khse - portland state university · 2015-09-08 · khse psu capital projects and construction....
TRANSCRIPT
AV
S
<-->
A1.1
Cover Sheet w/ notes, symbols, and index.
no scale
Contacts
Site View
Sheet Index
Symbols
KHSE
PSU Capital Projects and Construction.
University Svcs. Bldg.
617 SW Montgomery St. #302
Portland, OR 97201
(503) 725-3738
Ron Blaj - Director
Steve Rounds - Asst. Director
Gail Hamilton - Const Mgr. PSU Crews.
Anthony Bohan - Project Manager
Quinn Soifer - TSG Manager
Joshua Steed - Electrical Engineer
Tom Arnich - Architect
PSU Network -Teleco OIT
Todd King - Tech. Services Bldg.
2121 SW 4th Ave. #400
Portland, OR 97201
Office: 503-725-4434
Cell: 360-903-8777
Doug McCartney - AV Services
Office: 503-725-9110
ARCHITECTURAL
(16 - sheets)
Dated: 6 / 30 / 2015
A1.1 - 1.3 General Info. /Specifications
A1.4 LIfe Safety Egress Plan (GPA arch)
A2.1 Demo Plan
A2.2 Basement Plan
A2.3 First Floor Plan
A2.4 Second Floor Plan
A2.5 Reflected Ceiling Plan
A2.6 Finish / Equipment Plans
A3.1 - 3.3 Sections / Details
A4.1 - 4.2 Schedules
A5.1 - 5.2 Interior Elevations
STRUCTURAL ENG.
(2 sheet )
Dated 6 / 30 /15
S1 General Notes / Details
S2 Details
MECHANICAL /PLUMBING
(15 - sheets)
Dated: 6 /30 / 2015
MP1 - General Notes & Symbols
M1.0 - Basement Mechanical Demolition Plan
M1.1 - 1st Floor Mechanical Demolition Plan
M1.2 - 2nd Floor Mechanical Demolition Plan
M2.0 - Basement Mechanical New Work Plan
M2.1 - 1st Floor Mechanical New Work Plan
M2.2 - 2nd Floor Mechanical New Work Plan
M3.0 - Schedules and Details
P1.0 - Basement Plumbing Demolition Plan
P1.1 - 1st Floor Plumbing Demolition Plan
P1.2 - 2nd Floor Plumbing Demolition Plan
P2.0 - Basement Plumbing New Work Plan
P2.1 - 1st Floor Plumbing New Work Plan
P2.2 - 2nd Floor Plumbing New Work Plan
P3.0 - Schedules & Details
ELECTRICAL
(7 - sheets)
Dated: 6 /30 / 2015
E0.1 Legend
E1.0 – Electrical Specifications
E1.1-1.2 – Electrical Demo Work
E2.1- 2.2 – Electrical New Work
E3.0 1-Line Diagram, Schedules
North-East View
CODE NOTES
1. Remodel PSU K-House.
2. 2014 OSSC. (Refer to GPA Architect's LSS)
3. TYPE V Construction
4. Group B Office Occupancy
5. Contractor to Fire Sprinkle Entire Building per latest
Code Req'd.- (Basement is currently Fire Sprinkled)
6. Floor Remodel area = 3500 + 1000 = 4500 sf +/-
7. Existing Bldg. = 2 Stories, Basement
8. Total Bldg. Floor Area Gross = 13,200 sf +/-
9. Typ. Occupant Floor Area = 4460 sf / 100 sf per
occupant = 44 max. occupants per floor
10. 44 Occ. = < 50 req'd = 1 exit req'd : (2) exits if less
than 500
11. 75' max. com. path egress (sect.1014.3)
12. 250' max. access travel (sect.1016.1)
13. Codes - All work to conform to latest applicable codes
for City of Portland, including ADA stnds.,Ceiling
stnds, Environmental and Waste management
regulations.
14. See GPA Architects Code review plan sheet attached
for more details.
Cover Sheet
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
K-HOUSE
Vicinity MapNo Scale
SW
B
RO
AD
WA
Y A
VE
.
SW MONTGOMERY ST.
Location scale: 1 / 32 " = 1'- 0"
Code / General Notes
6/30/2015
K - HOUSE - INTERIOR REMODEL FOR CPSO
P O R T L A N D S T A T E U N I V E R S I T Y
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Bldg. / Property Manager
Facilites and Property Mgmt.
Linda Clark
617 SW Montgomery St. #202
Portland, OR 97201
Office: 503-725-3738
Mech / Plumbing Engineer
Insite Group Inc.
Consulting Engineers
Chris Wierman
Office: (503) 222-2044
310 SW 4th Ave. Suite #1120
Portland , OR 97204
Structural Engineer
ABHT Structural Engineers.
Clinton Ambrose
Office: 503-243-6682
224 NW 13th Ave #325
Portland, OR 97209
City of Portland-BDS
Facility Permit Program
1900 SW 4th Ave. #5000
Portland, OR 97201
Scott Burris - Inspector
Office: 503-823-0668
Jeff Galvin - Fire Marshal
Office: 503-823-4032
PSU Planning & Design
Ernest Tipton AIA
Assist. Director
PSU Facilities Planning and
Campus Design
Office: 503-725-4318
LIfe Safety Study - Egress Plan
Robert Schroeder / Kristen Picket
GPA Architects
2701 NW Vaughn, Suite 764
Portland, Or 97210
Office: 503-274-7800
PSU Campus Public Safety
503-725-4407- Non-Emergency
503-725-4404 - Emergency
Client
Facilities and Property Mgmt.
CPSO
( Total = 40 sheets at 34" x 22" size )
UNIVERSITY SERVICES BLDG.
SW
6
T
H A
VE
.
SW MILL ST.
K-HOUSE
SW
B
RO
AD
WA
Y A
VE
.
SW
6
T
H A
VE
.
SW MONTGOMERY ST.
SW MILL ST.
PSU PARKING STRUCTURE 2
patio
sunken
patio
entry
ramp
exit
walkway
RETAIL
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A1 - K-House - General.dwg, 6/29/2015 2:21:28 PM, DWG To PDF.pc3
A1.2
Specification
Spec. Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
A.General Items
A.1. General and Code Notes -- See Cover Sheet.
A.2. Contract Documents and Work - Conform to PSU
General Conditions of Contract and Bid Documents.
A.3. Area / Location of Work -- See drawings.
A.4. All Products shall be installed per manufacturer's
specifications and recommendations. Products listed
shall be as noted. Approved equals shall be allowed
by contractor submitted substitution request form
prior to Bid Invitation deadline. Provide product
submittals samples for PSU to review prior to
ordering product. Product Review approval does not
imply or change the contract documents without an
approved change request and change order.
A.5. See Schedules --- for color / finish / material / room
/roof / door schedules for more specification
information.
A.6. Dimensions & Existing Conditions -- All drawing
dimensions shall have preference over scale. Verify
all dimensions and Existing Conditions prior to
commencement of work. Notify PSU of any
discrepancy.
A.7. Structural Engineer Approvals - Penetrations of
Structure by Contractor, including anchoring, coring,
scraping, cutting or removal is not permitted unless
approved by PSU Structural Engineer.
B.Demolition
B.1. General Demo --- Remove existing walls, doors,
frames, finishes, electrical, mechanical, and other
building items as required to accommodate new
construction. Remove all abandoned mech., elect.,
and plumbing lines in area of work. Verify all existing
structure and protect. Protect all egress paths and
exits.
B.2. GPR -Survey -- Prior to concrete floor or wall demo
or core penetrations contractor to provide radar
survey report and submit to PSU structural engineer
for approval.
C.Walls
C.1. Wall Finish -- Smooth texture or to match existing
surrounding surfaces.
C.2. New Wall Assembly --- See Structural drawings for
min. requirements. Walls to be minimum unless
noted other wise 3 -1/2" metal studs x 20ga. @ 16"
o.c. w/ 5 /8" type 'X' gyp. bd. typical both sides.
C.3. Wall Bracing --- See Structural drawings for
minimums. Unless notes otherwise. Brace above all
walls, windows, relites, to be minimum unless noted
otherwise---3-1/2" x 20 ga. metal studs @ 4' o.c.
alternating direction at 45 deg. angle max.
C.4. Wall Board -- Typ. Gypsum Board -- Georgia Pacific,
Greenguard certified, or approved equal, smooth
finish.
C.5. 1-HR. Shaft Wall Construction - USG gypsum brd.
core board shaft wall system metal frame
construction or approved equal.
C.6. or approved equal Wall Board -- Typ. Gypsum Board
-- Georgia Pacific, Greenguard certified, or approved
equal, smooth finish.
C.6.1. Tile walls - to include water-resistant backer
board underlayment, US Gypsum or approved
equal.
C.6.2. Shower walls / ceilings -- to have US Gypsum
Greenboard water resistant 5/ 8" type X gyp.
bd. or approved equal.
C.7. Wall Insulation -- Insulate all new walls with wall
insulation batts. See Insulation spec.notes
C.8. Existing + New Wall Blocking, Patching / Painting --
Block, Patch and Prep and Paint as required to
include at new and existing gypsum brd / plaster and
framing, demo work, cabinetry, woodwork, all new
mechanical and electrical work. Contractor to install
hidden fire retardant or metal framing blocking at all
wall mount accessories. Clean and patch exist
masonry.
D.Doors / Windows
D.1. See Schedules Sheet
D.2. Door Wood Species --- Stain grade Maple
D.3. Wood Doors --- 1-3/4" solid core by Eggers
Industries, Vancouver Door Company or approved
equal. Include Doors with lites, Flush doors, and
multi-folding flush door types. All doors to be
internally blocked for closer and panic bar installation
support.
D.4. Hollow Metal Frames at Doors and Relites ---
Painted Finish -- Ceco or approved equal 16 gauge
hollow metal welded frames.
D.5. Glass -- All glass to conform to City of Portland code
safety impact requirements. 1 /4" thk. tempered clear
glass at relites with complete metal framing surround.
1/ 2" thk. tempered clear glass at butt joint glass
installations. Clear Silicone at butt joints.
D.6. Hollow Metal Doors -- Painted Finish. Ceco or
approved equal --16 ga.solid core interior door.
D.7. Observation Window at Detention Area
D.7.1. 4-1/2" thk., STC 49, 1-way view glass, 2"
airspace, with vert laminate glass each side,
noise stop window model studio 5 by
Acoustical Surfaces Inc. or approved equal.
D.7.2. 1 /4" thk. , clear Lexan, with 1-way view film
on window so detention area can not see out.
D.8. Frosted Film - On Glass by Wallpaper on Walls or
approved equal, 8 mil thick, white lite frost privacy
type, self adhesive, cleanable, smudge resistant,
translucent type. Verify samples with PSU.
D.9. Aluminum Storefront - Kawneer or approved equal.
Retro fit with existing as required to accommodate
new work to match existing.
D.10. Aluminum Door with Glass - Reuse existing and
relocate . Provide new hardware as required to
accommodate new location and work.
D.11.Bullet Proof Dispatch Window - Relocate Existing
from existing CPSO offices at Shattuck Hall
D.12.New Bullet Proof Dispatch Window - Not Required
D.12.1. Match existing By Total Security Solutions or
approved equal, Bullet Resistant Level 1 ---
Secure to wall , Clear anod alum frame 7" x
1-3/4" , 18" wide stainless steel counter with a
stainless steel deal tray 16" x 10" x 1- 1 /2"
drop, stainless steel voice portal--verify height
from finished floor , and 1-1 /4" thk. bullet
resistant acylic window in channel. Include 1
/4" thk. armor fiberglass level 1 to fit metal stud
wall at transaction window--see details.
E. Door Hardware
E.1. Finish -- See hardware Schedule.
E.2. Standards --- Provide complete installation per ADA
handicap accessibility standards. All hardware to be
manufactured, specified, and installed per
specifications and standards per the American
Society of Architectural Hardware Consultants.
Review all hardware operation settings with PSU
locksmith prior to final city permit inspector review.
E.3. Submittal List --- Provide to PSU a complete
hardware submittal list for review and approval prior
to ordering and construction.
E.4. ADA Power door operators - See hardware schedule.
F. Signage
F.1. Signage -- BY PSU -- New floor and building interior
signage per code, ADA, and PSU standard
requirements .
G.Access Control
G.1. PSU to provide, install, and activate access control
low voltage cabeling and devises.
G.2. Contractor to provide complete pathway installation in
walls include conduit and boxes for card readers. Do
not pentrate structure or existing fire .
G.3. See Hardware Schedule.
H. Metal / Wood Cabinetry / Woodwork
H.1. New Metal Cabinetry Island --- None Required.
H.2. Rework Existing Metal Cabinetry - None Required.
H.3. New Cabinetry --- All woodwork and cabinetry to
conform to "Custom Grade" - Architectural
Woodwork Institute standards and specifications.
Secure to wall and floor. Provide backing. Wood
species to be Maple, stain-grade, plain sliced, book
matched. Hardwood lumber for exposed and
semi-exposed surfaces to be Maple. Hardwood
Plywood species for exposed surfaces, including both
faces of doors and drawer fronts to be grade "A"
maple veneer with machine applied maple veneer
self edge. Semi-exposed and concealed hardwood
plywood surfaces to be Low pressure decorative
overlay, color: White with machine applied maple
veneer self edge at semi-exposed surfaces and white
at concealed surfaces. All hardwood surfaces to
receive transparent finish with satin sheen in
accordance to AWI and as recommended for
Institutional use. Fasteners shall be size and type to
suit application. Cabinet Hardware---- Concealed
110 degree min. European hinge, Blum or equal. Full
extension drawer slides rated at 75 lbs. per pair at
ADA units and 3/4 extension rated at 75 lbs. per pair
at all other locations, KV or equal. 6" brushed nickel
pulls with 3-3/4" drill spacing by Berenson or
approved equal. All shelves to be adjustable with a
max. width of 3', 4" high recessed base. Frameless
Style-A, single length section Type ll, flush overlay
design-type 1-edges trimmed. Provide removable
base cabinets below sinks for wheel chair ADA
clearance access. 1/2" high lip on all upper shelves
for seismic roll off prevention. See finish coating
specification. AW I construction type to be
Reveal Overlay on Face Frame to match existing
construction.
H.4. Countertop -- Wilsonart or approved equal, Black
Matt colorPost-formed high pressure decorative
laminate counter top, 2" nominal thickness-full
bullnose front edge with 4" high squared off high
pressure decorative laminate backsplash.
H.5. WB -- Wood Base --- None Required.
I. Flooring / Base / Surfaces
I.1. See Schedules.
I.2. Floor Hole Patching --- Verify with Structural
Engineer. For max. 4" dia holes use 6" dia. x 16 ga.
galv metal plate and epoxy. Fill with 1 hr. rated fire
safing and caulk.
I.3. Floor / Wall Preparation -- Prepare, fill and level all
surfaces as required for new finishes for equal
smooth level transitions with existing surfaces. Use
finish manufacturer's approved products and
specifications.
I.4. Carpet Existing - Protect existing carpet unless noted
otherwise.
I.5. New Carpet - LEES or approved equal Distinctive
481, 24x 24 tile rotate
1
4
turn.
I.6. New Accent Carpet - Not Required.
I.7. Walk-off Carpet - Connexus Super Nop 52 walk off
tile, charcoal color, or approved equal.
I.8. Resilient 12 x 12 Tile Flooring - FORBO
marmoleum, or approved equal, (3) alternating shade
colors Mercury, Neptune, and Pluto.
I.9. Resilient Sheet Flooring - FORBO marmoleum, or
approved equal, Eiger-629 , lap wall with Intregal
Base 4". and alum. top trim to match.
I.10. Floor Transitions - to be new between floor types
where new installations occur, by Johnsonite or
approved equal, conform to ADA requirements.
I.11. Rubber Stair Treads, Riser, Landings. - Roppe or
approved equal,raised dot style, ADA profile, with
warning strip MG Dark Gray.
I.12. Ceramic / Quarry Tile --- ("CT" on plan) -- See
Interior Designer Specification --- by American Olean
Urban Canvas or approved equal, min. ht. (see
elevations) tile wainscot at all walls, 4 x12 field
(artichoke)wall stacked bond tile with 4 x 8 base
(smokey quartz) and wall top 2 x 8 accent trim(circuit
multicolor ) ( and 1 /4 round cap (black) , and 6 x 6
(smoked grey) quarry floor tile.
I.13. Tile Thinset --- Secure tile with adhesive per
manufacturer approved assembly of backer board
and water proofing membrane. Floor Water-proofing
membrane to lap walls 4". Slope floors to drain.
Installation method per Tile Council of America
Handbook and American National Standard
Specification for Installation of Tile.
I.14. Tile Grout --- Bostik Hydroment grout or approved
equal. Color samples to be selected and approve d.
I.15. Wall Base at Carpet - Rubber base with Toe,
Johnsonite or approved equal, 4" ht., # 63 Burnt
Umber base color.
I.16. Floor Transitions - Vinyl between different floor
surfaces , Johnsonite or approved equal, conform to
ADA requirements.
I.17. Resin Floor Coating System - None Required -
Silikal Flake, 62-SLF-M or approved equal. 1 /4" min.
MMA intregal flooring sytem with 4" ht. wall base
application, acid resistant system , including patch
repair, moisture treatment, primer, membrane, flake
coating, and top coat. Standard Color - #3 , white
with black and grey flake blend.
I.18. FRP Wainscot -- Marlite or approved equal ,Standard
FRP 3/ 32" thk. pebbled surface black #P-807 with
top alum. trim. Secure to wall with manufacturer's
adhesive.
J. Paint / Coatings / Colors/ Sealants
J.1. Colors --- See Schedules. Provide (3) 8-1 /2 x 11"
draw-down samples of each color on material for
review.
J.2. Products
J.2.1. TYPE - A -- Acro Pure, Miller or approved
equal, water based, Satin sheen unless noted
otherwise. Primer and (2) finish coats. Satin
sheen.
J.2.2. TYPE - B -- 100% Acrylic for use on metal,
PPG Pitt. Tech. Breakthrough or approved
equal, water base, Satin sheen. Primer and
(2) finish coats. Semi-gloss at Restrooms and
Shower areas.
J.2.3. TYPE - C -- Clear Flat Finish, Waterborne
Varnish, Emtech EM 8000cv, EM8428, Pre
Cat Waterborne Conversion Varnish, by
Target Coatings or approved equal, clear
natural coating for wood. (4) coats.
J.2.4. Match finish for reworked metal cabinetry. See
cabinetry section and details.
J.3. General Locations
J.3.1. General Painting, Gypsum Board / Plaster
Walls and Ceilings -- TYPE A
J.3.2. Exposed Natural Wood Work including Doors,
Trim or Base -- TYPE C
J.3.3. Existing painted Wood Work with Existing Oil
Based Paint including Doors, Frames, Trim ,
or Base. -- TYPE B
J.3.4. Metal Doors, Frames, Metal Work, Metal
Ceiling grids, or Railings -- TYPE B
J.3.5. Interior Hollow Metal Frames for Doors and
Windows. -- TYPE B
J.3.6. Interior Joint Sealers -- Silicone GE, Dow, or
approved equal. Sanitary type at bathrooms.
J.3.7. Concrete Sealer -- Ardex CG or approved
equal.
J.4. General Notes : Paint all Areas of Work including
exposed areas / surfaces remaining after-demolition,
and exposed utilities including mechanical ductwork,
air grilles, plumbing, fire sprinkler lines, and electrical
conduit + wiremold and exposed low voltage wiring.
Match color of surrounding surface unless noted
otherwise. Prepare, fill and level all surfaces as
required for new finishes for equal smooth level
transitions with existing surfaces. Use finish
manufacturer's approved products and specifications.
J.5. Window Mullion Filler Strip - None Required
Acoustical Filler Strip -- Continuous between all stud
walls abutting window mullion, 1/ 2" thk x 2" wide
black closed cell neoprene compressed filler strip by
K-Mac Distribution, H-O Products Corp., Pemko,
GTS, or approved equal.
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A1 - K-House - General.dwg, 6/29/2015 2:21:30 PM, DWG To PDF.pc3
A1.3
Specification
Spec. Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
K. Furnishings
K.1. White Boards -- None Required - Claridge or
approved equal. Deluxe white porcelain enamel steel
marker brd. with satin anodized alum. trim and tray.
White # 75 low gloss.
K.2. Systems Furniture - By PSU - to include relocate,
modify and install existing, or provide and install new.
K.3. Existing Equipment - By PSU - to include relocate,
modify and install existing, or provide and install new.
K.4. Existing Furniture - By PSU - to include relocate,
modify and install existing, or provide and install new.
K.5. Lockers / Locker rm Benches - By PSU - to include
relocate, modify and install existing, or provide and
install new.
K.6. Window Blinds / Shades - . None Required.
K.7. New Furniture - By PSU - to include relocate, modify
and install existing, or provide and install new.
K.8. Metal Restroom Partitions / Urinal Screens -
Sanymetal or approved equal. Black color. Powder
Shield coating epoxy electrostatic coating on
galvanized metal. Floor-Wall mounted including all
required chrome hardware for complete operation and
installation.
K.9. Restroom Specialty Accessories - Contractor to
Provide and install following items unless noted "By
PSU". Contractor to provide hidden backing /blocking
behind wall finish for support for all items listed
including those By PSU.
K.9.1. Toilet Paper Dispensers - By PSU
K.9.2. Seat Protectors - By PSU
K.9.3. Soap dispensers - By PSU
K.9.4. Folding Baby Changer - By PSU
K.9.5. ADA Shower Grab Bars - Intregal with Shower
specified.
K.9.6. Lockers - PSU to Relocate Existing
K.9.7. Locker Rm Benches - PSU to Relocate
Existing
K.9.8. ADA Shower Stall - See Plumbing Drawings.
This model not used --tAcrylic - Kohler Freewill
36 x 36 x 84 int. clearances - white with grey
fold up seat, grab bars. See PLUMBING dwgs
for sliding adjustable / removable ADA shower
head and controls.
K.9.9. ADA Grab Bars - Intregal with Shower
specified.
K.9.10. Towel Bars / Hooks--Provide (2) new Bobrick
B-6747 - satin finish, 24" surface mounted
towel bars and (2) Bobrick B -6777 - satin
finish, Towel Pin, or approved equal, in each
residential bathroom. See plans and
elevations for locations and lengths.
K.9.11. Grab Bars-- 1-1/2" dia. grab bars, concealed
mounting with snap flange, Bobrick B-6806
Series with satin finish, or approved equal.
Install in accordance with ADA Guidelines,
local codes, and per manufactures instructions
and recommendations. ADA designated
bathrooms only -- See plans and elevations for
locations
K.9.12. Shower Curtain / Hooks -- Provide vinyl
shower curtain and hooks - Bobrick 204-2, 42"
and 204-3, 70" vinyl shower curtain, or
approved equal as appropriate for tub/shower
type. Bobick 204-1 Type 304 Stainless Steel
Shower Curtain Hook, or approved equal.
K.9.13. Shower / Bath Curtain Rods -- Moen or
approved equal. 1" dia brushed nickel finish
low profile curved rod with mounting brackets
and covers. DN2145 for 5' tub / showers and
similar for 3' showers. Verify all existing
finished dimensions for product fit.
K.9.14. Mirrors -- At ADA bathrooms provide 24"W x
30"H Bobrick, B-294 Series Angle-Frame Two
Position Tilt Mirror--satin finish, or approved
equal, at sink location. At all other residential
unit bathrooms provide 30"W x 36"H Bobrick,
B-165 Series Channel-Frame Mirror--satin
finish, or approved equal, at sink location.
L. Appliances / Equipment --
L.1. New Refrigerator - Not Required.
M. Insulation, Acoustical, Fire Caulk, and Safing
M.1. Wall Insulation Batts --
M.2. Fire Caulking / Fire Safing --Manuf. 3M, STI, or
approved equal -- 1-hr. rated include at penetrations
at floors, roof, fire rated walls, concrete block
walls,stairway or shaft walls, fire corridors, mechanical
/electrical rooms, and vertical pipe and duct chases
thru floors.
M.3. Ceiling Insulation --
M.4. Fire Doors / Smoke Gaskets --
N. Ceilings
N.1. New Interior Suspended Acoustical Ceiling -- New
Suspended Acoust. Lay-in Ceiling---Armstrong
" Dune" or approved Tegular 2' x 4' tile with 2'x2'
score lines to match grid width. Color white. New
Heavy-duty exposed white "T" grid--Prelude XL 15/16"
exposed T system. Secure to structure above.
Seismic braced as required by latest code and as
approved by City of Portland. Contractor to provide
and submit ceiling engineering to City Bldg. Dept. as
required.
N.2. New Interior Suspended Gypsum Brd. Ceiling -
Armstrong or approved equal Drywall Grid 8600
series Heavy Duty, galvanized, wet location, fireguard,
Suspended Ceiling Grid for Gyp. Brd. attachment.
Typ. 5 /8" Type X Gypsum Board -- Georgia Pacific,
Greenguard certified, or approved equal. Greenboard
water resistant type at restrooms or shower
rms.Secure to structure above. Seismic braced as
required by latest code and as approved by City of
Portland. Contractor to provide and submit ceiling
engineering to City Bldg. Dept. as required.
O. Audio Visual
O.1. AV Equipment / Anchors and Cabeling --
O.2. Telephone and Computer Network Cabling and WIFI
See Electrical Engineer's dwgs. and specifications.
General contractor to provide and install.
P.Lighting / Electrical / Telco /Access Control
P.1. Electrical and Lighting --- See Electrical Engineer's
drawings for more information. Protect existing as
required. Provide new lighting / Switches / Outlets as
indicated on drawings. Switch and outlet plates to be
stainless steel with grey devises. ADA ht. required.
Use Existing unless noted otherwise.
P.2. Pathway & Boxes - Contractor to provide all boxes at
ceiling, walls, and floors, conduit, and pathway as
req'd. to include Electrical, Access Control, Audio
Visual, Telco, Alarms, ADA door actuator, and other
devises.
P.3. Access Control - Contractor to provide and install
pathway and boxes. PSU to provide cabeling and
devices for a working system.
P.4. Exit and Emergency -- Contractor to complete
Construction so as to provide minimum exit, egress,
audible strobe alarms, and emergency lighting as
required by City of Portland, including (1) footcandle
min at floor during construction. All doors, exits, and
hardware, to meet min.code requirements of the
City of Portland for exits and ADA clearances.
P.5. Systems Furniture -- Provide and Install data and
electrical whips to wall and panels.
P.6. PSU Equipment - Verify locations of network printer
and AV requirements with Electrical engineer's
drawings.
P.7. Telephone and Computer Network Cabling and WIFI -
See Electrical Engineer's dwgs. and specifications.
General contractor to provide and install pathway and
boxes. PSU to install cabeling, stainless steel plates,
grey devises and labeling.
Q.Mechanical / Air Grilles
Q.1. Mechanical -- See Mechanical Engineer's drawings
for mechanical items.
Q.2. Balance HVAC system--- Contractor to Balance per
code requirements and submit an Engineer's
approved report for PSU Mechanical Engineer review
and approval.
R.Plumbing
R.1. Plumbing -- See Mechanical Engineer's drawings for
plumbing fixtures with controls to include following:
R.1.1. ADA PreFab Shower -
R.1.2. Wall Hung Sinks -
R.1.3. Kitchen Stainless Steel Sink -
R.1.4. Counter Mounted Sinks -
R.1.5. Floor Mount Toilets -
R.1.6. Urinals -
R.1.7. Floor Drains -
R.1.8. Water Heater -
R.1.9. ADA Drinking Fountains -
S. Fire - Systems
S.1. Fire Alarm / Sprinkler Systems. -- Verify new
locations of new work with drawings. Contractor to
Submit to city fire marshal and provide PSU with City
of Portland fire marshal signed and dated approved
fire system drawings. Provide new work to conform to
NFPA and include demolition, relocation, materials
and labor for a complete code compliant installation.
Refer to Elect. Engineer drawings and specifications
for additional requirements.
S.2. Fire Sprinkler Heads - Provide New Quick Response
Fire Sprinkler head assembly to replace existing
throughout area of work. Verify existing. Move fire
sprinkler / heads or add new to accommodate new
work per code and approval of Fire Marshall. Match
existing finished sprinkler heads and plates. AT new
fire sprinkled areas use semi-recessed heads with
chrome trim.
T. Concrete
T.1. Concrete Ramp - New 2500 psi min. 4" thk. reinforced
concrete ramp. Grind smooth and clean existing
concrete sidewalls at previous concrete location for
appearance grade finish. Min.60 KSI reinforcing steel.
See drawings for more details.
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A1 - K-House - General.dwg, 6/29/2015 2:21:33 PM, DWG To PDF.pc3
A2.1
Demolition Plans
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 / 32 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Demo Slab for Utility lines - Protect existing structure,
foundations, and Utilies below slab. See Mech / Plumbing
drawings for locations of new utilities below slab. Sawcut
and remove slab as required to accommodate new
construction.
3. Demo walls and doors as indicated.
4. Ceiling Demo/ Modifications - Verify with ceiling plan to
accommodate new demo work including mechanical,
electrical, plumbing, and curtain assembly.
5. Demo Cabinetry - At existing kitchen 1st level to
accommodate new construction.
6. Demo RR - At existing large restrooms 1st level to
accommodate new ADA requirements.
7. Demo Dumbwaiter Shaft. - As required to accommodate
new construction..
8. Remove Exist Concrete Ramp -
9. Existing Doors and Room Finishes - See schedules for New
door , finish items, and room numbers..
10. AREA OF WORK
Basement
2nd Floor
1st Floor
Roof
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:36 PM, DWG To PDF.pc3
A2.2
Basement Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 /16 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Wall Types - See Diagramatic Bldg Section on Detail Sheet.
3. MEP - Verify all new, relocation or removal of existing
mechanical electrical and plumbing.
4. New Walls & Doors - As shown. Provide backing for doors
stops, grab bars, towel bars and other wall mounted items.
5. Sink Counter Tops - New Built-in - ADA Counter tops with
Sinks.
6. Pre-FAB ADA Shower -
7. Lockers - Secure and relocate lockers from existing CPSO
offices.
8. ADA Clearances at Tile Walls - Dimensions shown are
minimum to face of all finishes.
See Spec. Notes
THRU
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:38 PM, DWG To PDF.pc3
A2.3
1st Floor Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 /16 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
See Spec. Notes
THRU
1. Typical Notes - See Specifications Sheet.
2. Wall Types - See Diagramatic Bldg Section on Detail Sheet.
3. MEP - Verify all new, relocation or removal of existing
mechanical electrical and plumbing.
4. Walls & Doors - As shown. Provide backing for doors stops,
grab bars, towel bars and other wall mounted items.
5. ADA Restrooms - Retrofit existing Restrooms to
accommodate new single occupancy ADA restrooms.
6. ADA Drinking Fountain - Brace wall and provide plumbing
as required.]
7. Kitchenette - Provide and ADA new sink and cabinetry.
8. Concrete Ramp - provide and install to include sand base,
on 4" thk.
3
4
minus gravel base. Reinf. concrete with #3 at
24" oc. Concrete form and fill below concrete side wallsl
with 4" thk. concrete.
9. Bullet -Proof Window - Relocate existing to Dispatch at
lobby.
10. New Observation window - At Detention
11. 1-hr. Shaft Wall Const. - At vert. duct work.
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:39 PM, DWG To PDF.pc3
A2.4
2nd Floor Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 /16 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
See Spec. Notes
THRU
1. Typical Notes - See Specifications Sheet.
2. Wall Types - See Diagramatic Bldg Section on Detail Sheet.
3. MEP - Verify all new, relocation or removal of existing
mechanical electrical and plumbing.
4. Walls & Doors - As shown. Provide backing for doors stops,
grab bars, towel bars and other wall mounted items.
5. New ADA Restrooms
6. 1-hr. Shaft Wall Const. - At vert. duct work.
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:41 PM, DWG To PDF.pc3
A2.5
Ceiling Plan
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 /32 " = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
1. Typical Notes - See Specifications Sheet.
2. Demo Existing Mechanical, Electrical and Plumbing to
accommodate new ceiling work.
3. New Gypsum Brd. Ceiling- Moisture resistant at Basement
4. Lighting - Revise to accommodate for new work. See Elect.
Engineer dwg.
5. Fire Sprinkers - Revise Existing and Add as required to
accommodate new work per code and specifications. Match
existing type. N = New, E= Existing, R = Relocated , D =
Demo
6. Mechanical - New mech. difusers to accommodate new
work - see Mech Eng.dwgs.
7. New Suspended Ceiling - Moisture resistant at Basement.
8. Existing Ceiling Items - Verify Existing MEP and sprinkler
ceilng items with Engineers drawings and adjust or remove
as required.
Basement
2nd Floor 1st Floor
See Spec. Notes
THRU
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:42 PM, DWG To PDF.pc3
A2.6
Finish/Equipment
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
scale: 3 / 32" = 1'- 0"
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
See systems furniture
designer plans and
spec book items for
more information.
1. Typical Notes - See Specifications Sheet.
2. Furniture - Existing Relocated
3. White Board - 4' x 8' Secure to Structure or Wall.
4. Equipment Moves - See specifications note sheet for more
information:
5. VRF - MECH. UNITS - See Mechanical Dwgs. Provide and
install 6" ht. intregal manuf. mech curb on roof.
6. New Roof Equipment to Conform to City Planning
Standards:
6.1. Bldg has a roof pitch less than 1 to 12
6.2. Only (2) mechanical units are on roof.
6.3. Equipment height does not exceed allowed max height
sight line of 1' ht. per 4'. horiz distance from parapet.
(Closest parapet is 13' away from nearest mech. unit
which allows 3.25' ht. + 3.5' ht parapet = 6.75' max.
mech unit height as shown. Actual = mech unit ht
6'-0"max + 6" curb = 6'- 6" ht < 6'- 9" allowed -- OK. )
6.4. Matte finish is standard on all mechanical equipment.
7. Accent Wall Paint - Dashed line - See Specifications
Sheet.
8. FRP Wainscot - Remodeled 1st and 2nd Floor
Restrooms.(dashed line)
9. Restroom Specialty Accessories -
10. TILE Wainscot. - New Basement Restrooms. (dashed line)
11. Restroom Partitions
Basement
2nd Floor
1st Floor
Roof
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A2 - K-House - Plan.dwg, 6/29/2015 2:21:44 PM, DWG To PDF.pc3
HALLWAY
HALLWAY
OFFICE AREA
CLOSET STAIR SHAFT
SIDEWALK
WALKWAY
HALLWAYLOBBYMEN - LOCKERSWOMEN - LOCKERS
OFFICE
OFFICE
OFFICE
HALLWAY
OFFICE
MECHANICAL
LOBBY OFFICE
section - south entry
3 / 16 " = 1' - 0"
section - west-east
1
-
3
-
Protect existing
structure and
utilities. Obtain core
drill or anchor
location approval.
A3.1
Plan Notes
1. See specification sheet for notes.
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
Sections
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
3 /16 " = 1' - 0"
For other notes and info
see plans, detail sheets
and section below.
Line of wood frame
ceiling
Verify existing wood
walls, floors and
structure.
Existing Roofing on
wood deck
ROOF DECK
2ND FLOOR
1ST FLOOR
BASEMENT
ROOF DECK
2ND FLOOR
1ST FLOOR
BASEMENT
2
section - west - east
TYPICAL GRIDS
TYPICAL NOTES
A B C D
B C4 3
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A3 - K-House - Sections-Details.dwg, 6/29/2015 2:21:45 PM, DWG To PDF.pc3
WB WF
Metal Stud WallsHollow Metal Frames Vert. Butt Joint Glass
Horiz.Alum Frames ,
L
F
R
GW
GDBelow Ceiling Full Height Continuous
Door with Lite Glass Door
Flush Door
Glass Relites
Glass Wall
WF - A
Above Ceiling
Existing WallorDoor / Window
New WallAbove
Doors & Windows
SOFFITCONDITIONAS OCCURS(DASHED)
WB-W
Below Wood Ceiling
AS
Alum. StorefrontVert. and Horiz. Frames
ASD
Window Door
equal equal
RELITE
DOOR
CEILING
(verify width)
CEILING
+/-
RELITE
DOOR
RELITE
FLOOR
(verify width)
RELITE
FLOOR
+/-
(verify width)
RELITE
DOOR
INSIDE RM.
CEILING
RELITE
WALL
GLASS
WALL
CEILING
CEILING
or / RELITEDOOR
CEILING
A3.2
Plan Notes
1. See specification sheet for notes.
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
1-1/2 " = 1' - 0"
3 /8 " = 1' - 0"
door / window details
bldg. section - diagramatic
3 /16 " = 1' - 0"
bldg section / detail notes
1. General Items
1.1. Framing and Anchoring -- See Section 1 for
framing and anchoring of stud walls, doors, relites,
and glass walls to structure. Typical products listed
or approved equal.
1.2. See spec. notes sheet A2 for more details.
2. Ceilings
2.1. Code -- Ceiling installation to be per latest city of
Portland approved IBC / 25 / # 2 standards.
2.2. Hangers -- Provide additional hangers at all
members within 8" of the ceiling perimeter.
2.3. Hanger connection devices --Secure all hangers to
bldg. structure with approved connector of min 100
lb. capability.
2.4. Stabilizer bar to be between all members at ceiling
perimeter.
2.5. Vertical Struts -- to be at 12' oc each way.
2.6. Sloped Hangers -- Provide (2) counter slope
hangers if more than 1 to 6 out of plumb.
2.7. Trapeze Hangers around ductwork and other large
obstructions.
2.8. Ceiling Grid -- Suspended ceiling grid to be Heavy
Duty type.
2.9. Runners -- Secure cross runners between main
runners
2.10. Gyp. Brd. or Plaster Ceiling as occurs.
3. Walls , Bracing, Fillers, and Insulation.
3.1. New Walls typical --- Unless noted otherwise, walls
to be min. 3-1 /2" x 20 ga. metal studs @ 16"
o.c.with 5 /8" type 'X' gyp. brd. both sides. Do not
secure walls to suspended ceiling grid. Do not cut
ceiling grid at below ceiling walls.
3.2. Bracing -- At wall and windows to be min. 3-1 /2" x
20 ga. metal studs @ 4' o.c. alternating direction at
45 deg. angle max. (w/ vert. studs at window
locations). Secure to L2"x2"x12" x 16 ga. metal
angle at conc. structure above.
3.3. Filler Strip - Jamb to Mullion - 1 /2" thk. x 2" black
closed cell neoprene filler strip. Filler Strip -
Wall Head to Suspended Ceiling - 1/ 4" thk.
x 2" wide.
3.4. Filler - Floor holes --Core Drills or existing max 4"
dia holes patch with 6" dia x 18 ga. metal plate and
epoxy. Fill with 2-hr. safing and fire caulk.
3.5. Filler - Rigid Insulation - fire rated, secure in metal
track framing.
3.6. Ceiling & Wall Insulation - R-11 min.
3.7. Drywall metal edge at gyp. brd. for level smooth
continuous line.
3.8. New Upper Wall - Provide typical vert. studwall,
insulation and bracing above ceiling where full ht.
walls are required per plan.
3.9. Patch Drywall - smooth patch and finish paint
drywall at joining of (2) walls.
3.10. Header - built up metal header above 16 ga. hollow
metal door / window frames. Anchor metal studs on
end secured to top and bottom tracks with #8
screws at 12" oc min. at sides and top and bottom.
4. Doors / Windows
4.1. Doors and Windows.
4.2. Wood door w/ lite -- 1/4" glass lite and wood stops
to match door.
4.3. Hollow Metal Frame .
4.4. Ceiling break to accommodate continuous wall or
window-door frame.
4.5. Hollow Metal Frame Relites (R1 and R2) 1/ 4" clear
temp glass in hollow metal frames.
4.6. Continuous Ceiling - at walls that are constructed
below ceiling.
4.7. Glass Walls (GW) -- 1/2" clear temp. butt joint glass
at jambs with alum. frame sill and continuous head
over door. Clear silicone sealer at butt joints.
4.8. Glass Door (GD)-- 1/2" thick clear tempered glass,
to butt joint glass walls, with 1" x door ht. manuf.
tublar alum door pull each side. Alum. frame head
and sill, floor pivot, hidden in frame, ADA closer at
head. At Suite Entry locations for door exit out
requirements provide push activated latch release
at vert. exit bar. Key latch at min 36" ht. at exterior
side of door always activated by interior vert. push
bar.
4.9. Butt Joint -- Clear Transparent Caulk Butt Joint
glass at wall and at glass joints.
5. Fasteners (Secured to Structure - verify thickness of
concrete decks)
5.1. Wall Bracing -- 16 ga . x 3-1 /2" metal stud min. 48"
oc alternating -- Fasteners to metal framing
includes, brace to angle at deck, or brace to wall
plate track. Steeler Tek Screws --- Typ. min. (3) #8
x 3/4 . Do not screw to suspended ceiling grid.
5.2. Alum. Window Sill -- Simpson Titen HD Mini
Screws at Concrete --- Typ. min. 3/16" dia. --
embed in concrete 1-1/4" at 16" o.c.
5.3. Angle to Deck --12" x 16 ga. Fasten with Powers
Fasteners LVF at Concrete --- Typ. min (3) - 0.145"
dia -- embed in concrete 1-1/4" at 3" o.c.
5.4. Hollow Metal Frame Sill -- Powers Fasteners at
Concrete --- Typ. min. (1) 1 /2" dia flat head hd
sleeve anchor-- conc. embed 1-1/ 4" @ 32"o.c.
through metal frame support sleeve.
5.5. Wall Sill Track -- Powers low veloc. shot pin
anchors at Concrete -- Typ. 0.145 " dia., embed
in concrete 1-1 /4" at 16" o.c.
5.6. Wall Head Track - 18 ga. Slotted expansion head
track fastened to concrete with Powers 0.145 dia.
LVF embed in concrete 1-1/4" at 16" oc.
5.7. Hollow Metal Frame Fastener Straps --- (3) min per
jamb. Secure to framing with Typ. min. (3) #8 Tek
screws each side of strap.
5.8. Window Head. -- Steeler Tek Screws Typ. min.
#8 x 3/4 " at 12" o.c. --- secure to metal wall
track...not to suspended ceiling grid.
5.9. Joint of (2) Vertical Walls - Use (2) #8 at 16" oc to
join top track of existing wall to new sill track of
upper wal
5.10. Secure metal top plate to new 2x4 blkg between
wood clg joists secured with joist hangers.
5.11. Secure Alum Frame to Structure.
wall details
head @ relitehead @ all-glass door head @ door and relite jamb @ butt joint glass
sill @ relitejamb - door / intregal relitesill @ relite
1-1/2 " = 1' - 0"
door / window details
1-1/2 " = 1' - 0"
wall jamb @ windowwall head @ structure
hollow metal frame
aluminum frame / butt jt. glass aluminum frame / butt jt. glass aluminum frame / butt jt. glass
wall jamb - door / sep. relite
aluminum frame / butt jt. glass
hollow metal frame hollow metal frame hollow metal frame
See details and section this sheet.
head @ wall below ceiling
wall above ceiling
Details
5
-
3
-
4
-
2
-
1
-
-
Also see Wall Legend on Cover Sheet.
typ. header
(see det 5A similar window/door frame)
detail detail detail
1-1/2 " = 1' - 0"
misc. details6
-
1
2
3
4
5
3.6
5.5
3.4
5.6
3.8
5.1
3.2
5.3
4.6
5.8
5.1
5.8
5.1
4.4
5.8
5.1
4.4
4.9
4.9
5.2
5.4
3.8
5.1
4.6
3.7
3.3
3.8
5.1
4.4
3.9
3.7
5.9
3.3
5.6
5.10
5.6 5.11
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A3 - K-House - Sections-Details.dwg, 6/29/2015 2:21:47 PM, DWG To PDF.pc3
Floor line
Top of wainscot
A3.3
Details
1 - 1 /2" = 1'-0"
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Plan Notes
1. See specification sheet and room / finish schedules. Information
shown is general and diagramatic.
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
Detention Window
1' = 1'- 0"
Sink Counter Top
1 - 1 /2 " = 1' - 0"
Detail
1 /2 " = 1' - 0"
Detail
1/2" = 1' - 0"
Tile Wall Detail
1- 1 /2 " = 1' - 0"
Detail
1- 1 /2 " = 1' - 0"
Detail
Detail
1-1 /2" = 1' - 0"
1" = 1' - 0"
Inset sink - See
plumbing drawings.
Steel angle bracing -
secure to wall structure.
Stainless Steel
Brunswick or approved
equal24 x 24 x 2"
BKT24X24BR
Plastic Laminate top on
3 /4" thick AD plywd. w/
4" backsplash laminate
back splash and
sourround front trim.
Full bullnose front edge
counter top
Structure - verify
with structural
detail sheets.
Existing relocated bullet
proof window / frame
Relocated Laminate
Counter and deal tray.
1' = 1' - 0"
Bullet Proof Window
Lexan Clear in Metal
Welded metal window
frame.
Subway tile and decor.
trim.
Gyp Brd. - Rough tex
Cap tile
Accent tile
Top of sink
to finished floor
ADA
24" oc blocking
Paint all exposed
surfaces.
Base Tile
Brick facing on concrete
block wall
Detention
Hollow Metal
Frame Head
Window
Observation
Dispatch
Lobby
Relocated Bullet Proof
Window with Tray
New Steel Channel
Frame surround at new
opening in Reinf
Masonry Wall - See
structural DWGS
Patch Existing Plaster
at new opening at Steel
Channel with Metal
Edge trim
Re-Trim out finished
Window with Brick with
no visible Saw cuts
showing.
CPSO Lobby Dispatch
Sawcut Existing
Masonry Wall 8" +/-
THK.
(e) Slab
(e) Ceiling / Structure
(e) Wood Floor
Existing Plaster.
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A3 - K-House - Sections-Details.dwg, 6/29/2015 2:21:50 PM, DWG To PDF.pc3
A4.1
Plan Notes
schedules
no scale
1. See specification sheet for notes.
2. See plans / sections for ceiling ht.s
Finish / Window
Schedule
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A4 - K-House - Schedules.dwg, 6/29/2015 2:21:51 PM, DWG To PDF.pc3
F or FR EL - Single Dr. or Pair EL - Alum. Dr. with Lite EW/ FR
A4.2
Plan Notes
schedules
no scale
1. See specification sheet for notes.
2. See plans for recessed entries with low soffits above.
3. All Latch Guards to be provided and installed by PSU
Locksmith.
Door Schedule
Door Hardware List
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Door Types
E = Existing F = Flush L = Lite FR = Fire Rated
W = Window Verify door swing direction with plan. See detail sheet for more information.
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A4 - K-House - Schedules.dwg, 6/29/2015 2:21:52 PM, DWG To PDF.pc3
ADA Fountain - SeeGeneric Standarddimension detail fordimensions.
7'-11"
5'-6"
Ceiling
Floor
+/- VERIFY
+/- V
ERIF
Y
9'-0"
Ceiling
Floor
14'-0"
Privacy screen
+/- V
ERIF
Y
+/- VERIFY
5'-0"
14'-0"
+/- VERIFY
Insulated Pipes+/- VERIFY
12'-11"
6'-6"
+/- V
ERIF
Y
12'-11"
+/- VERIFY
5'-0"
Ceiling
Floor
7'-3"
ExistingBrick wall
Dispatchwindow
10'-2"
4'-0"
+/- V
ERIF
Y+/-
+/-
5'-0"
4'-0"
2'-10"
+/-
+/- VERIFY20'-4"
+/- VERIFY
Tempered glass atEntry alum. storefront -Typical
7'-2"
+/- V
ERIF
Y
Relocated Door
10'-11"
+/- VERIFYInsulated Pipes
10'-11"
+/- VERIFYInsulated Pipes
8'-9"
5'-0"
+/- VERIFY
7'-11"
Ceiling
Floor8'-9"
+/- V
ERIF
Y
+/- VERIFY
Refrigerator
Counter top andbacksplash.
8'-9"
7'-10"
Ceiling
Floor
+/- VERIFY
+/- V
ERIF
Y
2'-10"
1'-6"
3'-6"
Removable cabinetbase for ADA access
SINK
4'-6"
(e) Duct Shaft.
-
1
Basement Men Restroom
-
2
A5.1
Plan Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
Int. Elevations
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
North Elevation
South Elevation East Elevation
1. Typical Notes - See Specifications Sheet.
2. FRP Wainscot. - See Schedules
3. Tile Wainscot - See Details
4. ADA Standard Dimensions - See detail 3 / A5.2
-
4
CPSO Lobby1 /4 " = 1' - 0"
-
5
Front Entry
-
6
Drinking Fountains.1 /4 " = 1' - 0"1 /4 " = 1' - 0"
Basement Women Restroom1 /4 " = 1' - 0"
South Elevation West Elevation
South Exterior Elevation
-
7
1st Floor Men Restroom1 /4 " = 1' - 0" See Women's RR for Details.
-
8
North ElevationEast Elevation
1st Floor Women Restroom1 /4 " = 1' - 0"
West Elevation North Elevation
East Elevation
-
3
Kitchen1 /4 " = 1' - 0"
1 /4 " = 1' - 0" See Women's RR for Details.
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A5 - K-House - Elevations.dwg, 6/29/2015 2:21:53 PM, DWG To PDF.pc3
8'-1"
Ceiling
Floor
5'-0"
7'-5"
+/- VERIFY
+/- V
ERIF
Y
minmax
min.
max.
ADA DrinkingFountain.
6'-6"
+/- VERIFY
7'-5"
Insulated Pipes
+/- VERIFY6'-6"
+/- VERIFY
-
1
2nd Floor - Restroom - Rm 2081 /4 " = 1' - 0"
-
2
A5.2
Plan Notes
FOR ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
TELCO AV, AND FIRE SPRINKLER / ALARM INFORMATION
SEE ENGINEER'S DRAWINGS and SPECIFICATIONS.
Int. Elevations
6/30/2015
PSU Capital Projects & Construction
KHSEK-House
Campus Public Safety OfficeINTERIOR REMODEL
(Block 189)633 SW Montgomery St.Portland, Oregon 97201
Revisions :
Drawn :
Checked :
Date :
Verify All Dimensions
and Existing Conditions
prior to accommodating
new construction.
South Elevation East Elevation
1. Typical Notes - See Specifications Sheet.
2. FRP Wainscot. - See Schedules
3. ADA Standard Dimensions - See detail 3 / A5.2
2nd Floor - Restroom - Rm. 2071 /4 " = 1' - 0"
South Elevation West Elevation
-
7
Detail1 /4 " = 1' - 0"
-
8
Detail1 /4 " = 1' - 0"
-
3
Generic - Standard ADA Dimensions Only1 /4 " = 1' - 0"
See RR Rm. 207 for Details.
(See other elevation details for specific room locations per plan)
I:\Staff\Facilities\Projects\189_KHSE\KHSE_OPEN\2015_189_KHS15C01 CPSO Move To KHSE\1-DESIGN\5-Arch\0.1-Bid Set - ACAD Dwgs\A5 - K-House - Elevations.dwg, 6/29/2015 2:21:55 PM, DWG To PDF.pc3