00
10018.00
10019.00
10020.00
10040.00
908.00
1093.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
06
06
10015.00
10016.00
10017.00
10018.00
10019.00
10020.00
10040.00
908.00
1093.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2010
2016
2018
2018
2018
2018
2018
2018
2018
2010
2016
3.204
.012
.015
.126
.004
.03
1.984
10.074
.051
3.214
.022
.019
.182
.02
.036
1.99
10.274
.091
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
RELIABILITY / AM-BRIDGE (P)
![Page 69: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/69.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 67
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-62 FROM SALEM PIKE (CR-1005) TO APPROXIMATELY MP 12.3.(12CCN)(14CCR)
RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.(12CCN)(14CCR)(18CCN)
IMPROVE MOBILITY, CONNECTIVITY AND SAFETY BY ADDRESSINGCOMMERCIAL AND INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W SOUTH OFKY-218 TO I-65. (16CCR)(18CCR)
ADDRESS PAVEMENT CONDITION ON US-31E FROM MILEPOINT 13.18 TOMILEPOINT 21.58
WATHEN LANE: UPGRADE WITH WIDENED LANES, CURB, GUTTER ANDSIDEWALK FROM US 60 TO CITY LIMITS.
IMPROVE SAFETY AND REDUCE CONGESTION ON CS-1372 (WATSON LANE).(18CCR)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
.400
.500
8.400
1.086
HARRISON
HARRISON
HART
HART
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
US-62
US-27
KY-335
US-31E
US-60
CS-1372
-
-
-
$2,920,000
$6,000,000
$2,500,000
$964,000
$304,000
$8,200,000
$1,176,000
$700,000
$700,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
C
R
U
C
D
D
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2021
2023
2020
2021
2023
2018
2019
2020
2021
2022
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
NH
NH
PM
SHN
SPP
SPP
SPP
SPP
SHN
SHN
SHN
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,920,000
$500,000
$5,500,000
$1,500,000
$1,000,000
$964,000
$304,000
$400,000
$1,400,000
$1,400,000
$5,000,000
$1,176,000
$700,000
$700,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
04
04
02
02
02
02
02
8707.00
8708.00
441.00
20029.00
382.00
383.00
700.13
700.14
700.15
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
04
04
02
02
02
02
02
8707.00
8708.00
441.00
20029.00
382.00
383.00
700.13
700.14
700.15
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2016
2018
2018
2018
2012
2014
2014
2012
2012
2016
2018
2018
2018
2012
2014
2014
11.9
12.7
1.2
13.18
0
.309
12.3
13.4
2.545
21.58
1.226
1.395
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 70: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/70.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 68
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANESINCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20%MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)
WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FTPRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPAPROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(051C00014)
KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCTTHE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUNDAPPROACH. (2012BOP)
US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADDDEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASINGTO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER ATINTERSECTION WITH KY 1078 051B00015N.(12CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER ATINTERSECTION WITH KY 1078. (SR 39) 051B00015N (ADDITIONAL FUNDING FOR CPHASE)
.140
.100
.100
.208
.208
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
HENDERSON
-
-
-
US-41
CS-1453
KY-2183
US-41
US-60
US-60
$700,000
$700,000
$700,000
$1,100,000
$180,000
$1,150,000
$650,000
$6,000,000
$6,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
R
U
C
U
C
R
U
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2018
2018
2018
2018
2018
2018
2018
2019
2018
2018
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
SHN
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$700,000
$700,000
$700,000
$50,000
$100,000
$950,000
$20,000
$160,000
$150,000
$400,000
$600,000
$50,000
$100,000
$500,000
$6,000,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
02
700.16
700.17
700.18
711.00
713.00
714.00
715.00
1080.00
1080.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
02
700.16
700.17
700.18
700.07
700.07
700.08
700.08
1080.00
1080.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2006
2018
2012
2012
2018
2016
2016
2016
2018
2006
2006
2008
2008
2018
2018
12.766
.72
1.693
18.488
19.236
19.236
12.906
.77
1.793
18.588
19.444
19.444
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / SAFETY(P)
RELIABILITY / AM-BRIDGE (P)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
![Page 71: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/71.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 69
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
DEVELOP ALIGNMENT FOR I-69 HENDERSON/EVANSVILLE OHIO RIVERCROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)(C-COST=$1.0BILLION; KYTC SHARE $600 MILLION)
ADDRESS DEFICIENCIES AND PAINTING ON US 41 BRIDGES OVER OHIO RIVER.JOINT PROJECT WITH INDIANA. (051B0002R, 051B0007L)(BSBP)
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT142.146 TO MILEPOINT 148.09 (150.142 NON-CARDINAL)
IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY-53 TO KY-153.
MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)(18CCR)
MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY-153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)
ADDRESS DEFICIENCIES OF KY 997 BRIDGE OVER WHITE SULPHUR CREEK.(052B00060N)
ADDRESS DEFICIENCIES OF KY 3175 BRIDGE OVER WHITE SULPHUR FORK.(052B00064N)
ADDRESS DEFICIENCIES OF KY 3320 BRIDGE OVER TRIB OF HARRODS CREEK.(052B00070N)
1.028
3.273
4.631
4.631
HENDERSON
HENDERSON
HENDERSON
HENRY
HENRY
HENRY
HENRY
HENRY
HENRY
I-69
US-41
I-69
I-71
KY-146
KY-146
KY-997
KY-3175
KY-3320
$28,400,000
$21,200,000
$7,040,000
$5,600,000
$6,930,000
$6,930,000
$458,500
$836,500
$497,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
C
D
C
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2022
2022
2021
2021
2023
2019
2023
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
BR
PM
PM
NH
SPP
SPP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$19,900,000
$8,000,000
$21,200,000
$640,000
$6,400,000
$5,600,000
$6,930,000
$6,930,000
$192,500
$266,000
$262,500
$574,000
$210,000
$287,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
05
05
05
05
05
05
1088.10
2091.10
20023.00
552.00
8300.00
8300.01
10002.00
10003.00
10004.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JEFFERSON
02
02
02
05
05
05
05
05
05
1088.10
2091.00
20023.00
552.00
8300.00
8300.00
10002.00
10003.00
10004.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2006
2018
2018
2018
2018
2016
2016
2018
2018
2006
2006
2018
2018
2018
19.14
142.146
24.727
2.169
2.169
1.9
.065
1.816
20.168
148.09
28
6.8
6.8
1.906
.081
1.822
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
22.033 24.727Milepoints: To:From:
![Page 72: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/72.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 70
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF GULLION RUN RD BRIDGE OVER TRIB OF GULLIONRUN. (052C00045N)
ADDRESS DEFICIENCIES OF KY 1606 BRIDGE OVER WHITE SULPHUR FORK.(052B00048N)
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT24.727 TO MILEPOINT 28.173.
ADDRESS PAVEMENT CONDITION OF I-71 CARDINAL DIRECTION(S) FROMMILEPOINT 37.183 TO MILEPOINT 38.086
ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON KY-1826 OVER TOWNCREEK (B79) IN CLINTON. (053B00079N)
ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3MI NW OF HICKMAN/GRAVES CO LINE 053C00003N
ADDRESS DEFICIENCIES OF KY 2206 BRIDGE OVER CANE CR FK -OBION CRK.(053B00090N)
US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR"STP" COMPONENT)
IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)
.100
.055
3.600
2.030
HENRY
HENRY
HENRY
HENRY
HICKMAN
HICKMAN
HICKMAN
HOPKINS
HOPKINS
CR-1027
KY-1606
I-71
I-71
KY-1826
CR-1011
KY-2206
US-41A
US-41A
$406,000
$1,267,000
$4,950,000
$440,000
$1,400,000
$1,879,500
$1,085,000
$2,879,680
$5,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
D
C
D
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2019
2020
2020
2019
2019
2020
2019
2020
2018
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
PM
BR
BR
BR
BR
BR
HPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$231,000
$245,000
$1,022,000
$450,000
$4,500,000
$40,000
$400,000
$1,400,000
$266,000
$1,613,500
$210,000
$875,000
$2,879,680
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
01
01
01
02
02
10006.00
10017.00
20002.00
20007.00
1062.00
1156.00
10011.00
137.02
137.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
01
01
01
02
02
1006.00
10017.00
20002.00
20007.00
1062.00
1156.00
10011.00
137.02
137.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2004
2000
1996
2018
2018
2018
2018
2018
2018
2004
2000
2.423
6.326
24.727
37.183
4.888
.25
.653
0
1.246
2.429
6.354
28.173
38.086
4.988
.305
.671
3.426
3.275
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
SAFETY / AM-BRIDGE (P)
RELIABILITY / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 73: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/73.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 71
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)
WIDEN US-41A FROM YORKWOOD PLACE TO US-41 / KY-281. (SECTION 2)(2012BOP)(16CCR)
IMPROVE KY-281 FROM ISLAND PARK DRIVE TO CARRIAGE LANE (KY-2281).
CONSTRUCT CENTER ST CONNECTOR RD BEGIN AT CENTER ST/PROCEED TOCSX RR, SECT.1, 5,173 LI. FT.PROCEED THRU PORTION OF SECT. 2,END AT I-SECTION OF CONNECTOR RD BEING CONSTRUCTED WITH ISLAND FD DR.ALLDEEDED TO CITY-MADISONVILLE, ALL 100FT WIDE.(14CCR)(18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20MI EAST OF PENNYRILE PARKWAY; 054B00022N (14CCR)
IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281.(06CCN)(12CCR)(18CCR)
ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER SUGAR CREEK. (054B00088N)
ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER CLEAR CREEK. (054B00182N)
3.426
1.246
.736
.100
.600
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
US-41A
US-41A
KY-281
-
KY-260
US-41
KY-70
KY-70
$5,000,000
$8,000,000
$2,500,000
$5,400,000
$1,085,000
$12,380,000
$1,452,500
$1,505,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
R
U
D
R
U
C
C
D
R
U
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2018
2023
2024
2024
2019
2019
2020
2021
2018
2021
2021
2022
2024
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
STP
STP
STP
SPP
SPP
SPP
SPP
BR
STP
STP
STP
STP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,000,000
$8,000,000
$500,000
$1,000,000
$1,000,000
$400,000
$200,000
$800,000
$4,000,000
$1,085,000
$900,000
$1,180,000
$1,440,000
$8,860,000
$210,000
$1,242,500
$210,000
$1,295,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
137.11
137.20
384.00
804.00
1072.00
8305.00
10005.00
10006.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
137.10
137.00
384.00
804.00
1072.00
8305.00
10005.00
10006.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2000
2018
2014
2018
2006
2018
2018
2000
2000
2018
2014
2018
2006
2018
2018
0
0
.996
2.09
16.989
13.46
14.248
3.426
1.246
1.759
2.19
17.548
13.474
14.272
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 74: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/74.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 72
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 138 BRIDGE OVER POND RIVER. (054B00009N)
ADDRESS DEFICIENCIES OF KY 109 BRIDGE OVER TRADEWATER RIVER.(054B00079N)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILEPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.825 TO MILEPOINT 34.256
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT114.254 TO MILEPOINT 117.936
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT124.946 TO MILEPOINT 133.677
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT93.724 TO MILEPOINT 95.604
ADDRESS PAVEMENT CONDITION OF I-69 BOTH DIRECTION(S) FROM MILEPOINT95.604 TO MILEPOINT 105.046
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.807 TO MILEPOINT 43.424
ADDRESS PAVEMENT CONDITION ON US-41A FROM MILEPOINT 0.00 TOMILEPOINT 9.69
9.690
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
HOPKINS
KY-138
KY-109
EB-9004
I-69
I-69
I-69
I-69
WK-9001
US-41A
$280,000
$210,000
$1,870,000
$3,190,000
$9,625,000
$1,650,000
$8,360,000
$550,000
$1,069,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2021
2021
2023
2023
2023
2023
2022
2022
2021
2021
2023
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$35,000
$245,000
$35,000
$175,000
$170,000
$1,700,000
$290,000
$2,900,000
$875,000
$8,750,000
$150,000
$1,500,000
$760,000
$7,600,000
$50,000
$500,000
$1,069,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
02
10024.00
10025.00
20025.00
20029.00
20031.00
20033.00
20034.00
20035.00
20048.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
02
10024.00
10025.00
20025.00
20029.00
20031.00
20033.00
20034.00
20035.00
20048.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
8.457
.092
32.825
114.254
124.946
93.724
95.604
42.807
0
8.493
.154
34.256
117.936
133.677
95.604
105.046
43.424
9.69
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 75: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/75.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 73
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-30 FROM US-421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE & ENVIR)(16CCR)(TO BE LET WITH 10-279.61)
ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER HORSE LICK CREEK.(055B00028N)
ADDITION OF NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY, INCLUDINGOPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (2004BOPC)
ADDITION OF NB AND SB AUX. LANES ON I-71 NEAR KENNEDY, INCLUDINGOPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (ADDITIONALFUNDING FOR C PHASE)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)(BSBP)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIORIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
8.396
2.500
2.500
.300
JACKSON
JACKSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-30
KY-89
I-71
I-71
I-64
I-64
I-64
I-64
I-64
$18,500,000
$1,995,000
$15,680,000
$12,380,000
$7,000,000
$10,000,000
$10,000,000
$10,000,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
R
U
C
C
D
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2020
2019
2020
2020
2022
2023
2019
2020
2021
2022
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
BR
BR
NH
NH
NH
NH
NH
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$18,500,000
$175,000
$1,820,000
$800,000
$1,500,000
$1,000,000
$12,380,000
$12,380,000
$2,000,000
$5,000,000
$10,000,000
$10,000,000
$10,000,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
05
05
05
05
05
05
05
278.30
10041.00
48.10
48.11
64.00
64.01
64.02
64.03
64.04
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
05
05
05
05
05
05
05
278.30
10041.00
48.02
48.10
64.00
64.00
64.00
64.00
64.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2018
2004
2006
2000
2018
2018
2018
2018
2014
2018
2000
2004
2000
2000
2000
2000
2000
9.121
0
0
0
0
0
0
0
0
17.517
.01
2.5
2.5
.316
.316
.316
.316
.316
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
![Page 76: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/76.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 74
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM EAST OF BEARGRASS CREEKNEAR POPE AVENUE TO ZORN AVENUE. TO INCLUDE BIKE LANES. PROJECTLENGTH 1.3 MILES.
EXTENSION OF RIVER ROAD, LOUISVILLE. (2006KYD)(SEE 5-512.00 FOR PROJECTINFORMATION)
CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENESNYDER FREEWAY(10CCR)(SD)
IMPROVE RAMP CAPACITY OF THE I-64 WESTBOUND RAMP TO I-264 WESTBOUNDFROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDEDIMPROVEMENTS TO ADDRESS WEAVE ISSUES AT MERGE ON I-264.(2006BOPP)(12CCR)
WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)
WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)
WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)
WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)
WIDEN ENGLISH STATION ROAD FROM 2 TO 3 LANES (3RD LANE WILL BE ACENTER TURN LANE) FROM AIKEN ROAD TO AVOCA ROAD.(FUNDING SUBJECTTO FISCAL CONSTRAINT PENDING MPO TIP).
1.500
.500
1.669
1.669
2.600
2.600
.850
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CS-1001B
CS-1001B
I-265
I-64
KY-1450
KY-1450
KY-1931
KY-1931
CR-1006C
$11,500,000
$1,630,000
$3,790,000
$10,130,000
$4,500,000
$6,500,000
$4,860,000
$4,860,000
$6,408,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2018
2019
2020
2021
2019
2020
2021
2022
2023
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
BR
NH
STP
STP
SPP
SPP
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$11,500,000
$550,000
$540,000
$540,000
$3,790,000
$10,130,000
$4,500,000
$6,500,000
$4,860,000
$4,860,000
$6,408,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
91.02
91.08
136.00
159.00
247.10
247.11
323.01
323.03
353.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
91.02
91.08
136.00
159.00
247.00
247.10
323.01
323.01
965.08
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2004
2000
2000
2000
2018
2000
2018
2000
2000
2004
2000
2000
1996
2000
2000
2000
1998
1.6
.232
1.873
1.873
.54
.54
.457
2.925
.779
3.542
3.542
3.148
3.148
1.232
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRG PAINTING(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
![Page 77: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/77.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 75
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN)(2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)
RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN)(2004BOPC)(14CCR)(18CCR)
EXTEND AND RECONSTRUCT I-65 SB RAMP TO BROOK STREET AND FLOYDSTREET. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PHASE 3.EXTEND AND CONSTRUCT 2 LANE ROADWAY WITH CONTINUOUSCENTER-TURN LANE FROM KY 864 (BEULAH CHURCH RD) TO US 31E(BARDSTOWN RD) AT BARDSTOWN FALLS RD. PROJECT WILL INCORPORATESIDEWALKS AND 10' PAVED SHOULDERS.
ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THESOUTH LEG OF 18TH STREET TO THE EAST. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)
REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).
CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (MAIN,JEFFERSON,LIBERTY, MUHAMMAD ALI, CHESTNUT,3RDSTREETS). PHASE 1
CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2
DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS. IMPROVE DIXIE HIGHWAYBETWEEN CRUMS LANE (KY 2049) AND ROCKFORD LANE (KY 2051)(12CCR)
.357
.400
.100
2.700
.100
1.503
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-22
KY-22
I-65
-
US-150
-
CS-1014B
CS-1049F
US-31W
$1,740,000
$1,320,000
$1,500,000
$4,700,000
$1,000,000
$100,000
$4,195,000
$660,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
U
R
U
C
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2020
2018
2019
2018
2018
2018
2018
2018
2018
2018
2019
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,740,000
$1,320,000
$750,000
$750,000
$3,200,000
$1,500,000
$1,000,000
$100,000
$195,000
$4,000,000
$60,000
$600,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
371.10
371.13
378.10
404.01
413.00
439.05
470.00
470.10
478.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAMBULLITT
05
05
05
05
05
05
05
05
05
371.12
371.00
378.00
404.00
413.00
439.03
965.12
965.12
478.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2004
2000
2004
2004
2014
2011
2014
2012
2004
1998
1998
2000
2004
2006
2004
2004
2012
1.432
2.537
0
.97
0
.047
13.837
1.789
2.937
.155
1.18
.848
.58
15.34
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / SAFETY(P)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
Milepoints:Milepoints:
To:To:
From:From:
![Page 78: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/78.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 76
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
WIDEN HUBBARDS LANE FROM 2 TO 3 LANES (3RD LANE WILL BE A CENTERTURN LANE) FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD).ADD BIKE LANES TO HUBBARDS LANE FROM KRESGE WAY TO KY 1447. PROJECTLENGTH IS 0.6 MI.(BOPC2010)
KY 864 - WIDEN BEULAH CHURCH ROAD FROM 2 TO 3 LANES FROM I-265 TOCEDAR CREEK ROAD.(2010BOP)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT AMULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &JEFFERSON ST IN DOWNTOWN JEFFERSONTOWN CONNECTING THEDOWNTOWN ST NETWORK TO THE GOOD SAMARITAN CENTER & BICYCLE/PEDTRAIL.
DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SANDQUARRY TUNNEL AT GENE SNYDER FWY TO WEST TERMINUS OF EXISTING MSDTRAIL APPROX. 2.7 MI WHICH WILL INCLUDE BRIDGE OVER POND CR.
MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT ANDREPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITYON A REOCCURRING ANNUAL BASIS.
.614
1.547
5.000
5.000
5.000
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CR-1005B
KY-864
I-71
I-71
I-71
-
-
-
$3,510,000
$4,925,000
$16,000,000
$15,000,000
$30,000,000
$1,300,000
$2,155,000
$37,800
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
R
U
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2018
2019
2018
2018
2019
2020
2021
2018
2018
2018
2019
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
NH
NH
NH
NH
NH
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$260,000
$350,000
$2,900,000
$2,950,000
$1,975,000
$500,000
$500,000
$15,000,000
$15,000,000
$30,000,000
$1,300,000
$100,000
$55,000
$2,000,000
$37,800
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
479.00
481.00
483.00
483.01
483.02
486.00
489.00
493.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OLDHAM
OLDHAM
OLDHAM
05
05
05
05
05
05
05
05
965.12
965.12
483.00
483.00
483.00
965.12
965.12
965.12
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2014
2018
2018
2014
2014
2014
2004
2004
2014
2014
2014
2004
2004
2004
0
1.818
9.1
9.1
9.1
.614
3.445
11.315
11.315
11.315
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
11.315
11.315
11.315
14.1
14.1
14.1
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 79: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/79.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 77
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY:CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERNPARKWAY BETWEEN SOUTH 3RD AND NEW CUT ROAD.
CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.
CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.
CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.
RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWNLOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)
OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT BICYCLE/PEDESTRIANFACILITIES ALONG CAMPGROUND RD FROM END OF SHARED USE PATH AT THERAILROAD CROSSING ON CAMPGROUND RD NEAR I-264 TO LEES LANE & THECONNECTION TO RIVERSIDE GARDENS PK AT 2899 LEES LANE.(18CCR)
WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAYTO MAPLE ROAD, AND WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROMOLD TAYLORSVILLE ROAD TO RUCKRIEGEL PARKWAY. PROJECT TO INCLUDESTREETSCAPE ENHANCEMENTS TO IMPROVE THE CORRIDOR.
REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THELEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)
.151
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1020
KY-2054
KY-2054
KY-2054
CR-1001B
KY-2051
CR-1004H
I-64
$5,172,877
$1,740,000
$1,388,945
$3,423,854
$200,000
$4,550,000
$1,848,000
$400,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
R
U
C
R
U
C
D
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2021
2018
2019
2020
2018
2018
2019
2018
2019
2020
2020
2018
2019
2020
2018
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$100,000
$4,672,877
$160,000
$80,000
$1,500,000
$160,000
$80,000
$1,148,945
$200,000
$160,000
$3,063,854
$200,000
$800,000
$750,000
$3,000,000
$264,000
$352,000
$1,232,000
$400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
495.00
496.00
497.00
498.00
499.00
505.00
518.00
521.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
99
965.12
965.12
965.12
965.12
965.12
505.00
965.12
65.11
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2014
2014
2014
2004
2014
2014
2004
2004
2004
2004
2004
2004
2004
2008
7.837
.72
1.22
1.64
0
2.7
3.179
1.387
9.15
1.22
1.64
2.717
6.761
6
3.33
1.891
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 80: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/80.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 78
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMBLEVINS GAP ROAD TO NORTH END OF SAND QUARRY TUNNEL AT GENESNYDER FWY (THE TUNNEL WILL BE PART OF THIS SEGMENT) APPROXIMATELY2.5 MILES.
DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMPENDLETON RD AT MEDORA RD TO THE BEGINNING OF JEFFERSON MEMORIALFOREST PROPERTY ON BLEVINS GAP RD APPROXIMATELY 1.3 MILES
NORTHEAST LOUISVILLE LOOP SECTION II. CONSTRUCT A SHARED USE PATHALONG US 60 FROM EASTWOOD CUTOFF TO EASTWOOD RECREATION CENTER.(METRO PARKS PROJECT) (2014BOP)
CONST MULTIUSE PATH THRU AB SAWYER PK CONNECT TO SURROUNDINGNEIGHBORHOODS INCLUDE: UNDERPASS/BRIDGE/SITEAMENITIES/CONSTRUCTION OF PEDESTRIAN FACILITIES ALONG HURSTBOURNEPKWY FR MIDDLE FORK-BEARGRASS CRK BRIDGE TO ORMSBY STA/CONNECT-AB SAWYER PK GRWAY.
IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROMUS 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD) APPROXIMATELY1.07 MILES (2014BOP).
WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3 LANES FROM US 31W (DIXIEHWY) TO DOSS HIGH SCHOOL. 1.7 MILES (2014BOP)
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71. 11.318
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
-
-
KY-2841
-
KY-1932
KY-1931
I-265
$2,115,000
$1,100,000
$1,028,333
$1,850,000
$865,000
$9,000,000
$24,460,000
Total
Total
Total
Total
Total
Total
Total
R
U
C
U
C
R
U
C
R
U
C
D
R
R
U
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2018
2019
2018
2018
2019
2018
2018
2019
2018
2018
2018
2019
2018
2020
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$55,000
$60,000
$2,000,000
$100,000
$1,000,000
$533,333
$45,000
$450,000
$50,000
$300,000
$1,500,000
$650,000
$215,000
$3,000,000
$6,000,000
$5,800,000
$1,580,000
$2,080,000
$15,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
523.00
524.00
525.00
529.00
531.00
536.00
537.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
523.00
524.00
525.00
529.00
965.13
965.13
537.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2014
2006
2014
2014
2016
2012
2012
2014
2006
2006
2006
2016
.03
5.523
3.148
23.409
.4
6.59
4.887
34.727
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MATCHED FED FUNDS(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 81: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/81.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 79
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TOFACILITATE RAMP MOVEMENTS TO AND FROM I-265.
BLUEGRASS COMMERCE PARK BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE IIALONG BLUEGRASS PARKWAY FROM WATTERSON TRAIL TO TUCKER STATIONROAD AND ALONG TUCKER STATION ROAD FROM BLUEGRASS PARKWAY TOPLANTSIDE DRIVE (2016BOP)
RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)
RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)
IMPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDYINTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) ADDRESSING SAFETY ANDCONGESTION ISSUES. THE IMPROVEMENTS MAY INCLUDE BUT ARE NOTLIMITED TO: CONSIDERATION OF ALTERNATIVE TRANSPORTATION MODES,DEPLOYMENT
IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO US-31E.
11.318
11.318
3.700
3.700
7.171
7.050
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-265
I-265
I-71
CS-1002H
I-265
I-265
I-64
I-265
$18,660,000
$25,000,000
$5,400,000
$1,300,000
$13,000,000
$15,000,000
$2,800,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
C
C
D
R
U
C
C
P
D
P
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2023
2024
2019
2018
2018
2019
2019
2020
2021
2019
2022
2021
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
SLO
NH
NH
NH
NH
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,580,000
$2,080,000
$15,000,000
$25,000,000
$5,400,000
$1,300,000
$1,000,000
$1,000,000
$1,000,000
$10,000,000
$15,000,000
$250,000
$2,550,000
$1,000,000
$3,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
537.01
537.02
539.00
543.00
549.00
549.01
553.00
554.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
537.00
537.00
539.00
965.15
21.00
549.00
553.00
554.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2016
2016
2016
2018
2018
2018
2016
2016
2016
2008
2016
2016
2018
2018
23.409
23.409
8.6
2.474
24.6
24.6
5.104
10.25
34.727
34.727
9.5
2.927
26.4
26.4
12.275
17.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 82: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/82.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 80
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY-1747 (HURSTBOURNEPARKWAY) FROM STONY BROOK DRIVE TO I-64.
IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVE TO I-264.
IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM I-264 TO I-265.
IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM US-31E(BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD).
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSONEXPRESSWAY) INTERCHANGE.
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSONEXPRESSWAY) INTERCHANGE.
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-265 (GENE SNYDERFREEWAY) INTERCHANGE.
INTERSECTION RE-BUILD AT MAIN STREET/ STORY AVENUE / BAXTER AVENUEINCLUDING TRANSITIONS BETWEEN WENTZEL STREET TO THE WEST ANDJOHNSON STREET TO THE EAST.(18CCR)
A COMPREHENSIVE OPERATIONAL ANALYSIS (COA) TO ANALYZE ANDEVALUATE EXISTING TARC SERVICE IN COMPARISON WITH COMMUNITYGROWTH, ECONOMIC AND LAND USE DEVELOPMENT, AND CURRENT ANDFUTURE NEEDS OF PUBLIC TRANSIT USERS.
1.495
3.000
4.000
5.800
2.298
2.298
1.000
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1747
I-71
I-71
I-265
I-65
I-65
I-65
US-42
-
$250,000
$2,000,000
$5,000,000
$7,500,000
$3,500,000
$3,000,000
$400,000
$3,666,319
$354,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
P
D
P
D
D
P
D
D
P
D
U
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2023
2019
2022
2023
2019
2021
2022
2021
2018
2019
2021
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
NH
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$2,000,000
$2,000,000
$3,000,000
$7,500,000
$500,000
$3,000,000
$3,000,000
$400,000
$176,000
$176,000
$3,314,319
$354,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
555.00
556.00
557.00
558.00
559.00
559.01
560.00
561.00
562.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
555.00
556.00
557.00
558.00
559.00
559.01
560.00
561.00
562.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
10.5
2
5
17.3
129.289
129.289
124.7
0
11.995
5
9
23.1
131.587
131.587
125.7
.056
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SCOPING STUDY DD (O)
![Page 83: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/83.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 81
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
PLANNING STUDY:EXAMINE NEED FOR BICYCLE/PED/VEHICULAR ACCESSIMPROVEMENTS TO PROPOSED DIXIE BRT IN CORRIDORS: KY 907 FR US 31W TOSTONESTREET RD, ROCKFORD LN FR CANE RUN RD TO US 31W, GAGEL AVE FRUS 31W TO MANSLICK RD & CRUMS LN FR I-264 TO MANSLICK RD.
RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (12CCR)(14CCR)
SAFETY PROJECT FOR RECONSTRUCTION OF TAYLORSVILLE ROAD AND SOUTHPOPE LICK ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK.(2016BOP)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1038L OVER BEE LICK CREEK.056C00104N
1.700
.600
.060
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-2049
I-264
KY-155
-
-
-
-
-
CR-1038L
$352,000
$30,140,000
$2,130,000
$24,007,000
$11,670,000
$23,500,000
$9,262,000
$23,500,000
$231,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
P
R
U
C
R
U
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2021
2021
2024
2019
2019
2019
2018
2021
2022
2023
2024
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
NH
NH
NH
STP
STP
STP
SLO
SLO
SLO
SLO
SLO
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$352,000
$5,280,000
$1,270,000
$23,590,000
$180,000
$150,000
$1,800,000
$24,007,000
$11,670,000
$23,500,000
$9,262,000
$23,500,000
$231,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
563.00
804.00
808.00
965.16
965.19
965.20
965.21
965.22
1061.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
99
05
05
05
05
05
05
563.00
390.00
391.05
965.16
965.19
965.20
965.21
965.22
1061.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2010
2016
2008
2016
2016
2018
2018
2010
2018
2006
2012
2008
2016
2016
2018
2018
2010
.514
20.9
4.4
0
1.72
22.6
5
.06
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SCOPING STUDY DD (O)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / DESIGN ENGINEERING(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / MATCHED FED FUNDS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 84: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/84.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 82
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE ON E BROADWAY (US 150) OVER SOUTHFORK BEARGRASS CREEK AT INTERSECTION WITH BRENT STREET (CS1312G)056B00348N (SD)
ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTHFORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G) 056C00083N
ADDRESS DEFICIENCIES OF BRIDGE OVER NORTHERN DITCH ON GRADE LANE(CR 1001G) 0.34 MI S OF KY 1747 (FERN VALLEY ROAD) (056C00064N)
ADDRESS DEFICIENCIES OF BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR1001B) 0.2 MI N OF LIME KILN ROAD (CR 1002B) (056C00130N)
NORTHEAST LOUISVILLE LOOP MET SECTION 1 BECKLEY WOODS TO BECKLEYSTATION. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEYWOODS TO BECKLEY STATION, 0.5 MILE. (2016BOP)
NORTHEAST LOUISVILLE LOOP MET SECTION 2 BECKLEY STATION TOBIRCHAM ROAD. CONSTRUCT A SHARED USE PATH ALONG US 60 FROMBECKLEY STATION TO BIRCHAM ROAD. 0.7 MILE (2016BOP)
NORTHEAST LOUISVILLE LOOP MET SECTION 3 BIRCHAM ROAD TO BECKLEYCREEK PARK. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BIRCHAMROAD TO BECKLEY CREEK PARK, 0.5 MILE. (2016BOP)
NORTHEAST LOUISVILLE LOOP MET SECTION 4 BECKLEY CREEK PARK TOEASTWOOD CUTOFF. CONSTRUCT A SHARED USE PATH ALONG US 60 FROMBECKLEY CREEK PARK TO EASTWOOD CUT OFF, 0.6 MILE. (2016BOP)
.040
.040
.020
.070
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
US-150
CS-1017G
CR-1001G
CR-1001B
US-60
US-60
US-60
US-60
$850,000
$497,000
$920,000
$1,232,000
$750,000
$1,300,000
$2,125,000
$1,500,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
D
C
U
C
R
U
C
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2019
2020
2019
2020
2018
2018
2018
2019
2019
2018
2018
2019
2018
2019
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$850,000
$497,000
$20,000
$50,000
$850,000
$315,000
$917,000
$50,000
$700,000
$300,000
$200,000
$800,000
$50,000
$75,000
$2,000,000
$350,000
$150,000
$1,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
1067.00
1070.00
1077.00
1079.00
3030.10
3030.20
3030.30
3030.40
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
1067.00
1070.00
1077.00
1079.00
3030.00
3030.00
3030.00
3030.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2012
2014
2014
2016
2016
2010
2010
2012
2012
2014
2014
2010
2010
2010
2010
3.6
1.293
2.48
3.8
12.895
12.895
12.895
12.895
3.64
1.333
2.5
3.87
14.718
14.718
14.718
14.718
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
![Page 85: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/85.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 83
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
WATTERSON TRAIL PHASE I- IMPROVE STREETSCAPE, RECONSTRUCTSIDEWALKS AND ENHANCE LANDSCAPING FROM MAPLE ROAD TO OLDTAYLORSVILLE ROAD IN JEFFERSONTOWN. (BOPC2012)
CONSTRUCT SIDEWALKS ALONG KRATZ LANE FOR .35 MILES BETWEENSHELBYVILLE RD. AND OLD SHELBYVILLE RD./MAIN ST., INCLUDING SOMEDRAINAGE IMPROVEMENTS (2016BOP).
CONSTRUCT A SIDEWALK ALONG CANNONS LANE BETWEEN WILLIS AVE. ANDBOWMAN FIELD (SENECA LOOP), 1.0 MILES (2016BOP)
RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TOSOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)
THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTSWITH PALATKA ROAD AND TURN LANES. (14CCN)
ERECT SOUND WALL ON NORTH SIDE OF GENE SNYDER FREEWAY FROM MP 15.3TO MP 16.10. (14CCN)(18CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 5.4 TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)(16CCR)(18CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE SOUTH SIDE OF I-71FROM MP 7.5 TO MP 7.8. (14CCN)(16CCR)(18CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)(18CCN)
.352
1.200
.599
.800
.900
.300
1.200
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CS-1073H
CS-1367H
CS-2048
KY-1819
KY-1931
I-265
I-71
I-71
I-71
$2,648,800
$234,382
$700,000
$2,700,000
$6,790,000
$3,000,000
$2,961,000
$1,152,000
$2,304,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
U
C
C
R
U
C
C
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2018
2018
2019
2021
2024
2022
2022
2019
2024
2023
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SPP
STP
STP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$792,000
$1,856,800
$234,382
$100,000
$100,000
$500,000
$2,700,000
$2,630,000
$4,160,000
$3,000,000
$2,961,000
$1,152,000
$2,304,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
3031.00
3039.00
3212.00
8203.00
8810.00
8855.00
8858.00
8859.00
8860.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
3031.00
965.15
3212.00
8203.00
8810.00
8855.00
8858.00
8859.00
8860.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2016
2016
2004
2014
2014
2014
2014
2014
2012
2008
2016
2004
2014
2014
2014
2014
2014
0
0
1.09
6.9
4.561
15.3
5.4
7.5
7.5
.352
.295
2.09
8.1
5.5
16.1
6.3
7.8
8.7
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / TRANSP ENHANCEMENT(P)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
![Page 86: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/86.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 84
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (18CCN)
WIDEN TAYLORSVILLE ROAD TO 3 LANES FROM I-265 TO KY-148. (18CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-64 WESTBOUNDBETWEEN MILEPOINTS 13.7 AND 14.2. (16CCN)(18CCN)
WIDEN US-60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TOROCKCREST WAY (MP 15.1). (LOCALS WILL DO DESIGN FOR $330,000).(16CCN)(18CCR)
DESIGN AND BUILD A NOISE BARRIER WALL ON THE NORTH SIDE OF I-265BETWEEN MP 15.3 AND MP 16.1 FOR APPROXIMATELY 4700 FEET. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF CLARK STATION RD BRIDGE OVER S LONG RUN.(056C00091N)
ADDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER GOOSE CREEK.(056C00113N)
ADDRESS DEFICIENCIES OF PENDLETON RD BRIDGE OVER POND CREEK.(056C00118N)(SD)
.396
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-71
KY-155
I-64
US-60
I-265
CR-1004J
CS-1079C
CR-1007L
$2,304,000
$19,840,000
$2,100,000
$1,870,000
$250,000
$630,000
$476,000
$1,351,000
Total
Total
Total
Total
Total
Total
Total
Total
C
P
D
R
U
C
C
R
U
C
D
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2020
2022
2022
2023
2019
2019
2020
2021
2018
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,304,000
$915,000
$1,495,000
$1,000,000
$500,000
$15,930,000
$2,100,000
$410,000
$460,000
$1,000,000
$250,000
$280,000
$350,000
$175,000
$301,000
$245,000
$1,106,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
8860.10
8908.00
8951.00
8952.00
8957.00
10007.00
10008.00
10009.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
8860.00
8908.00
8951.00
8952.00
8957.00
10007.00
10008.00
10009.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2016
2016
2016
2018
2018
2018
2014
2018
2016
2016
2016
2018
2018
2018
7.5
4.4
13.7
14.718
15.3
.488
.03
.997
8.7
5.75
14.2
15.114
16.1
.498
.038
1.035
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 87: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/87.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 85
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF S WATTERSON TRL BRIDGE OVER FERN CREEK.(056C00159N)
ADDRESS DEFICIENCIES OF STONEBRIDGE RD BRIDGE OVER TRIB MUDDY FKBEARGRASS. (056C00240N)
ADDRESS DEFICIENCIES ON I-64 RIVERSIDE EXPRESSWAY BRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B00142N)(SD)
BRIDGE PAINTING OF I-64 RIVERSIDE EXPRESSWAYBRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B00142N)
ADDRESS DEFICIENCIES OF US 31E BRIDGE OVER S FK BEARGRASS CREEK.(056B00137N)
ADDRESS DEFICIENCIES OF SCENIC LOOP BRIDGE OVER MID FK BEARGRASSCREEK. (056C00027N)
ADDRESS DEFICIENCIES OF PARK BOUNDARY RD BRIDGE OVER MID FKBEARGRASS CREEK. (056C00033N)
ADDRESS DEFICIENCIES OF CHAMPIONS TRACE LN BRIDGE OVER S FKBEARGRASS CREEK. (056C00096N)
ADDRESS DEFICIENCIES OF OLD CLARK STATION BRIDGE OVER BRUSH RUN.(056C00167N)
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CR-1005H
CS-1096B
I-64
I-64
US-31E
CS-1003G
CS-3396
CR-1021
CS-1004J
$546,000
$476,000
$4,950,000
$30,000,000
$1,316,000
$546,000
$581,000
$1,470,000
$497,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2019
2021
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$245,000
$301,000
$210,000
$266,000
$350,000
$4,600,000
$30,000,000
$350,000
$966,000
$140,000
$406,000
$140,000
$441,000
$280,000
$1,190,000
$140,000
$357,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
10010.00
10011.00
10015.00
10016.00
10018.00
10019.00
10020.00
10021.00
10022.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
10010.00
10011.00
10015.00
10016.00
10018.00
10019.00
10020.00
10021.00
10022.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2108
2018
2018
2018
2018
2018
2018
2018
2018
2108
.685
.008
16.353
1.796
.01
.71
.006
.691
.022
16.361
1.808
.018
.728
.014
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRG PAINTING(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 88: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/88.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 86
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KIMBERLY WAY BRIDGE OVER LITTLE CEDARCREEK. (056C00182N)
ADDRESS PAVEMENT CONDITION OF I-64 BOTH DIRECTION(S) FROM MILEPOINT6 TO MILEPOINT 11.57.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-64 CARDINALDIRECTION(S) FROM MILEPOINT 0.65 TO MILEPOINT 0.828.
ADDRESS PAVEMENT CONDITION OF I-65 BOTH DIRECTION(S) FROM MILEPOINT128.13 TO MILEPOINT 131.24.
ADDRESS PAVEMENT CONDITION OF I-71 BOTH DIRECTION(S) FROM MILEPOINT0 TO MILEPOINT 11.32.
ADDRESS PAVEMENT CONDITION OF I-264 CARDINAL DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 0.46.
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTHDIRECTION(S) FROM MILEPOINT 12.7 TO MILEPOINT 18.41
ADDRESS PAVEMENT CONDITION OF I-264 BOTH DIRECTION(S) FROMMILEPOINT 20.7 TO MILEPOINT 22.927
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
CS-1325H
I-64
I-64
I-65
I-71
I-264
I-264
I-264
$357,000
$6,325,000
$110,000
$6,820,000
$12,650,000
$330,000
$12,650,000
$4,950,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2024
2024
2019
2019
2020
2020
2024
2024
2019
2019
2024
2024
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$140,000
$217,000
$575,000
$5,750,000
$10,000
$100,000
$620,000
$6,200,000
$1,150,000
$11,500,000
$30,000
$300,000
$1,150,000
$11,500,000
$450,000
$4,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
10023.00
20009.00
20010.00
20012.00
20014.00
20015.00
20016.00
20017.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
10023.00
20009.00
20010.00
20012.00
20014.00
20015.00
20016.00
20017.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.059
6
.65
128.13
0
0
12.7
20.7
.063
11.57
.828
131.24
11.32
.46
18.41
22.927
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 89: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/89.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 87
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTHDIRECTION(S) FROM MILEPOINT 0.46 TO MILEPOINT 12.7
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTHDIRECTION(S) FROM MILEPOINT 15.66 TO MILEPOINT 18.8
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTHDIRECTION(S) FROM MILEPOINT 18.8 TO MILEPOINT 23.364
ADDRESS PAVEMENT CONDITION OF I-265 BOTH DIRECTION(S) FROMMILEPOINT 23.364 TO MILEPOINT 26.6
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
I-264
I-265
I-265
I-265
KY-841
KY-864
KY-913
KY-1020
$13,420,000
$3,575,000
$5,060,000
$3,850,000
$7,975,000
$3,575,000
$550,000
$825,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2022
2022
2019
2019
2022
2022
2022
2022
2019
2019
2021
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,220,000
$12,200,000
$325,000
$3,250,000
$460,000
$4,600,000
$350,000
$3,500,000
$725,000
$7,250,000
$325,000
$3,250,000
$50,000
$500,000
$75,000
$750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
20018.00
20019.00
20020.00
20021.00
20022.00
20023.00
20024.00
20025.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
20018.00
20019.00
20020.00
20021.00
20022.00
20023.00
20024.00
20025.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.46
15.66
18.8
23.364
0
7.111
2.384
2.669
12.7
18.8
23.364
26.6
10.25
11.438
3.072
3.661
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 90: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/90.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 88
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TOMILEPOINT 7.25
EASTWOOD FISHERSVILLE CONNECTOR TO I-64 (18CCN)
7.250
.200
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
KY-1065
KY-1932
KY-1934
KY-1934
KY-2048
KY-2052
US-31W
US-31W
KY-1531
$2,200,000
$550,000
$3,575,000
$4,125,000
$1,100,000
$3,300,000
$825,000
$965,000
$750,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2021
2021
2021
2021
2022
2022
2022
2022
2021
2021
2020
2020
2022
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$2,000,000
$50,000
$500,000
$325,000
$3,250,000
$375,000
$3,750,000
$100,000
$1,000,000
$300,000
$3,000,000
$75,000
$750,000
$965,000
$750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
20026.00
20027.00
20028.00
20029.00
20030.00
20031.00
20032.00
20039.00
80000.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
05
20026.00
20027.00
20028.00
20029.00
20030.00
20031.00
20032.00
20039.00
80000.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2.504
3.21
0
4.444
0
0
14.51
0
8.1
5.25
3.8
4.444
9.742
1.13
4.205
14.96
7.25
8.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / NEW INTERCHANGE(O)
![Page 91: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/91.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 89
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
WIDEN US-60 TO 6 LANES FROM OLD SHELBYVILLE RD. TO NORTH ENGLISHSTATION RD.(18CCN)
NEW INTERCHANGE ON I-64E EAST OF THE GENE SNYDER FREEWAY(18CCN)
EXTEND PLANTSIDE DRIVE FROM REHL ROAD TO TAYLORSVILLE ROAD(18CCN)
CONSTRUCT NEW INTERCHANGE ON KY-841 AT THE RENAISSANCE SOUTHBUSINESS PARK(18CCN)
EXTEND EXISTING SOUND WALL ON I-264 NEAR NEWBURG RD. APPROXIMATELY750' WEST.(18CCN)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE WESTBOUND SIDEOF I-64 FROM MP 10.3 TO MP 11.2 FOR APPROXIMATELY 4800 FEET.(18CCN)
RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TOIMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMICDEVELOPMENT.(18CCN)
RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TOIMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMICDEVELOPMENT.(18CCN)
EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY ANDMOBILITY EAST AROUND NICHOLASVILLE FROM SOUTH OF KY-39 TO NORTH OFKY-169.
.591
.500
.142
1.242
1.242
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JEFFERSON
JESSAMINE
US-60
I-64
-
KY-841
I-264
I-64
US-31E
US-31E
-
$4,025,000
$650,000
$750,000
$12,500,000
$375,000
$3,456,000
$5,000,000
$5,000,000
$7,800,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
P
D
C
D
C
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2021
2022
2023
2021
2020
2021
2021
2021
2021
2022
2019
2020
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
STP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,255,000
$550,000
$720,000
$1,500,000
$650,000
$750,000
$12,500,000
$50,000
$325,000
$250,000
$3,206,000
$5,000,000
$5,000,000
$7,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
07
80001.00
80002.00
80003.00
80006.00
80051.00
80052.00
80053.00
80053.10
87.20
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
07
80001.00
80002.00
80003.00
80006.00
80051.00
80052.00
80053.00
80053.10
87.10
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2014
2018
2018
2018
2018
2018
2018
2018
2018
2000
11.093
9.1
14.108
10.3
16.325
16.325
11.684
9.6
14.25
11.2
17.567
17.567
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / NEW INTERCHANGE(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
![Page 92: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/92.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 90
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAYHAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27(NICHOLASVILLE RD)(12CCR)(18CCN)
IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAYHAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27(NICHOLASVILLE RD). BEGIN RIGHT OF WAY PURCHASE FROM US-68 EASTWARDTO RAILROAD CROSSING.(18CCN)
IMPROVE INTERSECTION OF KY-29 NORTH OF WILMORE.(16CCR)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGEON KY 39 1.3 MI N OF KY 1268. (057B00002N)(EBRP)
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM.057R00605N
ADDRESS DEFICIENCIES OF RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET)BETWEEN MEADOWLARK LANE & ILHARDT AVENUE.(057R00603N)(14CCN)(16CCR)(SD)
ADDRESS DEFICIENCIES OF KY 1268 BRIDGE OVER HICKMAN CREEK.(057B00022N)
FEDERAL HIGHWAY FUNDS DEDICATED TO RECONSTRUCT STONE COAL ROADIN JOHNSON COUNTY. ("KYD" FUNDS NOT AVAILABLE FOR ADDITIONALAMOUNT NEEDED TO COVER COST)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINTCREEK 0.38 MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE 058B00012N
3.205
.700
.036
.046
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JESSAMINE
JOHNSON
JOHNSON
KY-1980
KY-1980
US-68
KY-39
CR-1238
KY-169
KY-1268
KY-172
KY-40
$22,500,000
$2,000,000
$1,730,000
$1,715,000
$1,065,000
$1,500,000
$1,540,000
$203,005
$665,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
D
C
D
C
C
D
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2023
2024
2020
2019
2020
2019
2020
2019
2020
2020
2019
2020
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
STP
STP
BR
BR
BR
BR
BR
BR
BR
KYD
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,500,000
$5,000,000
$12,000,000
$2,000,000
$650,000
$1,080,000
$350,000
$1,365,000
$260,000
$805,000
$1,500,000
$308,000
$1,232,000
$203,005
$665,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
12
12
414.00
414.10
915.00
1136.00
1144.00
8851.00
10011.00
134.02
1114.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
12
12
414.00
414.00
915.00
1136.00
1144.00
8851.00
10011.00
134.00
1114.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2018
2010
2018
2018
2018
2018
2008
2012
2012
2012
2010
2018
2018
2018
2018
2002
2012
0
0
4.1
3.74
.868
10.807
4.162
9.132
.372
3.205
3.205
4.8
3.776
.892
10.853
4.188
9.232
.412
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 93: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/93.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 91
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
KY 143 HPP EARMARK "ADDRESS DEFICIENCIES OF BRENT SPENCE BRIDGE,KENTON COUNTY, KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL2005HPP FUNDING)(SD)
BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING). (10CCR)(12CCR)(SD)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-1303 FROM KY-536 TOBEECHGROVE ELEMENTARY (PRIORITY SECTION 4). DESIGN PHASE UNDERPARENT NO. 6-162.01. (2012BOP)(16CCR)(18CCR)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST ENDOF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGNPHASE UNDER PARENT NO. 6-162.01. (16CCN)(18CCR)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST ENDOF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGNPHASE UNDER PARENT NO. 6-162.01.(16CCN)(18CCR)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM KY 1303 TOWILLIAMSWOOD ROAD/CALVARY DRIVE (PRIORITY SECTION 2). DESIGN PHASEUNDER PARENT NO. 6-162.01. (2012BOP)(18CCN)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM WILLIAMSWOODROAD/CALVARY DRIVE TO KY-17 (PRIORITY SECTION 3). DESIGN PHASE UNDERPARENT NO. 6-162.01. (2012BOP)(18CCR)
PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROMANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)
1.100
1.061
1.061
1.481
1.934
.275
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
I-75
I-75
KY-1303
KY-536
KY-536
KY-536
KY-536
CR-1316
$1,439,840
$30,000,000
$15,000,000
$6,410,000
$5,410,000
$18,000,000
$13,640,000
$5,245,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
R
U
C
U
C
C
R
U
C
R
U
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2023
2023
2024
2019
2020
2021
2020
2020
2022
2022
2024
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
HPP
BR
STP
STP
STP
STP
STP
STP
SPP
SPP
SPP
SPP
SPP
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,439,840
$30,000,000
$3,000,000
$3,000,000
$9,000,000
$1,000,000
$5,410,000
$5,410,000
$3,000,000
$1,500,000
$13,500,000
$12,080,000
$1,560,000
$400,000
$800,000
$4,045,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
17.05
17.09
162.10
162.20
162.21
162.30
162.40
419.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BOONE
06
06
06
06
06
06
06
06
17.05
17.09
162.01
162.01
162.20
162.01
162.01
966.02
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2012
2016
2018
2012
2012
2012
2018
2018
2000
2000
2016
2000
2000
2004
191.277
191.277
0
0
0
1.061
2.542
0
191.777
191.777
1.1
1.061
1.061
2.542
4.476
.275
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / AIR QUALITY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MATCHED FED FUNDS(O)
14.363 14.746Milepoints: To:From:
![Page 94: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/94.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 92
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
PHASE 2 BROMLEY CRESCENT SPRINGS ROAD BETWEEN THE TWO SEGMENTSOF AMSTERDAM ROAD. RECONSTRUCT BROMLEY CRESCENT SPRINGS ROADAND IMPROVE INTERSECTION WITH ST. JOHNS ROAD.
RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMASMORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TOCATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
DUDLEY ROAD PHASE 3. ROADWAY RESURFACING AND STABILIZATION.CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROMCATHERINE DRIVE TO THE SUMMIT HILLS COUNTRY CLUB ENTRANCE.
DUDLEY ROAD PHASE 4. ROADWAY RESURFACING AND STABILIZATION.CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM SUMMITHILLS COUNTRY CLUB ENTRANCE TO DIXIE HIGHWAY.
WIDEN SIDEWALK FOR ADA COMPLIANCE AND ROADWAY RECONSTRUCTIONON JOHNSON ST & W RIVERCENTER BLVD FROM 3RD STREET TO THE EXISTINGCONCRETE SECTION HEADING TOWARDS MADISON AVENUE IN COVINGTON.(2014BOP)
CONSTRUCT LEFT TURN LANE ON NB APPROACH AT THE INTERSECTION OF US25 AND BEECHWOOD RD JUST S OF I-75. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP) (2014BOP)
LUDLOW RIVERFRONT COMMONS TRAIL- CONSTRUCT A ONE-MILE MULTI-USEPATH ALONG THE OHIO RIVER FROM HOOPER STREET TO ASH STREET IN THECITY OF LUDLOW (2016BOP).
.240
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
CS-3806
CS-4128
CS-4128
CS-4128
CS-4128
CS-2023
US-25
-
$1,609,600
$1,044,000
$924,000
$1,258,000
$1,907,800
$677,800
$1,950,000
$245,133
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
C
C
D
C
D
C
C
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2019
2020
2018
2018
2018
2019
2019
2020
2018
2018
2018
2018
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$269,600
$504,000
$560,000
$276,000
$1,044,000
$924,000
$178,000
$1,080,000
$271,000
$1,636,800
$677,800
$100,000
$250,000
$1,600,000
$5,000
$240,133
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
419.01
428.10
428.20
428.30
428.40
430.00
432.00
435.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
419.01
428.00
428.00
428.30
428.40
966.04
966.04
966.04
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2014
2014
2018
2018
2014
2016
2016
2018
2014
2014
2018
2018
2006
2006
2006
.275
2.19
1.46
.879
0
0
9.34
.741
3.11
2.19
1.459
.879
.068
9.58
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MATCHED FED FUNDS(O)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RESURFACING(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
RELIABILITY / MATCHED FED FUNDS(O)
![Page 95: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/95.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 93
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE SAFETY, TRAFFIC FLOW AND DRAINAGE ISSUES ALONG BUTTERMILKPIKE (CS 6142) FROM ROGERS ROAD TO COLLINS ROAD IN THE CITY OF VILLAHILLS. A DISTANCE OF 0.527 MILES (2016BOP).
RECONSTRUCT AMSTERDAM ROAD FROM GENERAL DRIVE TO REDWOOD DRIVEWITH CURB, GUTTER, STORM SEWERS AND SIDEWALK (2016BOP).
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE I-275INTERCHANGE. (18CCR)
IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-1303 (TURKEYFOOTRD) FROM DUDLEY RD TO US-25 (DIXIE HWY). (18CCR)
ADELA AVENUE. CURB-LINE MILLING, ASPHALT RESURFACING, REPLACESIDEWALK/CURBING AND NEW SIDEWALK AS NEEDED FROM KY 1072 (SLEEPYHOLLOW ROAD/DEVERILL STREET) TO KY 8 (ELM STREET).
CODY ROAD. REPLACE CULVERT FOR BANKLICK CREEK. MILL AND OVERLAYWITH NEW ASPHALT FROM BANKLICK CREEK TO INDEPENDENCE STATIONROAD.
MADISON AVENUE. UNDERGROUND UTILITIES, STREET TREES, MAST ARMPOLES, STREETLIGHTS, RESURFACING, SIGNAL IMPROVEMENTS FROM 11THSTREET TO 8TH STREET.(18CCN)
.500
1.238
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
CS-6142
CS-9004
KY-17
KY-1303
CS-1560
CS-1045
CS-2103
$313,857
$2,168,000
$1,000,000
$4,500,000
$255,000
$523,000
$2,170,000
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
D
R
U
D
R
U
D
R
C
D
U
C
D
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2018
2019
2019
2020
2020
2019
2019
2020
2018
2018
2018
2018
2019
2019
2018
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
SNK
STP
STP
STP
STP
STP
STP
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
SNK
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$313,857
$56,000
$32,000
$2,080,000
$450,000
$200,000
$350,000
$1,500,000
$2,000,000
$1,000,000
$35,000
$20,000
$200,000
$57,000
$120,000
$346,000
$280,000
$240,000
$1,650,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
437.00
438.00
449.00
450.00
454.00
455.00
456.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
966.09
966.04
449.00
450.00
454.00
455.00
456.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2018
2018
2018
2018
2018
2016
2006
2018
2018
2018
2018
2018
0
.285
18.15
5.01
0
1.3
.841
.527
.652
18.65
6.248
.612
2.33
1.074
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / RESURFACING(P)
RELIABILITY / DRAINAGE IMPROVE(P)
RELIABILITY / TRANSP ENHANCEMENT(P)
![Page 96: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/96.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 94
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
7TH STREET. SIDEWALK REPLACEMENT, UNDERGROUND UTILITIES, STREETTREES, MAST ARM TRAFFIC SIGNALS, LIGHTING, RESURFACING FROMWASHINGTON STREET TO GREENUP STREET.
WEST 15TH STREET; ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHESOVER CSX RR IN COVINGTON. (059C00029N)(12CCR)(SD)
EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OFRUSSELL ST; 059B00083N
ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET(KY 8) IN COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN. (059B00037N)*CAMPBELL CO MPS ARE 0.0-0.19
IMPROVE HANDS PIKE (KY-1501) FROM KY-17 TO CRYSTAL LAKEDRIVE.(12CCR)(14CCR)(16CCR)
EXTEND HOUSTON ROAD TO CINEMA PROPERTY. (16CCN)(18CCN)
IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD,AND US 25. FT. MITCHELL WILL PAY $50,000 TOWARD DESIGN. (16CCN)(18CCN)
ADDRESS DEFICIENCIES ON JOHN A. ROEBLING BRIDGE OVER OHIO RIVER.(059B00048N)(BSBP)
.079
.100
.062
1.032
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
CS-2217
CS-2097
KY-1120
KY-8
KY-1501
CS-3000
US-25
KY-17
$2,970,000
$3,490,000
$520,000
$40,410,000
$8,010,000
$250,000
$12,250,000
$1,200,000
Total
Total
Total
Total
Total
Total
Total
Total
D
U
C
R
U
C
C
D
R
U
C
C
D
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2019
2018
2018
2018
2018
2021
2022
2022
2024
2019
2019
2019
2021
2022
2023
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SNK
SNK
SNK
BR
BR
BR
BR
BR
BR
BR
BR
SPP
SPP
SPP
SPP
SPP
SPP
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$240,000
$2,450,000
$830,000
$550,000
$2,110,000
$520,000
$3,900,000
$2,440,000
$1,170,000
$32,900,000
$8,010,000
$250,000
$250,000
$5,000,000
$2,000,000
$5,000,000
$1,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
457.00
1070.00
1075.00
1086.00
8307.10
8916.00
8951.00
10005.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CAMPBELL
06
06
06
06
06
06
06
06
457.00
1070.00
1075.00
1086.00
8307.00
8916.00
8951.00
10005.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2006
2016
2016
2018
2018
2018
2018
2018
2006
2016
2016
2018
.033
.144
.59
7.6
0
0
8.583
23.949
.12
.223
.65
7.662
1.032
.31
8.667
24.321
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / TRANSP ENHANCEMENT(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
0 .134Milepoints: To:From:
![Page 97: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/97.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 95
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
JOINT REPLACEMENT AND PREVENTIVE MAINTENANCE ON CLAY WADE BAILEYBRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (059B00049N)
ADDRESS DEFICIENCIES OF KY 177 BRIDGE OVER BOWMAN CREEK. (059B00011N)
ADDRESS DEFICIENCIES OF KY 2045 BRIDGE OVER BRUSHY CREEK. (059B00025N)
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 166.263 TO MILEPOINT 169.439
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 166.263 TO MILEPOINT 169.439
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTHDIRECTION(S) FROM MILEPOINT 186.95 TO MILEPOINT 190.721
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROMMILEPOINT 190.68 TO MILEPOINT 191.22
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 190.721 TO MILEPOINT 191.777
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.582 (1.05 NON-CARDINAL)
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
US-25
KY-177
KY-2045
I-75
I-75
I-75
I-75
I-75
I-275
$350,000
$3,115,000
$3,955,000
$4,290,000
$4,290,000
$8,250,000
$330,000
$1,100,000
$15,620,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2019
2020
2021
2021
2023
2023
2024
2024
2019
2019
2022
2022
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$350,000
$420,000
$2,695,000
$350,000
$3,605,000
$390,000
$3,900,000
$390,000
$3,900,000
$750,000
$7,500,000
$30,000
$300,000
$100,000
$1,000,000
$1,420,000
$14,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
06
10006.00
10011.00
10012.00
20030.00
20031.00
20032.00
20033.00
20034.00
20035.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
06
10006.00
10011.00
10012.00
20030.00
20031.00
20032.00
20033.00
20034.00
20035.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
13.587
7.319
.397
166.263
166.263
186.95
190.7
190.721
0
13.976
7.349
.403
169.439
169.439
190.7
191.22
191.777
1.582
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 98: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/98.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 96
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 NON-CARDINALDIRECTION(S) FROM MILEPOINT 1.054 TO MILEPOINT 1.582
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 77.759 TO MILEPOINT 79.796
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 80.12 TO MILEPOINT 82.475
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTHDIRECTION(S) FROM MILEPOINT 82.475 TO MILEPOINT 83.78
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
KENTON
I-275
I-275
I-275
I-275
KY-16
KY-16
KY-16
KY-17
$440,000
$3,300,000
$3,850,000
$2,200,000
$4,400,000
$825,000
$550,000
$9,680,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2024
2024
2024
2024
2019
2019
2021
2021
2021
2021
2021
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$40,000
$400,000
$300,000
$3,000,000
$350,000
$3,500,000
$200,000
$2,000,000
$400,000
$4,000,000
$75,000
$750,000
$50,000
$500,000
$880,000
$8,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
06
20036.00
20037.00
20038.00
20039.00
20040.00
20041.00
20042.00
20043.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
06
06
06
20036.00
20037.00
20038.00
20039.00
20040.00
20041.00
20042.00
20043.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
1.054
77.759
80.12
82.475
13.9
14.9
15.69
16.2
1.582
79.796
82.475
83.78
14.9
15.69
16.15
18.4
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 99: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/99.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 97
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON KY-177 FROM MILEPOINT 9.17 TOMILEPOINT 15.99
RECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET TOJACQUELINE DRIVE.(18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON ROCKLICK BRANCH (CR 1008) OVERRIGHT FORK BEAVER CREEK AT JUNCTION WITH SOUTH HIGHWAY 7(060C00006N).
ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT FORK TROUBLESOME CREEKON FIELDWOOD DRIVE (CS1016) IN HINDMAN (060C00060N)
ADDRESS DEFICIENCIES OF BRIDGE OVER BALLS FORK ON KY 3209. (16CCN)060B00053N
6.820
1.227
.012
KENTON
KENTON
KENTON
KENTON
KENTON
KNOTT
KNOTT
KNOTT
KY-236
KY-1072
US-25
KY-177
KY-236
CR-1008
CS-1016
KY-3209
$330,000
$220,000
$3,575,000
$893,000
$8,100,000
$420,000
$665,000
$700,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
D
R
U
C
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2021
2021
2021
2021
2022
2019
2020
2021
2022
2018
2019
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$30,000
$300,000
$20,000
$200,000
$325,000
$3,250,000
$893,000
$800,000
$1,000,000
$1,000,000
$5,300,000
$420,000
$210,000
$455,000
$700,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
12
12
12
20044.00
20045.00
20046.00
20051.00
80002.00
1116.00
1124.00
8904.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
06
06
06
06
06
12
12
12
20044.00
20045.00
20046.00
20051.00
80002.00
1116.00
1124.00
8904.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2012
2014
2016
2018
2018
2018
2018
2018
2012
2014
2016
2.131
2.489
8.65
9.17
.141
0
.018
.312
2.622
2.83
10.85
15.99
1.368
.04
.03
.328
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 100: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/100.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 98
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-1098 BRIDGE OVER LAUREL FK OF QUICKSAND C.(060B00035N)
ADDRESS DEFICIENCIES OF COLLINS BRANCH RD BRIDGE OVER CARR FORK.(060C00029N)
ADDRESS DEFICIENCIES OF FRANKIE JANE DR BRIDGE OVER CANEY CREEK.(060C00071N)
IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ONUS-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)
IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ONUS-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US25E. 061C00063N
ADDRESS DEFICIENCIES OF SPIDER CREEK RD BRIDGE OVER EAST FORK LYNNCAMP CREEK. (061C00048N)
ADDRESS DEFICIENCIES OF DETHERAGE CEMETERY BRIDGE OVER BRUSHCREEK. (061C00056N)
ADDRESS DEFICIENCIES OF BURTON BRANCH RD BRIDGE OVER BURTONBRANCH. (061C00086N)
1.976
1.976
.004
KNOTT
KNOTT
KNOTT
KNOX
KNOX
KNOX
KNOX
KNOX
KNOX
KY-1098
CR-1130
CR-1565
US-25E
US-25E
CR-1325
CR-1353
CR-1162
CR-1065
$855,000
$556,150
$512,890
$2,300,000
$6,920,000
$525,000
$661,500
$525,000
$535,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2020
2021
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
NH
NH
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$680,000
$157,500
$398,650
$175,000
$337,890
$2,300,000
$6,920,000
$175,000
$350,000
$192,500
$469,000
$157,500
$367,500
$175,000
$360,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
11
11
11
11
11
11
10001.00
10002.00
10015.00
188.00
188.01
1102.00
10021.00
10022.00
10023.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
11
11
11
11
11
11
10001.00
10002.00
10015.00
188.00
188.00
1102.00
10021.00
10022.00
10023.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2012
2018
2016
2018
2018
2018
2018
2018
2018
2012
2012
2016
2018
2018
2018
.032
.015
.028
24.221
24.221
.191
.396
.032
.038
.044
.021
.034
26.197
26.197
.195
.406
.036
.05
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 101: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/101.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 99
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 21.72 TOMILEPOINT 26.20
US25E TURN LANES- TURN LN @ THE PALLET STORE, L. TURN LN @ SAWMILL @CNTY LINE, R. TURN LN @ DOLLAR GENERAL, L. TURN LN PAST BENNETT BRSBND, L. TURN LN @ WARREN LOOP DR, LEFT TURN LN @ SUE MNTN DR., L.TURN LANE @ SIERRA LN, R. LN. @ HIGGINS RD.(18CCN)
CONDUCT A TRAFFIC SAFETY STUDY ON US 25E AT HEIDRICK, KY IN KNOXCOUNTY.(18CCN)
CONNECTOR IMPROVEMENTS HODGENVILLE TO I-65. (16CCN) (18CCN)
SPOT IMPROVEMENTS ON KY 84 FROM HODGENVILLE TO I-65. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER SOUTH FORK BRANCH.(062B00008N)
4.480
.800
9.033
KNOX
KNOX
KNOX
KNOX
KNOX
LARUE
LARUE
LARUE
KY-6
US-25E
US-25E
US-25E
US-25E
KY-222
KY-84
KY-61
$330,000
$1,375,000
$2,267,000
$300,000
$50,000
$675,000
$500,000
$693,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
D
C
P
D
R
U
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2019
2019
2023
2019
2019
2019
2019
2019
2020
2020
2020
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
PM
PM
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$30,000
$300,000
$125,000
$1,250,000
$2,267,000
$30,000
$270,000
$50,000
$125,000
$50,000
$100,000
$400,000
$50,000
$450,000
$87,500
$605,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
04
04
04
20007.00
20008.00
20022.00
80000.00
80009.00
8909.00
8911.00
10002.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
HARDIN
11
11
11
11
11
04
04
04
20007.00
20008.00
20022.00
80000.00
80009.00
8909.00
8911.00
10002.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2016
2016
2018
2018
2018
2018
2018
2018
2016
2016
2018
13.714
9.438
21.72
11.5
0
4.045
14.212
11.554
26.2
12.3
9.033
4.057
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
RELIABILITY / SAFETY(P)
SAFETY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
25.827 26.044Milepoints: To:From:
![Page 102: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/102.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 100
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVECONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROMTHE NEW CONNECTOR NORTH TO KY-192; AND IMPROVE ACCESS TO THESCHOOL FROM KY-192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)
REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVECONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROMTHE NEW CONNECTOR NORTH TO KY-192; AND IMPROVE ACCESS TO THESCHOOL FROM KY-192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)
4.300
4.300
4.300
4.300
7.296
7.296
7.296
1.505
1.505
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
I-75
I-75
I-75
I-75
I-75
I-75
I-75
US-25
US-25
$10,120,000
$20,000,000
$18,500,000
$18,500,000
$20,750,000
$20,750,000
$20,750,000
$10,000,000
$5,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
C
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2020
2021
2022
2023
2022
2023
2024
2022
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
NH
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$70,000
$50,000
$10,000,000
$20,000,000
$18,500,000
$18,500,000
$20,750,000
$20,750,000
$20,750,000
$10,000,000
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
11
9.10
9.14
9.15
9.16
11.00
11.02
11.03
147.00
147.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
11
9.00
9.10
9.10
9.10
11.00
11.00
11.00
147.00
147.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2018
2018
2018
1996
2018
2018
2006
2018
1996
2000
2000
2000
1996
1996
1996
2006
2006
28.9
28.85
28.85
28.85
40.704
40.704
40.704
9
9
33.2
33.162
33.162
33.162
48
48
48
10.505
10.505
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 103: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/103.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 101
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY-363 FROM KY-1006 TO KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)
IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTIONON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770(12CCR)(16CCR)
IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTIONON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770(12CCR)(16CCR)
IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; ANDREDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)
IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; ANDREDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)
REDUCE CONGESTION ON THE HAL ROGERS PARKWAY FROM RELOCATED KY-30 TO KY-192. (18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341)OVER SINKING CREEK 0.56 MILE NW OF SINKING CREEK RD (FD 781) 063C00025N
ADDRESS DEFICIENCIES OF BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SEOF KY 192. (063B00053N)(14CCR)(SD)
REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043RAND B00043L)(SD)
.467
2.024
2.024
2.070
2.070
2.788
.020
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
KY-363
US-25E
US-25E
KY-192
KY-192
HR-9006
CR-1341
KY-312
I-75
$3,000,000
$4,580,000
$6,860,000
$9,500,000
$12,000,000
$9,710,000
$945,000
$1,200,000
$2,800,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
R
U
C
C
D
R
U
C
D
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2020
2021
2018
2018
2022
2023
2021
2022
2022
2023
2019
2020
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
NH
NH
SPP
SPP
NH
NH
NH
NH
NH
NH
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$4,580,000
$6,860,000
$1,000,000
$2,500,000
$6,000,000
$12,000,000
$1,870,000
$2,080,000
$1,250,000
$4,510,000
$175,000
$770,000
$1,200,000
$2,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
11
147.10
185.00
185.01
187.00
187.01
365.00
1094.00
1096.00
1105.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
11
147.00
185.00
185.00
187.00
187.00
365.00
1094.00
1096.00
1105.01
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2012
2018
2012
2018
2018
2012
2014
2016
2006
2012
2012
2012
2012
2018
2012
2014
2016
9.187
0
0
18.35
18.35
1.089
1.071
1.737
30.55
9.654
2.024
2.024
20.42
20.42
3.877
1.111
1.757
30.65
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 104: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/104.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 102
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM KY-1006 TO US-25E. (08CCN)
REPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045) (AREA ADJACENTTO FARISTON INDUSTRIAL PARK WITH NEW ROADWAY ALIGNMENT).(14CCN)(18CCN)
IMPROVE THE HAL ROGERS PARKWAY TO INTERSTATE STANDARDS FROM 4.0MI EAST OF KY 192 TO LAUREL/CLAY CO. LINE. (I-75 TO HAZARD) (16CCN)(18CCR)
ADDRESS DEFICIENCIES OF KY-1223 BRIDGE OVER HORSE CREEK. (063B00007N)
ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER LICK FORK CREEK. (063B00013N)
ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER HOOPPOLE CREEK. (063B00017N)
ADDRESS DEFICIENCIES OF KY 490 BRIDGE OVER ROCKCASTLE RIVER.(063B00004N)
ADDRESS DEFICIENCIES OF KY 638 BRIDGE OVER BIG RACCOON CREEK.(063B00061N)
.080
2.716
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
US-25
CR-1221
HR-9006
KY-1223
KY-80
KY-80
KY-490
KY-638
$3,500,000
$1,343,900
$31,200,000
$553,000
$735,000
$682,500
$2,737,000
$1,022,000
Total
Total
Total
Total
Total
Total
Total
Total
P
D
C
D
R
U
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2022
2019
2021
2022
2023
2024
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
SPP
NH
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$3,000,000
$1,343,900
$1,000,000
$2,200,000
$1,000,000
$27,000,000
$175,000
$378,000
$210,000
$525,000
$175,000
$507,500
$245,000
$2,492,000
$192,500
$829,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
8515.00
8811.00
8909.00
10024.00
10025.00
10026.00
10042.00
10043.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
8515.00
8811.00
8909.00
10024.00
10025.00
10026.00
10042.00
10043.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2014
2016
2018
2018
2018
2018
2018
2008
2014
2016
2018
2018
2018
2018
2018
0
1
7.877
1.241
17.706
22.228
11.502
7.792
10.475
1.08
10.593
1.245
17.71
22.236
11.509
7.814
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / DESIGN ENGINEERING(O)
RELIABILITY / BRIDGE REPLACEMENT(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 105: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/105.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 103
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 3.877
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 29.39 TO MILEPOINT 32.49 (33.2 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-075 CARDINALDIRECTION(S) FROM MILEPOINT 32.485 TO MILEPOINT 32.9
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 41.4 TO MILEPOINT 50.524 (49.87 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 50.524 (49.87 NON-CARDINAL) TO MILEPOINT 50.714
ADDRESS PAVEMENT CONDITION ON KY-490 FROM MILEPOINT 0.00 TOMILEPOINT 6.14
RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).(2014BOP)
SPOT IMPROVEMENTS ON SPANKEM BRANCH ROAD (CR 1044).(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF MAXIE BRANCH RD BRIDGE OVER RT FORK-BLAINECREEK. (064C00076N)
6.140
.318
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAUREL
LAWRENCE
LAWRENCE
LAWRENCE
HR-9006
I-75
I-75
I-75
I-75
KY-490
KY-2565
CR-1044
CR-1234
$3,410,000
$3,300,000
$1,320,000
$12,100,000
$1,100,000
$924,000
$790,000
$500,000
$618,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
C
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2023
2023
2019
2019
2023
2023
2019
2019
2022
2018
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$310,000
$3,100,000
$300,000
$3,000,000
$120,000
$1,200,000
$1,100,000
$11,000,000
$100,000
$1,000,000
$924,000
$790,000
$500,000
$140,000
$478,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
12
12
12
20009.00
20010.00
20011.00
20012.00
20013.00
20023.00
196.10
8951.00
10003.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
12
12
12
20009.00
20010.00
20011.00
20012.00
20013.00
20023.00
196.00
8951.00
10003.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2012
2016
2018
2018
2018
2018
2018
2018
2018
2012
2016
2018
0
29.39
32.485
41.4
50.524
0
1.916
.04
3.877
32.49
32.9
50.524
50.714
6.14
2.234
.052
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 106: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/106.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 104
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 644 BRIDGE OVER LEVISA FORK OF BIG SANDY.(064B00038N)
I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI INOWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY. START AT KY-30 AT LEVI IN OWSLEY MOVING NORTH. (06CCR)(10CCR)(14CCR)(18CCN)
ADDRESS DEFICIENCIES OF GOOSE CREEK RD BRIDGE OVER CSX RAILROAD.(065R00604N)
ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON US-421 OVER STINNETCREEK 0.028 MILE SOUTH OF KY-406 NEAR STINNETT(10CCR)(066B00008N)
ADDRESS DEFICIENCIES OF BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILESOUTH OF TAYLOR MORGAN ROAD (CR 1090).(066B00006N)
ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF CREEK ON COON CREEK ROAD(CR 1528) AT JCT WITH KY 3427 (066C00039N) (EBRP)
ADDRESS DEFICIENCIES OF BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022)OVER BEECH FORK. 066C00048N
ADDRESS DEFICIENCIES OF BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028)OVER MIDDLE FORK KENTUCKY RIVER. 066C00020N
4.200
.100
.014
.012
.012
LAWRENCE
LEE
LEE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
KY-644
KY-11
CR-1124
US-421
US-421
CR-1528
CR-1219
CR-1207
$3,440,500
$22,620,000
$1,015,000
$2,128,000
$612,500
$568,000
$858,000
$805,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
D
C
C
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$560,000
$2,880,500
$22,620,000
$245,000
$770,000
$2,128,000
$612,500
$123,000
$445,000
$245,000
$613,000
$245,000
$560,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
10
10
11
11
11
11
11
10016.00
292.10
10013.00
1078.00
1095.00
1100.00
1104.00
1106.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
OWSLEY
12
10
10
11
11
11
11
11
10016.00
292.00
10013.00
1078.00
1095.00
1100.00
1104.00
1106.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2004
2018
2008
2014
2014
2016
2016
2018
1996
2018
2008
2014
2014
2016
2016
1.468
0
0
15.137
18.423
0
.016
.022
1.558
1.082
.013
15.177
18.437
.012
.028
.034
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
14.343 17.444Milepoints: To:From:
![Page 107: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/107.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 105
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERSPARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)(18CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929 TO MP 44.188(SEGMENT 9). (16CCN)(18CCN)
UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT 10). (16CCN)(18CCN)
CONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH KY 80.(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-1780 BRIDGE OVER BEECH FORK. (066B00027N)
ADDRESS DEFICIENCIES OF KY-699 BRIDGE OVER MAGGARDS BRANCH.(066B00031N)
ADDRESS DEFICIENCIES OF KY-2431 BRIDGE OVER MIDDLE FORK OF KY RIVER.(066B00039N)
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
KY-1482
HR-9006
HR-9006
US-421
KY-1780
KY-699
KY-2431
$7,640,000
$116,400,000
$79,600,000
$2,050,000
$1,067,500
$700,000
$1,655,000
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
C
D
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2022
2023
2021
2022
2022
2023
2021
2022
2022
2024
2021
2022
2022
2023
2019
2020
2019
2020
2021
2022
2022
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$920,000
$420,000
$5,300,000
$1,000,000
$12,000,000
$9,000,000
$94,400,000
$1,000,000
$10,000,000
$7,000,000
$61,600,000
$500,000
$100,000
$250,000
$1,200,000
$210,000
$857,500
$175,000
$525,000
$300,000
$75,000
$180,000
$1,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
8516.00
8912.00
8913.00
8951.00
10027.00
10028.00
10029.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
8516.00
8912.00
8913.00
8951.00
10027.00
10028.00
10029.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2016
2016
2016
2018
2018
2018
2008
2016
2016
2016
2018
2018
2018
.09
35.929
44.188
44.188
14.276
8.134
.008
.19
44.188
51.026
51.026
14.288
8.138
.062
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / CONGESTION MITIGTN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 108: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/108.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 106
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF CR-1006 BRIDGE OVER RACCOON CREEK.(066C00002N)
ADDRESS DEFICIENCIES OF CR-1271 BRIDGE OVER MIDDLE FK KENTUCKY RVR.(066C00023N)
SAFETY IMPROVEMENTS ON KY 3424 FROM MP 1.1 TO MP 1.5.(18CCN)
INSTALL NEW GUARDRAIL ON KY 2009 FROM MP 13.418 TO MP 14.767.(18CCN)
INSTALL NEW GUARDRAIL ON KY 1482 FROM MP 0 TO MP 1.9.(18CCN)
INSTALL NEW GUARDRAIL ON KY 257 FROM MP 5.723 TO MP 5.853.(18CCN)
INSTALL NEW GUARDRAIL ON KY 1807 FROM MP 0.914 TO MP 1.256.(18CCN)
CONSTRUCT A SECONDARY RUNAWAY TRUCK RAMP ON KY 118 (HYDEN SPUR)JUST BEFORE THE INTERSECTION WITH KY 80/US 421 TO INCLUDE A NEW BOXCULVERT OR BRIDGE AT THE INTERSECTION(18CCN)
IMPROVE US-119 FROM NORTH OF KY-15 TO BRASS DRIVE(SOUTH).(16CCN)(18CCR)
.400
1.349
1.900
.130
.342
.078
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LESLIE
LETCHER
CR-1006
CR-1271
KY-3424
KY-2009
KY-1482
KY-257
KY-1807
KY-118
US-119
$644,000
$735,000
$1,300,000
$500,000
$107,000
$22,000
$45,000
$2,050,000
$2,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
C
C
D
R
U
C
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2021
2021
2021
2021
2021
2021
2022
2022
2022
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$192,500
$451,500
$210,000
$525,000
$1,300,000
$500,000
$107,000
$22,000
$45,000
$400,000
$300,000
$50,000
$1,300,000
$1,300,000
$1,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
12
10030.00
10031.00
80002.00
80003.00
80004.00
80005.00
80006.00
80007.00
199.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
12
10030.00
10031.00
80002.00
80003.00
80004.00
80005.00
80006.00
80007.00
199.10
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2016
2018
2018
2018
2018
2018
2018
2018
2018
2016
.006
.056
1.1
13.418
0
5.723
.914
.02
17.005
.016
.066
1.5
14.767
1.9
5.853
1.256
.1
19.038
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 109: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/109.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 107
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-119 FROM NORTH OF KY-15 TO THE KY 2034/COUGAR DRIVEINTERSECTION.(16CCN)(SEE 12-199.10 FOR D, R, U)
IMPROVE US-119 FROM KY 2034/COUGAR DRIVE TO BRASS DRIVE(SOUTH).(16CCN)(SEE 12-199.10 FOR D, R, U)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 EOF US 119 067B00121N
ADDRESS DEFICIENCIES OF BRIDGE OVER POOR FORK OF CUMBERLAND RIVERON KY 3404 100 FT SOUTH OF US 119. (067B00114N)
ADDRESS DEFICIENCIES OF BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01)OVER COWAN CREEK. 067C00021N
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK.067C00020N
ADDRESS DEFICIENCIES OF KY-805 BRIDGE OVER POTTERS FORK. (067B00022N)
ADDRESS DEFICIENCIES OF KY-2034 BRIDGE OVER CRAFTS COLLY CREEK.(067B00069N)
ADDRESS DEFICIENCIES OF CORNFIELD DR BRIDGE OVER BOONE FORK.(067C00004N)
.750
.040
.012
.008
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
US-119
US-119
KY-2034C
KY-3404
CR-1226
CR-1225
KY-805
KY-2034
CR-1433
$1,000,000
$6,000,000
$973,000
$420,000
$385,000
$805,000
$826,840
$546,105
$567,840
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2021
2018
2020
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$6,000,000
$973,000
$420,000
$385,000
$420,000
$385,000
$210,000
$616,840
$140,000
$406,105
$140,000
$427,840
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
12
199.11
199.15
1113.00
1120.00
1125.00
1126.00
10004.00
10005.00
10006.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
12
199.11
199.15
1113.00
1120.00
1125.00
1126.00
10004.00
10005.00
10006.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2012
2014
2016
2016
2018
2018
2018
2016
2016
2012
2014
2016
2016
2018
2018
2018
17.15
17.964
.006
.782
.006
.03
2.989
2.369
.005
17.9
18.826
.046
.794
.014
.038
2.997
2.375
.015
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 110: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/110.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 108
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF TURKEY CRK BRIDGE OVER TURKEY CREEK.(067C00050N)(SD)
ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER CSX RR & N FK KY RIVER.(067B00038N)
ADDRESS DEFICIENCIES OF KY 343 BRIDGE OVER WRIGHT FORK. (067B00078N)
ADDRESS DEFICIENCIES OF E POTTER RD BRIDGE OVER YONTS FORK.(067C00007N)
ADDRESS DEFICIENCIES OF HOLBROOK TOWN BRIDGE OVER N.FK.KENTUCKYRVR. (067C00017N)
ADDRESS DEFICIENCIES OF PARADISE LN BRIDGE OVER KINGDOM COMECREEK. (067C00051N)
ADDRESS DEFICIENCIES OF ORCHARD RD BRIDGE OVER NORTH FORK KYRIVER. (067C00065N)
ADDRESS PAVEMENT CONDITION ON US-119 FROM MILEPOINT 17.00 TOMILEPOINT 22.63
5.630
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
LETCHER
CR-1386
KY-7
KY-343
CS-3000
CR-1149
CR-1799
CR-1737
US-119
$872,000
$5,425,000
$553,560
$529,900
$726,810
$409,500
$865,900
$1,477,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$697,000
$525,000
$4,900,000
$175,000
$378,560
$157,500
$372,400
$210,000
$516,810
$140,000
$269,500
$210,000
$655,900
$1,477,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
10007.00
10017.00
10018.00
10019.00
10020.00
10021.00
10022.00
20005.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
10007.00
10017.00
10018.00
10019.00
10020.00
10021.00
10022.00
20005.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.003
2.602
.458
.03
.049
.006
.02
17
.025
2.68
.464
.038
.061
.012
.034
22.63
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 111: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/111.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 109
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RECONSTRUCT KY-59 FROM KY-9 (AA) IN VANCEBURG TO JUNCTION OF KY-344MP 18.1 TO MP 23.19.(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OFDEEP HOLE BRANCH ROAD (CR 1125).(068B00057N)(16CCR)(SD)
CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKINGRIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)
RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICKROAD.(16CCN)(18CCN)
RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE.(14CCN)(16CCR)(18CCN)
ADDRESS DEFICIENCIES OF KY-344 BRIDGE OVER GRASSY BRANCH. (068B00015N)
ADDRESS DEFICIENCIES OF KY 1021 BRIDGE OVER BRIERY CREEK. (068B00075N)
ADDRESS PAVEMENT CONDITION
5.090
.020
4.057
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
LEWIS
KY-59
KY-1068
KY-57
KY-8
KY-57
KY-344
KY-1021
KY-9
$54,000,000
$1,050,000
$3,640,000
$500,000
$30,700,000
$1,890,000
$1,172,500
$2,310,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
C
D
D
R
U
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2024
2018
2018
2019
2019
2021
2022
2023
2023
2024
2019
2020
2019
2020
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$6,000,000
$5,000,000
$3,000,000
$40,000,000
$75,000
$75,000
$900,000
$3,640,000
$500,000
$2,100,000
$5,200,000
$3,400,000
$20,000,000
$350,000
$1,540,000
$315,000
$857,500
$210,000
$2,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
231.00
1090.00
8507.00
8806.10
8807.00
10010.00
10023.00
20010.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
ROWAN
FLEMING
09
09
09
09
09
09
09
09
231.00
1090.00
8507.00
8806.10
8807.00
10010.00
10023.00
20010.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2014
2008
2016
2014
2018
2018
2018
2016
2014
2008
2016
2014
2018
2018
2018
18.1
1.74
0
24.016
.5
18.474
3.648
21.027
23.19
1.76
.031
28.95
4.557
18.488
3.654
25.532
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
8.952 9.012
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 112: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/112.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 110
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION ON KY-9 FROM MILEPOINT 15.77 TOMILEPOINT 21.03
US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY ANDREDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.
US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY ANDREDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.
IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEWGOSHEN CUT-OFF ROAD)(2005HPP-KY115)(18CCR)
IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEWGOSHEN CUT-OFF ROAD)(2005HPP-KY115)(18CCR)
REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4)069B00055N
REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N
NEW TURNING LANE AT ARCADIA VIEW DRIVE(18CCN)
5.260
4.712
4.712
.700
.700
.040
LEWIS
LINCOLN
LINCOLN
LINCOLN
LINCOLN
LINCOLN
LINCOLN
LINCOLN
KY-9
US-27
US-27
US-27
US-27
KY-1247
CR-1043
US-127
$1,070,000
$7,720,000
$11,580,000
$5,750,000
$3,250,000
$567,000
$672,000
$1,000,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
R
U
R
U
C
C
C
D
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2022
2022
2023
2023
2019
2019
2020
2021
2018
2019
2020
2019
2019
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
NH
NH
NH
NH
NH
NH
NH
NH
BR
BR
BR
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,070,000
$4,720,000
$3,000,000
$7,080,000
$4,500,000
$1,400,000
$1,100,000
$3,250,000
$3,250,000
$567,000
$175,000
$497,000
$100,000
$50,000
$50,000
$800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
08
08
08
08
08
08
08
20017.00
167.00
167.01
196.00
196.01
1055.00
1066.00
80000.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
08
08
08
08
08
08
08
20017.00
167.00
167.00
196.00
196.00
1055.00
1066.00
80000.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2018
2014
2018
2012
2018
2018
2018
2012
2012
2014
2014
2012
2018
2018
15.77
11.169
11.169
18.155
18.2
17.67
.635
9.6
21.03
15.881
15.881
18.865
18.9
17.71
.651
9.74
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW INTERCHANGE(O)
![Page 113: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/113.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 111
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
US 150 NEW TURNING LANE NEAR HOBBLE ROAD AND CRAWFORD LANE(18CCN)
US 127 NEW TURNING LANE AT KY 1194(18CCN)
ADD A TURNING LANE ON US 150 AT WILDERNESS TRAIL ROAD(18CCN)
EXPAND US-27 TO FOUR LANES FROM THE WALMART IN STANFORD TO THE DIXRIVER(18CCN)
PADUCAH-HENDERSON; RELOCATE US-60 FROM EAST OF THE TENNESSEE RIVERBRIDGE TO EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)(14CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER0.27 MILE N OF KY 70 070B00017N.
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER0.27 MILE N OF KY 70 (SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 29.543 TO MILEPOINT 33.88
3.300
.344
.344
LINCOLN
LINCOLN
LINCOLN
LINCOLN
LIVINGSTON
LIVINGSTON
LIVINGSTON
LIVINGSTON
US-150
US-127
US-150
US-27
US-60
US-60
US-60
I-24
$500,000
$1,000,000
$500,000
$40,400,000
$3,140,000
$16,000,000
$16,000,000
$3,850,000
Total
Total
Total
Total
Total
Total
Total
Total
D
U
C
D
R
U
C
D
U
C
D
R
U
C
R
U
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2018
2019
2019
2019
2019
2019
2019
2019
2021
2022
2023
2024
2021
2021
2019
2020
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
NH
NH
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$50,000
$350,000
$100,000
$50,000
$50,000
$800,000
$100,000
$50,000
$350,000
$2,100,000
$7,500,000
$6,500,000
$24,300,000
$1,580,000
$1,560,000
$16,000,000
$16,000,000
$350,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
01
01
01
01
80001.00
80002.00
80008.00
80009.00
330.00
1142.00
1142.01
20007.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
08
01
01
01
01
80001.00
80002.00
80008.00
80009.00
330.00
1142.00
1142.00
20007.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
1998
2018
2016
2018
2018
2018
2018
2018
1998
2018
2018
2018
2.485
6.85
1.5
18.521
.891
12.524
12.524
29.543
2.521
6.95
1.6
20.8
4.2
12.868
12.868
33.88
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / NEW INTERCHANGE(O)
SAFETY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RELOCATION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 114: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/114.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 112
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION ON KY-453 FROM MILEPOINT 0.00 TOMILEPOINT 4.57
IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEENSTOCKYARDS AND INDUSTRIAL PARK. (16CCN)(18CCN)
IMPROVE SAFETY AND BRIDGE CONDITION ON WHIPPORWILL CREEK BRIDGENEAR KY-1151. BRIDGE ID 071B00025 (SD)
WIDEN US-79 TO 3 LANES FROM TODD COUNTY LINE TO INTERSECTION WITHRUSSELLVILLE BYPASS.(18CCN)
ADD RESTROOM FACILITY TO I-24 EASTBOUND & WESTBOUND WEIGH STATIONSIN LYON COUNTY (DESIGN FUNDS AUTHORIZED UNDER ITEM NO. 99-44.00)
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE.
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE.
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THELYON/CALDWELL COUNTY LINE. (ADDITIONAL FUNDING FOR 1-187.50)
4.570
.100
4.250
4.250
LIVINGSTON
LOGAN
LOGAN
LOGAN
LYON
LYON
LYON
LYON
KY-453
KY-2349
US-79
US-79
I-24
US-641
US-641
US-641
$879,000
$1,250,000
$1,965,000
$49,600,000
$1,900,000
$11,000,000
$8,500,000
$6,000,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
C
D
R
U
C
C
D
R
U
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2021
2022
2022
2023
2019
2020
2021
2022
2023
2024
2023
2019
2020
2020
2022
2021
2021
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
SPP
SPP
SPP
SPP
BR
BR
STP
STP
STP
STP
NH
NH
NH
NH
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$879,000
$150,000
$100,000
$150,000
$850,000
$250,000
$1,715,000
$4,300,000
$6,500,000
$10,700,000
$28,100,000
$1,900,000
$2,500,000
$2,000,000
$500,000
$6,000,000
$2,000,000
$500,000
$6,000,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
03
03
03
01
01
01
01
20030.00
8908.00
10010.00
80050.00
7.00
187.50
187.51
187.52
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
03
03
03
01
01
01
01
20030.00
8908.00
10010.00
80050.00
7.00
187.50
187.50
187.50
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2016
2018
2018
2000
2006
2018
2018
2018
2016
2018
2018
2000
2006
2006
2006
0
.3
4.35
0
35.8
0
0
0
4.57
.5
4.85
10.713
35.9
4.548
4.548
4.548
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / WEIGH STA REHAB(P)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 115: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/115.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 113
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES.
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES.
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TOFREDONIA, 4.5 MILES. (ADDITIONAL FUNDING FOR 1-187.60)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 33.988 TO MILEPOINT 45.133
ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROMMILEPOINT 45.133 TO MILEPOINT 51.886
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINALDIRECTION(S) FROM MILEPOINT 45.171 TO MILEPOINT 51
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTHDIRECTION(S) FROM MILEPOINT 51.89 (51.0 NON-CARDINAL) TO MILEPOINT 54.862
CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TOKY-21. PHASE 1 - BEREA BYPASS FROM US-25 TO KY-1016.(2004BOPC)(08CCR)(12CCR)(18CCN)
4.500
4.500
4.500
3.600
LYON
LYON
LYON
LYON
LYON
LYON
LYON
MADISON
US-641
US-641
US-641
I-24
I-24
I-24
I-24
-
$12,100,000
$10,300,000
$7,500,000
$9,900,000
$2,970,000
$3,300,000
$4,400,000
$12,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
R
U
C
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2022
2021
2021
2023
2024
2024
2024
2020
2020
2024
2024
2024
2024
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
STP
NH
NH
STP
STP
PM
PM
PM
PM
PM
PM
PM
PM
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,800,000
$2,000,000
$800,000
$7,500,000
$2,000,000
$800,000
$7,500,000
$7,500,000
$900,000
$9,000,000
$270,000
$2,700,000
$300,000
$3,000,000
$400,000
$4,000,000
$12,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
01
07
187.60
187.61
187.62
20008.00
20009.00
20010.00
20011.00
192.20
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CALDWELL
CALDWELL
CALDWELL
01
01
01
01
01
01
01
07
187.60
187.60
187.60
20008.00
20009.00
20010.00
20011.00
192.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2018
2018
2004
2016
2016
2016
2018
2018
2018
2018
2000
4.548
4.548
4.548
33.988
45.133
45.171
51.89
5.715
5.715
5.715
45.133
51.886
51
54.862
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / NEW ROUTE(O)
0
0
0
4.187
4.187
4.187
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
From:
From:
From:
![Page 116: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/116.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 114
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TOKY-21. PHASE 2 - BEREA BYPASS FROM KY-1016 TO KY-21.(2004BOPC)(08CCR)(12CCR)(18CCN)
IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THEDUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR)(DESIGN/BUILD)(16CCR)(18CCR)
IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THEDUNCANNON ROAD INTERCHANGE. (DESIGN/BUILD) (18CCN)
IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THEDUNCANNON ROAD INTERCHANGE.(DESIGN/BUILD) (18CCN)
COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET ANDBEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA).(16CCR)(LET BY CITY)
WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN ANDPLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THEMADISON COUNTY FISCAL COURT, WHICH SHALL COORDINATE THE PROJECT.(2005HPP-KY110)(06CCR)
PRIORITY SECTION II & III: WIDEN US-25 FROM US-421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421)OVER COWBELL CREEK AT JCT WITH HIGHWAY 21 E (KY 21)076B00021
ADDRESS DEFICIENCIES OF BRIDGE ON OLD HAYS FORK LN (CR 1158) OVERBRANCH OF HAYS FORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)076C00023N
6.845
6.845
3.500
2.980
.040
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
-
KY-52
KY-52
KY-52
KY-595
US-25
US-25
US-421
CR-1158
$12,000,000
$12,000,000
$9,000,000
$10,000,000
$266,952
$719,921
$3,750,000
$805,000
$336,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
C
C
C
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2020
2020
2021
2022
2018
2018
2024
2018
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
HPP
HPP
NH
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$12,000,000
$4,000,000
$4,000,000
$4,000,000
$9,000,000
$10,000,000
$266,952
$719,921
$3,750,000
$90,000
$90,000
$625,000
$336,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
192.21
235.00
235.10
235.20
236.00
251.01
251.40
1130.00
1131.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
192.00
235.00
235.00
235.00
236.00
251.01
251.50
1130.00
1131.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2002
2018
2018
2004
2004
2006
2018
2018
2000
2002
2002
2002
2004
2004
2004
2018
2018
1.17
1.17
1.17
2.565
11.903
11.903
2.443
.252
8.015
8.015
8.015
2.665
15.442
14.883
2.483
.292
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / SCOPING STUDY(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 117: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/117.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 115
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376IN BEREA 200 FT N OF PEACHTREE DRIVE (CS 2072).(076B00085N)
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK.076C00004N (SD)
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDYCREEK. 076C00066N
IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75.(INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)(18CCR)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75.(INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)(18CCR)
IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSESTREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS.(08CCN)(10CCR)(12CCR)(LET BY KYTC)
PROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO THEMADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881 MP.783-MP 2.780),JOHN BALLARD RD (KY 2877 MP0-MP.806 & CR 1236 MP0-MP.429) FROM MENELAUSTO AIRPORT RD, & A NEW BRIDGE OVER SILVER CR.(14CCN)(16CCR)
ADDRESS DEFICIENCIES OF KY-1984 BRIDGE OVER TATES CREEK. (076B00071N)
.020
.120
.120
1.212
3.232
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
MADISON
KY-3376
CR-1017
CR-1044
KY-627
KY-627
US-25
KY-2881
KY-1984
$1,067,500
$610,000
$665,000
$5,000,000
$5,000,000
$7,200,000
$13,200,000
$875,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
C
C
D
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2018
2019
2018
2019
2020
2021
2022
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
NH
NH
SPP
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$857,500
$190,000
$420,000
$210,000
$455,000
$5,000,000
$5,000,000
$7,200,000
$1,000,000
$500,000
$2,700,000
$9,000,000
$210,000
$665,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
1137.00
1142.00
1143.00
8403.00
8403.01
8505.00
8853.00
10001.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
1137.00
1142.00
1143.00
8403.00
8403.00
8505.00
8853.00
10001.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2008
2018
2008
2014
2018
2018
2018
2018
2008
2008
2008
2014
2018
.279
3.397
.003
.073
.073
4.644
.783
2.029
.299
3.413
.011
.193
.193
5.856
2.78
2.041
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 118: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/118.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 116
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER E. FK. OTTER CREEK.(076C00011N)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 73.408 TO MILEPOINT 83.4
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCR)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)
IMPROVE US-460 IN MAGOFFIN COUNTY AT IVY POINT HILL WEST OFSALYERSVILLE. (16CCN)
ADDRESS DEFICIENCIES OF KY-1635 BRIDGE OVER OAKLEY CREEK. (077B00029N)
ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER LICKING RIVER. (077B00059N)
4.600
4.600
4.600
4.600
.700
MADISON
MADISON
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
CR-1056
I-75
KY-9009
KY-9009
KY-9009
KY-9009
US-460
KY-1635
KY-30
$875,000
$13,200,000
$15,000,000
$10,000,000
$30,000,000
$25,000,000
$4,370,000
$735,000
$1,120,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
C
R
U
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2021
2019
2020
2021
2022
2022
2022
2024
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
NH
NH
NH
NH
STP
STP
STP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$665,000
$1,200,000
$12,000,000
$15,000,000
$10,000,000
$30,000,000
$25,000,000
$1,660,000
$220,000
$2,490,000
$140,000
$595,000
$175,000
$945,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
10
10
10
10
10
10
10
10002.00
20017.00
126.40
126.41
126.42
126.43
8901.00
10002.00
10003.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
10
10
10
10
10
10
10
10002.00
20017.00
126.03
126.40
126.40
126.40
8901.00
10002.00
10003.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
1998
2016
2016
2018
2016
2018
2018
2018
2018
1996
1998
1998
1998
2016
2018
2018
1.775
73.408
65
65
65
65
10
5.613
10.91
1.789
83.4
69.6
69.6
69.6
69.6
10.7
5.621
10.944
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 119: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/119.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 117
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY 3049 BRIDGE OVER JOHNSON CREEK.(077B00069N)
ADDRESS DEFICIENCIES OF WHITE BRANCH BRIDGE OVER STATE ROAD FORK.(077C00036N)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 63.123 TO MILEPOINT 69.98
ADDRESS PAVEMENT CONDITION ON US-460 FROM MILEPOINT 14.57 TOMILEPOINT 20.37
SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO MP 21.830) AS PER THE KY-49PLANNING STUDY. (14CCN)(18CCN)
IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON KY-49 NEAR SOUTHERN KY-52 INTERSECTION. (14CCN)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 84 OVER HARDINS CREEK.(16CCN)(078B00025N)
HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TOBOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)
HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TOBOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)
5.800
.930
1.630
MAGOFFIN
MAGOFFIN
MAGOFFIN
MAGOFFIN
MARION
MARION
MARION
MARION
MARION
KY-3049
CR-1032
KY-9009
US-460
KY-49
KY-49
KY-84
KY-55
KY-55
$577,500
$612,500
$4,400,000
$1,485,000
$3,900,000
$3,300,000
$710,500
$5,700,000
$4,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
R
U
C
C
D
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2020
2020
2022
2020
2021
2023
2020
2018
2019
2019
2019
2022
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
SPP
SPP
SPP
SPP
BR
BR
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$402,500
$175,000
$437,500
$400,000
$4,000,000
$1,485,000
$800,000
$700,000
$2,400,000
$3,300,000
$94,500
$616,000
$350,000
$350,000
$5,000,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
04
04
04
04
04
10014.00
10015.00
20000.00
20013.00
8802.00
8803.00
8914.00
8916.00
8916.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WASHINGTON
WASHINGTON
10
10
10
10
04
04
04
04
04
10014.00
10015.00
20000.00
20013.00
8802.00
8803.00
8914.00
8916.00
8916.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2014
2014
2016
2016
2018
2018
2018
2018
2018
2014
2014
2016
2016
2016
.005
.022
63.123
14.57
20.9
23.35
13.176
1.866
1.866
.009
.026
69.98
20.37
21.83
24.98
13.192
4.669
4.669
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / SPOT IMPROVEMENTS(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)0
0
3.485
3.485
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 120: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/120.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 118
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANONBYPASS.(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF WHITE OAK CRK RD BRIDGE OVER WHITE OAKCREEK. (078C00035N)
IMPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM KY-95 TO THEEXISTING FOUR-LANE HIGHWAY AT LONE VALLEY RD NEAR I-24 INTERCHANGEAND FUTURE I-69 CONNECTION.
ADDRESS DEFICIENCIES OF KY-1949 BRIDGE OVER SMITH CREEK. (079B00110N)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 17.32 TO MILEPOINT 29.14
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUSTBEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDONHOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASEMOTORIST AND PEDESTRIAN SAFETY. (12CCR)
ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON PR-1015 OVERROCKCASTLE CREEK (C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKEDRUN ROAD. (080C00026N)
.200
MARION
MARION
MARSHALL
MARSHALL
MARSHALL
MARSHALL
MARTIN
MARTIN
US-68
CR-1127
US-62
KY-1949
I-24
US-641
KY-40
CR-1324
$13,400,000
$315,000
$5,000,000
$705,000
$10,450,000
$825,000
$1,460,000
$60,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
C
D
R
U
C
D
C
D
C
D
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2023
2024
2024
2019
2020
2021
2023
2023
2024
2019
2021
2023
2023
2019
2019
2024
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
STP
STP
STP
STP
BR
BR
PM
PM
PM
PM
SPP
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$600,000
$900,000
$900,000
$11,000,000
$98,000
$217,000
$750,000
$250,000
$500,000
$3,500,000
$250,000
$455,000
$950,000
$9,500,000
$75,000
$750,000
$1,460,000
$60,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
01
01
01
01
12
12
8917.00
10003.00
398.00
10003.00
20013.00
20016.00
192.00
1092.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
01
01
01
01
12
12
8917.00
10003.00
398.00
10003.00
20013.00
20016.00
192.00
1092.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2018
2012
2008
2016
2018
2018
2018
2018
2018
2012
2008
0
.149
7.2
7.319
17.32
7.981
18.2
0
9.364
.155
8.497
7.329
29.14
8.824
18.4
.028
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 121: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/121.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 119
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
SETSER BRANCH ROAD BRIDGE AND APPROACHES OVER MIDDLE FORK OFROCKCASTLE CREEK (C43) (OFF NHS) (FD04) (2000BOP): (080C00043N)
ADDRESS DEFICIENCIES OF WILLIS DIALS RD BRIDGE OVER PIGEONROOSTFORK. (080C00053N)
ADDRESS PAVEMENT CONDITION ON KY-645 FROM MILEPOINT 0.00 TOMILEPOINT 6.11
NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTONEAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITYSECTION)(2004BOPC)(06CCR)(18CCN)
NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AAHWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)(18CCN)
REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056.(081B00067N)(16CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCECREEK. (16CCN)(081B00020N)
ADDRESS DEFICIENCIES OF THE BRIDGE ON DAVIS LANE. (16CCN)(081C00022N)
ADDRESS DEFICIENCIES OF THE BRIDGE ON KENNEDY CREEK ROAD.(16CCN)(081C00009N)
.100
6.110
2.700
2.900
.400
MARTIN
MARTIN
MARTIN
MASON
MASON
MASON
MASON
MASON
MASON
CR-1215
CR-1120
KY-645
US-68
US-68
US-68
KY-3056
CR-1124
CR-1019
$350,000
$625,380
$2,015,000
$36,630,000
$37,930,000
$1,400,000
$1,120,000
$875,000
$560,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
C
D
R
U
C
D
R
U
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2019
2020
2022
2021
2023
2023
2024
2021
2022
2022
2024
2018
2020
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
BR
BR
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$350,000
$157,500
$467,880
$2,015,000
$780,000
$1,580,000
$1,820,000
$32,450,000
$780,000
$1,580,000
$1,820,000
$33,750,000
$1,400,000
$1,120,000
$875,000
$560,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
09
09
09
09
09
09
4093.00
10023.00
20006.00
147.20
147.60
1095.00
8906.00
8910.00
8911.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
99
12
12
09
09
09
09
09
09
335.00
10023.00
20006.00
147.11
147.11
1095.00
8906.00
8910.00
8911.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2018
2018
2004
2004
2016
2016
2016
2016
1998
2018
2018
1998
1998
2016
2016
2016
2016
.03
.091
0
16.8
3.679
.007
.189
.07
.101
6.11
17.2
3.685
.029
.197
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 122: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/122.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 120
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)(SD)
ADDRESS DEFICIENCIES ON WILLIAM HARSHA BRIDGE OVER THE OHIO RIVER.JOINT PROJECT WITH OHIO. (081B00069N)(BSBP)(SD)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITHILLINOIS TO MITIGATE SCOUR (073B00100N)(BSBP)(SD)
PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)(18CCR)
PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)(18CCR)
MAJOR WIDENING OF US-62 FROM KY-998 TO PADUCAH INFORMATION AGEPARK. (12CCR)
IMPROVE KY-1286 (FRIENDSHIP ROAD) FROM MP 3.6 TO MP 6.4 IN PADUCAH.(PRELIMINARY ENGINEERING) (12CCR)(14CCR)(16CCN)(18CCR)
CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US-60 AT THEI-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.
1.000
1.600
1.600
.957
2.800
.407
MASON
MASON
MASON
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
CR-1122
US-68
US-68
I-24
US-60
US-60
US-62
KY-1286
US-60
$60,000
$2,900,000
$9,075,000
$260,000
$4,030,000
$1,320,000
$8,080,000
$16,290,000
$3,960,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
C
C
R
U
R
U
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2020
2020
2020
2019
2022
2019
2019
2021
2019
2020
2024
2024
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
PM
PM
BR
NH
NH
NH
SPP
SPP
SPP
SPP
SPP
SPP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$60,000
$100,000
$2,800,000
$825,000
$8,250,000
$260,000
$1,320,000
$2,710,000
$1,320,000
$2,340,000
$5,740,000
$1,500,000
$2,480,000
$2,310,000
$10,000,000
$3,960,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
01
01
01
01
01
01
8916.00
10013.00
20011.00
2.00
115.10
115.11
152.00
153.00
154.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
09
09
01
01
01
01
01
01
8916.00
10013.00
20011.00
2.00
115.10
115.10
152.00
153.00
154.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
1998
2018
2012
2016
2014
2016
2018
2018
2018
1998
1998
2012
2016
2014
1.576
18.045
0
0
.4
.4
7.851
3.623
10.484
1.594
18.457
10.3
1.067
1.968
1.968
8.808
6.423
10.891
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)
![Page 123: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/123.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 121
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILENORTH OF KY 348 (073B00096N) .
ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY994 0.8 MI NW OF KY 348 (073B00015N)(EBRP)
NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIORIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)(14CCR)(18CCN)
ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER OHIO RIVER. JOINT PROJECTWITH ILLINOIS. (073B00100N)(BSBP)(SD)
ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING ON I-24 BRIDGE OVER THEOHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B000100N)(BSBP)(SD)
ADDRESS DEFICIENCIES OF KY 339 BRIDGE OVER MASSAC CREEK. (073B00058N)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROMMILEPOINT 16.172 TO MILEPOINT 17.32
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 2.22 TO MILEPOINT7.70
.022
.038
5.480
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
MCCRACKEN
KY-1954
KY-994
KY-305
I-24
I-24
KY-339
I-24
US-45
US-60
$574,000
$959,000
$23,680,000
$2,000,000
$375,000
$1,102,500
$1,100,000
$1,100,000
$853,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
R
U
C
C
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2019
2020
2021
2023
2024
2020
2019
2019
2020
2023
2023
2019
2019
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$574,000
$168,000
$791,000
$4,200,000
$3,250,000
$16,230,000
$2,000,000
$375,000
$210,000
$892,500
$100,000
$1,000,000
$100,000
$1,000,000
$853,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
01
01
01
1152.00
1154.00
8702.00
10006.00
10007.00
10012.00
20017.00
20019.00
20031.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
01
01
01
01
01
01
1152.00
1154.00
8702.00
10006.00
10007.00
10012.00
20017.00
20019.00
20031.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2012
2018
2018
2018
2018
2018
2018
2018
2018
2012
2018
2018
2018
2018
2018
2018
.768
2.27
0
0
5.387
16.172
10.33
2.22
.79
2.308
1
1
5.403
17.32
10.806
7.7
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 124: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/124.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 122
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARYCOUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)
ADDRESS DEFICIENCIES OF KY-1044 BRIDGE OVER MARSH CREEK. (074B00023N)
ADDRESS DEFICIENCIES OF KY-700 BRIDGE OVER INDIAN CREEK. (074B00026N)
ADDRESS DEFICIENCIES OF KY-478 BRIDGE OVER MARSH CREEK. (074B00027N)
ADDRESS DEFICIENCIES OF OVERFLOW STRUCTURE ON US-431 AT THEMUHLENBERG-MCLEAN CO LINE B00056N.
ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF POND DRAIN CREEK ONKY 2385 0.9 MI SW OF KY 81 (075B00066N)
4.566
4.566
.040
.142
.080
MCCREARY
MCCREARY
MCCREARY
MCCREARY
MCCREARY
MCCREARY
MCCREARY
MCLEAN
MCLEAN
KY-92
KY-92
KY-92
CR-1239
KY-1044
KY-700
KY-478
US-431
KY-2385
$8,000,000
$7,000,000
$9,000,000
$644,000
$626,500
$1,365,000
$696,500
$2,500,000
$1,092,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
D
C
D
C
D
C
D
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2019
2020
2019
2020
2019
2020
2019
2020
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$8,000,000
$7,000,000
$9,000,000
$196,000
$448,000
$175,000
$451,500
$210,000
$1,155,000
$175,000
$521,500
$2,500,000
$308,000
$784,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
08
08
08
02
02
261.30
261.31
261.32
1065.00
10002.00
10003.00
10004.00
1078.00
1090.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
WHITLEY
MUHLENBERG
11
08
08
08
08
08
08
02
02
184.20
261.31
261.32
1065.00
10002.00
10003.00
10004.00
1078.00
1090.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2018
2018
2018
2018
2018
2018
2018
2018
2014
2018
2018
2018
2018
2018
2018
2018
2018
20.335
20.335
20.335
.25
4.385
14.059
8.388
0
3.5
24.835
24.835
24.835
.29
4.399
14.091
8.404
.071
3.58
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
0
28.273
.066
28.344
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 125: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/125.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 123
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250.(08CCN)(12CCR)(18CCN)
CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233.(14CCN)(18CCN)
ADDRESS DEFICIENCIES OF US-431 BRIDGE OVER DRAIN TO CYPRESS CREEK.(075B00019N)
ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER SLOUGH. (075B00026N)
ADDRESS DEFICIENCIES OF CULVERT OVER UNNAMED STREAM ON KY 823 0.5MILE WEST OF KY 2734.(082B00008N)
RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)(18CCN)
RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)(18CCN)
RESURFACING AND WIDENING EXISTING GRAVEL PARKING PULL-OFFS ANDINSTALLATION OF GUARDRAIL ALONG KY 77 AND KY 715 IN THE RED RIVERGORGE AREA IN MENIFEE, POWELL, AND WOLFE COUNTIES. (2016BOP)
.100
.120
.010
3.148
3.826
MCLEAN
MCLEAN
MCLEAN
MCLEAN
MEADE
MEADE
MEADE
MENIFEE
US-431
KY-56
US-431
KY-81
KY-823
KY-79
KY-79
KY-77
$880,000
$450,000
$3,290,000
$1,137,500
$665,000
$17,470,000
$15,560,000
$765,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
D
C
D
C
D
C
D
R
U
C
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2020
2020
2019
2020
2019
2020
2019
2020
2021
2023
2024
2024
2021
2023
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
SPP
SPP
SPP
SPP
SPP
SPP
FH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$180,000
$500,000
$450,000
$280,000
$3,010,000
$245,000
$892,500
$105,000
$560,000
$1,040,000
$3,250,000
$1,770,000
$11,410,000
$2,030,000
$13,530,000
$765,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
04
04
04
10
8400.00
8852.00
10007.00
10008.00
1088.00
8702.00
8705.00
371.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
POWELLWOLFE
02
02
02
02
04
04
04
10
8400.00
8852.00
10007.00
10008.00
1088.00
8702.00
8705.00
371.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2008
2014
2018
2018
2014
2012
2012
2016
2008
2014
2018
2018
2014
2012
2012
2016
9.8
6.1
.743
5.655
.54
1.263
4.411
9.9
6.22
.837
5.661
.55
4.411
8.237
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / FOREST HIGHWAY(P)
Milepoints:Milepoints:
To:To:
From:From:
![Page 126: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/126.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 124
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 NORTH OF THE LONG BOWBOAT RAMP IN MENIFEE COUNTY. (2016BOP)
ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 SOUTH OF THEMENIFEE/ROWAN COUNTY LINE. (2016BOP)
IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELLHILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK.(14CCN)(16CCR)(18CCR)
IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELLHILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK.(14CCN)(16CCR)(18CCR)
SAFETY IMPROVEMENTS ON US 127 IN SALVISA. (14CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-1941 BRIDGE OVER CHAPLIN RIVER. (084B00030N)
ADDRESS DEFICIENCIES OF STRATTON RD BRIDGE OVER BRUSH CREEK.(084C00029N)
ADDRESS DEFICIENCIES OF BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5MILE SE OF KY 533.(085B00025N) EBRP)(SD)
2.300
2.300
2.434
.020
MENIFEE
MENIFEE
MENIFEE
MENIFEE
MERCER
MERCER
MERCER
METCALFE
KY-1274
KY-1274
US-460
US-460
US-127
KY-1941
CR-1322
KY-496
$2,825,000
$4,510,000
$9,200,000
$6,020,000
$200,000
$982,000
$787,500
$462,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
R
U
C
R
U
C
C
D
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2018
2018
2018
2018
2020
2020
2021
2022
2019
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FH
FH
FH
FH
FH
FH
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$100,000
$2,625,000
$250,000
$250,000
$4,010,000
$2,180,000
$1,000,000
$6,020,000
$6,020,000
$200,000
$300,000
$682,000
$192,500
$595,000
$175,000
$287,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
07
07
07
03
372.00
373.00
8802.00
8802.01
8858.00
10003.00
10004.00
1087.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
07
07
02
03
372.00
373.00
8802.00
8802.00
8858.00
10003.00
10004.00
1087.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2016
2014
2018
2014
2018
2018
2018
2016
2016
2014
2014
2014
2018
2018
2018
6.5
13.28
6.2
6.2
14.469
3.515
.247
11.201
8
13.378
8.5
8.5
16.903
3.531
.255
11.221
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FOREST HIGHWAY(P)
RELIABILITY / FOREST HIGHWAY(P)
SAFETY / SAFETY(P)
SAFETY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 127: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/127.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 125
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER ROGERS CREEK ATMP 7.307. (DESIGN HANDLED UNDER 3-8506.00) 085B00010N (2014BOP)(SD)(18CCR)
SPOT IMPROVEMENTS ON US-68 FROM THE CUMBERLAND PARKWAY TO THEGREEN/METCALFE COUNTY LINE.(12CCN)(16CCN)(18CCN)
RECONSTRUCT KY 163 AS A NEW ROUTE ON WEST SIDE OF EDMONTON FROMKY 163 AT GARY BELL RD (MP 10.0) S OF EDMONTON CROSSING US 68 (STOCKTONST) 2000 FT WEST OF THE COURTHOUSE SQ, TO US 68 (GREENSBURG ST) AT I-CHNG WITH NUNN PKWY (MP 9.8).(14CCN)(16CCR)(18CCN)
IMPROVE HIGHWAY SAFETY AND SYSTEMS MOBILITY IN THE KY 163 CORRIDORBETWEEN KY 90 (MP 2.907) AND THE PROPOSED WEST EDMONTON BYPASS (MP9.777). (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-1243 BRIDGE OVER KNOB LICK SPRINGS.(085B00034N)
ADDRESS DEFICIENCIES OF MOSBY RIDGE RD BRIDGE OVER E FORK LITTLEBARREN RVR. (085C00005N)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22.357 TO MILEPOINT 36.16
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)
.616
2.191
1.443
6.870
METCALFE
METCALFE
METCALFE
METCALFE
METCALFE
METCALFE
METCALFE
MONROE
KY-163
US-68
KY-163
KY-163
KY-1243
CR-1108
LN-9008
KY-214
$3,000,000
$10,395,000
$18,135,000
$2,500,000
$420,000
$1,106,000
$12,100,000
$444,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
D
R
U
C
D
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2021
2022
2023
2020
2021
2022
2023
2021
2019
2020
2019
2020
2021
2021
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
STP
STP
STP
SPP
SPP
SPP
SPP
SPP
BR
BR
BR
BR
PM
PM
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$775,000
$970,000
$8,650,000
$1,000,000
$3,000,000
$2,190,000
$11,945,000
$2,500,000
$157,500
$262,500
$210,000
$896,000
$1,100,000
$11,000,000
$444,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
8506.20
8706.00
8859.00
8955.00
10005.00
10006.00
20013.00
128.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
8506.00
8706.00
8859.00
8955.00
10005.00
10006.00
20013.00
128.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2014
2016
2018
2018
2018
2014
2008
2016
2014
2016
2018
2018
2018
2014
6.999
17.635
9.777
2.907
7.493
.181
22.357
1.737
7.615
20.016
11.22
9.777
7.497
.209
36.16
1.837
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / SPOT IMPROVEMENTS(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
RELIABILITY / FERRY OPERATION(P)
![Page 128: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/128.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 126
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2023.
OPERATION OF TURKEY NECK BEND FERRY FOR FY 2024.
CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)(18CCR)
CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)(18CCR)
REPLACE BRIDGE ON KY-100 BETWEEN MP 14.7 AND 14.9. (18CCN)
WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK,MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)
1.768
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONROE
MONTGOMERY
KY-214
KY-214
KY-214
KY-214
KY-214
-
-
KY-100
KY-1991
$444,000
$444,000
$444,000
$444,000
$444,000
$730,000
$6,580,000
$1,600,000
$559,899
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
C
C
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2023
2024
2019
2020
2019
2020
2020
2021
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
STP
STP
SPP
SPP
SPP
SPP
HPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$444,000
$444,000
$444,000
$444,000
$444,000
$730,000
$6,580,000
$250,000
$150,000
$500,000
$700,000
$559,899
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
07
128.11
128.12
128.13
128.14
128.15
7020.17
7020.18
80003.00
240.01
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
07
128.11
128.12
128.13
128.14
128.15
7020.01
7020.17
80003.00
240.01
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2018
2018
2002
2018
2018
2010
2014
2016
2016
2018
2018
2002
2002
2018
2010
1.737
1.737
1.737
1.737
1.737
14.7
0
1.837
1.837
1.837
1.837
1.837
14.9
1.768
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / FERRY OPERATION(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / BRIDGE REPLACEMENT(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 129: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/129.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 127
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)
UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TOTHE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIALACCESS ROAD TO HINKSTON PIKE). (12CCR)(18CCN)
WIDEN EXISTING PAVEMENT & IMPROVE VERTICAL & HORIZONTAL CURVESFROM EXISTING MT STERLING BYPASS (KY 686) TO 500' W OF BENTBROOKSUBDIVISION. ADD FULL WIDTH SHOULDERS & A CENTER TURNING LANE INCONGESTION AREAS FROM MP 2.2 TO 4.311.(14CCN)(16CCR)(18CCN)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 104.26 TO MILEPOINT 112.1
RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING ATRIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OFINTERSECTION WITH CEDAR RD (CS 1053). (2014BOP)(D,R,U COMPLETED UNDER10-293)(CONSTRUCTION SEQ 2)(16CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE OAK CREEK ON US 460 0.5MILE NW OF KY 1000. (088B00021N)
IMPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)(16CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 191 OVER CANEY CREEK .5 MILESWEST OF KY 1162. (16CCN)(SD)
1.480
1.032
2.111
.366
.050
.519
.040
MONTGOMERY
MONTGOMERY
MONTGOMERY
MONTGOMERY
MORGAN
MORGAN
MORGAN
MORGAN
US-460
KY-1991
US-60
I-64
KY-7
US-460
KY-2498
KY-191
$9,450,000
$4,010,000
$11,800,000
$7,150,000
$3,300,000
$1,463,000
$4,490,000
$938,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
R
U
C
D
C
C
D
C
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2019
2020
2022
2022
2024
2024
2024
2018
2019
2020
2022
2023
2024
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
SPP
SPP
SPP
SPP
SPP
PM
PM
STP
BR
BR
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$9,450,000
$4,010,000
$800,000
$1,500,000
$1,500,000
$8,000,000
$650,000
$6,500,000
$3,300,000
$224,000
$1,239,000
$1,580,000
$350,000
$2,560,000
$182,000
$756,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
10
10
10
10
250.10
411.00
8810.00
20018.00
293.10
1111.00
8804.00
8902.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
10
10
10
10
250.10
411.00
8810.00
20018.00
293.00
1111.00
8804.00
8902.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2014
2018
2012
2014
2016
2016
2010
2012
2014
2018
2012
2014
2016
2016
18.125
1.768
2.007
104.26
.134
25.74
7.2
7.813
19.6
2.8
4.311
112.1
.5
25.79
7.719
7.853
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 130: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/130.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 128
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF US 460 BRIDGE OVER BIG SPRING BRANCH.(088B00022N)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 57.72 TO MILEPOINT 63.08
ADDRESS PAVEMENT CONDITION ON KY-7 FROM MILEPOINT 3.90 TO MILEPOINT8.14
ADDRESS PAVEMENT CONDITION ON KY-519 FROM MILEPOINT 0.00 TOMILEPOINT 3.94
WIDEN US-62 FROM WAL-MART TO US-431.(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)
WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TOWENDELL FORD CENTER. (14CCN)(18CCN)
STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEARTHE INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONALGUARD CENTER, AND JOB CORP. (14CCN)(18CCN)
ADDRESS DEFICIENCIES OF UNION RIDGE RD BRIDGE OVER ROCKY CREEK.(089C00004N)
4.250
3.940
1.500
2.467
MORGAN
MORGAN
MORGAN
MORGAN
MUHLENBERG
MUHLENBERG
MUHLENBERG
MUHLENBERG
US-460
KY-9009
KY-7
KY-519
US-62
KY-181
KY-2533
CR-1141
$647,500
$2,310,000
$1,207,000
$1,981,000
$7,500,000
$5,060,000
$6,600,000
$822,500
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
C
C
R
U
C
D
R
U
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2019
2022
2023
2018
2020
2021
2022
2019
2020
2021
2022
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$472,500
$210,000
$2,100,000
$1,207,000
$1,981,000
$7,500,000
$530,000
$1,820,000
$2,710,000
$780,000
$500,000
$820,000
$4,500,000
$175,000
$647,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
02
02
02
02
10016.00
20001.00
20014.00
20015.00
8506.00
8802.00
8803.00
10009.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
02
02
02
02
10016.00
20001.00
20014.00
20015.00
8506.00
8802.00
8803.00
10009.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2008
2014
2014
2018
2018
2018
2018
2018
2008
2014
2014
2018
27.809
57.72
3.9
0
16.471
12.767
0
2.415
27.815
63.08
8.14
3.94
17.93
15.234
2.023
2.433
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 131: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/131.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 129
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.424 TO MILEPOINT 45.95
IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THEBLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE.(2016BOP)(18CCR)
IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THEBLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE. (18CCN)
ADDRESS DEFICIENCIES OF BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 INBLOOMFIELD 090B00096N (SR 28.2) 090B00095N (12CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI WOF US 31E (090B00068N)
IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110).(06CCN)(2006BOPC)(12CCR)(14CCR)(16CCR)(18CCR)
IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110). (18CCN)
NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN. (16CCR)(18CCN)
ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER MONKS CREEK. (090B00033N)
5.474
.100
.018
.600
MUHLENBERG
NELSON
NELSON
NELSON
NELSON
NELSON
NELSON
NELSON
NELSON
WK-9001
US-150
US-150
US-62
KY-509
US-150
US-150
-
KY-52
$2,200,000
$600,000
$3,050,000
$1,260,000
$861,000
$5,000,000
$4,800,000
$500,000
$1,120,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
D
C
C
D
C
U
C
C
D
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2023
2023
2020
2021
2024
2018
2019
2020
2019
2020
2021
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
STP
STP
STP
BR
BR
BR
SPP
SPP
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$2,000,000
$600,000
$600,000
$2,450,000
$1,260,000
$105,000
$756,000
$1,000,000
$4,000,000
$4,800,000
$500,000
$105,000
$1,015,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
04
04
04
04
04
04
04
04
20036.00
396.10
396.12
1078.00
1089.00
8309.10
8309.20
8809.00
10004.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
04
04
04
04
04
04
04
04
20036.00
396.00
396.10
1078.00
1089.00
8309.00
8309.10
8809.00
10004.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2016
2018
2012
2014
2006
2018
2014
2018
2018
2014
2016
2012
2014
2006
2006
2014
2018
43.424
1.952
2.266
27.278
3.61
1.697
1.697
12.591
45.95
7.426
7.653
27.318
3.628
2.285
2.285
12.621
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 132: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/132.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 130
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE OVER SIMPSON CREEK.(090C00045N)
ADDRESS DEFICIENCIES OF POTTERSHOP LOOP BRIDGE OVER ROWAN CREEK.(090C00021N)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 24.24 TO MILEPOINT 35.15
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 8.837 TO MILEPOINT 10.172
ADDRESS PAVEMENT CONDITION ON KY-49 FROM MILEPOINT 0.00 TOMILEPOINT 4.52
CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF US-31E AND US-62.(NELSON COUNTY FISCAL COURT WILL DO DESIGN AND BUILDROUNDABOUT)(18CCN)
IMPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS COUNTYSCHOOL PROPERTY. (12CCR)(16CCR)
RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)(16CCR)(18CCN)
SAFETY IMPROVEMENTS ALONG KY 32 FROM LAKE ROAD (MP 9.5) TOSCRUBGRASS CREEK (MP 12.5) TO CORRECT HORIZONTAL, VERTICAL,PAVEMENT WITH DEFICIENCIES. (14CCN)(18CCN)
4.520
.183
.230
3.000
NELSON
NELSON
NELSON
NELSON
NELSON
NELSON
NICHOLAS
NICHOLAS
NICHOLAS
CS-4003
CR-1128
BG-9002
BG-9002
KY-49
US-62
KY-36
KY-36
KY-32
$504,000
$318,500
$9,625,000
$1,210,000
$484,000
$1,500,000
$2,270,000
$1,750,000
$100,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
C
C
R
U
R
U
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2022
2022
2019
2019
2022
2020
2024
2024
2021
2021
2023
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
PM
PM
PM
SPP
STP
STP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$98,000
$406,000
$91,000
$227,500
$875,000
$8,750,000
$110,000
$1,100,000
$484,000
$1,500,000
$1,380,000
$890,000
$200,000
$150,000
$1,400,000
$100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
09
09
09
10005.00
10014.00
20022.00
20023.00
20030.00
80050.00
205.00
8811.00
8812.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
04
04
04
04
04
09
09
09
10005.00
10014.00
20022.00
20023.00
20030.00
80050.00
205.00
8811.00
8812.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2012
2014
2014
2018
2018
2018
2018
2018
2018
2012
2014
2014
.43
.027
24.24
8.837
0
14.24
3.1
8
9.5
.444
.033
35.15
10.172
4.52
14.274
3.283
8.23
12.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / CONGESTION MITIGTN(O)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
![Page 133: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/133.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 131
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
REPLACE BRIDGE ON ABNER'S MILL ROAD (CR 1010) 2.4 MILES NORTH OF KY 32.(16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER BRUSHY FORK. (091B00018N)
ADDRESS DEFICIENCIES OF DORSEY AVE BRIDGE OVER BRUSH FORK.(091C00029N)
ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER BRANCH OF THREE LICKFORK 0.23 MILE E OF GREEN MEADOWS DR (CS 6068)092B00032 (SD)
ADDRESS DEFICIENCIES OF BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE EOF GREEN MEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)
I-65 SPUR CORRIDOR; RECONSTRUCT THE EXISTING NATCHER PARKWAY/KY-69INTERCHANGE (EXIT 50) IN OHIO COUNTY. (2016BOP)
REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETYISSUES WITH BRIDGES ON KY-136 FROM KY-56 IN MCLEAN COUNTY TO US-231IN OHIO COUNTY. (14CCN)
IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANESINCLUDING CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS.(16CCN)(18CCN)
.040
.074
32.218
.948
NICHOLAS
NICHOLAS
NICHOLAS
OHIO
OHIO
OHIO
OHIO
OHIO
CR-1010
KY-36
CS-1096
US-62
US-62
WN-9007
KY-136
KY-54
$100,000
$2,135,000
$875,000
$1,148,000
$1,337,000
$11,300,000
$8,240,000
$10,750,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
D
C
C
D
C
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2020
2019
2020
2018
2019
2020
2019
2019
2021
2022
2022
2024
2021
2023
2024
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
NH
NH
NH
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$100,000
$525,000
$1,610,000
$280,000
$595,000
$1,148,000
$308,000
$1,029,000
$1,350,000
$1,250,000
$8,700,000
$450,000
$1,250,000
$6,540,000
$750,000
$1,000,000
$2,000,000
$7,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
02
02
02
02
02
8951.00
10011.00
10012.00
1083.00
1091.00
2092.20
8812.00
8951.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
MCLEAN
09
09
09
02
02
02
02
02
8951.00
10011.00
10012.00
1083.00
1091.00
2092.00
8812.00
8951.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2016
2014
2016
2016
2018
2018
2018
2018
2016
2014
2016
2.387
2.96
.075
11.892
12
49.7
0
7.047
2.414
2.972
.085
11.932
12.074
50.1
9.6
7.995
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / BRIDGE REPLACEMENT(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / MINOR WIDENING(O)
0 22.618Milepoints: To:From:
![Page 134: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/134.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 132
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER BR OF W FK LEWIS CREEK.(092B00053N)
ADDRESS DEFICIENCIES OF WEST HALLS CREEK R BRIDGE OVER BRANCH OFHALLS CREEK. (092C00001N)
ADDRESS DEFICIENCIES OF SUNNYDALE RD BRIDGE OVER BRANCH OF ROUGHRIVER. (092C00020N)
ADDRESS DEFICIENCIES OF RAILROAD BED RD BRIDGE OVER WFK ADAMSCREEK. (092C00067N)
ADDRESS DEFICIENCIES OF JOHNSON SCHOOL RD BRIDGE OVER BARASS DITCH.(092C00080N)
ADDRESS DEFICIENCIES OF ROCK CREEK LN BRIDGE OVER BR-S.FK PANTHERCK. (092C00097N)
ADDRESS DEFICIENCIES OF QUARTERHORSE LN BRIDGE OVER N FK PANTHERCREEK. (092C00133N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 65.68 TO MILEPOINT 83.3
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
OHIO
KY-85
CR-1003
CR-1067
CR-1036
CR-1414
CR-1083
CR-1510
US-62
WK-9001
$1,172,500
$805,000
$805,000
$945,000
$822,500
$1,050,000
$1,137,500
$5,500,000
$16,596,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2022
2022
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$962,500
$175,000
$630,000
$175,000
$630,000
$210,000
$735,000
$175,000
$647,500
$210,000
$840,000
$245,000
$892,500
$500,000
$5,000,000
$16,596,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
02
02
02
02
02
02
10010.00
10011.00
10012.00
10013.00
10014.00
10015.00
10016.00
20038.00
20039.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
02
02
02
02
02
02
02
02
02
10010.00
10011.00
10012.00
10013.00
10014.00
10015.00
10016.00
20038.00
20039.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
9.614
1.331
2.377
2.88
4.907
.007
.256
19.797
65.68
9.627
1.338
2.386
2.892
4.92
.012
.269
25.95
83.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
![Page 135: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/135.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 133
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KYPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 83.3 TO MILEPOINT 87.544
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION ON KY-136 FROM MILEPOINT 0.00 TOMILEPOINT 9.60
EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)(18CCN)
EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362).(18CCN)
INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROMLAGRANGE TO JEFFERSON COUNTY LINE. (LOU T.I.P.)(LOCAL MATCH)(ALLWORK BY OLDHAM COUNTY)(2002BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).(18CCR)
OLDHAM COUNTY BICYCLE & PEDESTRIAN TRAIL - OLD LAGRANGE RD.CONSTRUCT A BICYCLE AND PEDESTRIAN TRAIL ALONG OLD LAGRANGE ROADFROM KY 146 TO THE INTERSECTION WITH KY 329 BYPASS.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP). (14CCR)(18CCR)
CONSTRUCT A 4-LANE UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE.(LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP). (14CCR)
CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERSPOINT TRAIL.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
9.600
2.200
2.361
.750
.286
OHIO
OHIO
OHIO
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
WK-9001
WN-9007
KY-136
-
-
KY-146
CR-1203
CR-1002
KY-1793
$4,282,000
$11,064,000
$1,177,000
$10,000,000
$8,500,000
$500,000
$750,000
$10,100,000
$100,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
C
D
D
R
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2020
2022
2021
2022
2021
2019
2020
2018
2019
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
SPP
SPP
SLO
SLO
SLO
SLO
SLO
SLO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,282,000
$11,064,000
$1,177,000
$10,000,000
$8,500,000
$500,000
$250,000
$500,000
$100,000
$10,000,000
$100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
02
05
05
05
05
05
05
20040.00
20041.00
20049.00
367.20
367.21
410.00
410.01
434.00
440.10
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JEFFERSON
JEFFERSON
02
02
02
05
05
05
05
05
05
20040.00
20041.00
20049.00
367.00
367.20
400.02
410.00
434.00
440.01
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2010
2018
2002
2004
2004
2004
2018
2018
2018
1996
2010
2000
2002
2004
2004
83.3
49.8
0
0
0
0
1.542
87.544
59.86
9.6
2.361
3.391
.747
1.828
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / BIKE/PED FACIL(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 136: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/136.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 134
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
RECONSTRUCT US 42 AND WIDEN FROM 2 LANES TO 3 LANES (3RD LANE WILL BEA CENTER TURN LANE) FROM JEFFERSON/OLDHAM COUNTY LINE TORIDGEMOOR DRIVE. PROJECT WILL INCLUDE THE CONSIDERATION OFIMPROVEMENTS TO THE HAYFIELD WAY INTERSECTION. (2004BOPC)
INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALLWORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP)
CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT,SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESSROAD LOCATED ON APPLE PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 INCRESTWOOD.(2010BOPC)(ADDITIONAL FUNDING)(14CCN)
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO KY-393 (MP18.0). (16CCN)
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4).(16CCN)
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4),INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)
CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVECONGESTION IN LAGRANGE.
CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVECONGESTION IN LAGRANGE.
.900
.200
.041
3.900
4.400
4.400
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
US-42
KY-22
CS-2102
I-71
I-71
I-71
I-71
I-71
$5,320,000
$300,000
$1,174,800
$31,100,000
$2,750,000
$2,750,000
$12,400,000
$6,000,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
D
R
U
C
D
D
D
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2018
2019
2022
2022
2024
2023
2024
2018
2019
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,320,000
$300,000
$1,174,800
$3,500,000
$1,900,000
$1,700,000
$24,000,000
$2,750,000
$2,750,000
$1,500,000
$3,000,000
$1,900,000
$6,000,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
441.01
449.00
468.10
483.10
483.20
483.21
483.30
483.31
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
441.00
965.12
468.10
483.10
483.20
483.20
483.20
483.30
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2004
2014
2016
2016
2018
2018
2018
2004
2004
2014
2016
2016
2016
2016
2018
0
3.15
0
14.1
18
18
20
20
.942
3.35
.041
18
22.4
22.4
21
21
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 137: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/137.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 135
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER TO THE ROAD, AND ADD SIGNAGE FOR SAFETY.
INTERSECTION REALIGNMENT/RECONSTRUCTION AT KY 329 AND KY 329 BYPASS(2016BOP).
CONSTRUCTION OF A NEW CONNECTION FROM OLD LAGRANGE ROAD TO KY393 AT BUCKNER. LPA CONTRACT. (BOP2012)
CONSTRUCT 5' CONCRETE SIDEWALKS IN THE EXISTING RIGHT-OF-WAY ALONGBOTH SIDES OF SPRING HILL TRACE FROM KY 329 TO THE END OF THE EXISTINGSUBDIVISION, SLIGHTLY BEYOND SPRING HILL COURT (2014BOP).
DESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22 (TOTAL 3.2MILES). (14CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY 1488 BRIDGE OVER ORGAN CREEK. (093B00048N)
IMPROVE THE INTERCHANGE OF I 71 AND KY 329. (18CCN)
CONSTRUCT A TURN LANE ON KY 329 BYPASS AT DOVEFIELD DRIVE.(18CCN)
IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845.(06CCR)(08CCN)(12CCR)(14CCR)
2.617
4.742
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OLDHAM
OWEN
CR-1209
KY-329
-
CS-2030
KY-53
KY-1488
KY-329
KY-329
KY-22
$700,000
$320,000
$3,242,500
$520,000
$2,000,000
$623,000
$250,000
$300,000
$3,500,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
R
U
C
U
C
D
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2020
2018
2019
2019
2018
2019
2021
2019
2020
2019
2022
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SLO
SPP
BR
BR
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$700,000
$120,000
$100,000
$100,000
$714,500
$228,000
$2,300,000
$75,000
$445,000
$2,000,000
$280,000
$343,000
$250,000
$300,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
06
494.00
542.00
754.00
757.00
8852.00
10012.00
80005.00
80050.00
198.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
05
05
05
05
06
965.12
965.14
754.00
517.00
8852.00
10012.00
80005.00
80005.00
198.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2012
2014
2014
2018
2018
2018
2006
2004
2006
2012
2014
2014
2018
2018
2018
2006
1.43
7.226
0
3.068
2.031
6.8
.4
11.315
1.44
.45
5.685
2.037
7
.5
16.057
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY-HAZARD ELIM(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / NEW ROUTE(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / DESIGN ENGINEERING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
![Page 138: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/138.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 136
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845.(06CCR)(08CCN)(12CCR)(14CCR)
ADDRESS DEFICIENCIES OF BRIDGE OVER CEDAR CREEK ON SAWDRIDGECREEK W ROAD (CR 1214) 0.2 MI N OF US 127 (094C00011N)
ADDRESS DEFICIENCIES OF KY 3102 BRIDGE OVER BRUSH CREEK. (094B00034N)
ADDRESS PAVEMENT CONDITION ON KY-22 FROM MILEPOINT 11.33 TOMILEPOINT 18.56
IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTYLINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE &ENVIR)(AR/W)(14CCR)(16CCR)(18CCR)
IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTYLINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE &ENVIR)(AR/W)(14CCR)(16CCR)(18CCR)
IMPROVE SAFETY ON US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTHOF KY-154 IN CAMPBELL COUNTY.(12CCN)(14CCR)
ADDRESS DEFICIENCIES OF KY-159 BRIDGE OVER NORTH LITTLE KINCAID CRE.(096B00006N)
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY-15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY-15 BYPASS
4.700
.040
7.230
13.562
13.562
3.340
1.243
OWEN
OWEN
OWEN
OWEN
OWSLEY
OWSLEY
PENDLETON
PENDLETON
PERRY
KY-22
CR-1214
KY-3102
KY-22
KY-30
KY-30
US-27
KY-159
KY-15
$3,500,000
$672,000
$2,222,500
$947,000
$14,500,000
$14,500,000
$5,000,000
$700,000
$47,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
C
C
C
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2020
2019
2020
2022
2019
2021
2020
2019
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
BR
BR
BR
PM
STP
STP
SPP
BR
BR
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,500,000
$672,000
$280,000
$1,942,500
$947,000
$14,500,000
$14,500,000
$5,000,000
$210,000
$490,000
$47,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
10
10
06
06
10
198.01
1088.00
10013.00
20052.00
279.61
279.62
8706.00
10004.00
158.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CAMPBELL
06
06
06
06
10
10
06
06
10
198.00
1088.00
10013.00
20052.00
279.60
279.62
8706.00
10004.00
158.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2014
2016
2012
2018
2012
2006
2018
2018
2018
2014
2016
2012
2018
2012
11.315
.22
3.005
11.33
0
0
17.9
4.658
13.269
16.057
.26
3.017
18.56
5.166
5.166
19.34
4.68
14.512
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(P)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
0 1.9Milepoints: To:From:
![Page 139: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/139.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 137
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-476 FROM KY-15X IN WALKERTOWN TO NORTH OF WALKERCORNETT ROAD IN WABACO.
ADDRESS DEFICIENCIES OF BRIDGE OVER NORTH FORK KENTUCKY RIVER ONKENMONT ROAD (CR 1114) 380 FT SE OF KY 7 (097C00005N)
ADDRESS DEFICIENCIES OF BRIDGE OVER STRAIGHT FORK ON LITTLELEATHERWOOD CREEK ROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)
NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL ROGERS PARKWAY.(16CCN)(18CCN)
SAFETY IMPROVEMENTS ON KY-80 FROM LESLIE COUNTY LINE TO KY-451.(16CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK.(16CCN) 097B00110N
ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166 OVER MACES CREEK. (16CCN)097B00072N (SD)
ADDRESS DEFICIENCIES OF BRIDGE OVER LEATHERWOOD CREEK. (16CCN) 097C00021N
.900
.047
.009
.200
4.600
.040
.050
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
KY-476
CR-1114
CR-1140
HR-9006
KY-80
KY-1166
KY-1166
CR-1150
$600,000
$1,624,000
$686,000
$3,152,000
$6,730,000
$938,000
$1,000,000
$455,000
Total
Total
Total
Total
Total
Total
Total
Total
D
D
C
D
C
R
U
C
D
R
U
C
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2020
2019
2020
2019
2020
2021
2019
2020
2020
2022
2020
2018
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
BR
BR
BR
BR
STP
STP
STP
STP
STP
STP
STP
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$600,000
$224,000
$1,400,000
$182,000
$504,000
$1,200,000
$320,000
$1,632,000
$700,000
$350,000
$280,000
$5,400,000
$938,000
$155,000
$103,000
$742,000
$455,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
10
209.00
1113.00
1114.00
8903.00
8906.00
8910.00
8913.00
8915.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
10
10
209.00
1113.00
1114.00
8903.00
8906.00
8910.00
8913.00
8915.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2014
2014
2016
2016
2016
2016
2016
2018
2014
2014
2016
2016
2016
2016
2016
0
.07
0
54.9
0
.64
4.283
0
.9
.117
.009
55.1
4.6
.648
4.291
.05
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW INTERCHANGE(O)
RELIABILITY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 140: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/140.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 138
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF GEORGES BRANCH RD BRIDGE OVER GEORGESBRANCH. (097C00007N)
ADDRESS DEFICIENCIES OF OWENS BR RD BRIDGE OVER OWENS BRANCH.(097C00018N)
ADDRESS DEFICIENCIES OF HALL OLD HOME PLACE BRIDGE OVER BIG CREEK.(097C00084N)
ADDRESS DEFICIENCIES OF KY 476 BRIDGE OVER BALL FORK. (097B00007N)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 55.966 TO MILEPOINT 57.166
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TONEAR DESKINS BRANCH CULVERT. (18CCR)
IMPROVE KY-194 FROM US-119 RAMP NEAR SMITH FARMS BOTTOM (CR-1458) TONEAR DESKINS BRANCH CULVERT
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)
3.049
2.049
.400
PERRY
PERRY
PERRY
PERRY
PERRY
PERRY
PIKE
PIKE
PIKE
CR-1115
CR-1145
CR-1083
KY-476
HR-9006
KY-80
KY-194
KY-194
US-460
$530,000
$480,000
$788,000
$1,050,000
$550,000
$200,000
$10,420,000
$6,760,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2024
2024
2019
2019
2021
2021
2023
2024
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
SPP
SPP
SPP
SPP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$140,000
$390,000
$140,000
$340,000
$175,000
$613,000
$210,000
$840,000
$50,000
$500,000
$100,000
$100,000
$2,100,000
$1,560,000
$6,760,000
$6,760,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
12
12
12
10004.00
10005.00
10006.00
10017.00
20002.00
20003.00
198.00
198.01
263.67
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
12
12
12
10004.00
10005.00
10006.00
10017.00
20002.00
20003.00
198.00
198.00
263.60
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2014
2018
2006
2018
2018
2018
2018
2018
2018
2014
2014
2000
.32
.121
.026
12.419
55.966
7.9
17.951
17.951
.326
.127
.044
12.435
57.166
8.4
21
21
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
![Page 141: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/141.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 139
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARYHOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARYHOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGEONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING FOR C PHASE UNDER 12-263.67)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND KY-1460INTERSECTION.
MARION BRANCH INDUSTRIAL PARK ACCESS ROAD. (18CCR)
MARION BRANCH INDUSTRIAL PARK ACCESS ROAD. (ADDITIONAL FUNDING FOR12-347.00)(18CCR)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1MI S OF JCT KY-1469; (AR/W)098B00069N
ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOONCREEK AT INTERSECTION WITH COON CREEK (CR 1371) 098B00093N
3.400
.400
.200
.100
.040
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
US-460
US-460
US-460
US-460
US-460
-
-
KY-610
KY-1441
$9,000,000
$10,000,000
$10,000,000
$10,000,000
$2,270,000
$7,000,000
$7,000,000
$770,000
$665,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
C
D
R
U
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2022
2023
2024
2021
2022
2022
2024
2019
2020
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
SPP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$9,000,000
$10,000,000
$10,000,000
$10,000,000
$240,000
$400,000
$160,000
$1,470,000
$7,000,000
$7,000,000
$770,000
$665,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
12
263.69
263.95
263.96
263.97
346.00
347.00
347.01
1104.00
1115.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
12
263.60
263.67
263.67
263.67
346.00
347.00
347.00
1104.00
1115.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2018
2018
2018
2018
2018
2018
2010
2012
2000
2006
2006
2006
2018
2018
2018
2010
2012
2.57
8.096
10.279
2.77
8.196
10.319
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / SURFACE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MINOR WIDENING(O)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 142: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/142.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 140
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROADCONNECTOR (CR 1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN(098C00088N)
ADDRESS DEFICIENCIES OF BRIDGE OVER BLACKBERRY CREEK ON BIG BLUESPRINGS ROAD (CR 1801) AT JCT WITH KY 1056 (098C00028N)
IMPROVE CONNECTIVITY BETWEEN THOMPSON ROAD AND US-23 ATSTONECOAL.(12CCN)(14CCR)(16CCR)
ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER PINSONS CREEK. (098B00032N)
ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER POND CREEK. (098B00036N)
ADDRESS DEFICIENCIES OF KY-3419 BRIDGE OVER LEFT FK BLACKBERRY CR.(098B00180N)
ADDRESS DEFICIENCIES OF PIGEON ROOST RD BRIDGE OVER BIG CREEK.(098C00005N)
ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE OVER POND CREEK.(098C00021N)
ADDRESS DEFICIENCIES OF BEEFHIDE CRK BRIDGE OVER BEEFHIDE CREEK.(098C00119N)
.038
.265
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
CR-1181
CR-1801
CS-1215
KY-199
KY-199
KY-3419
CR-1517
CR-1545
CR-1906
$980,000
$210,000
$5,890,000
$659,400
$471,100
$828,450
$546,700
$707,280
$681,100
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
C
U
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2024
2024
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
SPP
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$980,000
$210,000
$600,000
$5,290,000
$175,000
$484,400
$140,000
$331,100
$210,000
$618,450
$157,500
$389,200
$140,000
$567,280
$175,000
$506,100
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
12
12
12
1122.00
1123.00
8705.00
10008.00
10009.00
10010.00
10011.00
10012.00
10013.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
12
12
12
1122.00
1123.00
8705.00
10008.00
10009.00
10010.00
10011.00
10012.00
10013.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2012
2018
2018
2018
2018
2018
2018
2014
2014
2012
2018
2018
2018
2018
2018
2018
.04
.005
8.876
6.591
11.321
.083
.004
1.424
.078
.027
8.882
6.597
11.329
.089
.014
1.43
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / NEW ROUTE(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 143: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/143.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 141
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE OVER SHELBY CREEK.(098C00080N)
ADDRESS DEFICIENCIES OF RIGHT FORK OF BRUS BRIDGE OVER LEFTFK.BRUSHY FORK. (098C00091N)
ADDRESS DEFICIENCIES OF CANEY HWY #1 BRIDGE OVER CANEY CREEK.(098C00113N)
ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE OVER JOHNS CREEK.(098C00170N)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
IMPROVE SAFETY AND GEOMETRICS, AND REDUCE CONGESTION KY-213 FROMKY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
IMPROVE SAFETY AND GEOMETRICS, AND REDUCE CONGESTION KY-213 FROMKY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
IMPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL COUNTYFROM SONS ROAD TO REED COURT.
3.676
3.676
.526
PIKE
PIKE
PIKE
PIKE
PIKE
PIKE
POWELL
POWELL
POWELL
CR-1789
CR-1360Q4
CR-1911
CR-1460
US-23
US-119
KY-213
KY-213
KY-213
$1,123,080
$602,000
$670,250
$1,102,500
$5,775,000
$1,925,000
$7,100,000
$6,000,000
$520,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
R
U
C
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2020
2020
2021
2021
2019
2019
2020
2021
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
SPP
SPP
SPP
SPP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$192,500
$930,580
$157,500
$444,500
$140,000
$530,250
$227,500
$875,000
$525,000
$5,250,000
$175,000
$1,750,000
$4,000,000
$1,100,000
$2,000,000
$6,000,000
$520,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
12
12
12
12
12
12
10
10
10
10024.00
10025.00
10026.00
10027.00
20002.00
20003.00
163.00
163.01
210.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
12
12
12
12
12
12
10
10
10
10024.00
10025.00
10026.00
10027.00
20002.00
20003.00
163.00
163.00
210.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2012
2018
2018
2018
2018
2018
2018
2018
2018
2012
2012
2018
.024
.049
.309
.03
29.5
10.4
7.595
7.595
6.371
.04
.057
.323
.058
32.78
12.4
11.271
11.271
6.897
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY-HAZARD ELIM(P)
![Page 144: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/144.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 142
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CORRECT FLOODING ISSUES ON KY-2026 FROM KY-11 TO THE RED RIVER INCLAY CITY.
ADDRESS DEFICIENCIES OF KY-599 BRIDGE OVER CANE CREEK. (099B00069N)
ADDRESS DEFICIENCIES OF KY-2026 BRIDGE OVER RED RIVER. (099B00090N)
ADDRESS DEFICIENCIES OF KY 3354 BRIDGE OVER CAT CREEK. (099B00081N)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 11.91 TO MILEPOINT 19.15
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 19.15 TO MILEPOINT 22.307
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 22.307 TO MILEPOINT 27.376
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 27.376 TO MILEPOINT 32.788
.336POWELL
POWELL
POWELL
POWELL
POWELL
POWELL
POWELL
POWELL
KY-2026
KY-599
KY-2026
KY-3354
KY-9000
KY-9000
KY-9000
KY-9000
$1,950,000
$945,000
$1,330,000
$735,000
$6,380,000
$2,750,000
$4,510,000
$5,416,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
C
D
C
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2020
2021
2019
2020
2019
2020
2019
2020
2022
2022
2023
2023
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$500,000
$200,000
$150,000
$1,100,000
$175,000
$770,000
$210,000
$1,120,000
$175,000
$560,000
$580,000
$5,800,000
$250,000
$2,500,000
$410,000
$4,100,000
$5,416,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
10
10
10
10
10
10
211.00
10007.00
10008.00
10018.00
20004.00
20005.00
20006.00
20007.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
10
10
10
10
10
10
10
211.00
10007.00
10008.00
10018.00
20004.00
20005.00
20006.00
20007.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
0
.908
.381
4.095
11.91
19.15
22.307
27.376
.381
.926
.411
4.103
19.15
22.307
27.376
32.788
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 145: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/145.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 143
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 32.788 TO MILEPOINT 36
IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY-80. (18CCR)
IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY-80. (18CCR)
SAFETY PROJECT TO RECONSTRUCT KY 635 TO ELIMINATE AT GRADERAILROAD CROSSING AND REPLACE WITH RAILROAD SEPARATION CROSSINGAT SCIENCE HILL, KENTUCKY IN PULASKI COUNTY. (2016BOP)
ADDRESS PAVEMENT CONDITION ON US-27 FROM MILEPOINT 0.00 TO MILEPOINT6.78
IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEWROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)(18CCN)
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 0.00 TO MILEPOINT11.00
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1MI N SAND HILLROAD UNDERPASS N TO 1.1 MILES N OF THE US-25 I-CHNG AT MT. VERNON.(16CCR)
3.879
3.879
1.286
6.780
.203
11.000
4.355
POWELL
PULASKI
PULASKI
PULASKI
PULASKI
ROBERTSON
ROBERTSON
ROCKCASTLE
KY-9000
KY-461
KY-461
KY-635
US-27
KY-616
US-62
I-75
$3,025,000
$17,500,000
$4,500,000
$9,600,000
$2,708,000
$3,280,000
$863,000
$41,110,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
U
C
R
U
R
U
C
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2023
2023
2019
2020
2021
2019
2020
2020
2020
2022
2022
2020
2020
2021
2022
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
NH
NH
NH
NH
NH
RRS
RRS
RRS
PM
SPP
SPP
SPP
PM
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$275,000
$2,750,000
$3,000,000
$1,500,000
$13,000,000
$3,000,000
$1,500,000
$1,800,000
$1,300,000
$6,500,000
$2,708,000
$250,000
$210,000
$2,820,000
$863,000
$41,110,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
08
08
08
08
06
06
08
20008.00
59.25
59.26
9010.00
20008.00
8711.00
20053.00
6.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
10
08
08
99
08
06
06
08
20008.00
59.10
59.26
352.13
20008.00
8711.00
20053.00
6.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2016
2018
2012
2018
1998
2018
2000
2018
2012
2018
2012
2018
1998
32.788
0
0
6.9
0
6.3
0
55.745
36
3.879
3.879
8.186
6.78
6.503
11
60.1
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / SAFETY-RR SEPARATN(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MAJOR WIDENING(O)
![Page 146: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/146.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 144
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)(18CCR)
IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)(18CCR)
ADDRESS DEFICIENCIES OF KY 1326 BRIDGE OVER LITTLE RENFRO CREEK.(102B00026N)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 52.05 TO MILEPOINT 55.295
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 71.668 TO MILEPOINT 73.408
ADDRESS PAVEMENT CONDITION
IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH.(12CCR)(18CCR)
IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)
1.922
1.922
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROCKCASTLE
ROWAN
ROWAN
KY-461
KY-461
KY-1326
I-75
I-75
US-25
KY-32
KY-32
$4,880,000
$2,570,000
$280,000
$4,290,000
$2,310,000
$1,925,000
$19,710,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
R
U
R
U
D
C
D
C
D
C
D
C
R
U
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2021
2022
2019
2020
2019
2019
2020
2020
2020
2020
2020
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
BR
BR
PM
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$1,450,000
$2,230,000
$1,450,000
$1,120,000
$70,000
$210,000
$390,000
$3,900,000
$210,000
$2,100,000
$175,000
$1,750,000
$5,500,000
$4,210,000
$10,000,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
08
08
09
09
8952.00
8952.01
10010.00
20003.00
20004.00
20005.00
204.00
204.01
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
08
08
08
09
09
8952.00
8952.01
10010.00
20003.00
20004.00
20005.00
204.00
204.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2018
2018
2018
2018
2012
2018
2016
2018
2018
2018
2018
2018
2012
2012
7
7
3.584
52.05
52.05
20.404
2.235
2.235
9.404
9.404
3.588
55.295
55.295
27.052
4.157
4.157
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 147: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/147.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 145
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVESAFETY.(12CCR)
REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140)AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)(18CCN)
RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OFKY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS,UNOBSTRUCTED CLEAR ZONES, FLATTER VERTICAL GRADES, AND GENTLYHORIZONTAL CURVES. (08CCN)(12CCR)(14CCR)(18CCN)
IMPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION ON KY-377FROM KY-32 TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)(18CCR)
PROVIDE WEST TURN LANES ON US 60 AT SUNNYBROOK. (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETTCREEK.(16CCN)
WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO.(16CCN)(18CCN)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 128.96 TO MILEPOINT 134.75
.300
.010
1.500
8.200
.200
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
ROWAN
US-60
CR-1140
US-60
KY-377
US-60
CR-1025
KY-801
I-64
$520,000
$850,000
$7,030,000
$19,400,000
$3,450,000
$822,500
$100,000
$5,225,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
R
U
C
R
U
C
D
R
U
C
C
P
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2021
2022
2022
2022
2021
2022
2024
2020
2021
2022
2021
2022
2022
2024
2020
2019
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
BR
BR
BR
BR
SPP
SPP
SPP
STP
STP
STP
SPP
SPP
SPP
SPP
BR
STP
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$520,000
$350,000
$50,000
$50,000
$400,000
$830,000
$700,000
$5,500,000
$2,600,000
$7,700,000
$9,100,000
$300,000
$250,000
$400,000
$2,500,000
$822,500
$100,000
$475,000
$4,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
09
09
227.00
1093.00
8401.00
8406.00
8913.00
8914.00
8915.00
20012.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
CARTER
FLEMING
09
09
09
09
09
09
09
09
227.00
1093.00
8401.00
8406.00
8913.00
8914.00
8915.00
20012.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2008
2008
2016
2016
2016
2018
2012
2014
2008
2008
2016
2016
2016
2018
5.25
.01
16
0
16.3
.081
15.61
128.96
5.8
.02
17.112
8.3
16.5
.089
16.978
134.75
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / BRIDGE REPLACEMENT(P)
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / CONGESTION MITIGTN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
0
0
.4
.912
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 148: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/148.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 146
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 141.5 TO MILEPOINT 147.95
CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAYINTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)
RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)
RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)
RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RDINTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OFCUMBERLAND RIVER (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)(14CCR)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 62.544 TO MILEPOINT 72.087
ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 19.03 TOMILEPOINT 26.21
ADD A RIGHT TURNING ON US 127 SOUTHBOUND BEGINNING AT THEEASTBOUND EXIT OF THE CUMBERLAND PARKWAY FOR 0.2 MILES(18CCN)
GEORGETOWN NORTHWEST BYPASS: IMPROVE CONNECTIVITY AND MOBILITYNORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)
GEORGETOWN NORTHWEST BYPASS: IMPROVE CONNECTIVITY AND MOBILITYNORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)
2.520
2.520
2.520
7.190
ROWAN
RUSSELL
RUSSELL
RUSSELL
RUSSELL
RUSSELL
RUSSELL
RUSSELL
SCOTT
SCOTT
I-64
LN-9008
US-127
US-127
US-127
LN-9008
US-127
US-127
-
-
$5,775,000
$6,740,000
$9,320,000
$8,280,000
$8,280,000
$8,525,000
$1,549,000
$400,000
$5,000,000
$10,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
C
C
C
D
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2022
2018
2019
2020
2021
2023
2023
2022
2019
2020
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
SPP
NH
NH
NH
PM
PM
PM
SPP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$525,000
$5,250,000
$6,740,000
$9,320,000
$8,280,000
$8,280,000
$775,000
$7,750,000
$1,549,000
$400,000
$5,000,000
$10,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
08
08
08
08
08
08
08
07
07
20014.00
8502.00
8601.21
8601.23
8601.24
20007.00
20009.00
80007.00
102.50
102.51
-
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
09
08
08
08
08
08
08
08
07
07
20014.00
8502.00
8601.21
8601.21
8601.21
20007.00
20009.00
80007.00
102.01
102.50
-
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2008
2012
2018
2018
2018
2018
2018
2004
2018
2018
2008
2012
2012
2012
2018
2018
2018
1996
2004
141.5
70.3
0
0
0
62.544
19.03
17.825
147.95
71.24
2.5
2.5
2.5
72.087
26.21
18.025
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
RELIABILITY / BYPASS(O)
RELIABILITY / PREFINANCD CONVRSN(O)
![Page 149: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/149.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 147
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46MILE W OF KY 227105B00038N
ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR1022) AT SCOTT/HARRISON CO LINE (105R00607N) (EBRP)
RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTALCURVE. (16CCN)
ADDRESS DEFICIENCIES OF KY-620 BRIDGE OVER ROGERS GAP CREEK.(105B00095N)
ADDRESS DEFICIENCIES OF LEMONS MILL RD BRIDGE OVER NS (CNO&TP)SYSTEM. (105C00112N)
ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER LOCUST FORK. (105B00039N)
ADDRESS DEFICIENCIES OF HINTON RD BRIDGE OVER NS (CNO&TP) SYSTEM.(105R00605N)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 120.792 TO MILEPOINT 121.117
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 138.424 TO MILEPOINT 143.24
.040
.020
.360
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
SCOTT
KY-1689
CR-1022
KY-227
KY-620
CS-1010
KY-1689
CR-1020
I-75
I-75
$462,000
$1,330,000
$200,000
$875,000
$1,645,000
$441,000
$749,000
$440,000
$6,325,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
C
D
C
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2018
2019
2018
2019
2020
2019
2020
2019
2020
2019
2020
2020
2020
2024
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
STP
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$462,000
$210,000
$1,120,000
$200,000
$210,000
$665,000
$350,000
$1,295,000
$133,000
$308,000
$238,000
$511,000
$40,000
$400,000
$575,000
$5,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
07
07
07
07
07
07
1127.00
1139.00
8907.00
10005.00
10006.00
10012.00
10013.00
20019.00
20021.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
07
07
07
07
07
07
07
07
07
1127.00
1139.00
8907.00
10005.00
10006.00
10012.00
10013.00
20019.00
20021.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2016
2018
2018
2018
2018
2018
2018
2018
2018
2016
2018
2018
2018
2018
2018
2018
1.801
1.19
2.98
15.923
.025
2.219
0
120.792
138.424
1.841
1.21
3.34
15.939
.045
2.227
.021
121.117
143.24
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 150: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/150.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 148
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TOTHE KY-1790 UNDERPASS. (2006BOPC)
WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TOTHE KY-1790 UNDERPASS. (2006BOPC)
WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY 55 INTERCHANGE TOTHE KY 1790 UNDERPASS. (2006BOPC)
WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDINGCOVERS 5-2035.70 SECTION ALSO)
WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDINGCOVERS 5-2035.70 SECTION ALSO)(ADDITIONAL FUNDING FOR C PHASE)
WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)(18CCR)
WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)(18CCR)
CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKETLANE. (12CCN)(14CCR)
ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE OVER FOX RUN CREEK.(106C00004N)
3.600
3.600
3.600
4.370
4.370
1.900
1.900
1.378
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
SHELBY
I-64
I-64
I-64
I-64
I-64
KY-53
KY-53
US-60
CR-1007
$23,800,000
$19,800,000
$19,800,000
$16,530,000
$16,330,000
$3,000,000
$7,700,000
$2,170,000
$357,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
U
C
C
C
R
U
C
C
C
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2022
2023
2024
2021
2021
2023
2024
2019
2020
2021
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
NH
STP
STP
SPP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$2,000,000
$19,800,000
$19,800,000
$19,800,000
$100,000
$100,000
$16,330,000
$16,330,000
$3,000,000
$7,700,000
$2,170,000
$140,000
$217,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
05
05
05
05
05
65.40
65.41
65.42
2035.40
2035.41
8511.00
8511.01
8713.00
10024.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
FRANKLIN
FRANKLIN
05
05
05
05
05
08
05
05
05
65.20
65.40
65.40
2035.02
2035.40
8511.00
8511.00
8713.00
10024.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2006
2018
2018
2004
2006
2008
2018
2012
2018
2004
2006
2006
2004
2004
2008
2012
2018
32.3
32.3
32.3
43.33
43.33
6.064
6.064
11.5
1.394
35.9
35.9
35.9
46.303
46.303
8.006
8.006
12.878
1.398
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(P)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
46.303
46.303
47.7
47.7
Milepoints:
Milepoints:
To:
To:
From:
From:
![Page 151: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/151.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 149
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF CLORE JACKSON RD BRIDGE OVER FOX RUN CREEK.(106C00007N)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROMMILEPOINT 38.18 (38 NON-CARDINAL) TO MILEPOINT 43.33 (43.892 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION ON KY-53 FROM MILEPOINT 8.01 TOMILEPOINT 13.79
FOUR RIGHT TURNING LANES AT THE INTERSECTION OF KY 55X AND KY 43 ANDTWO LEFT TURNING LANES FROM KY 55X ONTO KY 43.(18CCN)
GARVIN LANE EXTENSION TO HENDERSON INDUSTRIAL PARK.(14CCN)(16CCR)(18CCN)
IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)
IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)
IMPROVE US-31W FROM KY-1008 TO KY-621. (14CCN)(16CCR)
5.790
.645
.645
2.302
SHELBY
SHELBY
SHELBY
SHELBY
SIMPSON
SIMPSON
SIMPSON
SIMPSON
CR-1009
I-64
KY-53
KY-55X
-
KY-1008
KY-1008
US-31W
$546,000
$8,525,000
$943,000
$694,000
$300,000
$5,640,000
$1,670,000
$3,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
D
R
U
C
C
R
U
C
U
D
R
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2022
2022
2023
2019
2019
2019
2020
2019
2022
2022
2023
2023
2021
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$140,000
$406,000
$775,000
$7,750,000
$943,000
$150,000
$22,000
$22,000
$500,000
$300,000
$1,880,000
$560,000
$3,200,000
$1,670,000
$1,000,000
$2,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
05
05
03
03
03
03
10025.00
20033.00
20040.00
80004.00
8810.00
8855.00
8855.01
8856.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
05
05
03
03
03
03
10025.00
20033.00
20040.00
80004.00
8810.00
8855.00
8855.00
8856.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2014
2014
2018
2014
2018
2018
2018
2018
2014
2014
2014
2014
2.738
38.18
8.01
1.2
3.688
3.688
8.477
2.75
43.33
13.79
1.3
4.333
4.333
10.799
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / SAFETY(P)
NEW ROUTES / NEW ROUTE(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / MAJOR WIDENING(O)
![Page 152: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/152.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 150
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-621 BRIDGE OVER SINKING CREEK. (107B00018N)
ADDRESS DEFICIENCIES OF PLEASANT HILL ROAD BRIDGE OVER MAYSBRANCH. (107C00011N)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 13.71
ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EASTOF YODER TIPTON ROAD (CR 1142). (108B00022N)(EBRP)
CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCERCOUNTY AND KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BYADDING A CONTINUOUS THIRD LANE THAT SERVES AS AN ALTERNATINGPASSING LANE.(16CCN)(18CCN)
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY-44 NEARDUTCHMAN CREEK ROAD. (16CCN)
ADDRESS DEFICIENCIES OF KY 1169 BRIDGE OVER ELK CREEK. (108B00040N)
ADDRESS DEFICIENCIES OF WASHBURN LANE BRIDGE OVER ELK CREEK.(108B00017N)(SD)
.160
SIMPSON
SIMPSON
SIMPSON
SPENCER
SPENCER
SPENCER
SPENCER
SPENCER
KY-621
CR-1126
I-65
KY-1169
KY-155
KY-44
KY-1169
CR-1128
$490,000
$437,500
$18,150,000
$742,000
$4,750,000
$230,000
$700,000
$441,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
D
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2024
2024
2019
2020
2024
2022
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
PM
PM
BR
BR
SPP
STP
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$157,500
$332,500
$157,500
$280,000
$1,650,000
$16,500,000
$245,000
$497,000
$4,750,000
$230,000
$210,000
$490,000
$192,500
$248,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
05
05
05
05
05
10007.00
10008.00
20014.00
1076.00
8954.00
8955.00
10013.00
10014.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JEFFERSON
03
03
03
05
05
05
05
05
10007.00
10008.00
20014.00
1076.00
8954.00
8955.00
10013.00
10014.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2014
2016
2016
2018
2018
2018
2018
2018
2014
2016
2016
2018
2018
6.68
1.453
0
8.53
0
.28
4.639
.025
6.686
1.459
13.711
8.552
4.247
.44
4.655
.033
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
0 4Milepoints: To:From:
![Page 153: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/153.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 151
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF FEATHERBED HOLW RD BRIDGE OVER LITTLE PLUMCREEK. (108C00019N)(18CCR)
ADDRESS PAVEMENT CONDITION ON KY-44 FROM MILEPOINT 9.93 TOMILEPOINT 14.89
HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70.SECTION 1. (2010BOP)(14CCR)(16CCR)
HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70.SECTION 1. (2010BOP)(14CCR)(16CCR)(18CCR)
HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEWCAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EAST OF CAMPBELLSVILLE.SECTION 2. (2010BOP)(16CCR)
IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY-70 INCAMPBELLSVILLE FROM US-68 TO COUNTRY VIEW COURT (CS-1305)
HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THETAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)
HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THETAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS.(16CCN)(18CCR)
ADDRESS DEFICIENCIES OF WEST MAIN STREET BRIDGE OVER BUCKHORNCRK.. (109B00051N)
4.960
1.367
SPENCER
SPENCER
TAYLOR
TAYLOR
TAYLOR
TAYLOR
TAYLOR
TAYLOR
TAYLOR
CR-1155
KY-44
KY-555
KY-555
KY-555
KY-70
KY-55
KY-55
KY-323
$777,000
$808,000
$7,600,000
$7,600,000
$1,000,000
$700,000
$2,500,000
$7,000,000
$962,500
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
C
C
C
U
D
R
U
C
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2023
2022
2020
2019
2024
2019
2019
2020
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
NH
NH
NH
STP
NH
NH
NH
NH
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$567,000
$808,000
$7,600,000
$7,600,000
$1,000,000
$700,000
$500,000
$1,000,000
$1,000,000
$7,000,000
$157,500
$805,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
05
05
04
04
04
04
04
04
04
10026.00
20041.00
142.20
142.21
142.30
443.00
8920.00
8920.01
10006.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
05
05
04
04
04
04
04
04
04
10026.00
20041.00
142.10
142.20
142.10
443.00
8920.00
8920.00
10006.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2010
2018
2010
2018
2016
2018
2018
2018
2018
2006
2010
2006
2018
2016
2016
2018
.088
9.93
0
0
0
8.731
.112
14.89
1.367
8.003
8.003
8.737
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / NEW ROUTE(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 154: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/154.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 152
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF SOUTH JACKSON ST BRIDGE OVER BUCKHORNCREEK. (109C00028N)
RECONSTRUCT KY-181 (ELKTON ROAD) FROM US-79 (MP 0.000) TO NORTH OFINTERSECTION WITH US-41 (MP 0.214) TO INCLUDE A NEW INTERSECTION WITHKY-294. (MP 0.000-0.400) (14CCN)(18CCN)
ADDRESS DEFICIENCIES OF RATTLESNAKE RD BRIDGE OVER BUCK FORK.(110C00059N)
ADDRESS DEFICIENCIES OF ROGER Q MILL RD. BRIDGE OVER RED RIVER WFORK BRANCH. (110C00061N)
US 79 WIDENING FROM MP 0 TO MP 3. (18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK111C00027N
OVERLAY BRIDGE DECK AND ADDRESS DEFICIENCIES OF EXPANSION JOINTS ONEASTBOUND I-24 BRIDGE OVER TRW RAILROAD EAST OF US 68 AT (MP 66.515).(111B00027R) (2012BOP)(SD)
REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE ANDSIGHT DISTANCE. (16CCN)(18CCN)
.400
TAYLOR
TODD
TODD
TODD
TODD
TRIGG
TRIGG
TRIGG
CS-1241
KY-181
CR-1333
CR-1233
US-79
CR-1380
I-24
KY-139
$472,500
$3,520,000
$486,500
$542,500
$14,200,000
$521,500
$250,000
$1,100,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
R
U
C
D
C
D
C
D
R
U
C
D
C
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2021
2023
2019
2020
2019
2020
2019
2021
2021
2022
2019
2020
2018
2019
2020
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
SPP
SPP
BR
BR
BR
BR
SPP
SPP
SPP
SPP
BR
BR
BR
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$105,000
$367,500
$250,000
$670,000
$2,600,000
$192,500
$294,000
$157,500
$385,000
$1,200,000
$2,000,000
$3,000,000
$8,000,000
$140,000
$381,500
$250,000
$200,000
$150,000
$150,000
$600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
03
03
03
03
01
01
01
10007.00
8811.00
10009.00
10013.00
80001.00
1160.00
2039.00
8951.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
04
03
03
03
03
01
99
01
10007.00
8811.00
10009.00
10013.00
80001.00
1160.00
65.10
8951.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2014
2018
2018
2018
2018
2018
2016
2018
2014
2018
2018
2018
2018
2008
2016
.077
0
1.471
.028
0
.011
66.5
17.83
.083
.4
1.475
.032
3
.017
66.53
17.98
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MINOR WIDENING(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / AIR QUALITY(P)
![Page 155: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/155.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 153
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-139 BRIDGE OVER BURGE CREEK. (111B00012N)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINALDIRECTION(S) FROM MILEPOINT 57.39 TO MILEPOINT 69.83
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINALDIRECTION(S) FROM MILEPOINT 57.389 TO MILEPOINT 69.389
ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95MI N.E. OF JCT US-60; 113B00006N (LET W/ 2-1074)
ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK;1.1 MI N.E. OF JCT US-60; 113B00007N (LET W/ 2-1073)
IMPROVE ROADWAY TO REDUCE FLOODING ON US-60 FROM EAST OF HOUSEBRIDGE ROAD (CR-1027) TO UNION/HENDERSON COUNTY LINE. (16CCN)
ADDRESS DEFICIENCIES OF KY-359 BRIDGE OVER LITTLE MASON CREEK.(113B00008N)
ADDRESS DEFICIENCIES OF KY 492 BRIDGE OVER WASH CREEK. (113B00054N)
IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE TO THE BUTLER COUNTY LINE.(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)(18CCR)
.100
.100
1.400
5.623
TRIGG
TRIGG
TRIGG
UNION
UNION
UNION
UNION
UNION
WARREN
KY-139
I-24
I-24
KY-359
KY-359
US-60
KY-359
KY-492
KY-185
$1,277,500
$13,420,000
$13,420,000
$434,000
$511,000
$2,700,000
$892,500
$420,000
$5,000,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
C
C
D
R
U
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2024
2024
2024
2024
2018
2018
2019
2023
2023
2024
2019
2020
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
PM
PM
BR
BR
STP
STP
STP
STP
BR
BR
BR
BR
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$997,500
$1,220,000
$12,200,000
$1,220,000
$12,200,000
$434,000
$511,000
$300,000
$150,000
$250,000
$2,000,000
$210,000
$682,500
$70,000
$350,000
$5,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
02
02
02
02
02
03
10005.00
20020.00
20022.00
1073.00
1074.00
8955.00
10017.00
10026.00
110.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
01
01
01
02
02
02
02
02
03
10005.00
20020.00
20022.00
1073.00
1074.00
8955.00
10017.00
10026.00
110.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2016
2018
2018
2000
2018
2018
2018
2018
2018
2016
2018
2018
2000
13.386
57.389
57.39
.921
1.143
23.8
6.147
6.096
6.29
13.422
69.389
69.83
1.021
1.243
25.2
6.166
6.104
11.913
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
![Page 156: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/156.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 154
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE TO THE BUTLER COUNTY LINE.(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)(18CCR)
IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)
IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)
CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US-31W CONNECTINGBUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)
IMPROVE KY-526 FROM NEAR KY-2630 TO US-31W. (2014BOP)
I-65 SPUR CORRIDOR SIGNING; EXISTING NATCHER PARKWAY FROM I-65INTERCHANGE (EXIT 2) IN WARREN CO. EXTENDING NORTH TO THE US 60INTERCHANGE IN DAVIESS CO. TO MEET INTERSTATE STANDARDS. (2016BOP)
I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE(EXIT 9) ON THE WEST SIDE OF BOWLING GREEN. (SEE ITEM NO. 3-202 FORDESIGN) (2016BOP)
IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)
5.623
2.600
2.600
.183
70.185
.998
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
KY-185
US-31W
US-31W
US-31W
KY-526
WN-9007
WN-9007
US-231
$5,000,000
$2,880,000
$6,730,000
$450,000
$410,000
$2,150,000
$8,200,000
$5,100,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
C
D
C
R
U
C
C
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2022
2023
2022
2024
2019
2019
2020
2019
2021
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
SPP
SPP
STP
STP
SPP
SPP
SPP
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,000,000
$2,880,000
$6,730,000
$50,000
$400,000
$70,000
$180,000
$160,000
$2,150,000
$8,200,000
$2,500,000
$2,600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
110.01
199.00
199.01
199.99
322.00
2042.11
2042.20
8702.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
BUTLEROHIODAVIESS
03
03
03
03
99
03
03
03
110.00
199.00
199.00
199.99
86.12
2042.10
2042.00
8702.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2012
2018
2016
2014
2016
2016
2012
2000
2012
2012
2016
2002
2016
2016
2012
6.29
4.1
4.1
4.1
6.2
2.473
9.4
9.455
11.913
6.7
6.7
4.258
6.383
20.246
9.6
10.453
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
SAFETY / BIKE/PED FACIL(O)
RELIABILITY / MINOR WIDENING(O)
ECONOMIC DEVELOPMENT / SIGNING(P)
RELIABILITY / I-CHANGE RECONST(O)
RELIABILITY / MAJOR WIDENING(O)
20.24637.14361.557
37.14361.55772.264
Milepoints:Milepoints:Milepoints:
To:To:To:
From:From:From:
![Page 157: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/157.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 155
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)
THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHERPARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)(18CCN)
IMPROVE US-31W FROM CAMPBELL LANE (US-231) TO UNIVERSITY BOULEVARD(US-231X). (14CCN)(16CCR)(18CCR)
WIDEN US 31W FROM PARK AVENUE TO FAIRVIEW AVENUE MP 13.7-14.25. (18CCN)
IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-68 TOMIZPAH. (16CCN)
ADDRESS DEFICIENCIES OF HAMMET HILL ROAD BRIDGE OVER SALT LICKCREEK. (114B00071N)
ADDRESS DEFICIENCIES OF KY 1435 BRIDGE OVER GASPER RIVER. (114B00074N)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 13.711 TO MILEPOINT 25
.998
1.320
1.256
.971
1.586
.360
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
US-231
KY-884
US-31W
US-31W
US-31W
KY-2632
KY-1435
I-65
$870,000
$15,730,000
$8,000,000
$8,250,000
$4,900,000
$507,500
$1,452,500
$14,850,000
Total
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
D
R
U
C
D
R
U
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2021
2023
2019
2019
2022
2019
2020
2020
2021
2020
2020
2020
2022
2019
2020
2019
2020
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
SPP
SPP
SPP
SPP
SPP
SPP
STP
STP
STP
STP
STP
STP
STP
STP
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$870,000
$4,000,000
$2,800,000
$8,930,000
$1,750,000
$2,000,000
$4,250,000
$500,000
$1,500,000
$1,750,000
$4,500,000
$800,000
$900,000
$400,000
$2,800,000
$157,500
$350,000
$280,000
$1,172,500
$1,350,000
$13,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
03
8702.01
8818.00
8857.00
8904.10
8905.00
10014.00
10015.00
20016.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
03
8702.00
8818.00
8857.00
8904.10
8905.00
10018.00
10015.00
20016.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2014
2014
2018
2016
2018
2018
2018
2012
2014
2014
2018
2016
2018
2018
9.455
7.302
10.561
13.698
20.904
4.96
9.445
13.711
10.453
8.622
11.817
14.669
22.49
4.966
9.481
25
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
NEW ROUTES / MINOR WIDENING(O)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / MINOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
![Page 158: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/158.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 156
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROMMILEPOINT 35.616 TO MILEPOINT 42.89
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 2.473
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTHDIRECTION(S) FROM MILEPOINT 9.2 TO MILEPOINT 20.246
SOUTHWEST PARKWAY - NEW CONSTRUCTION FROM US-68 TO A CONNECTIONAT KOBE WAY IN BOWLING GREEN(18CCN)
ADD LEFT TURNING LANE ON KY 242 INTO RICHPOND ELEMENTARY SCHOOL ATMP 3.8 TO 3.95(18CCN)
SAFETY IMPROVEMENTS AND REHABILITATION ON KY-3225. KEEP EXISTINGFOOTPRINT BY REPLACING CURBLINE IN SAME LOCATION FROM MP 0 TO MP1(18CCN)
EXTEND THE 5 LANE SECTION ON KY-234 FROM MP 11.9 TO 12.4. IMPROVEMENTSMAY INCLUDE A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTONDR.(18CCN)
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
WARREN
I-65
WN-9007
WN-9007
US-68
KY-242
KY-3225
KY-234
$9,570,000
$2,200,000
$11,083,000
$4,550,000
$625,000
$2,610,000
$3,330,000
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2019
2020
2020
2019
2019
2019
2019
2019
2020
2020
2020
2020
2021
2021
2022
2022
2023
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$870,000
$8,700,000
$200,000
$2,000,000
$11,083,000
$200,000
$280,000
$200,000
$3,870,000
$50,000
$125,000
$250,000
$200,000
$200,000
$1,110,000
$100,000
$1,200,000
$250,000
$180,000
$1,500,000
$1,400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
20017.00
20018.00
20019.00
80000.00
80005.00
80051.00
80052.00
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
03
03
03
03
03
03
03
20017.00
20018.00
20019.00
80000.00
80005.00
80051.00
80052.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
35.616
0
9.2
3.8
0
11.9
42.89
2.473
20.246
3.95
1
12.4
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
NEW ROUTES / NEW ROUTE(O)
SAFETY / SAFETY(P)
SAFETY / SAFETY(P)
RELIABILITY / MINOR WIDENING(O)
![Page 159: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/159.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 157
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE US-150 FROM SPRINGFIELD TO BARDSTOWN.
IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ALONG US-150 FROM WEST OFOLD FREDERICKTOWN-BARDSTOWN ROAD (KY-1872) THROUGH GRUNDY HOMECURVE TO MAYFIELD LN (CR-1336). (2016BOP)
ADDRESS DEFICIENCIES OF BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUNBRANCH.(115B00043N)
ADDRESS DEFICIENCIES OF BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) ATMP 0.349 OVER LONG LICK CREEK.(115C00039) (16CCN)(SD)
ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US 150 INWASHINGTON COUNTY FROM 400 FEET WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD (KY 1872) TO 0.7 MILES EAST OF GRUNDY HOME ROAD (CR1337). (16CCN)(18CCN)
ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER SEIBERT CREEK. (115B00026N)
ADDRESS DEFICIENCIES OF KY 1920 BRIDGE OVER DEEP CREEK. (115B00061N)
IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD TO THE BRIDGE AT MP 19.5.(12CCR)(16CCR)(18CCR)
12.178
2.074
1.809
WASHINGTON
WASHINGTON
WASHINGTON
WASHINGTON
WASHINGTON
WASHINGTON
WASHINGTON
WAYNE
US-150
US-150
KY-528
CR-1140
US-150
KY-55
KY-1920
KY-90
$3,000,000
$5,750,000
$1,477,000
$175,000
$12,520,000
$598,500
$350,000
$4,220,000
Total
Total
Total
Total
Total
Total
Total
Total
D
D
R
U
C
D
C
C
D
R
U
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2022
2022
2024
2019
2020
2020
2019
2020
2021
2022
2019
2020
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
STP
BR
BR
BR
SPP
SPP
SPP
SPP
BR
BR
BR
BR
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$500,000
$500,000
$750,000
$4,000,000
$175,000
$1,302,000
$175,000
$700,000
$900,000
$1,100,000
$9,820,000
$87,500
$511,000
$87,500
$262,500
$4,220,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
04
04
04
04
04
04
04
08
396.00
396.20
1094.00
8957.00
8958.00
10008.00
10015.00
109.10
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
NELSON 04
04
04
04
04
04
04
08
396.00
396.00
1094.00
8957.00
8958.00
10008.00
10015.00
109.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2016
2016
2018
2018
2004
2014
2014
2016
2016
2016
2018
2018
2000
0
.426
1.433
.344
8.669
.017
17.691
6.557
2.5
1.441
.354
8.679
.025
19.5
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / RECONSTRUCTION(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
SAFETY / SAFETY(P)
2.032 7.653Milepoints: To:From:
![Page 160: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/160.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 158
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD TO THE BRIDGE AT MP 19.5.(18CCN)
ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTHFORK RIVER; 0.25 MI SE OF JCT CR-5137; 116C00007N
ADDRESS DEFICIENCIES OF DODSON HOLLOW RD BRIDGE OVER MEADOWCREEK. (116C00028N)
ADDRESS PAVEMENT CONDITION ON KY-90X FROM MILEPOINT 0.00 TOMILEPOINT 3.54
PRELIMINARY ENGINEERING AND ENVIRONMENTAL CORRIDOR STUDY FORIMPROVING SAFETY AND MAKING KY-92 A SCENIC ROUTE FROM MONTICELLOTO STEARNS (FLEXIBLE SOLUTIONS)(18CCN)
IMPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD AND RESURFACEFROM KY 1275 FROM BELL LANE TO KY 833/ROGERS GROVE ROAD(18CCN)
WIDEN KY 1275 TO FOUR LANES WITH FOUR FOOT SHOULDERS AND FIVE FOOTSIDEWALKS FROM KY 90 TO BELL LANE(18CCN)
RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TOALLEVIATE FLOODING. (12CCR)(18CCN)
.100
3.540
.281
WAYNE
WAYNE
WAYNE
WAYNE
WAYNE
WAYNE
WAYNE
WEBSTER
KY-90
CR-1136
CR-1016
KY-90X
KY-92
KY-1275
KY-1275
KY-138
$4,220,000
$455,000
$641,000
$1,623,000
$1,500,000
$323,500
$4,190,000
$1,550,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
C
C
P
D
R
U
C
D
R
U
C
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2019
2019
2020
2024
2020
2019
2019
2019
2020
2019
2020
2020
2021
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
BR
BR
BR
PM
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$4,220,000
$455,000
$175,000
$466,000
$1,623,000
$1,500,000
$60,000
$3,500
$60,000
$200,000
$490,000
$200,000
$500,000
$3,000,000
$100,000
$250,000
$1,200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
08
08
08
02
109.20
1050.00
10005.00
20010.00
80004.00
80005.00
80006.00
228.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
08
08
08
08
08
08
08
02
109.10
1050.00
10005.00
20010.00
80004.00
80005.00
80006.00
228.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2012
2004
2018
2018
2018
2018
2018
2018
2012
17.691
.175
.216
0
4.479
4
10.449
19.5
.275
.224
3.54
4.7
4.479
10.73
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
SAFETY / PLANNING-OKI(O)
SAFETY / SAFETY(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
![Page 161: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/161.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 159
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF KY-1835 BRIDGE OVER SUGAR CAMP CREEK.(117B00023N)
ADDRESS DEFICIENCIES OF KY-132 BRIDGE OVER NALL DITCH. (117B00064N)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN. (C-COST=$87,500,000)(18CCR)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN. (18CCR)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN(ADDITIONALCONSTRUCTION FUNDING FOR 11-14.80)(18CCN)
TENN. STATE LINE-LEXINGTON: WIDEN I-75 TO 8 LANES FROM MP 20.2 INWHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN. (ADDITIOALCONSTRUCTION FUNDING FOR 11-14.80)(18CCN)
RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)
RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1) (ADDITIONALFUNDING FOR 11-184.10)
8.650
8.650
4.172
4.172
WEBSTER
WEBSTER
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
KY-1835
KY-132
I-75
I-75
I-75
I-75
KY-92
KY-92
$875,000
$1,347,500
$11,000,000
$25,000,000
$25,000,000
$25,000,000
$10,000,000
$6,000,000
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
R
U
C
C
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2019
2020
2021
2022
2023
2019
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
NH
NH
NH
NH
NH
NH
STP
STP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$210,000
$665,000
$245,000
$1,102,500
$500,000
$500,000
$10,000,000
$25,000,000
$25,000,000
$25,000,000
$10,000,000
$6,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
02
02
11
11
11
11
11
11
10018.00
10019.00
14.80
14.81
14.83
14.84
184.10
184.11
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
LAUREL
LAUREL
LAUREL
LAUREL
MCCREARY
MCCREARY
02
02
11
11
11
11
11
11
10018.00
10019.00
14.00
14.01
14.80
14.80
184.00
184.10
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2000
1998
2018
2018
2014
2018
2018
2018
1998
1998
2000
2000
2010
2014
.385
12.304
20.2
20.2
20.2
20.2
0
0
.406
12.314
27.943
27.943
27.943
27.943
4.172
4.172
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / PREFINANCD CONVRSN(O)
RELIABILITY / RELOCATION(O)
RELIABILITY / PREFINANCD CONVRSN(O)
27.943
27.943
27.943
27.943
24.74
24.74
28.851
28.851
28.851
28.851
24.835
24.835
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
![Page 162: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/162.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 160
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)
IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)
REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1)(B00063R AND B00063L)(SD)
ADDRESS DEFICIENCIES OF KY-904 BRIDGE OVER TYES FK OF BENNETTS BR.(118B00070N)
ADDRESS DEFICIENCIES OF KY-779 BRIDGE OVER BROWNS CREEK. (118B00079N)
ADDRESS DEFICIENCIES OF KY-204 BRIDGE OVER YOUNGS CREEK. (118B00084N)
ADDRESS DEFICIENCIES OF KY-2996 BRIDGE OVER WOLF CREEK. (118B00101N)
ADDRESS DEFICIENCIES OF BETHEL ROAD BRIDGE OVER PATTERSON CREEK.(118C00029N)
2.325
2.325
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
US-25W
US-25W
I-75
KY-904
KY-779
KY-204
KY-2996
CR-1275
$10,260,000
$6,670,000
$2,800,000
$668,500
$623,000
$1,172,500
$630,000
$455,000
Total
Total
Total
Total
Total
Total
Total
Total
R
U
C
C
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2021
2021
2022
2023
2018
2019
2020
2019
2020
2019
2020
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,770,000
$4,160,000
$3,330,000
$6,670,000
$2,800,000
$175,000
$493,500
$175,000
$448,000
$262,500
$910,000
$175,000
$455,000
$140,000
$315,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
186.00
186.01
1105.00
10032.00
10033.00
10034.00
10035.00
10036.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
LAUREL
11
11
11
11
11
11
11
11
186.00
186.00
1105.00
10032.00
10033.00
10034.00
10035.00
10036.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2018
2016
2018
2018
2018
2018
2018
2012
2012
2016
2018
2018
2018
2018
2018
28.1
28.1
27.85
8.153
2.342
10.146
3.548
.479
30.425
30.425
27.943
8.157
2.346
10.156
3.554
.487
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / PREFINANCD CONVRSN(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
27.943 27.994Milepoints: To:From:
![Page 163: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/163.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 161
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE OVER SANDERS CREEK.(118C00039N)
ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RVR.(118B00041N)
ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RIVER.(118B00042N)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 0 TO MILEPOINT 11.27
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROMMILEPOINT 20.2 TO MILEPOINT 24.645
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROMMILEPOINT 23.0 (25.26 NON-CARDINAL) TO MILEPOINT 28.872
ADDRESS PAVEMENT CONDITION ON KY-26 FROM MILEPOINT 5.46 TOMILEPOINT 13.33
ADDRESS PAVEMENT CONDITION ON KY-90 FROM MILEPOINT 2.78 TOMILEPOINT 8.33
ADDRESS PAVEMENT CONDITION ON US-25W FROM MILEPOINT 26.17 TOMILEPOINT 32.43
7.870
5.550
6.260
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
WHITLEY
CR-1461
US-25W
US-25W
I-75
I-75
I-75
KY-26
KY-90
US-25W
$581,000
$2,135,000
$1,890,000
$9,900,000
$2,200,000
$3,740,000
$1,313,000
$926,000
$2,135,000
Total
Total
Total
Total
Total
Total
Total
Total
Total
D
C
D
C
D
C
D
C
D
C
D
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2022
2022
2022
2022
2019
2019
2022
2022
2024
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$406,000
$245,000
$1,890,000
$245,000
$1,645,000
$900,000
$9,000,000
$200,000
$2,000,000
$340,000
$3,400,000
$1,313,000
$926,000
$2,135,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
11
11
11
10037.00
10044.00
10045.00
20015.00
20018.00
20019.00
20024.00
20025.00
20026.00
-
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
11
11
11
11
11
11
11
11
10037.00
10044.00
10045.00
20015.00
20018.00
20019.00
20024.00
20025.00
20026.00
-
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
.091
5.045
6.205
0
20.2
23
5.46
2.78
26.17
.097
5.117
6.277
11.27
24.645
28.872
13.33
8.33
32.43
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (INT)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 164: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/164.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 162
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
INSTALL GUARDRAIL ON KY 204 BETWEEN MP 10.7 AND 10.8(18CCN)
IMPROVE THE KY-191 AND KY-1812 INTERSECTION.
ADDRESS DEFICIENCIES OF KY-191 BRIDGE OVER LACEY CREEK. (119B00001N)
ADDRESS DEFICIENCIES OF KY 2491 BRIDGE OVER SWANGO FORK. (119B00058N)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 36 TO MILEPOINT 42.85
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 42.853 TO MILEPOINT 46.208
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 46.208 TO MILEPOINT 55.434
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAYBOTH DIRECTION(S) FROM MILEPOINT 55.434 TO MILEPOINT 57.72
.200
WHITLEY
WOLFE
WOLFE
WOLFE
WOLFE
WOLFE
WOLFE
WOLFE
KY-204
KY-191
KY-191
KY-2491
KY-9000
KY-9009
KY-9009
KY-9009
$15,000
$1,240,000
$714,000
$700,000
$6,050,000
$3,025,000
$4,070,000
$990,000
Total
Total
Total
Total
Total
Total
Total
Total
C
D
R
U
C
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2023
2023
2023
2024
2019
2020
2019
2020
2021
2021
2022
2022
2021
2021
2019
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
STP
STP
STP
STP
BR
BR
BR
BR
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$15,000
$260,000
$80,000
$100,000
$800,000
$150,000
$564,000
$175,000
$525,000
$550,000
$5,500,000
$275,000
$2,750,000
$370,000
$3,700,000
$90,000
$900,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
10
10
10
10
10
10
10
80001.00
212.00
10009.00
10019.00
20009.00
20010.00
20011.00
20012.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
11
10
10
10
10
10
10
10
80001.00
212.00
10009.00
10019.00
20009.00
20010.00
20011.00
20012.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
10.7
4.765
9.456
4.899
36
42.853
46.208
55.434
10.8
4.965
9.47
4.905
41.373
46.208
55.434
57.72
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
SAFETY / SAFETY(P)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-BRIDGE (P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
![Page 165: KEY TO INTERPRETING THE INFORMATION PRESENTED FOR HIGHWAY … › Program-Management › Highway... · 2018-08-09 · kytc project identifica tion number route length (miles) description](https://reader034.vdocument.in/reader034/viewer/2022042407/5f221674d7f0b1655209be6a/html5/thumbnails/165.jpg)
KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN
Page: 163
FY - FY - THRU2018 2024
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION
28 JUN 2018
ADDRESS PAVEMENT CONDITION ON KY-15S FROM MILEPOINT 0.00 TOMILEPOINT 0.93
ADDRESS PAVEMENT CONDITION ON KY-11 FROM MILEPOINT 0.35 TOMILEPOINT 5.32
IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE. (18CCR)
IMPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE COUNTY TONORTH OF KY-1967 IN WOODFORD COUNTY.
ADDRESS DEFICIENCIES OF THE WEISENBURG MILL ROAD BRIDGE AT THEWOODFORD/SCOTT COUNTY LINE. (10CCN)(120C00006N)
ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON ROAD ATWOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70).(16CCN)(18CCN)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASSPARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.95 (62.05 NON-CARDINAL)TO MILEPOINT 70.70 (70.91 NON-CARDINAL)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
.930
4.970
1.374
3.000
.023
WOLFE
WOLFE
WOODFORD
WOODFORD
WOODFORD
WOODFORD
WOODFORD
WOODFORD
KY-15S
KY-11
US-60
KY-169
CR-1015
US-60
BG-9002
US-60
$896,000
$1,228,000
$500,000
$800,000
$966,000
$4,100,000
$7,700,000
$3,850,000
Total
Total
Total
Total
Total
Total
Total
Total
C
C
D
D
C
D
R
U
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2024
2021
2023
2020
2020
2021
2022
2023
2019
2019
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
NH
STP
BR
SPP
SPP
SPP
SPP
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$896,000
$1,228,000
$500,000
$800,000
$966,000
$400,000
$950,000
$750,000
$2,000,000
$700,000
$7,000,000
$350,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
10
10
07
07
07
07
07
07
20016.00
20017.00
117.00
440.00
8642.00
8905.00
20022.00
20023.00
-
-
-
-
-
-
-
-
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
Purpose and Need:
JESSAMINE
SCOTT
10
10
07
07
07
07
07
07
20016.00
20017.00
117.00
440.00
8642.00
8905.00
20022.00
20023.00
-
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2006
2018
2018
2016
2018
2018
2018
2018
2006
2018
2018
2016
2018
2018
0
.35
11.238
0
2.499
9.38
61.95
7.345
.93
5.32
12.612
3
2.522
9.7
70.7
9.305
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
From:
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
RELIABILITY / MAJOR WIDENING(O)
RELIABILITY / RECONSTRUCTION(O)
ASSET MANAGEMENT / AM-BRIDGE (P)
RELIABILITY / CONGESTION MITIGTN(O)
ASSET MANAGEMENT / AM-PAVEMENT (PKY)(P)
ASSET MANAGEMENT / AM-PAVEMENT (PRI)(P)
18.64
.536
19.18
.559
Milepoints:
Milepoints:
To:
To:
From:
From: