kgrtc business development project · “your home for energy training and conferences”...
TRANSCRIPT
![Page 1: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/1.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
KGRTC Business Development Project
‘CURRENT STATUS’
![Page 2: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/2.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
KGRTC Business
Development
10 MW Hydro Power
Plant
New Learning Centre–10 No. Offices, 2 No. Laboratories, 40 Guest
Rooms, 1 No. Restaurant, 2 Multi-purpose Conference
Rooms
Simulator Equipment-Electricity Transmission and
Distribution Networks
Switchyard and Tower-Electrical Safety
RETs
Demo Facilities for Wind, Solar and Biomass
Energy Efficient Technologies
Solar Lighting, Solar Water Heaters
KGRTC Business Plan
2013 to 2017
PIU: KGRTC+ZESCO
![Page 3: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/3.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Small Hydro Power Station
![Page 4: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/4.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
KGPS cavern
powerhouse
HEADRACE
TUNNEL
INTAKE
(on KGPS tailrace)
KGL dam
CAVERN
POWERHOUSE
Small Hydro Power Station –General Layout
![Page 5: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/5.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Small Hydro Power Station – Power House
Project Completed - Feasibility Study Report and Tender Documents based on World Bank standards and FIDIC Contract Forms.
“Design flow of 11.0 m3/s ; 10.35 MW Hydropower Station with Annual Energy production of 90.7 GWh, and enhanced classical small hydropower station features suitable for training, at an estimated CAPEX of USD31.66 Million, and a
construction period of 3.3 years.”
![Page 6: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/6.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
New Learning Centre –3 Dimension Solid Model
![Page 7: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/7.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
New Learning Centre –Administration, Laboratories etc
![Page 8: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/8.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
New Learning Centre –Guest Rooms Type 1
![Page 9: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/9.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
New Learning Centre –Restaurant, Gymnasium etc
![Page 10: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/10.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
New Learning Centre –Guest Rooms Type 2
Project Completed - Final Detailed Design Report including full architectural and
engineering designs and work specifications, Construction plan and Implementation schedule,
Tender Documents comprising bills of quantities and forms of contract; and Project Cost
Estimates, submitted, reviewed and approved.
Construction cost estimated at USD20,705,528.55 and construction period of 3 Years.
EPB approved by ZEMA and drawings approved by Choma Local Planning Authority.
![Page 11: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/11.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Power System Simulator –Equipment and Furniture
![Page 12: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/12.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Power System Simulator -Building
Project Completed - Customized Power Systems
Simulator with the Zambian Transmission
Network, CEC Network, Lusaka Distribution
Network, Uganda Transmission Network, and the
Reduced Network for SAPP ǀ Generic Dam
Simulator delivered, commissioned and handed
over on 16/12/2016. Building at Defects Liability
Stage but functional.
![Page 13: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/13.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Wind Measurement Tower –Location
![Page 14: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/14.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Wind Measurement Tower –Fixtures and Instrumentation
![Page 15: KGRTC Business Development Project · “Your Home for Energy Training and Conferences” info@kgrtc.org.zm Small Hydro Power Station –Power House Project Completed - Feasibility](https://reader034.vdocument.in/reader034/viewer/2022042211/5eb1727a431d3737100af6b9/html5/thumbnails/15.jpg)
“Your Home for Energy Training and Conferences”www.kgrtc.org.zm [email protected]
Wind Measurement Tower –Commissioning
1. Installation, Commissioning and Handover of the 60 Meter MET MAST to start wind
measurements; 17/02/2017.
2.Six (6) Month Wind Resource Assessment Interim Report submission; 06/10/2017.
3.Twelve (12) Month Wind Resource Assessment Draft Report submission; 30/03/2018.
4.Submission of the Draft Final Report on Wind Resource Assessment, 28/02/2018.
5. 12 Month Wind Resource Assessment Report Submission; 30/03/2018.