    Case 1: (Assumed 1m high water in stream)

    Extent of area to be considered in thecalculation of the Kick-out.

  • 7/26/2019 Kick Out Supplymentry

    2/3

    +52.5mPD

    +49.0mPD

    +41.0mPD

    100 kPa

    Ee!ti"e #tress $ (#%i& densit' ater densit') * Deth %, #%i&$ (20 kg-m 10 kg-m) * Deth %, #%i&

    /here,%re the ressure in assi"e side w%u&d e in!reased.

    Case 2: (Assumed dr' stream water &e"e& at g%und)

    Ee!ti"e #tress $ (#%i& densit' ater densit') * Deth %, #%i&$ (20 kg-m 10 kg-m) * Deth %, #%i&

    /here,%re the ressure in assi"e side w%u&d e redu!ed.

    ConcreteBacklling

    For simplication slope in front of pipepile !ill not be considered

    "roposed "ipe

    #urcharge #oil"ressure

    #oil"ressure

    $ater"ressure

    $ater"ressure

    ConcreteBacklling

    For simplication slope in front of pipepile !ill not be considered

  • 7/26/2019 Kick Out Supplymentry

    3/3

    100 kPa

    ater Pressure#%i& Pressure#%i& Pressureater Pressure #ur!harge