king countyaqua.kingcounty.gov/council/agendas/flood_board/20200224-fcd-packet.pdffeb 24, 2020 ·...
TRANSCRIPT
King County Flood Control District
King County
Meeting Agenda
1200 King County Courthouse
516 Third Avenue Seattle, WA 98104
Boardmembers: Dave Upthegrove, Chair; Reagan Dunn, Vice Chair; Claudia Balducci, Rod Dembowski, Jeanne Kohl-Welles, Kathy Lambert, Joe McDermott, Pete von Reichbauer, Girmay Zahilay
Room 1001 1:30 PM Monday, February 24, 2020
SPECIAL MEETING REVISED AGENDA
1. Call to Order
2. Roll Call
3. Approval of Minutes of February 11, 2020 pg 3
4. Approval of Invoices pg 7
5. Executive Session per RCW 42.30.110(1)(i)
6. Adjournment
Printed on 2/20/2020 Page 1 King County King County Flood Control District February 24, 2020 1
[Blank Page]
King County Flood Control District February 24, 2020 2
1200 King County Courthouse
516 Third Avenue Seattle, WA 98104
King County
Meeting Minutes King County Flood Control District
Boardmembers: Dave Upthegrove, Chair; Reagan Dunn, Vice Chair; Claudia Balducci, Rod Dembowski,
Jeanne Kohl-Welles, Kathy Lambert, Joe McDermott, Pete von Reichbauer, Girmay Zahilay
1:00 PM Room 1001 Tuesday, February 11, 2020
DRAFT MINUTES REVISED AGENDA - Added Items 7 and 8
Call to Order1.The meeting was called to order at 1:42 p.m.
Roll Call2.Ms. Balducci, Mr. Dembowski, Mr. Dunn, Ms. Kohl-Welles, Ms. Lambert, Mr. McDermott, Mr. Upthegrove, Mr. von Reichbauer and Mr. Zahilay
Present: 9 -
Approval of Minutes of January 14, 20203.Supervisor McDermott moved to approve the minutes of the January 14, 2020, meeting as presented. Seeing no objection, the Chair so ordered.
Discussion and Possible Action
4. FCD Resolution No. FCD2020-02
A RESOLUTION approving an interlocal agreement with the City of Renton regarding the Lower CedarRiver Flood Risk Reduction Feasibility Study River Mile 0 to 2.7.
Michelle Clark, Executive Director, Flood Control District, briefed the District and answered questions.
A motion was made by Supervisor McDermott that this FCD Resolution be Passed. The motion carried by the following vote:
Yes: Ms. Balducci, Mr. Dembowski, Ms. Kohl-Welles, Ms. Lambert, Mr. McDermott, Mr. Upthegrove, Mr. von Reichbauer and Mr. Zahilay
8 -
Excused: Mr. Dunn 1 -
Page 1 King County King County Flood Control District February 24, 2020 3
February 11, 2020 King County Flood Control District Meeting Minutes
5. FCD Resolution No. FCD2020-03
A RESOLUTION approving an interlocal agreement with the City of Kent regarding real estate appraisals and preliminary designs relating to the Signature Point Levee Improvement Project.
Ms. Clark briefed the District and answered questions.
A motion was made by Supervisor McDermott that this FCD Resolution be Passed. The motion carried by the following vote:
Yes: Ms. Balducci, Mr. Dembowski, Ms. Kohl-Welles, Ms. Lambert, Mr. McDermott, Mr. Upthegrove, Mr. von Reichbauer and Mr. Zahilay
8 -
Excused: Mr. Dunn 1 -
6. FCD Resolution No. FCD2020-04
A RESOLUTION relating to the organization of the King County Flood Control Zone District, authorizing position descriptions for the King County Flood Control District's Engineer and Budget/Fiscal Analyst, and authorizing the Executive Director to recruit and hire.
Supervisor McDermott moved Amendment 1. The motion carried. Ms. Clark briefed the District and answered questions.
A motion was made by Supervisor McDermott that this FCD Resolution be Passed as Amended. The motion carried by the following vote:
Yes: Ms. Balducci, Mr. Dembowski, Ms. Kohl-Welles, Ms. Lambert, Mr. McDermott, Mr. Upthegrove, Mr. von Reichbauer and Mr. Zahilay
8 -
Excused: Mr. Dunn 1 -
Page 2 King County King County Flood Control District February 24, 2020 4
February 11, 2020 King County Flood Control District Meeting Minutes
Other Business
Briefing
7. FCD Briefing No. FCD2020-B09
Flood Event Briefing
Ms. Clark made opening remarks and introduced Megan Smith, Deputy Director, Water and Land Resources Division and Steve Bleifuhs, Section Manager, River and Floodplain Management Section. Ms. Smith made remarks and briefed the District on the current flood event. Mr. Bleifuhs answered questions of the District and provided the phone number to the King County Flood Warning Center, (206) 296-8200.
This matter was Presented
Budget Update 8. The Chair briefed the District on the 2020 Budget timeline. New grants for funding streams and proposed funding for Double WRIA Funding and Expanding Commitment to Habitat of Existing FCD Projects were discussed.
This matter was presented.
Adjournment 9. The meeting was adjourned at 2:37 p.m.
Approved this _____________ day of _________________
Clerk's Signature
Page 3 King County King County Flood Control District February 24, 2020 5
[Blank Page]
King County Flood Control District February 24, 2020 6
Board of Supervisors: Dave Upthegrove, Chair | Reagan Dunn, Vice-Chair | Claudia Balducci | Rod Dembowski | Jeanne Kohl-Welles | Kathy Lambert | Joe McDermott | Pete von Reichbauer | Girmay Zahilay
Invoice Summary – February 24, 2020
Vendor Invoice # Amount
Interfund Transfers
Water and Land Resources Division
September 2019
November 2019
$2,685,472.75
$5,073,991.22
Warrants
Lund Consulting KCFCD 2020-1 $12,360.00
King County Flood Control District February 24, 2020 7
[Blank Page]
King County Flood Control District February 24, 2020 8
KingCountyWater and Land Resources DivisionDepartment of Natural Resources and Parks
King Street Center201 South Jackson Street, Suite 600Seattle, WA 98104-3855206-477-480O Fax 206-296-0192TTY Relay: 711
November 13,2019
Melani PedrozaClerk of the BoardKing County Flood Control DistrictKing County Courthouse516 Third Avenue, Room 1200Seattle, WA 98104-3272
Dear Ms. Pedroza:
Please find enclosed our Billing Statement for the month of September 2019 for expendituresincurred by King County for services provided in the implementation of the Annual Scope ofServices for the King County Flood Control District (FCD).
The following is aÍr"at a glance" summary highlighting services provided during the month ofSeptember 2019.
Capital Expenditure
Capital Planningo Engineering analysis and planning for the Middle Fork Snoqualmie Capital Investment
Strategy (CIS), scheduled for discussion at a public meeting in December. At the direction ofthe Executive Committee in their September meeting, three projects on the draft CIS are
included in the Executive Committee's recommended2020 budget. The three projects are
channel monitoring of sediment levels, development of a Deficiency Action Plan (DAP) fortwo levees enrolled in but ineligible for the U.S. Army Corps of Engineers (Corps) PL 84-99
cost-share program, and acquisition of at-risk homes along the Middle Fork Snoqualmie.
Scheduled for 2019 Constructiono Construction of the Shake Mill Left Bank revetment repair was substantially completed in
September. Estimated total project cost is $3.2 million.o Project permitting and outreach for the Tukwila revetment on the Green River, which was
substantially complete in October. Total project cost is $320,000.o Lower Russell Setback Levee and Floodwall Project expenditures, groundbreaking for Phase
1 construction (including a floodwall and water main) of the $54 million project took place
on August 22. Substantial completion of Phase 1 is scheduled for }l4.ay 2020. Phase 2
construction is scheduled to be advertised for bids in January 2020.
King County Flood Control District February 24, 2020 9
Melani PedrozaNovember 13,2019Page 2
Scheduled for 2020 Constructiono Engineering design and permitting for a multiyear effort to complete improvements to the
Black River Pump Station. The first phase is replacement of high use pump engines in2020,following by control building improvements in 2022-2023.
o Engineering design and permitting for the Reinig Road Revetment Repair, protecting theCanyon Springs water main, the PSE transmission line, and Reinig Road. Estimated totalproject cost is $5.1 million.
o Engineering design and permitting for the Timberlane repair on the South Fork SkykomishRiver. Total project cost is $550,000.
Scheduled for 202 1 Constructiono Engineering design and property acquisition fbr the Herzmanlevee Setback project on the
Cedar River. Estimated construction cost is $5.4 million.o Engineering design and permitting for the Jan Road levee setback project, estimated
construction cost is $7.8 million.o Engineering design for the Galli's/Dykstra levee improvements along the Green River to
improve levee protection for the City of Auburn. Estimated construction cost is $2.4 million.
Scheduled for 2022 Constructiono Engineering design and permitting for the Old Jefß Farm project on the Green River. The
total estimated cost of the project is $4 million.
Scheduled for 2023 Constructiono Engineering design for the Pacific Right Bank project on the White River; selection of a
preferred alternative is anticipated in mid-2020 with construction scheduled for 2023. Thetotal project cost is estimated at$,29 million.
Agreements with Other Agencieso Expenses under the Cooperative Watershed Management Grant program totaled $24,045 for
four reimbursements. Total2019 budget authority for this program is $ 1 1 .7 million.. Expenses for the King County Subregional Opportunity Grant program totaled $786,353for four reimbursements plus administrative expenses. Total 2019 budget authority for thisprogram is $20.4 million.
o Expenses for the Flood Reduction Grant program totaled 5270,948 for sevenreimbursements. Total 2019 budget authority for this program is $8.9 million.
Land Acquisitions:o Property was purchased from the City of Pacific for the Right Bank levee setback project:
$t42,937.o Property was purchased from a private land owner in Carnation for the Tolt River Mile 1.1
setback project: 542,136.. Appraisal was completed for a property on the South Fork Skykomish in Baring; the
landowner declined the offer.
King County Flood Control District February 24, 2020 10
Melani PedrozaNovember 13,2019Page 3
Operating Proqram. Preparation of a comprehensive report on flood facility inspections and maintenance at the
request of the Executive Director, transmitted September 30. The inventory includedinformation about most recent inspections, status of any follow-up actions identified throughthe inspections, and facility status in federal cost-share programs for levees (through theCorps of Engineers) and revetments (through FEMA). Reimbursement of the King CountySheriff s Office (KCSO) for large wood hazard investigation and safety training.
o Flood facility inspections on the Cedar, Snoqualmie, White, and Green rivers, includingfloodwall inspections in Kent and Tukwila.
o Maintenance of the Black River Pump Station, implementation of the Green RiverDeficiency Action Plan (DAP) to maintain eligibility for federal disaster funding, as well as
work crews to maintain river facilities and conduct site maintenance at the SammamishTransition Zone and multiple other locations throughout King County.
o On September 10, staff provided a tour of the Black River Pump Station on the Green Riverfor Supervisor Reagan Dunn and Renton Councilmember Armondo Pavone. The tourhighlighted both near-term rehabilitation of systems functioning since 1972 and longer-termplans to address seismic risk and improve upstream and downstream passage across the damfor salmon.
Staff HoursThe invoice packet also includes report showing staff hours by name and project number.
Tasks for this period include:
Section Management Taskso Section management oversight and supervisory responsibilities; hiring new and vacant
positions; review and discussion of capital projects and operating programs with unitswithin the River and Floodplain Management Section (RFMS); organizational and hiringimplementation; training; performance appraisal reviews; and flood warning centeroversight (82 hours).
o Coordination and communication with the Water and Land Resources Division (WLRD)Director and Assistant Division Director, and FCD Executive Director and ExecutiveCommittee staff on capital project and operating program implementation; includingFCD Board, Executive Committee, Advisory Committee, and Basin TechnicalCommittee meetings (19 hours).
o Participation in meetings, reviewing documentation, project coordination and gate
meeting participation; including FEMA's Community Assistance Visit (CAV),Willowmoor, Middle Fork Snoqualmie River CIS, Lower Russell Road, Pacific RightBank, Old Jeffs Farm, Black River Pump Station, Jan Road, Riverbend, Strike Team2019-2020 flood damage repairs, South Fork Snoqualmie PL 84-99, Levee BreachAnalysis, and Farm Pad and Home Elevation Programs (59 hours).
King County Flood Control District February 24, 2020 11
Melani PedrozaNovember 13,2019Page 4
Section-Wide Capital Program Implementation OversightSection-wide capital program implementation oversight, weekly meetings with Sectionmanager, biweekly meetings with basin supervisors (Green, Snoqualmie, Strike Team,Cedar/White), FCD tracker, monthly Capital Improvement Project (CIP) coordination,managing supervisors meeting, FCD check-in meeting, standing gate committeemeetings, Cedar River Trail Site A (CRT-A) Gate lb, comprehensive facility informationmeeting, capital project managers meeting, Vy'ater Resources Development Act (WRDA)position, Middle Fork Snoqualmie CIS, Hafner/Barfuse project, Issaquah Chinook study,CIP supervisors meeting (91.5 hours).Lower Russell capital project: team intemal meeting, monthly coordination meeting withKent, knotweed management (phase 1), project representative meeting, barb wood designmeeting and formal agreement meeting with Muckleshoot Tribe, three-month look-aheadschedule, eddy/trail access site visit (27.5 hours).
o
a
Green River Basin Taskso Green River Basin: Signature Pointe, Tukwila 205 levee CIPs, WRIA 9 plan update (12.5
hours).o Lower Green River Conidor Plan (LGRCP): H&H contracting and kick-off meeting (2.5
hours).
Count)¡wide Polic)¡ and Program Services. Coordination with FCD regarding approval of work program items and communication
materials, review of flood facility inspection and maintenance information in response toFCD request for information, support for the District's 2020 budget (142 hours).
This Billing Statement has been prepared in accordance with Section 4: Invoices as set forth inthe Interlocal Agreement between King County and the King County Flood Control Zone DistrictRegarding Support Services, approved by OrdinanceFCZD 2007-05.02 of King County FloodControl Zone District' s Board of Supervisors on December I0, 2007 . Separate statements havebeen prepared for operating expenditures and capital improvement project expenditures.
Upon approval, please ask the District Executive Director to sign the Special Journal DistrictEntry Form and email the document to Nitin Chadha, Manager, Finance and AdministrationSection in the'Water and Land Resources Division of the Department of Natural Resources andParks. The Special Journal District Entry Form will then be entered into the King CountyFinancial system.
If you have any questions or need additional information, please do not hesitate to contact NitinChadha, Manager, Finance and Administration Section at 206-477 -5897.
King County Flood Control District February 24, 2020 12
Melani PedrozaNovember I3,20I9Page 5
Sincerely
Josh BaldiDivision Director
Enclosures
cc Michelle Clark, Executive Director, King County Flood Control DistrictMichael Murphy, Interim Deputy Division Director, Water and Land Resources
Division (V/LRD), Department of Natural Resources and Parks (DNRP)Nitin Chadha, Manager, Finance and Administration Section, WLRD, DNRP
King County Flood Control District February 24, 2020 13
\{IDepaftment of Executive ServicesFinance & Business Operations DivisionFinancial Management SectionADM-ES-0653
Specnl Drsrnrcr Jounrunl Erurnv Fonn¡ Kins CounSr |::,ii fi,ïru,ooGL. OracleEBS@kin gcou nty. gov
Please complete the form, print, si n, scan a and send it to GL.OracleE
o
5
4
3
2
1
Line
I 9001 001 0
Fund(e digits)
00000'1561
tüüsüütttûûûûtûütüütfi$*süüüû
0tüüûütüü$üilüt
Project(7 d¡sits)
n/'¡nnnft
nnônnA
Cost Center(6 digits)
33833
24218
Account(s dis¡ts)
iltt***ûüüütttü
Bars(7 d¡gits)
Note: Amounts must be positive numbers. The total debit must equal the total credit.
üûts**tüttiltüü***iltilû
Total
süüüt
ü**ilüûttstûüt*ü
Future(5 digits)
2,685,472.75
2,685,472.75
Disbursement(Enter Amount)
2,685,472.75
Receipt(Enter Amount)
REQUESTOR ¡NFORMATION
Accou n ti n g Date (tvttirvoorw)
Category llnterfunO Transfers
Currency IUSD
Global Source fwtanualLedger lrC
ACCOUNT ¡NFORMATION
AUTHORIZATION
EmailI t<atrina,joh nston @kin gcounty. gov ExtPhone * l{zo^a¡ +tt -4728
Contact t{ame IKatrina Johnston Organization King County Water & Land Resources Divison
CONTACT INFORMATION Typed or Printed
SEPT 2019 reimbursement,Fld Operating & Capitalservices
Explanation/Descri ption
2,685,472.75
Certification for Payment (By Authorized Signer) RCW 42.24.080I hereby certify that I have the authority over the funds listed above and authorize the transaction
Date Entered
EmaillI
I Date
Entered By I
, Document# I
Phone #
TitleApproved by
Print Name
FOR OFFICIAL USE ONLY
Rev0B01 201 4King County Flood Control District February 24, 2020 14
ffi Flood District Operating Billing: September 2O1g
20L9AdoptedBudget
53,327,451-
s675,380
S2,598,916
5L,rz7,ggz
5L,727,or7
S246,986
S3,135,3i.3
S1"2,839,055
20L8Contract
Carryovers
CurrentMonth's
Expenditures
SzgL,66o.47
s44,563.80
$gg,o+s.gs
s4,401.09
5Lg7,s4z.5t
$31,835.41
S186,908.97
Year to DateExpenditures
1"4-Oct-19
NotesDescription
Annual Maintenance
Flood Hazards Plan, Grants, Outreach
Flood Hazard Studies, Maps, Technical Services
Flood Preparation, Flood Warning Center
Program Management, Supervision, Finance, Budget
Program I mplementation
Overhead / Central Costs
Total
Notes
So
$o
So
so
5o
5o
So
Si-,355,321.04
S47i_,559.08
s614,166.04
5225,31.6.64
51,346,797.7s
S533,163.28
$2,4i.8,308.36
PercentExpended
41%
70%
24%
20%
78%
21,6%
77%
5o 5734,958.13 56,964,632.L9 54%
King County Flood Control District February 24, 2020 15
Operating Billing Detail: September 2019
Project Project Name
Annual Maintenance
Account Account Description Expenditure
$6,304.54
so,ogo.oo
s2,357.38
s3,994.05
Sse .zs
S4s.s4
54,912.00
S1,oo7.oo
(s9,675.98)
(ss,532.28)
$9,257.77)
($1,559.s0)
524,o94.6s
S631.69
S186.79
S143.09
538.72
s110,70
59,i67.96
s5,314.85
s10,480.18
Sso.zz
s38.2e
s1,339.34
$10,934.99
s4s.86
S123.s2
s1s0.0o
S1s4.96
s4,274.41
s2,443.88
s4,089.68
s688.91
Ss,teo.gE
L128378
rL28378
1L28378
t128378
1L28378
1728378
0000000
0000000
0000000
0000000
0000000
0000000
1111889
1111889
11i.1889
1111889
1111889
1111889
1111889
1111889
1111889
1111889
11L1889
1"111889
7728200
t128200
tt28200
1128200
7728200
1728200
t128200
L728200
rt28200
1111839
561010 ADMIN DEFAULT
561OI"O ADMIN DEFAULÏ
561010 ADMIN DEFAULT
561010 ADMIN DEFAULT
561010 ADMIN DEFAULT
561010 ADMIN DEFAULT
Default
Default
Default
Default
Default
Default
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECÏION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECÏION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM LOG JAM INVST&RELOC
5 1110
51315
51320
s1330
51340
51361
5LL15
51392
82100
82200
82300
82600
51110
51L20
51"L30
5222]-
s2290
55050
82100
82200
82300
82400
82500
82600
511L0
52290
s239L
55040
551_59
82100
82200
82300
82600
51110
REGULAR SALARIED EMPLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGU LAR SALARI ED EM PLOYEE
TEMPORARY
OVERTIME
SUPPLIES VEHICLE
MISC OPERATING SUPPLIES
ROAD EQUIP ER R
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARI ED EM PLOYEE
MISC OPERATING SUPPLIES
MAINTENANCE PARTS MATERIALS
COUNTY PARKING GARAGE LOT
FMD COPY CENTER
EMPLOYER PAID BENEIIÏS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
Monday, October 74, 2019 Page 1 of 10King County Flood Control District February 24, 2020 16
Project
1111839
L111839
1111839
1111839
1111839
1111839
1111839
1111839
7777841
tLtt847
1.1.11841.
tttt841.
LL1.784L
1.L24994
Lt24994
t124994
1724994
7124994
1724994
Lt24994
!724994
rt24994
tt24994
1L24994
tL24994
tr24994
t124994
1.724994
1124994
1t24994
tL24994
7724994
1111885
1111885
1111885
1111885
1111885
Project Name
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
Account
51198
52181
52391
53813
82100
82200
82300
82600
51110
82100
82200
82300
82600
511L0
5TL2O
51130
511"43
s1330
52202
52391
53105
s3s20
53521
53522
55050
55191
82L00
82200
82300
82400
82s00
82600
5111"0
5352L
53522
53525
82100
Account Description
SALARIES AND WAGES REIMB
INVENTORY EQUIP 5K UNDER
MAI NTENANCE PARTS MATERIALS
LICENSES FEES PERMITS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECÏ COST RATE 6
REGU LAR SALARI ED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
TEMPORARY
OVERTIME
DUTY ASSIGNMENT
RETIREMENT
SU PPLI ES MISCELLAN EOUS
MAINTENANCE PARTS MATERIALS
OTHER CONTRACTUAL PROF SVCS
UTILITIES
UTILITIES ELECTRICITY
UTILITIES WATER SEWER
ROAD EQUIP ER R
ADULT JUVENILE DETENTION
EMPLOYER PAID BENEFITS
PAID ÏIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGU LAR SALARI ED EM PLOYEE
UTILITIES ELECTRICITY
UTILITIES WATER SEWER
UTILITIES NATURAL GAS
EMPLOYER PAID BENEFITS
Expenditure
S18,898.20
Si.9,436.61
(so.o1)
S4os.86
52,017.r3
$1,153.32
57,929.97
s32s.os
s4,585.24
51,792.36
5L,024.79
5t,i14.86
S2s8.8s
S10,890.20
s40.7s
S1,814.86
S106.60
s13s.40
Sss.sz
S131.2s
562,073.72
S16.31
5266.r2
Ss+s.sr
S7,366.38
S66s.oo
54,54r.r1
s2,352.60
S6,131.58
53.24
$372.o4
Ss3s.7s
S333.66
s102.34
Si.48.37
s62.oo
S130.44
Monday, October 74, 2019 Page 2 of 10
King County Flood Control District February 24, 2020 17
Project
111188s
1111885
1111885
rCategory Total
Flood Hazards
700tt7t
100717t
1.00717r
rc}7fl7
1001171"
1001171
7007171,
0000000
0000000
0000000
0000000
0000000
0000000
1111869
1111869
11L1869
1111869
1111869
1111884
1111884
1111884
1111884
r.111884
111183 1
11i"1831
1111831
1111831
1111831
1111831
1111831
1111831
Project Name
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
Plan, Grants, Outreach
561005 ADMIN DEFAULT
561.005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
Default
Default
Defa u lt
Default
Default
Default
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
Account
82200
82300
82600
51110
5131s
51320
s1330
51340
51355
51361
51115
51392
82100
82200
82300
82600
51110
82100
82200
82300
82600
s1110
82100
82200
82300
82600
51110
52205
53311
s3330
55010
55050
82100
82200
Account Description
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
FLEX BENEFIT CASHBACK
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGU LAR SALARIED EM PLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGU LAR SALARIED EM PLOYEE
SUPPLIES FOOD
TRAVEL SUBSISTENCE OUT OF STA
PU RCHASED TRANSPORTATION
MOTOR POOL ER R SERVICE
ROAD EQUIP ER R
EMPLOYER PAID BENEFITS
PAID TIME OFF
Expenditure
574.s7
5L24.78
izt.oz
$231-,660.47
S11,323.13
S6,096.oo
52,446.88
54,746.2L
Sr"08.42
s6s.o0
547.36
s848.oo
s174.oo
(5s,!76.97)
(54,675.O2)
(57,823.32)
(s1,3r"7.87)
s1,248.66
5488.13
s27s.06
5467.o1,
s78.66
Ss93.27
S231.92
s132.s9
5221.87
537.40
$g,gzz.oz
5z4s.t7
5242.t1.
s12s.8s
S2,032,oo
572t.oo
S3,878.54
52,217.st
Monday, October t4, 2019 Page 3 of 10King County Flood Control District February 24, 2020 18
Project
1111831
1111831
ttt7873
t1tt873
rlt1873
711.1"873
11"1L873
Lttt873
rttt873Category Total
Flood
Project Name
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
Hazard Studies, Maps, Technical Services
TOO1.T72 561007 ADMIN DEFAULT
7OOTT72 561007 ADMIN DEFAULT
TOOT172 561007 ADMIN DEFAULT
TOOT172 561.007 ADMIN DEFAULT
7001.172 561007 ADMIN DEFAULT
TOO1.T72 561007 ADMIN DEFAUTT
LOO7772 56T007 ADMIN DEFAULT
TOO7T72 561007 ADMIN DEFAULT
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
1tL7878 WLFLD CEDAR/WH|TE tMpL & COORD
tL7t878 WLFLD CEDAR/WH|TE tMpL & COORD
1111878 WLFLD CEDAR/WHtTE tMpL & COORD
1111878 WLFLD CEDAR/WH|TE tMpL & COORD
7171878 WLFLD CEDAR/WH|IE tMpL & COORD
TIT1878 WLFLD CEDAR/WHITE IMPL & COORD
T777878 WLFLD CEDAR/WHITE IMPL & COORD
1771878 WLFLD CEDAR/WH|TE tMpL & COORD
1,1,11,878 WLFLD CEDAR/WHtTE tMpL & COORD
Account
82300
82600
51110
53330
53710
82100
82200
82300
82600
Account Description
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
PU RCHASED TRANSPORTATIO N
RENT LEASE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
FLEX BENEFIT CASHBACK
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
TEMPORARY
TRAVEL SUBSISTENCE OUT OF STA
MEETING REGISTRATIONS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
INDIRECT COST RATE 6
Expenditure
s3,710.80
Sozs.rr
s6,576.23
S48.so
s264.00
s2,570.63
$1,469.73
s2,459.51
S414.30
S44,563.80
58,337.r7
S:z:.oo
S6,096.oo
s3,069.38
54,s88.91
s86.7s
s6s.00
Sss.oo
S1,307.oo
s268.00
(s10,842.32)
(s6,199.29)
(s11,857.91)
$27i.33)
(ss7.86)
(it,ssl.+z¡
512,t58.97
S1,650.55
Srsz,ro
S429.oo
54,7s2.86
52,7L7.53
S5,164.84
s137.22
s87o.08
51110
51144
s1315
s1320
51330
51340
51355
51361
51115
51392
82100
82200
82300
82400
82s00
82600
51110
51120
53311
53820
82100
82200
82300
82440
82600
Monday, October 14, 2019 Page 4 of L0
King County Flood Control District February 24, 2020 19
Project
1128136
rt28136
tt28136
7728136
tt28l36
IL28T36
7728136
1.L28136
1128138
1128138
1128138
1.L28r38
1128138
1128138
Itr4299
tLL4299
1.774299
17r4299
711.4299
ttt4299
tL74299
77L4299
1"114299
7774299
1133606
1111836
1111836
1111836
1111836
1111836
1111836
1128846
1728846
1L28846
7728846
1.1"28846
Account
s1110
51130
52245
82100
82200
82300
82500
82600
51110
53101
82r00
82200
82300
82600
51110
51.120
51130
52t81
82r.00
82200
82300
82400
82500
82600
53104
51110
53104
82100
82200
82300
82600
51110
82100
82200
82300
82600
Expenditure
s2,687.s3
5220.s2
5298.67
s1,05o.7o
S6oo.7s
S1,087.78
S44,88
S183.24
$2,292.2O
se.8o
s896.03
5sr2.29
S8s7.32
5L44.39
$1L,91s.67
ss03.o1
s260.3s
5102.42
54,657.81
$2,663.18
54,742.12
540.01
ss2.98
$7s8.81
Si"3,616.94
Ss32.78
524,98r.16
5208.27
S119.10
5199.27
$33.se
s364.oo
s142.30
S81.36
Si.36.14
522.s2
S98,045.98
Project Name
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH KC STM FAC INUDA MAP
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH UW CLIMATE CHANGE
WLFLD TCH UW CLIMATE CHANGE
WLFLD TCH UW CLIMATE CHANGE
WLFLD TCH UW CLIMATE CHANGE
WLFLD TCH UW CLIMATE CHANGE
Account Description
REGULAR SALARIED EMPLOYEE
OVERTIME
SUPPLIES FOOD
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
PROFESSIONAL SERVICES PRINTIN
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
TEMPORARY
OVERTIME
INVENTORY EQUIP 5K UNDER
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
CONSULTANT SERVICES
REGULAR SALARIED EMPLOYEE
CONSULÏANT SERVICES
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
:Category Total
Monday, October 14, 2019 Page 5 of 10King County Flood Control District February 24, 2020 20
Project Project Name
Flood Preparation, Flood Warning Center
0000000 Default
0000000 Default
T1TT882 WLFLD PP FWC PREP & TRAINING
1J1T882 WLFLD PP FWC PREP & TRAINING
1T1.7882 WLFLD PP FWC PREP & TRAINING
7T1L882 WLFLD PP FWC PREP & TRAINING
T1.T1"882 WLFLD PP FWC PREP & TRAINING
Category Total
Program Management, Supervision, Finance, Budget
IOO7173 561008 ADMIN DEFAULT
1.001173 561008 ADMIN DEFAULT
1001173 561008 ADMIN DEFAULT
1001173 561008 ADMIN DEFAULT
TOO1"173 561008 ADMIN DEFAULT
TOOTIT3 561008 ADMIN DEFAULT
IOOT173 561008 ADMIN DEFAULT
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
11.11891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
1111891 WLFLD MGMT PROGRAM MGMT
Account
51115
51392
51110
82100
82200
82300
82600
Account Description
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
REGULAR SALARIED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURIry MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
OVERTIME
OFFICE SUPPLIES
MINOR ASSET NON CONTR LT 5K
SUPPLIES M ISCELLANEOUS
SUPPLIES BOOKS SUBSCRIPTIONS
MISC OPERATING SUPPLIES
ADVERTISING
TRAVEL SUBSISTENCE OUT OF STA
PU RCHASED TRANSPORTATION
MEETING REGISTRATIONS
Expenditure
S443.oo
$sr.oo
S1,88s.10
5736.87
5421.32
s70s.04
s118.76
$4,401.09
s25,039.79
s184.60
s19,812.00
s8,218.20
s13,954.93
52L6.92
itsg.22
S5,974.00
St,226.oo
(S31,480.88)
(s17,999.19)
(s30,240.20)
(s6s.66)
(ss,093.97)
57O,332.32
$634.67
s2s7.t7
s736.43
s182.39
$gs.oz
S131.38
s1s6.36
s280.10
Ssg,oo
S42e.oo
51110
51-L44
51315
51320
51330
51340
s1361
511L5
51392
82100
82200
82300
82500
82600
51110
51130
521t0
52180
52202
52275
52290
53100
53311
s3330
s3820
Monday, October 14, 2079 Page 6 of 10
King County Flood Control District February 24, 2020 21
Project
1111891
1111891
1r.r.1891
1111891
11L1891
1111891
Project Name
WLFLD MGMT PROGRAM MGMT
WLFLD MGMT PROGRAM MGMT
WLFLD MGMT PROGRAM MGMT
WLFLD MGMT PROGRAM MGMT
WLFLD MGMT PROGRAM MGMT
WLFLD MGMT PROGRAM MGMT
Account
55023
82100
82200
82300
82500
82600
51110
5tt44
s131s
s1320
51330
51340
51361
5s258
5111,0
5L144
51315
51320
51330
51340
51361
s1110
57744
51315
51320
sr.330
51340
51361
51110
51315
51320
51330
51340
51361
Account Description
ITS NEW DEVELOPMENT
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
MOTOR POOL ER R SVC
REGULAR SALARI ED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REGULAR SALARIED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REGULAR SALARIED EMPLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
Expenditure
SL2s.oo
527,390.27
s15,644.69
526,644.62
$12s.16
54,405.52
$rt7,s42.srrCategory Total
Program lmplementat¡on
T00I-1.67 561001ADMIN DEFAULT
1007T67 561001ADMIN DEFAULT
1.00!T67 561001 ADMIN DEFAULT
700T767 561001ADMIN DEFAULT
T0071.67 561001ADMIN DEFAULT
tOOLt5T 561001ADMIN DEFAULT
1007T67 561001ADMIN DEFAULT
TOOTT6T 561001ADMIN DEFAULT
1001168 561002 ADMIN DEFAULT
1001168 561002 ADMIN DEFAULT
1001168 561002 ADMIN DEFAULT
10011.68 561002 ADMIN DEFAULT
1001168 561.002 ADMIN DEFAULT
1001-168 567002 ADMIN DEFAULT
1001168 561002 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 561003 ADMIN DEFAULT
1001169 56].003 ADMIN DEFAULT
TOOT!70 561004 ADMIN DEFAULT
1001.1.70 561004 ADMIN DEFAULT
1OO117O 561004 ADMIN DEFAULT
TOOLTTO 561004 ADMIN DEFAULT
TOOILTO 561004 ADMIN DEFAULT
IOO1!7O 561004 ADMIN DEFAULT
$6,278.O7
s276.sO
s10,668.00
S+,sgo.Ez
s7,40!.76
s19s.17
s88.2e
(s24.oo)
S4,665.82
s369.20
57,620.00
s3,401.60
S5,793.81
Si.73.s8
S66.10
$14,90L.32
S23o.t6
s10,668.00
54,367.42
57,s29.77
S108,42
Sas.sr
57,t77.49
5L2,192.o0
54,934.72
58,o73.62
$86.7s
se6.0s
Monday, October L4, 20L9 Page 7 of 10King County Flood Control District February 24, 2020 22
Project
]-130774
1.130774
7730774
1130774
tt30774
Lt30774
t130774
0000000
0000000
0000000
0000000
0000000
0000000
0000000
0000000
1124994
LLL1870
tLtl870
tttt870
7117870
ttttg70
!177870
tt1.1870
ttttg70
ttt7870
1111870
tL77870
1111870
tL32429
LL32429
Lt32429
tL32429
tL32429
1111881
1111881
1111881
1111881
Project Name
561011 ADMIN DEFAULT
561011ADMIN DEFAULT
561.011 ADMIN DEFAULT
561011ADMIN DEFAULT
561011 ADMIN DEFAULT
561011ADMIN DEFAULT
561011 ADMIN DEFAULT
Default
Default
Default
Default
Default
Default
Default
Default
WLFLD AM SMP IMPLEMENTATION
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD GREEN RIV BASIN STEWARD
WLFLD GREEN RIV BASIN STEWARD
WLFLD GREEN RIV BASIN STEWARD
WLFLD GREEN RIV BASIN STEWARD
WLFLD GREEN RIV BASIN STEWARD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
Account
51110
5tL44
5L315
51320
51330
51340
51361
51115
51392
82100
82200
82300
82400
82500
82600
53105
51110
5tt20
51130
5220s
53710
53814
82100
82200
82300
82400
82500
82600
51110
82100
82200
82300
82600
51110
52tto
s3803
53814
Account Description
REGU LAR SALARI ED EM PLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
OTHER CONTRACTUAL PROF SVCS
REGU LAR SALARI ED EMPLOYEE
TEMPORARY
OVERTIME
SUPPLIES FOOD
RENT LEASE
TRAINING
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSÏS
INDIRECT COST RATE 6
REGU LAR SALARIED EM PLOYEE
OFFICE SUPPLIES
DUES MEMBERSHIPS
TRAINING
Expenditure
S9,zo7.s2
S323.06
S13,716.00
S5,449.55
59,247.82
s1ss.17
s10s.46
(s88o.oo)
(s17s.00)
(s95,7s0.55)
(554,746.o4)
(s96,148.2s)
(s7e3.81)
$436.74)
(sL6,l_96.38)
S18o.oo
S17,525.93
SL,6t2.9t
Ssao.+s
Ss9.so
S362.2s
S4oo.oo
s6,850.84
s3,917.00
S7,302.55
St2B.26
$78.6s
SL,23o.t7
$5,645.36
52,206.78
5L,261.78
S2,111.38
s3ss.6s
514,134.4L
5zz.qz
S4s.oo
S19s.oo
Monday, October 14, 2019 Page 8 of 10
King County Flood Control District February 24, 2020 23
,Category Total
Overhead / Central
0000000
t1-tt848
1111848
1111848
11r"1848
1_1_r1848
tLtt848
1.171.848
1111848
11L1848
tttL848
1111848
Project Name
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
Costs
Default
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSÏS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
Project
1111881
1111881
1111881
1111881
1r"11855
1111855
111L855
1111855
1111855
1111855
1111855
1130783
1130783
1130783
11_30783
1130783
1130783
7L30783
1130783
1130783
1130783
1130783
Account
821"00
82200
82300
82600
51110
533i"1
53820
82100
82200
82300
82600
51110
51720
57743
52tt0
533 11
53820
82100
82240
82300
82400
82600
Account Description
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGU LAR SALARI ED EM PLOYEE
TRAVEL SUBSISTENCE OUT OF STA
MEETING REGISTRATIONS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
IEMPORARY
DUTY ASSIGNMENT
OFFICE SUPPLIES
TRAVEL SUBSISTENCE OUT OF STA
MEETING REGISTRATIONS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
INDIRECT COST RATE 6
INTERFUND INTEREST AUTO
ITS INFRASTRUCTURE EXPEND
GIS OPERATIONS
TECH SERVICE REBATE
COUNTY PARKING GARAGE LOT
GIS MATRIX SERVICES
OVERHEAD COST ALLOCATION
INSURANCE SVC
KCIT CUSTOMER SUPPORT SERVIC
KCIT eGOVERN MENT SERVICES
KCIT COU NTYWI DE SERVICES
DOA GIS SERVICES
Expenditure
55,525.17
$3,1s9.07
S5,286.19
S8eo.39
5L3,427.oo
s182.09
5429.00
5s,246.9r
s2,998.09
s5,054.40
$837.46
572,O58.27
s888.63
S26.83
Sror.27
Ss72.2t
s8s8.oo
s4,713.59
52,695.O7
54,842.t4
$70.6s
Sars.zr
531",835.41
$1,117.98
527,74OIs
5t!,!69.92
(s1,060.s2)
s2,1oo.oo
S5,950.58
523,792.00
$o,rso.az
s3,116.78
57,grl.7s
S1,405.67
s6Ls,o0
5720L
5s025
55026
55027
55040
55052
55201
55252
55265
55268
55270
55279
Monday, October L4, 2019 Page 9 of 10King County Flood Control District February 24, 2020 24
Project
1111848
L111848
1111848
1117848
L111848
Project Name
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
WLFLD DEFLT CENTRAL COSTS
Account
55347
s5350
55351
58021
58077
Account Description
BRC SVC CHARGES
RADIO ACCESS
RADIO MAINT PROGRAM
T T SURFACE WATER MGMT
T T KCIT CIP FUND
Expenditure
s2,394.33
s234.00
sso.00
593,530.66
s6s0.00
Grand Total $zs4gsa.rs
Monday, October 14, 2OLg Page 10 of 10
King County Flood Control District February 24, 2020 25
Flood District Capital Billing: Sepfember 2019
Skykomish/Miller Rivers
CurrentMonthBilling
$267.73
$9,325.51
ProjectedTotal Cost
$16,040
$600,000
LTDExp
$12,707
$129,269
LTDBudget
WLRBudget
Adj ExplanationPcnt
Project Description
Pro$ram : Stand-Alone Projects
1129359 WLFLO TIMBERLANE 2016 REPAIR
1135532 WLFLO TIMBERLANE 2019 REPAIR
Program Subtotal:
Program r SF SÛkomish'Repetitive Loss Mitigation
1044461 WLFLO SF SKYKMSH REP LOSS MIT
Program Subtotal
Total: Sþkomish/Miller Rivers
$9,593.24 $616,040 $141,976 23% $616,040
$13,119.94 $1,264,809 $384698 31% $868,795
$13,119.94 $1,264,809 $386,698 31o/o $868,79s
ç22,713.18 91,880,849 8528,674 $1,484,835
Exp
79%
22%
$16,040
$600,000
Monday, October 14, 201 I Page 1 of 15King County Flood Control District February 24, 2020 26
Upper Snoqualmie River
Project Description
Program : Stand-Alone Projects1121044 WLFLI CIRCLE R RANCH RISK RED
1044469 WLFLI MF SNO CORRIDOR PLAN
1132629 WLFLI RECORD OFFICE 2016 REPAIR
1132628 WLFLI REINIG RD 2016 REPAIR
1129364 WLFL1 SHAKE MILL LB 2016 REPAIR
1129363 WLFL1 SHAKE MILL RB 2016 REPAIR
1132630 WLFLI SI VIEW RM4 2017 REPAIR
1132338 WLFLI USACE PL 84-99 SF SNO
Program Subtotal:
Program: UpperSno Residential Flood Mitigation1044517 WLFLI UPR SNO RES FLD MITIGTN
Program Subtotal
Program: WLFLI SF SNO LEVEE REMEDIATION
1133200 WLFLI SFG-1 SEEPAGE RM2.27
Program Subtotal
Total: Upper Snoqualmie River
$204,903.13 $13,990,706 $3,897,380 28% $8,884,133
$1,013.96 $25,523,988 $6,386,696 25% $7,494,986
$1,013.96 $25,523,988 $6,386,696 25% $7,494,986
$110.54 $295,673 $192,402 65% $295,673
$110.54 $295,673 $192,402 65% 9295,673
$206,027.63 $39,810,367 810,476,478 $1 6,674,792
CurrentMonthBilling
$4,054.18
$12,278.89
$1,434.26
$43,306.03
$68,453.67
$1,795.34
$73,127.20
$45s.56
ProjectedTotal Cost
$4,666,249
$1,824,912
$987,835
$1,464,166
$3,550,000
$51,090
$396,754
$1,049,699
LTDExp
$187,142
s1,628,475
$81,548
$741,213
$964,364
$3,589
$254,589
$36,460
LTDBudget
$540,1 65
$1,824,912
$987,835
$1,200,000
$3,550,000
$51,090
$396,754
$3s3,377
WLRBudget
Adj ExplanationPcntExp
4%
89%
8%
51o/o
27%
7%
6AYo
3%
Monday, October 14, 2019 Page2of15King County Flood Control District February 24, 2020 27
Lower Snoqualmie River
Project Descripüon
Program : Stand-Alone Projects1044581 WLFL2 FARM FLOOD TSK FORCE IMP
1044576 WLFL2 L SNO/ALDAIR CORRDOR PLN
1044582 WLFL2 LWR SNO RESDL FLD MITGTN
1122633 WLFL2 SE 1gTH WAY REVETMENT
1133884 WLFL2 STOSSEL RB 2018 REPAIR
1044579 WLFL2 TOLT PIPELINE PROTECTION
Program Subtotal:
Program: Lower Sno Repetitive Loss Mitigation
1044580 WLFL2 L SNO REP LOSS MITGTION
Program Subtotal
Total: Lower Snoqualmie River
$34,342.74 $29,255,929 $23,151,86s 79Yo $25,191,474
$215.89 $1,695,671 629,443 2% 8446,133
$215.89 $1,695,671 $29,443 2% $446,133
$34,558.63 $30,951,600 $23,181,309 $25,637,607
CurrentMonthBilling
$2,103.70
$1,393.48
$178.47
$20,190.15
$2.s7
$10,474.57
ProjectedTotal Cost
$1,591,488
$8,002,354
$5,859,839
$1,916,294
$1 ,107,886
$10,778,068
LTDExp
$822,521
$7,017,155
$2,212,100
$1,588,5s7
$962,666
$10,548,887
LTDBudget
$979,803
$7,365,814
$3,04s,609
$1,916,294
$1,107,886
$10,778,068
WLRBudget
Adj ExplanationPcntExp
52%
88%
38%
83%
87%
98%
Monday, October 14, 2019 Page3of15King County Flood Control District February 24, 2020 28
Tolt River
Project Description
Program : Stand-Alone Projects
1129365 WLFL3 FREW LEVEE 2016 REPAIR
1129366 WLFL3 GIRL SCOUT LEVEE 2016 REPAIR
1132019 WLFL3 HOLBERG FEASIBILITY
1132631 WLFL3 REMLINGER LEVEE2017 REPAIR
1044645 WLFL3 SAN SOUCI NBRHOOD BUYOUT
1131560 WLFL3 SEDIMENT MGMT FEAS
1131562 WLFL3 SR 203 BR IMPRVMNTS FEAS
1044644 WLFL3 TOLT CORRIDOR PLAN
1131559 WLFL3 TOLT R LEVEE L.O.S. ANALYSIS
Program Subtotal
Program: Tolt River Mile 1.'l Levee Setback1112058 WLFL3 TOLT R MILE I.1 SEÎBACK
Program Subtotal
Total: Tolt River
$32,066.11 $8,565,526 $6,671,541 78% $8,56s,528
$687.96 $4,306,107 $3,992,052 93% $4,120,014
$687.96 $4,306,107 $3,992,052 93./, $4,120,014
832,754.07 $12,871,633 910,663,593 812,685,542
CurrentMonthBílling
$159.44
6539.61
$15,038.07
$808.59
$1,030.70
$1 0,1 12.79
$599.80
$161 .92
$s,615.19
ProjectedTotal Cost
$360,360
$311,000
$263,969
$311,000
$4,953,353
$402,805
$395,900
$1,153,657
$413,484
LTDExp
s168,614
$166,079
$178,985
$142,838
$4,527,846
$67,044
$20,474
$1,139,119
$260,543
LTDBudget
$360,s60
$311,000
s263,969
$311,000
$4,953,353
$402,805
$395,900
$1,153,657
$413,484
WLRBudget
Adj ExplanationPcntExp
47%
s3%
68%
46%
91%
17%
5%
99%
63%
Monday, October 14, 2019 Page4of15King County Flood Control District February 24, 2020 29
Raging River
Project Description
Program : Stand-Alone Projects
1132632 WLFL4 RAGING MOUTH TO BR 2OI7 REPAI
Program Subtotal
Total: Raging River
$539.61 $500,000 $266,843 53% $500,000
$539.61 $500,000 $266,843 53% $500,000
$539.61 $500,000 $266,843 $500,000
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanationLTDExp
PcntExp
Monday, October 1 4, 201 I Page 5 of 15King County Flood Control District February 24, 2020 30
Sammamish River
Project Description
Prognm : Stand-Alone Projects1124988 WLFLS SAMMAMISH R BANK REPAIRS
1112037 WLFL5 WILLOWMOOR FLDPLAIN REST
Program Subtotal:
Total: Sammamish River
$28,774.55 $6,712,707 $4,180,188 62% $4,701,042
$28,774.55 $6,712,707 $4,180,188 $4,701,042
CurrentMonthBilling
$1,021.69
$27,752-86
ProjectedTotal Cost
$1,180,065
$5,532,642
LTDExp
$1,162,777
$3,017,411
LTDBudget
$1 ,180,065
$3,520,977
WLRBudget
Adj ExplanationPcntExp
99%
55%
Monday, Oclober 1 4, 201 I Page6of15King County Flood Control District February 24, 2020 31
Major Lake Tributaries
Project Description
Program : Stand-Alone Projects
1116846 WLFL6 LOWER COAL CRK PH I
1132746 WLFL6 MAYVALLEY DRAINAGE IMPRVMNT
Program Subtotal
Total: Major Lake Tributaries
$2,445.90 $14,968,950 $7,974,020 53% $10,841,592
82,445.90 814,968,950 $7,974,020 810,841,592
CurrentMonthBilling
$49.09
$2,396.81
ProjectedTotal Cost
$14,588,950
$380,000
LTDExp
$7,754,240
$219,780
LTDBudget
$10,461 ,592
$380,000
WLRBudget
Adj ExplanationPcntExp
53%
58%
Monday, October 1 4, 201 9 Page 7 of 15King County Flood Control District February 24, 2020 32
Cedar River
Project Description
Program : Stand-Alone Projects1 044734 WLFLT CDR PRE-CONST STRTGC ACQ
1131691 WLFLT CEDAR RIVER TRAIL SITE 2A BANK
1044729 WLFLT CEDAR RVR GRAVEL REMOVAL
1128284 WLFLT FBD CORRIDOR IMPL
1 131 549 WLFLT HERZMAN LEVEE SETBACK AND TR
1131550 WLFLT JAN ROAD NEIGHBORHOOD
1131689 WLFLT LOWER CEDAR FEASIBILITY STUDY
1131687 WLFLT MAPLEWOOD FEASIBILITY STUDY
1119888 WLFLT RIVERBEND MHP ACQ
1130557 WLFLT SR 169 FEASIBILITY STUDY
Program Subtotal:
Total: Gedar River
$247,450.82 $43,859,023 $25,873,180 59% $31,517,109
$247,450.82 $43,859,023 $25,873,180 $31 ,517,109
CurrentMonthBilling
$1,735.70
$1,854.40
$386.83
$25,800.53
$69,396.33
$129,832.68
$933.35
$1,050.80
$5,726.42
$10,733.78
ProjectedTotal Cost
$5,5s0,532
$290,000
$12,841,929
s5,311,784
$5,236,128
$7,780,561
$500,000
$490,246
$5,231,042
$646,800
LTDExp
$3,950,038
$16,11 1
$9,831,778
$5,701,409
$1 ,044,102
$419,017
$1,s90
$282,216
$4,370,352
$256,768
LTDBudget
$4,330,532
$290,000
$12,065,498
$5,311,784
$1,266,476
$1,484,731
$400,000
$490,246
$5,231,042
$646,800
WLRBudget
Adj ExplanationPcntExp
71o/o
6%
77o/o
107%
20%
s%
0%
58%
84%
40%
Monday, October 14, 2019 page I of 15
King County Flood Control District February 24, 2020 33
Green River
Project Description
Program: Stand-Alone Projects1129574 WLFLS BRPS HIGH-USE ENGINES
1135536 WLFLS GALLIDYKSTRA 2O2O REPAIR
1130118 WLFLS LWR GRN R CORR PLAN/EIS
1112056 WLFLS LWR RUSSELL LEVEE SETBCK
1127209 WLFLS S277TH ST REVETMENT
1135539 WLFLS TUK REVETMNT 2019 REPAIR
1129367 WLFLS TUK-205 GACO WSTRN RPAIR
1129577 WLFLS TUK-205 SEGALE FLOODWALL
Program Subtotal
Program: Green R PL84-99 Mitigation
1 1 15400 WLFLS TEUFEL PL84-99 MIT
Program Subtotal
Program : Green Pre-Construction Acquisition1133719 WLFLS BARNABY'S DESIMONE ACQ
1044961 WLFLS GREEN PRE-CONSÏRCTN ACQ
Program Subtotal
Total: Green RÍver
$120,061.29 $59,477,610 $15,847,559 27% $38,279,649
$7,589.64 $3,069,379 $4,113,485 '134% $4,545,865
$7'589.64 $3,069,379 $4,113,485 134Yo $4,545,865
CurrentMonthBilling
$38,872.28
$2,579.10
$14,651 .52
$53,270.57
$2,504.14
$7,028.91
$734.99
$419.78
$3,869.59
$0.00
ProjectedTotal Cost
$1 ,484,646
$1,200,000
$1,74s,249
$35,687,298
$2,800,000
$500,000
$15,732,418
$330,000
$1,800,000
$35,368,856
LTDExp
$1,085,927
$51,425
$295,061
$13,195,516
$294,455
$95,205
$824,998
$4,970
$1,802,365
$369,967
LTDBudget
$1,484,646
$200,000
$1,743,249
$17,462,534
$826,802
$500,000
$15,732,418
$330,000
$1,800,000
$8,568,856
WLRBudget
Adj ExplanationPcntExp
73%
4o/o
't7%
37%
1'lo/o
19%
5%
2%
100%
1Yo
$3,869.59 $37,168,856 $2,172,332 6% $10,368,8s6
$131 ,520.52 $99,71 5,845 $22,133,376 953,194,370
Monday, October 14, 2019 Page9ofl5King County Flood Control District February 24, 2020 34
White River
Project Description
Program: Right Bank Levee Setback1112038 WLFLg RIGHT BANK LEVEE SETBACK
1135541 WLFLg STUCK R DR 2019 REPAIR
Program Subtotal
Total: White River
943,475.16 $29,267,328 $12,766,276 44% $14,043,157
$43,475.16 $29,267,328 $12,766,276 $14,043,157
CurrentMonthBilling
$35,244.99
$8,230.17
ProjectedTotal Cost
$29,067,328
$200,000
LTDExp
$12,697,397
$68,879
LTDBudget
$13,843,1 57
$200,000
WLRBudget
Adj ExplanationPcntExp
44%
34%
Monday, October 1 4, 201 I Page 10 of 15
King County Flood Control District February 24, 2020 35
Grant Funds
Project Description
Program : Stand-Alone Projects1122628 WLFLG FLOOD REDUCTION GRANTS
1117333 WLFLG WRIA GRANTS
Program Subtotal:
Total: Grant Funds
$327,052.82 $93,422,176 $31,362,991 34% $s0,156,205
$327,052.82 $93,422,176 $31,362,991 $50,156,205
CurrentMonthBilling
$231,499.28
$95,553.54
ProjectedTotal Cost
$35,027,736
$58,394,440
LTDExp
$9,787,398
$21,575,594
LTDBudget
$17,852,257
$32,303,948
WLRBudget
Adj ExplanationPcntExp
28%
37%
Monday, October 14, 2019 Page 11 of 15King County Flood Control District February 24, 2020 36
Mon itori n g/Maintenance
Project Description
Program: Effectiveness Monitoring1 135538 WLFLS PUGET WAY CULVERT
Program Subtotal:
Program: Effectiveness Monitoring1131252 WLFLM 428TH AVE SE BRIDGE SM
1121301 WLFLM BELMONDO EM
1135995 WLFLM CEDAR FISH META-ANALYSIS
1121302 WLFLM CEDAR RAPIDS EM
1132748 WLFLM CIRCLE RVR RANCH SM
1121306 WLFLM COUNTYLINE REACH EM
1 1 12022 WLFLM EFFECTIVENESS MONITORING
1137128 WLFLM GUNTER LEV SLOPE REP SM
1135994 WLFLM ISSAQUAH CHINOOK STUDY
1121310 WLFLM LOWER RUSSELL EM
1 1 35858 WLFLM MONITORING COORDINATION
1131247 WLFLM PACIFIC RIGHT BANK EM
1121299 WLFLM REDDINGTON EM
1131246 WLFLM RIPARIAN REFERENCE SM
1131248 WLFLM SE 1gTH WAY REVETMENT SM
1121318 WLFLM SINNEMA QUAALE SM
1 1 35859 WLFLM SMALL PROJECTS
1137148 WLFLM SNOQ SMALL REPAIRS SM
1137145 WLFLM STOSSEL RB 2018 SM
1131243 WLFLMÏEUFELSM
1121317 WLFLM WINKELMAN SM
Program Subtotal
CurrentMonthBilling
ProjectedTotal Cost
$5,667,995
LTDBudget
WLRBudget
Adj ExplanationLTDExp
PcntExp
s24.53 $1,800,000
$24.53 $1,800,000
$580 |Yo $1,800,000
$580 0% $1,800,000
$1,204.84
$221.37
$784.81
$3,197.01
$3,518.41
$10,902.82
$87.21
$663.18
$3,665.74
$221.05
$3,279.74
$4.29
$1,611.75
$1,333.05
$2,594.57
$1,537.50
846.81
$178.58
$184.50
$177.99
$15,090.39
$17,O06
$1 02,804
$2,578
$198,966
$10,574
$267,491
$126,737
$663
$9,707
$141,044
$43,000
$875
$181 ,274
$28,263
$33,800
$27,525
$4,046
$179
$1 85
$83,717
$120,692
$17,600
$104,042
$0
$163,456
$12,600
$172,748
$505,1 36
$0
.$0
$104,056
$0
$s2,000
$184,121
$33,562
$24,349
$23,458
$0
$0
$0
$52,820
$76,552
$50,505.61 $5,667,995 $1 ,401,125 25% $1 ,506,500
Monday, October 14, 2019 page 12 of 15
King County Flood Control District February 24, 2020 37
Mon itori n g/Mai ntenan ce
Project Description
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
$3,306,500
WLRBudget
Adj ExplanationLTDExp
PcntExp
Total: Monitoring/Maintenance $50,530.14 97,467,995 $1,401,705
Monday, October 14, 201 I Page 13 of 15King County Flood Control District February 24, 2020 38
Subregional Opportunity Fund
Project Description
Program: Subregional Opportunity Fund
1045173 WLFLO HUNTS POINT SUBRGNL OP
1045177 WLFLO KING CO UNINC SUBRGNL OP
1045251 WLFLO RENTON SUBRGNL OP
1045254 WLFLO SEATTLE SUBRGNL OP
1045042 WLFLO SUBREGNL OPPRTNTY FUND
Program Subtotal:
Total: Subregional Opportunity Fund
$87,257,574
$786,353.34 $87,257,574 $21,553,841 25% $2S,981,197
$786,353.34 887,257,574 $21,553,841 $28,981,197
CurrentMonthBilling
$10,431.26
$509,682.96
$72,831.32
$189,929.17
$s,478.63
ProjectedTotal Cost
LTDExp
$93,222
$5,188,466
$1,576,350
$14,533,711
$162,092
LTDBudget
$126,488
$5,861,207
$1,762,095
$20,747,25s
$484,1 54
WLRBudget
Adj ExplanationPcntExp
0%
Monday, October 1 4, 201 I Page 14 of 15
King County Flood Control District February 24, 2020 39
Admin
Project Description
Program: Default (lnterest Êxpense/Temp Accruais)
0000000 Deîault
Program Subtotal:
Program: Gentral Charges
1 044281 WLFLX CENTRAL CHARGES
Program Subtotal:
Total: Admin
Total This Billing:
Pcnt
$29,625.01 $260,182
$29,625.01 $260,182
$6,693.24 $1,511,493 $745,897 49% $981,782
$6,693.24 $1,511,493 $745,897 49% $981,782
636,31 8.25 $1 ,511 ,493 $1 ,006,079 9981,782
$1,950,514.62
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanafionLTDExp Exp
Monday, October 1 4, 201 9 Page 15 of 15
King County Flood Control District February 24, 2020 40
Flood District Staffing Report: September 2019
Annual Maintenance
561010 ADMIN DËFAULT
Buitrago,Kristopher Dean Environmental Scientist I
Bergrud,Shawn A Engineer ll
Koon,John Douglas Engineer lll
Henry,Alexis Osborne Environmental Scientist lll
Total: 561010 ADMIN DEFAULT
WLFLD AM FACILITY INSPECTION: CEDAR/SAMMAMISH 1111889.3
Russell,Luke A lntern lll (Graduate lntern)
Strazer,Mary J Engineer lll
Winjum,Tracy Charles Engineer ll
Walker,Monica H Project/Program Manager lll
Sandford,NancyFaegenburg Project/ProgramManagerlll
Brummer,Christopher J Engineer lV
Lincoln,Alexandra E Environmental Scientist lll
Total: WLFLD AM FACILITY INSPECTION: CEDAR/SAMMAMISH 1111889.3
WLFLD AM FACILITY INSPECTION: FLOODWALL KENT 1111889.5
Jonson,Clarizza Engineer lll
Kitamura,Kaoru Engineer I
Total: WLFLD AM FACILITY ¡NSPECTION: FLOODWALL KENT 1111889.5
WLFLD AM FACILITY INSPECTION: FLOODWALL TUKWILA 1111889.6
Jonson,Clarizza Engineer lll
Kitamura,Kaoru Engineer I
Total: WLFLD AM FACIIITY INSPECTION: FLOODWALT TUKWILA 1111889'6
WLFLD AM FACILITY INSPECTION: GREEN 1111889.2
Robinson,Patricia A Project/Program Manager lll
Jonson,Clarizza Engineer lll
Simeona,Chad K Engineer ll
Elder,Gage Engineer I
Young,Jay K Engineer lll
Kara,Fatin Engineer lV
Russell,Luke A lntern lll (Graduate lntern)
Total: WLFLD AM FACILITY INSPECTION: GREEN 1111889.2
WLFLD AM FACILITY INSPECTION: RFI DATABASE MGMT 1111889.8
Comanor,Kyle Engineer lll
Buitrago,Kristopher Dean ËnvironmentalScientist I
CurrentMonth Hours
s8.0
28.0
30.0
15.0
131.0
28.0
16.s
L4.0
8.0
8.0
12.5
7.0
94.0
5.5
6.0
11.5
YTD Hours
430.0
299.O
286.0
185.0
1,200.0
98.5
68.5
4t.o28.0
18,0
L2.5
7.0
273.5
55.0
48.0
103.0
47.5
34.0
81.5
61.0
49.0
39.0
36.0
25.5
7.O
3.0
220.5
1,44.0
30.0
9.5
4.0
13.5
1.4.0
26.5
39.0
36.0
5.0
7.4
3.0
130.5
30.0
2.5
Monday, October 1,4, 201-,9 Page 1 of 29King County Flood Control District February 24, 2020 41
Flood District Staffing Report: September 2019
Henry,Alexis Osborne Environmental Scientist lll
Total: WLFLD AM FACILITY INSPECTION: RFI DATABASE MGMT 1111889.8
WLFLD AM FACTLTTY TNSPECTTON: SNOQISF SKYKOMtSH 1111889.1
Gelaw,Ashagrie A Engineer ll
Lewis,Teresa S Project/Program Manager lll
Smith,Jay Brian Engineer lll
Kays,Gus Brian Engineer lll
Rose,Richelle M Project/Program Manager lll
Wright,Olivia M Engineer ll
Barton,Chase M Engineer lV
Amrhein,Seth J Environmental Scientist ll
RadloflJudith K Environmental Scíentist lll
Garric,Craig M Engineer lll
TotaI: WLFLT} AM FACILITY INSPECTION: SNOQ/SF SKYKOMISH 1111889.1
WLFLD AM FACILITY INSPECTION: WHITI 1111889.4
Brummer,Christopher J Engineer lV
Total: WLFTD AM FACILITY INSPECTION: WHITE 1111889.4
WLFLD AM IMPLEMENT & COORD: ADMIN TIME LL282OO.4
Koon,John Douglas Engineer lll
Buitrago,Kristopher Dean Environmental Scientist I
Henry,Alexis Osborne EnvironmentalScientist lll
Bergrud,Shawn A Engineer ll
Total: WLFLD AM ¡MPIEMENT & COORD: ADMIN TIME 1128200.4
WLFLD AM IMPLEMENT & COORD: EXT COORD 1128200.1
Buitrago,Kristopher Dean Environmental Scientist I
Koon,John Douglas Engineer lll
Bergrud,Shawn A Engineer ll
Henry,Alexis Osborne EnvironmentalScientist lll
Total: WLFLD AM IMPLEMENT & COORD: EXT COORD L1282OO.L
WLFLD AM IMPLEMENT & COORD: RFMS COORDINATION IT282OO.2
Koon,John Douglas Engineer lll
Buitrago,Kristopher Dean Environmental Scientist I
Bergrud,Shawn A Engineer ll
Total: WLFLD AM IMPLEMENT & COORD: RFMS COORDINATION LL282OO.2
WLFLD AM LOG JAM INVST&RELOC: LW INVESTIGATION 1111839.1
Koon,John Douglas Engineer lll
Chiang,Sophia N Environmental Scientist lll
CurrentMonth Hours
8.0
40.5
65.0
32.0
21.0
24.5
29.0
25.0
8.0
11.0
9.0
7.O
231.5
0.5
0.5
25.5
22.0
27.0
19.0
93.5
21,.5
33.0
2.O
2.O
58.5
43.0
23.s
1.0
67.5
16.5
58.5
YïD Hours
13.0
187.0
231_.0
s2.0
42.0
4r.537.0
37.0
13.0
1L.0
9.0
7.0
480.5
8.5
8.5
267.O
169.5
153.0
142.O
731.5
179.5
86.s
24.0
8.0
298.0
279.s
1.17.5
3.0
400.0
200.5
128.5
Monday, October 14, 2OI9 Page 2 of 29King County Flood Control District February 24, 2020 42
Flood District Staffing Report: September 2019
Shelton,StephanieMelissa EnvironmentalScientistlV
Bauman,Kerry Environmental Scientist lll
Akyuz,Katherine A Capital Project Manager lV
Total: WLFLD AM LOG JAM INVST&RELOC: LW INVËSTIGATION 1111839.1
WLFLD AM MAINT RIVER FACILITY: PL 84-99 IMPL 1111841.13
Young,Jay K Engineer lll
Althauser,Donald R Engineer lll
Bergrud,Shawn A Engineer ll
Total: WLFLD AM MAINT RIVER FACILITY: PL 84-99 IMPL 1111841.13
WLFLD AM SMP IMPLEMENTATION: ALDAIR 2019 L124994.L4
Kis-Young,Darian V Engineer I
Total: WIFLD AM SMP IMPLEMENTATION: ALDAIR 2019 1124994.L4
WLFLD AM SMP IMPLEMENTATION: CEDAR/SAMMAM¡SH LL24994,8
Buitrago,Kristopher Dean Environmental Scientist I
Bannister,ThomasAndrew EnvironmentalScientistlll
Koon,John Douglas Engineer lll
Louie,Steven James Utility Worker ll
Jewett-Chan,Riley N Utility Worker ll
Peterson,Mykal Fale Equipment Operator
Sandford,NancyFaegenburg Project/ProgramManagerlll
Bauman,Kerry EnvironmentalScientist lll
Samra,Laxhdip Kaur Contract Specialist I
Kaluza,Ryan James Utility Worker ll
Henry,Alexis Osborne Environmental Scientist lll
Jonson,Clarizza Engineer lll
Russell,Luke A lntern lll (Graduate lntern)
Total: WLFLD AM SMP IMPLEMENTATION: CEDAR/SAMMAMISH Lt24994.8
WLFLD AM SMP IMPIEMENTATION: GREEN L124994.9
Buitrago,Kristopher Dean Environmental Scientist I
Koon,John Douglas Engineer lll
Samra,Laxhdip Kaur Contract Specíalist I
Bauman,Kerry Environmental Scientist lll
Tota!: WLFLD AM SMP IMPLEMENTATION: GREEN L124994.9
WLFLD AM SMP IMPLEMENTATION: LWR RUSSELL STBK SMP 1124994.L3
Bauman,Kerry EnvironmentalScientist lll
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLD AM SMP IMPLEMENTATION: LWR RUSSELL STBK SMP 1124994.
CurrentMonth Hours
1_0.5
6.5
3.5
95.5
41.0
29.0
17.0
87.0
0.5
0.5
5.5
1.0
3.5
16.0
14.0
t4.o2.5
9.0
3.0
7.O
2.0
4.5
2.0
84.0
5.0
0.5
1.0
3.0
9.5
YTD Hours
47.5
18.0
10.5
405.0
288.0
108.5
t7.o
413.5
75.5
75.5
72.5
42.5
26.5
16.0
L4.0
1,4.0
10.0
9.0
8.0
7.0
5.0
4.5
2.O
231.0
72.0
46.0
1"9.0
3.0
140.0
t2.o1.0
13.0
Monday, October L4, z0tg
1L.0
1.0
L2.O
Page 3 of 29King County Flood Control District February 24, 2020 43
Flood District Staffing Report: September 2019
WLFLD AM SMP IMPLEMENTATION: SMP DEVELOPMENT 1L24994.L2
Henry,Alexis Osborne EnvironmentalScientist lll
Koon,John Douglas Engineer lll
Comanor,Kyle Engineer lll
Amrhein,Seth J Environmental Scientist ll
Chiang,Sophia N Environmental Scientist lll
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLD AM SMP IMPIEMENTATION: SMP DEVELOPMENT L124994.12
WLFLD AM SMP IMPLEMENTATION: SNOQ/SKYKOMISH TT24994.3
Buitrago,Kristopher Dean Environmental Scientist I
Koon,John Douglas Engineer lll
Bergrud,Shawn A Engineer ll
Thomas,Anthony Michael Utility Worker ll
Dorfler,Jeffrey L Equipment Operator
Patterson,Don W Crew Chief
Kaluza,Ryan James Utility Worker ll
Samra,Laxhdip Kaur Contract Specialist I
Jewett-Chan,Riley N Utility Worker ll
Louie,Steven James Utility Worker ll
Henry,Alexis Osborne Environmentalscientist lll
Walters,Terri K Truck Driver ll
TOTAI: WLFLD AM SMP IMPLEMENTATION: SNOQ/SKYKOMISH TT24994.3
WLFLD AM SMP IMPLEMENTATION: WHITE 1t24994.11
Buitrago,Kristopher Dean Environmental Scìentist I
Bergrud,Shawn A Engineer ll
Walker,Monica H Project/Program Manager lll
Samra,Laxhdip Kaur Contract Specialist I
Shelton,StephanieMelissa EnvironmentalScientistlV
Total: WLFLD AM SMP IMPLEMENTATION: WHITE LL24994.L!
WLFLD ST GREEN R PUMP STATIONS: GENERAL PUMP ADMIN 1111885.1
Bean,Thomas Charles Engineer lV
Total: WLFLD ST GREEN R PUMP STATIONS: GENERAL PUMP ADMIN 1111885.
Cu rre ntMonth Hours
64.0
1.0
3.0
2.0
3.0
2.0
75.4
11_.5
6.0
11.0
24.O
9.5
10.0
24.O
2.0
9.0
8.0
6.0
4.0
125.0
2.0
1.0
3.8
2.0
1.0
9.8
5.5
5.5
YTD Hours
835.0
86.5
57.0
34.5
27.O
2.0
t,o42.o
128.5
99.5
66.0
62.0
59.5
25.0
24.0
L7.O
9.0
8.0
6.0
4.0
508.s
52.5
45.0
7.8
5.0
1.0
111.3
33.s
33.s
Total: Annual Maintenance
Flood Hazards Plan, Grants, Outreach
561005 ADMIN DEFAULT
Vanderpool, Kathleen
L,376.3 6,957.3
64.0 344.0
M onday, Octo ber'J.4, 201.9
Project/Program Manager lV
Page 4 of 29King County Flood Control District February 24, 2020 44
Flood District Staffing Report: September 2OLg
Zweig,Kenneth S Project/Program Manager lll
Paine,Mitchell C Project/Program Manager ll
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: 561005 ADMIN DEFAULT
WLFLD PP EDUCTN & PUB OUTRCH: FCD PROTOCOL COORD 1111869.1
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFLD PP EDUCTN & PUB OUTRCH: FCD PROTOCOL COORD 1111869.1
WLFLD PP EDUCTN & PUB OUTRCH: KC OUTREACH COORD 1111869.3
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFLD PP EDUCTN & PUB OUTRCH: KC OUTREACH COORD 1111869.3
WLFLD PP EDUCTN & PUB OUTRCH: OUTREACH PLANN¡NG 1111869.2
Walker,Monica H Project/Program Manager lll
Matej,Kimberly Communications Specialist lll
Vanderpool,Kathleen Project/Program Manager lV
Matej,Kimberly Deputy Executive Director
Total: WTFLD PP EDUCTN & PUB OUTRCH: OUTREACH PLANNING LLtt.869.Z
WLFLD PP GENERAL INQUIRIES: DEFAULT 1111884.1
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLD PP GENERAL INQUIRIES: DEFAULT 1111884.1
WLFLD PP KCFCZD IMPL & COORD: ADMINISTRATIVE TIME 1111831.4
Vanderpool,Kathleen Project/Program Manager lV
Matej,Kimberly Communications Specialist lll
Paine,Mitchell C Project/Program Manager ll
Zweig,Kenneth S Project/Program Manager lll
Matej,Kimberly Deputy Executive Director
TotaI: WTFLD PP KCFCZD IMPL & COORD: ADMINISTRATIVE TIME 1111831.4
WIFLD PP KCFCZD IMPL & COORD: FLOOD HAz CERTIFICAT 1111831.7
Wright,Olivia M Engineer ll
Total: WLFLD PP KCFCZD IMPL & COORD: FLOOD HAZ CERTIFICAT 1111831.7
WLFLD Pp KCFCZD IMPL & COORD: RFMS COORDINATION 1111831.2
Vanderpool,Kathleen Project/Program Manager lV
Matej,Kimberly Communications Specialist lll
Zweig,Kenneth S Project/Program Manager lll
Cu rre ntMonth Hours
80.0
40.0
40.0
40.0
264.0
4.8
4.8
9.5
YTD Hours
263.0
224.O
88.0
24.0
943.0
48.3
0.0
48.3
46.0
0.0
46.0
64.8
33.8
25.0
0.0
t23.5
109.0
109.0
515.5
419.8
182.5
170.o
16.3
1,304.0
28.0
28.0
407.0
300.3
105.0
5.3
5.3
10.5
1".0
5.3
9.0
5.3
20.5
11,.0
11.0
39.0
27.3
14.0
8.0
27.3
115.5
9.0
9.0
36.0
63.s
3.0
Monday, October L4, 2019 Page 5 of 29King County Flood Control District February 24, 2020 45
Flood District Staffing Report: September 2019
Matej,Kimberly Deputy Executive Director
Tota|: WLFLD PP KCFCZD IMPL & COORD: RFMS COORDINATION T1LI83L.2
WLFLD PP RIVIR & FLDPLN PLAN: CRS COMPLIANCE LLtt873.7
Paine,Mitchell C Project/Program Manager ll
Vanderpool,Kathleen Project/Program Manager lV
Total: WLFLD PP RIVER & FLDPLN PLAN: CRS COMPLIANCE lt!t873.7
WLFLD PP RIVER & FLDPLN PLAN: CRS STRATEGY 1111873.8
Matej,Kimberly Communications Specialist lll
Total: WLFLD PP RIVËR & FLDPLN PLAN: CRS STRATEGY 1111873.8
WLFLD PP RIVER & FLDPLN PLAN: FLD PLAN UPDATE LLIL873.T
Paine,Mitchell C Project/Program Manager ll
Vanderpool,Kathleen Project/Program Manager lV
Lott,Frederic C Engineer ll
Total: WLFLD PP RIVER & FLDPLN PLAN: FLD PLAN UPDATE 1111873.1
WLFLD PP RIVER & FLDPLN PLAN: HOME ILEV PROG DEV 1111873.3
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLD PP RIVER & FLDPLN PLAN: HOME ELEV PROG DEV 1111873.3
Cu rre ntMonth Hours
63.5
166.0
100.0
5.0
105.0
YTD Hours
46.0
858.3
938.0
47,O
98s.0
4,O
4.O
121.5
s5.5
36.s
213.5
256.0
256.0
4.O
4.O
6.0
7.0
11.0
24.O
6.0
6.0
Total: Flood Hazards Plan, Grants, Outreach
Flood Hazard Studies, Maps, Technical Services
561007 ADMIN DEFAULT
Comanor,Kyle Engineer lll
Bunn,Jeremy T Environmental Scientist lll
Radloff,Judith K Environmental Scientist lll
Lott,Frederic C Engineer ll
Total: 561007 ADMIN DEFAULT
WLFLD CEDAR/WHtTE lMpL & COORD: ADMTN TIMI tttt878.4Russell,Luke A lntern lll (Graduate lntern)
Brummer,Christopher J Engineer lV
Sandford,NancyFaegenburg Project/ProgramManagerlll
Akyuz,Katherine A Capital Project Manager lV
Strazer,Mary J Engineer lll
Walker,Monica H Project/Program Manager lll
Winjum,Tracy Charles Engineer ll
Heckendorf,Daniel G Engineer lll
Total: WLFLD CEDAR/WHtTE tMpL & COORD: ADMIN TtME 1111878.4
745.0 4,918.5
73.0
21,.5
3s.0
11.0
140.5
81.0
53.5
24.0
39.0
19.5
17.3
14.4
3.0
251.3
349.0
268.0
231.0
23.0
871.0
1"42.5
1.24.5
90.0
84,0
64.5
41.8
28.0
26.0
601.3
Monday, October 14, 2019 Page 6 of 29King County Flood Control District February 24, 2020 46
Flood District Staffing Report: September 2OLg
WLFLD CEDAR/WHITE IMPL & COORD: ÊXT COORDINATION LLtt878.t
Winjum,Tracy Charles Engineer ll
Brummer,Christopher J Engineer lV
Strazer,Mary J Engineer lll
Total: WLFLD CEDAR/WHITE IMPL & COORD: EXT COORDINATION 1111878.1
WLFLD CEDARIWHITE IMPL & COORD: PACIFIC PUMP STATION 1111878.6
Strazer,Mary J Engineer lll
Lincoln,Alexandra E Environmental Scientist lll
Walker,Monica H Project/Program Manager lll
Brummer,Christopher J Engineer lV
TOTAI: WLFLD CEDAR/WHITE IMPL & COORD: PACIFIC PUMP STATION 'LLL87
WLFLD CEDAR/WHIrE IMPL & COORD: RFMS COORDINATION LLll878.2
Sandford,NancyFaegenburg Project/ProgramManagerlll
Walker,Monica H Project/Program Manager lll
Total: WLFLD CEDAR/WHITE IMPL & COORD: RFMS COORDINATION 1111878.
WLFTD TCH CMZ STUDIES: RAGING 1128136.5
Bunn,Jeremy T Environmental Scientist lll
Walker,Monica H Project/Program Manager lll
Lewis,Teresa S Project/Program Manager lll
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFTD TCH CMZ STUDIES: RAG¡NG 1128136.5
WLFLD TCH CMZ STUDIES: WHITE 1128136.11
RadloflJudith K EnvironmentalScientist lll
Walker,Monica H Project/Program Manager lll
Matej,Kimberly Communications Specialist lll
Bunn,Jeremy T Environmental Scientist lll
Lewis,Teresa S Project/Program Manager lll
Lott,Frederic C Engineer ll
Matej,Kimberly Deputy Executive Director
Total: WLFLD TCH CMZ STUDIES: WHITE LL28L36.LL
WLFLD TCH FLOOD STUDTES: LEVEE ANALYSIS PH 1 1128138.4
Radloff,Judith K Environmental Scientist lll
Total: WLFLD TCH FLOOD STUDIES: LEVIE ANALYSIS PH 1 tt28L38.4
WLFIÞ TCH FTOOD STUDIES: SF SKY & ZONE A FLD tt28L38.7
Comanor,Kyle Engineer lll
CurrentMonth Hours
6.0
4.0
3.0
13.0
1,4.0
12.5
10.0
3.0
39.5
YTD Hours
13.0
4.0
3.0
20.0
74.0
12.5
12,0
3.0
47.5
19.5
0.5
20.0
274.8
108.3
94.5
42.5
0.0
s20.0
172.5
120.5
38.8
1_8.8
13.0
6.5
0.0
370.0
74.0
74.O
7.0
0.5
7.5
L6.0
3.3
12.0
L.3
1.3
33.8
8.5
2.4
1.0
5.0
2.5
6.5
1.0
26.5
3.0
3.0
2!.O r24.O
Monday, October 14, z}tg Page 7 of 29King County Flood Control District February 24, 2020 47
Flood District Staffing Report: September 2019
Alba,Christine J Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Matej,Kimberly Communications Specialist lll
Walker,Monica H Project/Program Manager lll
Matej,Kimberly Deputy Executive Director
Total: WIFLD TCH FLOOD STUDIES: SF SKY & ZONE A FLD !t28L38.7
WLFLD TCH IMPLEMENT & COORD: ADMINISTRATIVE TIME ttt4299.4Bunn,Jeremy T Environmental Scientist lll
Radloff,Judith K Environmental Scientist lll
Comanor,Kyle Engineer lll
Karlsson,Hannah M Engineer I
Lott,Frederic C Engineer ll
Total: WLFLD TCH IMPLEMENT & COORD: ADMINISTRATIVE TIME 1tL4299.4
WLFTD TCH IMPLEMENT & COORD: EXT COORDINATION ttt4299.tComanor,Kyle Engineer lll
Lott,Frederic C Engineer ll
Total: WLFLD TCH IMPLEMENT & COORD: ËXT COORDINATION tLt4299.t
WLFLD ïCH IMPLEMENT & COORD: RFMS COORDINATION Llt4Z99.2
Comanor,Kyle Engineer lll
Karlsson,Hannah M Engineer I
RadloffJudith K EnvironmentalScientist lll
Lott,Frederic C Ëngineer ll
Total: WTFLD TCH IMPLEMENT & COORD: RFMS COORDINATION t1,14299.2
WLFLD TCH SEDIMENT MON & MGMT: L SNO 1111836.3
Lott,Frederic C Engineer ll
RadloflJudith K Environmentalscientist lll
Total: WLFLD TCH SEDIMENT MON & MGMT: L SNO 1111836.3
WLFLD TCH SEDIMENT MON & MGMT: LIDAR IMAGIRY 1111836.12
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLD TCH SEDIMENT MON & MGMT: LIDAR IMAGERY 1111836.12
WLFLD TCH SEDIMENT MON & MGMT: RAGING 1111836.5
Lott,Frederic C Engineer ll
Total: WLFTD TCH SEDIMENT MON & MGMT: RAGING 1111836.5
WLFLD TCH SEDIMENT MON & MGMT: TOLT 1111836.4
Bunn,Jeremy T Environmental Scientist lll
Lott,Frederic C Engineer ll
Cu rre ntMonth Hours
7.0
1".0
5.8
1.0
5.8
41.5
YTD Hours
55.0
77.O
8.0
3.5
0,0
207.5
2s1,.0
159.8
131.0
105.0
36.0
682.8
2s0.0
63.s
313.5
415.0
L11.5
1,07.O
78,5
7t2.O
2.5
0.5
3.0
10.0
10.0
42.0
38.s
8.0
8.0
21.0
tL7.5
2t.o19.0
40.0
7.0
7.0
7.5
43.0
64.s
2.O
0.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
10.0
2.O
Monday, October L4, 2Oî9
4.5
2.O
Page B of 29King County Flood Control District February 24, 2020 48
Flood District Staffing Report: September 2OL9
Total: WLFLD TCH SED¡MENT MON & MGMT: TOLT 1111836.4
WLFLD TCH UW CLIMATE CHANGE: DEFAULT TASK LL28846.t
DeGasperi,Curtis L Engineer lV
Total: WLFLD TCH UW CLIMATE CHANGE: DEFAULT TASK 1128846.1
CurrentMonth Hours
6.5
6.0
6.0
YTD Hours
L2.O
10.0
10.0
Total: Flood Hazard Studies, Maps, Technical Services
Flood Preparation, Flood Warning Center
WLFLD PP FWC PREP & TRAINING: DEFAULT TASK 1111882.1
Zweig,Kenneth S Project/Program Manager lll
Koon,John Douglas Engineer lll
Radloff,Judith K Environmental Scientist lll
Total: WLFLD PP FWC PREP & TRAINING: DEFAULT TASK 1111882.1
795.5 4,469.5
33.0
1.0
1.0
35.0
125.0
9.5
1.0
135.5
Total: Flood Preparation, Flood Warning Center
Program Management, Supervision, Finance, Budget
561008 ADMIN DEFAULT
Bleifuhs,Steven J Environmental Prog. Sect Mgr
lsaac,Edna M Contract Specialist I
Stypula,Jeanne M Managing Engineer
Klusman,steven A Business & Finance Officer lV
Murray,Brian P Environmental Prog. Mng Supv
Carbaugh,Tammy M Contract Specialist ll
Aro,Sylvia K Administrative Specialist lll
Reinelt,Lorin Managing Engineer
Johnston,Katrina L Business & Finance Officer lll
Carlos,Ricardo Contract Specialist I
Alba,Christine J Contract Specialist I
Whited,JoAnn E Contract Specialist I
Total: 561008 ADMIN DEFAULT
WLFLD MGMT PROGRAM MGMT: ADMIN TIME tlLL89t.22
Stypula,Jeanne M Managing Engineer
Johnston,Katrina L Business & Finance Officer lll
Klusman,steven A Business & Finance Officer lV
Total: WLFLD MGMT PROGRAM MGMT: ADMIN TIME tttL89t.22
WLFLD MGMT PROGRAM MGMT: AUDIT RESPONSE 1111891.4
Carlos,Ricardo Contract Specialist I
Johnston,Katrina L Business & Finance Officer lll
35.0 13s.5
160.0
27.O
10.0
32.0
18.0
9.0
28.0
3s.0
40.0
23.0
24.0
20.0
426.O
1",512.0
475.5
306.0
296.0
285.0
275.0
268.0
267.0
232.0
207.0
201.3
198.0
4,322.8
41".0
5.3
14.o
60.3
21,6.0
82.8
6s.0
363.8
!7.O
8.0
Monday, October 14, 2019
4.0
6.8
Page 9 of 29King County Flood Control District February 24, 2020 49
Flood District Staffing Report: September 2019
Tota|: WLFLD MGMT PROGRAM MGMT: AUDIT RESPONSE 1111891.4
WLFLD MGMT PROGRAM MGMT: CONTRACT ADMIN 1111891.1
Carlos,Ricardo Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
lsaac,Edna M Contract Specialist I
Samra,Laxhdip Kaur Contract Specialist I
Alba,Christine J Contract Specialist I
Whited,JoAnn E Contract Specialist I
Alvarado,Jessica A Contract Specialist I
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT ADMIN 1111891.1
WLFLD MGMT PROGRAM MGMT: CONTRACT DEV WLRD 1111891.11
Alba,Christine J Contract Specialist I
Whited,JoAnn E Contract Specialist I
Carlos,Ricardo Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT DEV WLRD 1111891.11
WLFLD MGMT PROGRAM MGMT: CONTRACT STRATEGIC 1111891.13
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT STRATEGIC 1111891.13
WLFLD MGMT PROGRAM MGMT: FINANCIAL MGMT 1111891.5
Johnston,Katrina L Business & Finance Officer lll
Klusman,Steven A Business & Finance Officer lV
Total: WLFLD MGMT PROGRAM MGMT: FINANCIAL MGMT 1111891.5
WLFLD MGMT PROGRAM MGMT: NEW CM&ICONTRACT 1111891.15
Alvarado,Jessica A Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: NEW CM&l CONTRACT 1111891.15
WLFLD MGMT PROGRAM MGMT: NEW H&H CONTRACT 1111891.9
Alvarado,Jessica A Contract Specialist I
Alba,Christine J Contract Specialist I
Radloff,Judith K Environmental Scientist lll
Hallenius,Alexander D Engineer Ill
Heckendorf,Daniel G Engineer lll
Carbaugh,Tammy M Contract Specialist ll
Whited,JoAnn E Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: NEW H&H CONTRACT 1111891.9
Cu rre ntMonth Hours
10.8
79.5
60.0
69.0
47.0
47.0
37.O
3.0
0,3
0.3
343.0
YTD Hours
25.0
667.s
635.0
582.5
467.O
422.8
310.5
160.s
16.0
0.3
3,262,O
37.0
3.0
2.0
42.O
87.O
26.0
9.0
L22.O
40.0
40.0
986.5
927.O
1,913.5
30.5
30.s
t79.067.5
19.5
1_5.0
15,0
13.0
2.O
311.0
24.O
24.O
76.O
110.0
186.0
4.0
4.0
45.0
10.5
16.5
15.0
15.0
7.O
2.O
111.0
Monday, October 14, zOLg Page 10 of 29King County Flood Control District February 24, 2020 50
Flood District Staffing Report: September 2019
WLFLD MGMT PROGRAM MGMT: NEW SURVEY CONTRACT LtLt89t.L7
Alba,Christine J Contract Specialist I
lsaac,Edna M Contract SPecialist I
Total: WLFLD MGMT PROGRAM MGMT: NEW SURVEY CONTRACT 1111891.1
WLFLD MGMT PROGRAM MGMT: POLICIES & PROCEDURE 1111891.12
Carlos,Ricardo Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLD MGMT PROGRAM MGMT: POLICIES & PROCEDURE L!lL89t.L2
WLFLD MGMT PROGRAM MGMT: RFMS COORDINAT¡ON t"ttt89L.2
Aro,Sylvia K Administrative Specialist lll
Murray,Brian P Environmental Prog. Mng Supv
Stypula,Jeanne M Managing Engineer
Hepburn,SusanGwendolyn AdministrativeSpecialistlll
Reinelt,Lorin Managing Engineer
Hepburn,SusanGwendolyn AdministrativeSpecialistlV
lsaac,Edna M Contract SPecialist I
Total: WLFLD MGMT PROGRAM MGMT: RFMS COORDINATION 1111891.2
WLFLD MGMT PROGRAM MGMT: TOTAT WK INTEGRATION tt1,l89t.23
Klusman,Steven A Business & Finance Officer IV
Total: WLFLD MGMT PROGRAM MGMT: TOTAL WK INTEGRATION tt1-!89t.2
Cu rre ntMonth Hours
5.5
5.5
11.0
YTD Hours
38.0
32.5
70.5
45.5
36.0
81.5
1,316.0
1,130.0
969.0
960.0
71,9.0
200.0
6.0
5,300.0
200.0
200.0
7.5
2.0
9.5
139.0
1,42.0
109.0
160.0
77.0
160.0
2.0
789.0
4.0
4.O
Total: Program Management, Supervision, Finance, B
Program lmplementat¡on
561001ADMIN DEFAULT
Rose,Richelle M Project/Program Manager lll
Barton,Chase M Engineer lV
Kays,Gus Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
Wright,Olivia M Engineer ll
Smith,Jay Brian Engineer lll
Lewis,Teresa S Project/Program Manager lll
Total: 561001 ADMIN DEFAULT
2,020.5 L6,242.5
561002 ADMIN DEFAULÏ
Young,Jay K
Ka ra, Fatin
Robinson,Patricia A
Jonson,Cla rizza
Engineer lll
Engineer lV
Project/Program Manager I I I
Engineer lll
17.0
16.0
29.0
8.0
12.0
19.5
18.0
119.5
37.5
13.0
8.0
1_8.0
275.0
232.0
r94.0
192.O
186.5
169.5
133.0
1,382.0
525.5
269.8
2s6.0
249.O
Monday, October 14, 2OI9 Page 11 of 29King County Flood Control District February 24, 2020 51
Flood District Staffing Report: September 2019
Peters,Erik G Capital Project Manager lV
Total: 561002 ADMIN DEFAULT
561003 ADMIN DEFAULT
Heckendorf,Daniel G Engineer lll
Sandford,Nancy Faegenburg Project/Program Manager lll
Akyuz,Katherine A Capital Project Manager lV
Brummer,Christopher J Engineer lV
Winjum,Tracy Charles Engineer ll
Walker,Monica H Project/Program Manager lll
Strazer,Mary J Engineer lll
Total: 561003 ADMIN DEFAULT
Cu rre ntMonth Hours
8.0
84.5
86.0
3s.5
48.0
36.s
20.0
40.0
16.8
282.8
l_3.0
15.5
13.0
51.0
11.0
24.O
8.0
8.0
143.5
19.5
9.0
16.0
9.0
45.0
37.5
22.O
9.0
9.0
32.0
37.5
245.5
YTD Hours
208.0
1,508.3
313.5
284.O
240.O
224.0
195.0
1,92.O
67.O
1,515.5
194.0
190.3
182.0
175.O
130.0
tt4.o8.0
8.0
1,001.3
244.0
223.0
203.0
170.O
r41,.O
134.0
114.3
70.3
47.O
34.0
31.8
1,4t2.3
561004 ADMIN DEFAULT
Bloxton,Thomas D Environmental
Amrhein,Seth J Environmental
Bauman,Kerry Environmental
Shelton,Stephanie Melissa Environmental
Chiang,Sophia N Environmental
Bannister,Thomas Andrew Environmental
Lincoln,Alexandra E Environmental
Knox,Matthew Environmental
Total: 561004 ADMIN DEFAULT
Scientist ll
Scientist ll
Scientist lll
Scientist lV
Scientist lll
Scientist lll
Scientist lll
Scientist lll
561011ADMIN DEFAULT
Bean,Thomas Charles Engineer lV
Ruebel,Mark W Capital Project Manager IV
Beggs,Mark Robert Engineer ll
Torres,Stella I Capital Project Manager lll
Garric,Craig M Engineer lll
Hardy,Jessy Marie Lucas Engineer ll
Kis-Young,Darian V Engineer I
McPherson,Heather N Engineer I
Torres,Stella I Project/Program Manager ll
BartoliniVenegas,LindaY Project/ProgramManagerll
Hardy,Jessy Marie Lucas Engineer I
Total: 561011 ADMIN DEFAULT
WLFLD ECOLOGIC SVCS IMPL COORD: ADMIN TIME 1L1L870.4
Shelton,StephanieMelissa EnvironmentalscientistlV
Bloxton,Thomas D Environmental Scientist ll
Amrhein,Seth J Environmentalscientist ll
Bannister,ThomasAndrew EnvironmentalScientistlll
12.0
L2.O
1.2.0
6.0
435.5
281.5
262.3
192.5
Monday, Octo ber'J.4, 201.9 Page L2 of 29King County Flood Control District February 24, 2020 52
Flood District Staffing Report: September 2019
Bauman,Kerry EnvironmentalScientist lll
Chiang,Sophia N Environmental Scientist lll
Gorman,Brynden C lntern ll (Undergrad lntern)
Lincoln,Alexandra E Environmental Scientist lll
Knox,Matthew Environmental Scientist lll
Karlsson,Hannah M Engineer I
Total: WTFLD ECOLOGIC SVCS IMPL COORD: ADMIN TIME Il,tL87O.4
WLFLD ECOLOGIC SVCS IMPL COORD: EXT COORDINATION 1111870.1
Bauman,Kerry EnvironmentalScientist lll
TOTAI: WLFLD ECOLOGIC SVCS IMPL COORD: EXT COORDTNAT¡ON LL1T87O.L
WLFLD ECOLOGIC SVCS IMPL COORD: RFMS COORDINATION LTLL87O.2
Shelton,StephanieMelissa EnvironmentalScientistlV
Bloxton,Thomas D Environmental Scientist ll
Chiang,Sophia N Environmental Scientist lll
Bauman,Kerry Environmental Scientist lll
Lincoln,Alexandra E Environmental Scientist lll
TotaI: WLFLD ECOLOGIC SVCS :MPL COORD: RFMS COORDINATION Lí-1-T87O.2
WLFLD ECOIOGIC SVCS lMPt COORD: WRIA 10 COORDINAT¡ON 1111870.5
Shelton,StephanieMelissa EnvironmentalScientistlV
Lincoln,Alexandra E Environmental Scientist lll
TOTAI: WLFLD ECOLOGIC SVCS IMPL COORD: WRIA 10 COORDINATION TTTL87
WLFLD GREEN RIV BASIN STEWARD: REGREENING THE GREEN t132429.4
Beaver,Katherine H Project/Program Manager lll
Total: WLFLD GREEN RIV BASIN STEWARD: REGREENING THE GRIEN 1t32429
WLFLD GREEN RIVER IMPL COORD: ADMINISTRATIVE TIME 1111881.4
Jonson,Clarizza Engineer lll
Kara,Fatin Engineer lV
Young,Jay K Engineer lll
Robinson,Patricia A Project/Program Manager lll
Peters,Erik G Capital Project Manager lV
TotaI: WLFLD GREEN RIVER IMPL COORD: ADMINISTRATIVE TIME 1111881.4
WLFLD GREEN RIVER IMPL COORD: EXT COORDINATION 1111881.1
Kara,Fatin Engineer lV
Jonson,Clarizza Engineer lll
Reinelt,Lorin Managing Engineer
Total: WLFLD GREEN RIVER IMPL COORD: EXT COORDINATION 1111881.1
CurrentMonth Hours
9.0
12.0
11.0
L5.8
5.5
1_.5
96.8
YTD Hours
r92.0
177.5
134.5
127.0
125.5
22.0
1,950.3
1.0
1.0
39.0
39.0
130.s
73.0
68,0
40.5
13.3
325.3
1_56.5
6.9
163.4
540.0
540.0
464.5
218.8
175.0
92.0
63,0
1,013.3
315.5
222.0
49.5
587.0
5.0
1.0
4.5
5.0
L.5
L7.O
6.0
6.9
t2.9
TLz.5
LLz,5
22.0
72.8
22.5
2.O
2.0
61.3
66.3
33.s
6.0
105.8
Monday, October L4, 2OI9 Page 13 of 29King County Flood Control District February 24, 2020 53
Flood District Staffing Report: September 2019
WLFLD GREEN RIVER IMPL COORD: RFMS COORDINATION 1111881.2
Kara,Fatin Engineer lV
Reinelt,Lorin Managing Engineer
Robinson,Patricia A Project/Program Manager lll
Peters,Erik G Capital Project Manager lV
Total: WLFLD GREEN RIVER IMPL COORD: RFMS COORDINATTON 1111881.2
WLFLD SNOQ IMPLEMENT & COORD: ADMINISTRATIVE WORK 1111855.4
Barton,Chase M Engineer lV
Rose,Richelle M Project/Program Manager lll
Wright,Olivia M Engineer ll
Lewis,Teresa S Project/Program Manager lll
Smith,Jay Brian Engineer lll
Kays,Gus Brian Engineer lll
Reardon,Julie M Administrative Specialist lll
Total: WLFLD SNOQ IMPLEMENT & COORD: ADMINISTRATIVE WORK 1111855
WLFLD SNOQ IMPLEMENT & COORD: EXT COORDINATION 1111855.1
Barton,Chase M Engineer lV
Lewis,Teresa S Project/Program Manager lll
Rose,Richelle M Project/Program Manager lll
Reinelt,Lorin Managing Engineer
Total: WLFLD SNOQ TMPLEMENT & COORD: EXT COORDTNATTON 1111855.1
WLFLD SNOQ IMPLEMENT & COORD: RFMS COORDINATION 1111855.2
Barton,Chase M Engineer lV
Lewis,Teresa S Project/Program Manager lll. Gelaw,Ashagrie A Engineer ll
Ewing,Christopher Aaron Engineer lll
Total: WLFLD SNOQ TMPLEMENT & COORÐ: RFMS COORD|NATION 1111855.2
WLFLD ST IMPLEMENT & COORD: ADMIN TIME 1130783.4
Ruebel,Mark W Capital Project Manager lV
McPherson,Heather N Engineer I
Kis-Young,Darian V Engineer I
Hardy,Jessy Marie Lucas Engineer ll
Garric,Craig M Engineer lll
Bean,Thomas Charles Engineer lV
Torres,Stella I Capital Project Manager lll
Beggs,Mark Robert Engineer ll
Bartolini Venegas,Linda Y Project/Program Manager ll
Hardy,Jessy Marie Lucas Engineer I
Curre ntMonth Hours
35.5
9.5
16.0
14.0
75.O
23.0
25.0
39.0
21,5
16.5
6.0
1.0
132.0
31.0
11.0
24.4
6.0
72.O
28.0
11.0
3.0
2.0
44.O
49.O
50.5
34.0
27.0
11.5
19.0
8.0
1.2.0
39.5
27.O
YTD Hours
4I3.8107.0
52.0
45,5
618.3
339.5
280.0
265.0
159.0
149.0
s8.0
1.0
1,251.5
L91.5
1,r7.O
67.5
6.0
382.0
311.5
101.0
79.0
5.3
496.8
69L.0
s05.0
359.0
307.8
263.5
177.0
151.0
132.5
I24.5
94.O
Monday, October 14, 201.9 Page 1-4 of 29
King County Flood Control District February 24, 2020 54
Flood District Staffing Report: September 2019
Sebhat,Naod Engineer I
Torres,Stella I Project/Program Manager ll
Bartolíni Venegas,Linda Y Project/Program Manager I
Total: WLFLD ST IMPLEMENT & COORD: ADMIN TIME LL30783.4
WLFLD ST IMPLEMENT & COORD: RFMS COORDINATION tt30783.2
Whited,JoAnn E Contract Specialist I
Bean,Thomas Charles Engineer lV
Total: WLFLD ST IMPLEMENT & COORD: RFMS COORDINATION t13O783.2
Cu rre ntMonth Hours
26.5
8.0
39.5
351.5
13.0
3.5
16.5
YTD Hours
67.5
57.0
36.0
2,965.8
190.0
34.5
224.5
Total: Program lmplementation
Capital Projects
WLFTO SF SKYKMSH REP LOSS MIT
King,Lorí D Real Property Agent lV
Lewis,Teresa S Project/Program Manager lll
Engstrom,Kurt N Real Property Agent lV
Satterlund,Jeffrey C Crew Chief
LehnhoflKenneth Utility Worker ll
Corneloup,Christophe Patrice Truck Driver ll
Willaford,Clint Equipment Operator
Skagen,Jeff E Truck Driver ll
Hawkins,William Alexander Utility Worker ll
Total: WLFL0 SF SKYKMSH REP LOSS MIT
WLFLO TIMBERLANE 2016 REPAIR
Matej,Kimberly Communications Specialist Ill
Matej,Kimberly Deputy Executive Director
Total: WLFL0 TIMBERLANE 2016 REPAIR
L,973.9 L7,376.L
6.0
2.5
12.0
10.5
10.0
10.0
10.0
10.0
10.0
81.0
3.3
3.3
6.5
24.0
1.4.5
13.0
10.5
10.0
10.0
10.0
10.0
10.0
Ltz.O
9.8
0.0
9.8
386.0
200.8
771,.5
140.5
138.0
1,77.0
115.5
92.5
23.0
9.5
4.0
WLFLO TIMBERLAN E 2019 REPAI R
Hardy,Jessy Marie Lucas
McPherson,Heather N
Hardy,Jessy Marie Lucas
Bloxton,Thomas D
Torres,Stella I
Ruebel,Mark W
Torres,Stella I
Kis-Young,Darian V
Sebhat,Naod
Ba rtolini Venegas,Linda Y
Letourneau, Philippe David
Engineer ll
Engineer I
Engineer I
Environmental Scientist I I
Capital Project Manager lll
Capital Project Manager lV
Project/Progra m Manager I I
Engineer I
Engineer I
Project/Program Manager ll
Project/Program Manager ll I
12.o
12.8
12.0
13.5
9.0
32.0
9.0
2.0
18.0
2.0
1.5
Monday, October L4, 2OI9 Page 1"5 of 29King County Flood Control District February 24, 2020 55
Flood District Staffing Report: September 2019
Scott,J Todd Project/Program Manager lll
Radloff,Judith K Environmental Scientist lll
Total: WLFL0 TIMBERLANE 2019 REPAIR
WLFL1 CIRCLE R RANCH RISK RED
Kays,Gus Brian Engineer lll
Wright,Olivia M Engineer ll
Smith,DanielT Engineer ll
lsaac,Edna M Contract Specialist I
Kubo,Joshua Environmental Scientist lV
Barton,Chase M Engineer lV
Knox,Matthew EnvironmentalScientist lll
Carbaugh,Tammy M Contract Specialist ll
TOTAI: WLFL1 CIRCLE R RANCH RISK RED
WLFL1 MF SNO CORRIDOR PLAN
Rose,Richelle M Project/Program Manager lll
Wright,Olivia M Engineer ll
Amrhein,Seth J EnvironmentalScientist ll
Kays,Gus Brian Engineer lll
Lewis,Teresa S Project/Program Manager lll
Barton,Chase M Engineer lV
Samra,Laxhdip Kaur Contract Specialist I
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFLI MF SNO CORRIDOR PLAN
WLFL1 RECORD OFFICE 2016 REPR
Kays,Gus Brian Engineer lll
Barton,Chase M Engineer lV
King,Lori D Real Property Agent lV
Bloxton,Thomas D Environmental Scientist ll
Total: WLFL1 RECORD OFFICE 2016 REPR
Cu rrentMonth Hours
0.5
0.5
L24.8
7.0
1.0
1_0.0
5.5
10.0
1.0
1.5
4.0
40.0
49.5
3.0
18.0
1.5
5.0
24.5
1.0
L.0
1.0
104.5
5.5
2.0
5.0
1.0
13.5
102.0
72.5
37.5
16.0
55.0
55.0
55.0
16.5
YTD Hours
0.5
0.5
1,399.3
177.s
1.02.O
34.0
33,0
19.0
18.0
16.s
L2.O
4L2.O
536.0
1.I7.O
96.8
81.0
78.0
66.s
t2.o8.8
0.0
996.0
48.0
6.5
s.0
5.0
64.s
761.8
691".5
325.0
273.5
258.0
t74.5r.69.8
L34.0
WLFL1 REINIG RD 2016 REPAIR
Beggs,Mark Robert
Garric,Craig M
Bloxton,Thomas D
Kis-Young,Darian V
Torres,Stella I
Hardy,Jessy Marie Lucas
Hardy,Jessy Marie Lucas
Ward,Kevin R
Engineer ll
Engineer lll
Environmental Scientist I I
Engineer I
Capital Project Manager lll
Engineer ll
Engineer I
Engineer I
Monday, October 14, 2019 Page 16 of 29King County Flood Control District February 24, 2020 56
Flood District Staffing Report: September 2019
Torres,Stella I Project/Program Manager ll
RadloflJudith K Environmental Scientist lll
McPherson,Heather N Engineer I
Ruebel,Mark W Capital Project Manager lV
Bartolini Venegas,Linda Y Project/Program Manager ll
Sebhat,Naod Engineer I
Matej,Kimberly Communications Specialist lll
lsaac,Edna M Contract Specialist I
Bartolini Venegas,Linda Y Project/Program Manager I
Alba,Christine J Contract Specialist I
Kays,Gus Brian Engineer lll
Matej,Kimberly Deputy Executive Director
Total: WLFL1 REINIG RD 2016 REPAIR
WLFL1 SF G.l EROSION RM2.27
Kays,Gus Brian Engineer lll
Total: WLFL1 SF G-l EROSION RM2.27
WLFL1 SHAKE MILL LB 2016 RPR
Kays,Gus Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
Amrhein,Seth J EnvironmentalScientist ll
lsaac,Edna M Contract Specialist I
Rose,Richelle M Project/Program Manager lll
Barton,Chase M Engineer lV
Carbaugh,Tammy M Contract Specialist ll
Shelton,StephanieMelissa EnvironmentalScientistlV
Jose,Jessy N Engineer IV
Kubo,Joshua Environmental Scientist lV
Knox,Matthew Environmental Scientist lll
Total: WLFL1 SHAKE MILL LB 2016 RPR
WLFL1 SHAKE MILL RB 2016 REPR
BartoliniVenegas,LindaY Project/ProgramManagerll
Ruebel,Mark W Capital Project Manager lV
Total: WTFL1 SHAKE MILL RB 2016 REPR
CurrentMonth Hours
55.0
9.0
7.5
7.0
29.0
29.0
2.3
4.0
29.0
3.0
1.0
2.3
587.5
YTD Hours
I32.5
92.0
13.3
73.0
63.0
52.5
1.2.3
t2.o7.5
5.0
4.0
0.0
3,315.0
1.0
1.0
84.5
84.0
57.5
12.0
1.4.5
5.0
2.4
4.5
4.0
6.0
5.0
279.0
28.0
28.0
786.0
783.0
518.3
105.5
73.0
69.s
41..0
12.0
8,5
6.0
5.0
2,407.8
19.5
2.O
21.5
19.5
2,O
2t.5
311.0
202,3
96.5
75.3
74.O
WLFL1 SIVIEW RM4 2017 REPAIR
Kis-Young,Darian V
McPherson,Heather N
Bloxton,Thomas D
Patterson,Don W
Dorfler,jeffrey L
Engineer I
Engineer I
Environmental Scientist I I
Crew Chief
Equipment Operator
82.0
60.0
39.0
72.3
74.0
Monday, October L4, 2019 ?aget7 of29King County Flood Control District February 24, 2020 57
Flood District Staffing Report: September 2019
Walters,Terri K Truck Driver ll
Thomas,Anthony Michael Utility Worker ll
Beggs,Mark Robert Engineer ll
Reeve,Michael Shane Utility Worker ll
Sebhat,Naod Engineer I
Torres,Stella I Capital Project Manager lll
Corneloup,Christophe Patrice Truck Driver ll
Snyder,James Equipment Operator
Kaluza,Ryan James Utility Worker ll
Amundson,Robert E Truck Driver ll
Schulz,Jay David Truck Driver lll
Peterson,Mykal Fale Equipment Operator
Skagen,Jeff E Truck Driver ll
Torres,Stella I Project/Program Manager ll
Total: WLFLI SIVIEW RM4 2017 REPAIR
WLFL1 UPR SNO RES FLD MITIGTN
Zweig,Kenneth S Project/Program Manager lll
Total: WLFL1 UPR SNO RES FLÐ MITIGTN
WLFL1 USACE PL 84-99 SF SNO
Wright,Olivia M Engineer ll
Barton,Chase M Engineer lV
Total: WLFL1 USACE PL 84-99 SF SNO
WLFL2 FARM FLOOD TSK FORCE IMP
Barton,Chase M Engineer lV
Kameda,Wesley P Engineer ll
Total: WLFL2 FARM FLOOD TSK FORCE IMP
WLFLz L SNO REP LOSS MITGTION
Lewis,Teresa S Project/Program Manager lll
Total: WLFL2 t SNO REP LOSS MITGTION
WLFL2 L SNO/ALDATR CORRDOR PLN
Lewis,Teresa S Project/Program Manager lll
Bergrud,Shawn A Engíneer ll
Total: WLFL2 L SNO/ALDA|R CORRDOR PLN
WLFL2 LWR SNO RESDT FLD MITGTN
Johnston,Katrina L Business & Finance Officer lll
Barton,Chase M Engineer IV
Total: WLFL2 LWR SNO RESDL FLD MITGTN
Cu rre ntMonth Hours
/0.069.0
L0.0
56.0
42.O
L2.O
3s.0
20.0
20.0
19.0
18.0
10.0
8.0
L2.O
728.3
YïD Hours'/o.0
69.0
63.5
s6.0
51.5
46.0
3s.0
20.0
20.0
19.0
18.0
10.0
8.0
3.5
1,248.5
8.0
8.0
3.0
1.5
4.5
6.0
10.0
16.0
2.0
2.O
12.o
1.0
13.0
0.5
1.0
1.5
60.0
60.0
297.5
28.0
325.5
22.0
10.0
32.0
54.5
54.5
70.0
20.0
90.0
1"0.0
3.0
13.0
Monday, October 14, 2019 Page L8 of 29
King County Flood Control District February 24, 2020 58
Flood District Staffing Report: September zOLg
WLFLz SE 19TH WAY REVETMENT
Wright,Olivia M Engineer ll
Smith,Jay Brian Engineer lll
Amrhein,Seth J EnvironmentalScientist ll
Bergrud,Shawn A Engineer ll
lsaac,Edna M Contract Specialist I
Schulz,Jay David Truck Driver lll
Dorfler,Jeffrey L Equipment Operator
Reeve,Michael Shane Utility Worker ll
Thomas,Anthony Michael Utility Worker ll
Patterson,Don W Crew Chief
Walters,Terri K Truck Driver ll
Corneloup,Christophe Patrice Truck Driver ll
Rose,Richelle M Project/Program Manager lll
Total: WLFL2 SE 19TH WAY REVETMENT
WLFL2 TOLT PIPELINE PROTECTION
Garric,Craig M Engineer lll
Knox,Matthew Environmental Scientist lll
Alvarado,Jessica A Contract Specialist I
Whited,JoAnn E Contract Specialist I
Buitrago,Kristopher Dean Environmental Scientist I
Wilhelm,Jennifer O Environmental Scientist lll
Smith,DanielT Engineer ll
Carbaugh,Tammy M Contract Specialist ll
Sebhat,Naod Engineer I
Carlos,Ricardo Contract Specialist I
Reeve,Michael Shane Utility Worker ll
Thomas,Anthony Michael Utility Worker ll
Total: WIFL2 TOLT PIPELINE PROTECTION
WLFL3 FREW LEVEE 2016 REPAIR
Kis-Young,Darian V Engineer I
Torres,Stella I Capital Project Manager lll
Torres,Stella I Project/Program Manager ll
Total: WLFL3 FREW LEVEE 2016 REPAIR
Cu rre ntMonth Hours
1.0
15.5
2.5
28.0
3.0
22.0
20,0
20.0
20.0
18.0
12.0
6.0
1.0
169.0
16.0
27.5
2s.0
2.0
4.5
0.5
12.o
3.0
6.0
2.0
2.0
2.0
102.5
YTD Hours
L58.0
113.0
84.3
42.0
23.0
22.0
20.0
20.0
20.0
18.0
12.0
6.0
4.0
542.3
242.0
155.0
155.0
77.0
72.5
52.3
43.0
6.0
6.0
2.0
2.0
2.0
814.8
WLFL3 GIRL SCOUT 2016 REPAIR
Torres,Stella I
McPherson,Heather N
Bartolini Venegas,Linda Y
Ba rtolin¡ Venegas, Linda Y
Capital Project Manager Ill
Engineer I
Project/Program Manager ll
Project/Program Manager I
1_.0
1.0
1.0
3.0
3.0
2.8
1.0
1.0
23.0
10.0
0.5
33.5
17.O
12.o
1.0
0.8
Monday, October L4, 2}tg Page L9 of 29King County Flood Control District February 24, 2020 59
Flood District Staffing Report: September 2Ot9
Torres,Stella I Project/Program Manager ll
Total: WLFL3 GlRt SCOUT 2016 REPAIR
WLFL3 HOLBERG FEASIBILITY
Smith,Jay Brian Engineer lll
Wright,Olivia M Engineer ll
Bunn,Jeremy T Environmental Scientist lll
Lewis,Teresa S Project/Program Manager lll
Thomas,Anthony Michael Utility Worker ll
Jewett-Chan,Riley N Utility Worker ll
Dorfler,Jeffrey L Equipment Operator
Kaluza,Ryan James Utility Worker ll
Louie,Steven James Utility Worker ll
Peterson,Mykal Fale Equipment Operator
Reeve,Michael Shane Utility Worker ll
Total: WLFI3 HOLBERG FEASIBILITY
WLFL3 REMLINGER 2017 REPAIR
Torres,Stella I Capital Project Manager lll
Kis-Young,Darian V Engineer I
McPherson,Heather N Engineer I
Torres,stella I Project/Program Manager ll
Total: WLFL3 REMLINGER 2017 REPAIR
WLFL3 SAN SOUCI NBRHOOD BUYOUT
Lewis,Teresa S Project/Program Manager lll
Carlos,Ricardo Contract Specialist I
'ÔtAI: WLFL3 SAN SOUCI NBRHOOD BUYOUT
WLFL3 SEDIMENT MGMT FEAS
Lewis,Teresa S Project/Program Manager lll
Karlsson,Hannah M Engineer I
Bunn,Jeremy T Environmental Scientist lll
Smith,Jay Brian Engineer lll
Knox,Matthew EnvironmentalScientist lll
Amrhein,Seth J Environmental Scientist ll
TotaI: WLFL3 SEDIMENT MGMT FEAS
WLFL3 SR 203 BR IMPRVMNTS FEAS
Smith,Jay Brian Engineer lll
Lewis,Teresa S Project/Program Manager lll
Tota|: WLFL3 SR 203 BR IMPRVMNTS FEAS
Curre ntMonth Hours
3.0
10.8
43.5
63.0
25.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
154.5
YTD Hours
0.5
31.3
321.0
254.0
87.0
57,5
33.0
13.0
3.0
3.0
3.0
3.0
3.0
780.5
1.0
5.0
5.0
1.0
L2.O
10.0
8.0
6.0
0.5
24.5
25.5
5.0
30.s
246.0
130.5
L01.5
93,3
29.0
22.0
622.3
107.8
54.0
161.8
1.5
1.0
2.5
17.5
21,.0
50.0
3.0
8.0
8.5
108.0
2.0
3.5
5.5
Monday, Octo ber L4, 201-9 Page 20 of 29King County Flood Control District February 24, 2020 60
Ff ood District Staffing Report: September 2OL9
WLFL3 TOLT CORRIDOR PLAN
Lewis,Teresa S Project/Program Manager lll
Total: WLFL3 TOLT CORRIDOR PLAN
WLFL3 TOLT LEVEE LOS ANALYSIS
Smith,Jay Brian Engíneer lll
Lewis,Teresa S Project/Program Manager lll
Whited,JoAnn E Contract Specialist I
Wright,Oliv¡a M Engineer ll
Total: WLFL3 TOIT LEVEE LOS ANALYSIS
WLFL3 TOLT R MILE l.l SETBACK
King,Lori D Real Property Agent lV
Total: WLFL3 TOLT R MILE l.l SETBACK
WLFL4 MOUTH TO BR 2017 REPAIR
Torres,Stella I Capital Project Manager lll
McPherson,Heather N Engineer I
Bartolini Venegas,Linda Y Project/Program Manager ll
Torres,Stella I Project/Program Manager ll
BartoliniVenegas,LindaY Project/ProgramManagerl
Total: WIFL4 MOUTH TO BR 2017 REPAIR
WLFLs SAMMAMISH R BANK REPAIRS
Heckendorf,Daniel G Engineer lll
Carlos,Ricardo Contract Specialist I
Total: WLFLS SAMMAMISH R BANK REPAIRS
WLFLs WILLOWMOOR FLDPLAIN REST
Akyuz,Katherine A Capital Project Manager lV
Bannister,ThomasAndrew EnvironmentalScientistlll
Brummer,Christopher J Engineer lV
RadloflJudith K EnvironmentalScientist lll
Matej,Kimberly Communications Specialist lll
Kidane,Bisrat M Parks Specialist I
Waters,Jason Equipment Operator
Gorman,Brynden C lntern ll (Undergrad lntern)
Carbaugh,Tammy M Contract Specialist ll
Letourneau,PhilippeDavid Project/ProgramManagerlll
Grant,Brendan Joseph Engineer ll
Campbell,Stephanie M Parks Specialist ll
Matej,Kimberly Deputy Executive Director
Cu rrentMonth Hours
1.5
1.5
23.0
2.5
6.0
3.0
34.5
YTD Hours
3.0
3.0
355.5
46.0
15.0
3,0
419.5
48.0
48.0
3.0
2.8
1.0
3.0
1".0
10.8
4.0
4.0
5.0
2.O
7.O
19.0
9.8
l-.0
L.0
0.8
31.5
s6.0
30.0
86.0
38.5
65.0
1.0
19.0
1.8
63.0
51.0
42.0
2.0
7.3
4.0
9.0
1.8
826.0
422.3
139.0
129.3
95.3
63.0
51.0
46.5
23.0
16.8
10.0
9.0
1.0
Monday, October L4, z9tg Page 2L of 29King County Flood Control District February 24, 2020 61
Flood District Staffing Report: September 2019
Total: WLFLS WILLOWMOOR FLDPLAIN REST
WLFL6 LOWER COAL CRK PH I
Walker,Monica H Project/Program Manager lll
Total: WLFL6 LOWER COAL CRK PH I
WLFL6 MAY VALLEY DRAINAGE
Henry,Alexis Osborne EnvironmentalScientist lll
Total: WLFL6 MAY VALLEY DRAINAGE
WLFLT CDR PRI-CONST STRTGC ACQ
Bergrud,Shawn A Engineer ll
Letourneau,PhilippeDavid Project/ProgramManagerlll
Scott,J Todd Project/Program Manager lll
Total: WLFLT CDR PR:-CONST STRTGC ACQ
WLFLT CEDAR R TR SITE A BANK
Walker,Monica H Project/Program Manager lll
Bunn,Jeremy T Environmental Scientist lll
Brummer,Christopher J Engineer lV
lsaac,Edna M Contract Specialist I
Total: WLFLT CEDAR R TR SITE A BANK
WLFLT CEDAR RVR GRAVEL REMOVAL
Smith,Jay Brian Engineer lll
Tota|: WLFIT CEDAR RVR GRAVEL RÊMOVAL
WLFLT FBD CORRIDOR IMPL
iohnston,Katrina L Business & Finance Officer lll
Ward,Kevin R Engineer I
Bergrud,Shawn A Engineer ll
Akyuz,Katherine A Capital Project Manager lV
Letourneau,PhilippeDavid Project/ProgramManagerlll
Reardon,Julie M Administrative Specialist lll
Total: WLFLT FBD CORRIDOR IMPL
Cu rre ntMonth Hours
305.3
0.5
0.5
25.0
25.0
15.0
3.5
1.5
20.o
13.0
0.5
3.5
1.0
18.0
3.5
3.5
31.0
51.0
6.0
7.5
0.3
3.5
99.3
74.O
64.0
1_6.5
20.0
27.Q
5.5
YTD Hours
1,832.0
5.3
5.3
s7.0
s7.0
68.0
4.8
1.8
74.5
86.0
52.0
15.5
1.0
154.5
2r.521.5
L51.5
1,43.O
113.0
27.5
5.5
3.5
444.O
747.5
543.0
1_83.5
12r.5
11"9.5
109.8
WLFLT HERZMAN LEVE: SETBACK
Sandford,Nancy Faegenburg
Winjum,Tracy Charles
Ba nnister,Thomas And rew
Walker,Monica H
Beggs,Mark Robert
RadloflJudith K
Project/Program Manager ll I
Engineer ll
Environmental Scientist I ll
Project/Program Manager lll
Engineer ll
Environmental Scientist lll
Monday, October L4, z}tg Page 22 of 29King County Flood Control District February 24, 2020 62
Flood District Staffing Report: September z0tg
King,Lori D Real Property Agent lV
Brummer,Christopher J Engineer lV
Jackson,Robert B Real Property Agent lll
lsaac,Edna M Contract SPecialist I
Reardon,Julie M Administrative Specialist lll
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLT HERZMAN LEVEE SETBACK
WLFLT JAN RD NBRHOOD IMPRVMNTS
Heckendorf,Daniel G Engineer lll
Bannister,ThomasAndrew EnvironmentalScientistlll
Hyden,Timothy R Engineer lll
Radlofljudith K Environmental Scientist lll
Alba,Christine J Contract Specialist I
Sandford,NancyFaegenburg Project/ProgramManagerlll
Funke,David Edward Engineer lll
Brummer,Christopher J Engineer IV
lsaac,Edna M Contract SPecialist I
Ward,Kevin R Engineer I
Corwin,Alan Engineer lV
Total: WLFLT JAN RD NBRHOOD ¡MPRVMNTS
WLFLT LOWER CEDAR FEAS STUDY
Brummer,Christopher J Engineer lV
Total: WLFLT TOWER CEDAR FEAS STUDY
WLFLT MAPLEWOOD FEAS STUDY
Akyuz,Katherine A Capital Project Manager lV
Samra,Laxhdip Kaur Contract Specialist I
Brummer,Christopher J Engineer lV
Total: WLFLT MAPLEWOOD FEAS STUDY
WLFLT RIVERBEND MHP ACQ
Bergrud,Shawn A Engineer ll
Letourneau,PhilippeDavid Project/ProgramManagerlll
Total: WtFtT RIVERBEND MHP ACQ
Cu rre ntMonth Hours
16.0
3.5
3.5
3.0
1.0
1.0
235.0
YïD Hours
64.0
s0.0
27.0
25.0
7.0
1.0
1,998.8
55.0
7.5
40.0
4.0
9.5
9.0
9.0
4.0
3.0
4.0
3.0
148.0
7.5
7.5
710.0
2r0.3
193.3
168.8
101.0
77.0
60.0
45.0
12.o
8.0
5.0
1,590.3
8.5
8.5
s3.5
47.0
11.5
ttz.o
26.0
5.5
31.5
452.0
41.0
33.s
24.0
21..3
6,5
2.0
1.0
9.5
WIFLT SR 169 FEASIB¡LITY STUDV
Winjum,Tracy Charles
Alvarado,Jessica A
Brummer,Christopher J
Ba nnister,Thornas And rew
Walker,Monica H
Engineer ll
Contract Specialist I
Engineer lV
Environmental Scientist lll
Project/Program Manager lll
18.0
0.5
18.5
42.0
24.0
2.0
13.0
16.8
Monday, October 14, 2019 Page 23 of 29King County Flood Control District February 24, 2020 63
Flood District Staffing Report: September 2019
Carlos,Ricardo Contract Specialist I
Lincoln,Alexandra E Environmental Scientist lll
Bauman,Kerry Environmental Scientist lll
Strazer,Mary J Engineer lll
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLT SR 169 FEASIBILITV STUDY
WLFLS BARNABY'S DESIMONE ACQ
King,Lori D Real Property Agent lV
Bergrud,Shawn A Engineer ll
Walters,Terri K Truck Driver ll
Dorfler,Jeffrey L Equipment Operator
Thomas,Anthony Michael Utility Worker ll
Reeve,Michael Shane Utility Worker ll
Patterson,Don W Crew Chief
Total: WLFI8 BARNABY'S DESIMONE ACQ
WLFLS BRPS HIGH-USE ENGINES
Bean,Thomas Charles Engineer lV
Bartolini Venegas,Linda Y Project/Program Manager I
Ruebel,Mark W Capital Project Manager lV
Torres,Stella I Capital Project Manager lll
Garric,Craig M Engineer lll
Robinson,Patricia A Project/Program Manager lll
Whited,JoAnn E Contract Specialist I
Jonson,Clarizza Engineer lll
Samra,Laxhdíp Kaur Contract Specialist I
McPherson,Heather N Engineer I
Gravette,Bruce R. Wastewater Engineer -Principal
Torres,Stella I Project/Program Manager ll
Kis-Young,Darian V Engineer I
Bartolini Venegas,Linda Y Project/Program Manager ll
Gregersen,Christopher N. Environmental Scientist I
Bauman,Kerry Environmental Scientist lll
Sebhat,Naod Engineer I
Kara,Fatin Engineer lV
Matej,Kimberly Communications Specialist lll
Kitamura,Kaoru Engineer I
Matej,Kimberly Deputy Executive Director
Total: WLFLS BRPS HIGH-USE ENGINES
WLFLS GALLIDYKSTRA 2O2O REPAIR
Young,Jay K Engineer lll
Cu rre ntMonth Hours
3.0
4.0
3.0
3.0
2.0
t12.8
YTD Hours
L1.5
6,5
6.5
3.0
3.0
602.3
89.0
26.0
5.5
4.0
4.0
4.O
2,O
134.5
s.0
9.0
5.5
4.O
4.0
4.O
2.0
33.5
3,!2.5
36.0
41..0
59.0
8.0
27.0
15.0
1_3.5
2.O
7.0
L7.O
59.0
3.0
36.0
2.0
2.0
21.5
1.0
0.3
0.5
0.3
463.5
944.0
27L.5
217.O
201.0
L66.0
156.0
I22.O
110.0
99.0
79.3
76.5
76.0
70.3
60.5
45.5
31.0
28.0
17.0
1.4.8
0.5
0.3
2,786.O
1.4.5 r"19.0
Monday, October 14, 20î9 Page 24 of 29
King County Flood Control District February 24, 2020 64
Flood District Staffing Report: September 2019
Kara,Fatin Engineer lV
Robinson,Patricia A ProjectlProgram Manager lll
Total: WLFLS GALLIDYKSTRA 2020 REPAIR
WLFLS GALLI-DYKSTRA FEAS STUDY
Young,Jay K Engineer lll
Horwith,Timothy lsaac Project/Program Manager ll
Total: WIFLS GALLI-DYKSTRA FEAS STUDY
WLFLS LWR GRN R CORR PLAN/E|S
Robinson,Patricia A Project/Program Manager lll
Reinelt,Lorin Managing Engineer
Lott,Frederic C Engineer ll
Carlos,Ricardo Contract Specialist I
Wright,Olivia M Engineer ll
Total: WLFLS LWR GRN R CORR PLAN/EIS
WLFLS LWR RUSSËLL LEVEE SETBCK
Peters,Erik G Capital Project Manager lV
Bauman,Kerry Environmental Scientist lll
Robinson,Patricia A Project/Program Manager lll
Holecek,Linda L Real Property Agent Supervisor
Reinelt,Lorin Managing Engineer
Schabert,Bradley J Real Property Agent lll
Letourneau,PhilippeDavid Project/ProgramManagerlll
Whited,JoAnn E Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Johnston,Katrina L Business & Finance Officer lll
Alba,Christine J Contract Specialist I
Alvarado,Jessica A Contract Specialist I
Total: WLFLS LWR RUSSELL LEVEE SETBCK
WLFLS OI-D JEFFS FARM REVETMENT
Chiang,Sophia N Environmental Scientist lll
Jonson,Clarizza Engineer lll
Kara,Fatin Engineer lV
RadloflJudith K EnvironmentalScientíst lll
Total: WLFLS OLD JEFFS FARM REVETMENT
Cu rre ntMonth Hours
5.3
3.0
22.8
YTD Hours
58.0
56.0
233.0
24.5
8.0
32.5
425.0
s0.0
44.5
5.0
1.0
525.5
1.0
8.0
9.0
WLFLS TEUFEL PL84-99 MIT
Chiang,Sophia N
Alvarado,Jessica A
Ba uman,Kerry
Environmental Scientist I I I
Contract Specialist I
Environmental Scientist I I I
64.0
7.0
39.0
4.O
1.0
115.0
136.0
s6.0
26.0
32.0
19.5
12.0
8.5
2.O
2.0
0.s
2.0
2.4
298.5
3.5
9.0
7.0
2.5
22.O
20.0
3.0
1.0
1,128.0
404.0
223.0
21"4.5
21.r.5
132.0
69.0
39.0
37.0
16.8
16.0
3.0
2,493.8
2s9.0
158.5
68.3
27.0
512.8
81".0
26.0
15.0
Monday, Octo ber 1"4, zOLg Page 25 of 29King County Flood Control District February 24, 2020 65
Flood District Staffing Report: September 2019
Gorman,Brynden C lntern ll (Undergrad lntern)
Total: WLFLS TEUFËL PL84-99 MIT
WLFLS TUK REVETMNT 2019 REPAIR
Young,Jay K Engineer lll
Chiang,Sophia N Environmental Scientist lll
Kara,Fatin Engineer lV
Matej,Kimberly Communications Specialist lll
Matej,Kimberly Deputy Executive Director
Total: WLFLS TUK REVETMNT 2019 REPA¡R
WLFLS TUK-205 USACE GACO-SEGAL
Jonson,Clarizza Engineer lll
King,Lori D Real Property Agent lV
Total: WLFLS TUK-205 USACE GACO-SEGAL
WLFLg RIGHT BANK LEVEE SETSACK
Strazer,Mary J Engineer lll
Brummer,Christopher J Engineer lV
Walker,Monica H Project/Program Manager lll
Bergrud,Shawn A Engineer ll
Shelton,StephanieMelissa EnvironmentalScientistlV
Russell,Luke A lntern lll (Graduate lntern)
King,Lori D Real Property Agent lV
Lincoln,Alexandra E EnvironmentalScientist lll
Whited,JoAnn E Contract Specialist I
Bannister,ThomasAndrew EnvironmentalScientistlll
Total: WLFL9 RIGHT BANK LEVEE SETBACK
WLFLg STUCK R DR 2019 REPAIR
Whited,JoAnn E Contract Specialist I
Beggs,Mark Robert Engineer ll
Bloxton,Thomas D Environmental Scientist ll
Ruebel,Mark W Capital Project Manager lV
McPherson,Heather N Engineer I
Matej,Kimberly Communications Specialist lll
Brummer,Christopher J Engineer lV
Matej,Kimberly Deputy Executive Director
Total: WLFtg STUCK R DR 2019 REPAIR
WLFLG FLOOD REDUCTION GRANTS
Harper,Kimberley Ann Grant Administrator
Total: WLFLG FLOOD REDUCTION GRANTS
Curre ntMonth Hours
4.0
28.0
38.5
10.s
1.2.3
1.0
1.0
63.3
4.0
3.0
7.O
85.0
25.5
22.8
4.0
7.0
15.0
1.0
8.5
2.O
4.0
L74.8
42.0
5.0
8.0
20.0
7.3
0.3
2.0
0.3
84.8
22.0
22.O
YTD Hours
4.0
L26.0
272.5
1,87.0
58,8
7.3
0.0
525.5
7L,5
69.0
140.5
336.s
299.s
141.0
r29.0
11,4.5
6s.0
57.5
23.5
13.0
9.0
1,188.5
300.0
1"I2.0
92.0
63.0
7.3
6.5
3.0
0.3
584.0
320.5
320.5
M onday, October L4, 201-9 Page 26 of 29King County Flood Control District February 24, 2020 66
Flood District Staffing Report: September 2019
WLFLM 428TH AVE SE BR SM
David,Aaron Thomas Environmental Scientist ll
Amrhein,Seth J EnvironmentalScientist ll
Knox,Matthew Environmental Scientist lll
Total: WLFLM 4287H AVE SE BR SM
WLFLM CEDAR FISH META.ANALYSIS
Lincoln,Alexandra E Environmental Scientist lll
Total: WLFLM CEDAR FISH META-ANALYSIS
WLFLM CEDAR RAPIDS EM
Gorman,Brynden C lntern ll (Undergrad lntern)
Lott,Frederic C Engineer ll
Knox,Matthew Environmental Scientist lll
Total: WLFLM CEDAR RAPIDS EM
WLFLM CIRCLE RVR RANCH SM
David,Aaron Thomas Environmental Scientist ll
Gregersen,Christopher N. Environmental Scientist I
Kubo,Joshua Environmental Scientist lV
Total: WLFLM CIRCLE RVR RANCH SM
WLFLM COUNTYLINE REACH EM
Lincoln,Alexandra E Environmental Scientist lll
Gorman,Brynden C lntern ll (Undergrad lntern)
Total: WLFLM COUNTYLINE REACH EM
WLFTM GUNTER LEV SLOPE REP SM
Chiang,Sophia N Environmental Scientist lll
Total: WLFLM GUNTIR LEV SLOPE REP SM
WLFLM ISSAQUAH CHINOOK STUDY
Kubo,Joshua Environmental Scientist lV
Akyuz,Katherine A Capital Project Manager lV
Lincoln,Alexandra E Environmental Scientist lll
Shelton,StephanieMelissa EnvironmentalScientistlV
Total: WLFLM ISSAQUAH CHINOOK STUDY
WLFLM LOWER RUSSELL EM
Bauman,Kerry Environmental Scientist lll
Total: WTFLM LOWER RUSSELL EM
Cu rre ntMonth Hours
3.0
4.0
5.5
L2.5
9.0
9.0
20.0
3.0
5.5
28.5
26.5
12.o
2.O
40.5
20.5
5.0
25.5
YTD Hours
45.0
36.s
5.5
87.0
20.3
20.3
41,.0
9.0
5.5
55.5
40.5
31.0
27.O
98.5
L08.5
27.0
135.5
6.0
6.0
55.0
22.5
1,4.8
2.0
94.3
L33.5
133.5
6.0
6.0
12.o
15.0
5.3
2.0
34.3
2.O
2.O
Monday, October 14, 2OI9 ?age27 of29King County Flood Control District February 24, 2020 67
Flood District Staffing Report: September 2019
WLFLM MONITORING COORDINATION
Shelton,StephanieMelissa EnvironmentalscientistlV
Bannister,ThomasAndrew EnvironmentalScientistlll
Buitrago,Kristopher Dean Environmental Scientist I
Henry,Alexis Osborne Environmental Scientist lll
Total: WLFLM MONITORING COORDINATION
WLFLM REDDINGTON EM
Karlsson,Hannah M Engineer I
Total: WLFTM REDD:NGTON EM
WLFLM RIPARIAN REFERENCE SM
Bauman,Kerry EnvironmentalScientist lll
Karlsson,Hannah M Engineer I
Total: WLFLM RIPARIAN REFERENCE SM
WLFLM SE 19TH WAY REVETMENT SM
Kubo,Joshua EnvironmentalScientist lV
Knox,Matthew Environmental Scientist lll
Total: WLFLM SE 19TH WAY REVETMENT SM
WLFLM SMALT PROJECTS
Buitrago,Kristopher Dean EnvironmentalScientist I
Total: WTFLM SMALL PROJECTS
WLFLM SNOQ SMALL REPAIRS SM
Bloxton,Thomas D Environmental Scientist ll
TotaI: WLFLM SNOQ SMALL REPAIRS SM
WLFLM TEUFET SM
Karlsson,Hannah M
Total: WLFLM TEUFËL SM
Engineer I
WLFLM WIN(ELMAN SM
Kubo,Joshua Environmentalscientist lV
Gregersen,Christopher N. EnvironmentalScientist I
David,Aaron Thomas EnvironmentalScientist ll
Knox,Matthew Environmental Scientist lll
Wilhelm,Jennifer O Environmental Scientist lll
Tota|: WLFLM WINKELMAN SM
WLFTO SUSREGNL OPPRTNTY FUND
Cu rrentMonth Hours
1l-.0
13.0
3.5
4.0
31.5
YTD Hours
1.67.3
69.0
52.0
20.0
308.3
9.5
9.5
43.5
30.0
73.5
23.0
6.0
29.0
28,5
28.5
2.O
2.O
60.0
60.0
76.0
74.8
43.4
37.s
32.5
264.L
7.O
1"1.0
18.0
8.0
8.0
3.0
6.0
9.0
0.5
0.5
2.O
2.O
3.5
3.5
3.0
1.0
4.O
37.5
1.0
46.5
Monday, October 1.4, 2OI9 Page 28 of 29
King County Flood Control District February 24, 2020 68
Flood District Staffing Report: September 2019
Harper,Kimberley Ann Grant Administrator
Tota|: WtFtO SUBREGNL OPPRTNTY FUND
WLFLS PUGET WAY CULVERT
Walker,Monica H Project/Program Manager lll
Total: WTFLS PUGET WAY CULVERT
WLFLX CENTRAL CHARGES
Carlos,Ricardo Contract Specialist I
Jonson,Clarizza Engineer lll
Ewing,Christopher Aaron Engineer lll
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLX CENTRAL CHARGES
WLFLX WRIA GRANTS
Harper,Kimberley Ann
Total: WLFLX WRIA GRANTS
Grant Administrator
Curre ntMonth Hours
33.0
33.0
t.0t4.oL6.8
11_.0
42.8
55.0
55.0
0.3
0.3
6.0
6.0
YTD Hours
76,5
76.5
48.0
29.5
29.0
21.0
127.5
387.5
387.5
Total: Capital Projects
Grand Total:
5,413.0 32,756,4
L2,359.L 82,855.8
Monday, October L4, 2OI9 Page 29 of 29King County Flood Control District February 24, 2020 69
[Blank Page]
King County Flood Control District February 24, 2020 70
KingCountyWater and Land Resources DivisionDepartment of Natural Resources and Parks
King Street Center201 South Jackson Street, Suite 600Seattle, WA 98104-3855206-477-4A0O Fax 206-296-0L92TTY Relay: 711
January 14,2020
Melani PedrozaClerk of the BoardKing County Flood Control DistrictKing County Courthouse516 Third Avenue, Room 1200Seattle, WA 98104-3272
Dear Ms. Pedroza:
Please find enclosed our Billing Statement for the month of November 2019 for expendituresincurred by King County for services provided in the implementation of the Annual Scope ofServices for the King County Flood Control District (FCD).
The following is anooat a glarrce" summary highlighting services provided during the month ofNovember 2019.
Capital ExpenditureCapital Planning. Engineering analysis and planning for the Middle Fork Snoqualmie Capital Investment
Strategy (CIS), scheduled for discussion at a public meeting in Q1 2020.
2019 Constructiono The Shake Mill Left Bank revetment repair project reached substantial completion on
October 10,2019. A buried setback revetment, constructed adjacent to the North ForkSnoqualmie River, provides protection to the 428thAve Southeast roadway andthe NorthFork Snoqualmie River Bridge from channel migration and scour hazards while providingroom for natural river processes. Estimated total project cost is $3.1 million.
o Repairs to the Tukwila Trail revetment were completed in October. The project, located
along the Green River Trail just north of Fort Dent Park, restored 80 feet of revetment that
had been undermined by a deep scour hole next to the Green River Trail. The project also
included the installation of native riparian vegetation that will help to fuither stabilize the
bank and provide shade, cover, and forage for fish and wildlife. Total estimated project cost
is $320,000.o Lower Russell Setback Levee and Floodwall Project expenditures for Phase 1 construction
(including a floodwall and water main) of the $54 million project, as well as relocation ofcommercial tenants and a stipulated final judgement paid for the Pan Abode settlement.
King County Flood Control District February 24, 2020 71
a
Melani PedrozaJanuary 14,2020Page2
Substantial completion of Phase 1 is scheduled for }i4ay 2020. Phase 2 construction isscheduled to be advertised for bids in Februarv 2020.
Scheduled for 2020 ConstructionEngineering design and permitting for a multiyear effort to complete improvements to theBlack River Pump Station. The first phase is replacement of high use pump engines in2020,following by control building improvements in 2022-2023.Engineering design and permitting for the Reinig Road Revetment Repair, protecting theCanyon Springs water main, the PSE transmission line, and Reinig Road. Estimated totalproject cost is $5.1 million.
Scheduled for 202 I Constructiono Engineering design and property acquisition for the Herzman Levee Setback project on the
Cedar River. Estimated construction cost is $5.4 million.o Engineering design and permitting for the Jan Road levee setback project, estimated
construction cost is $7.8 million.
Scheduled for 2024 ConstructionEngineering design for the Pacific Right Bank project on the White River and reimbursement tothe City of Pacific for the Government Canal Pump Station. The total project cost is estimated at$30.9 million.
Agreements with Other Agencies. Expenses under the Cooperative V/atershed Management Grant program totaled $646,031 for
23 reimbursements. TotaI2019 budget authority for this program is $ 1 1 .7 million.o Expenses for the Flood Reduction Grant program totaled $606,734 for 17 reimbursements.
Total2}l9 budget authority for this program is $8.9 million.. Expenses for the King County Subregional Opportunity Grant program totaled $480,527 for
two reimbursements. Total 2019 budget authority for this program is $20.4 million.
Operating Progtamo Flood warning center annual training and operations during the October 21 flood event.o Flood facility inspections on the Cedar, Snoqualmie, Vy'hite, and Green rivers, including
floodwall inspections in Kent and Tukwila.o Maintenance of the Black River Pump Station, implementation of the Green River
Deficiency Action Plan (DAP) to maintain eligibility for federal disaster funding, as well aswork crews to maintain river facilities and conduct site maintenance at the SammamishTransition Zone and multiple other locations throughout King County.
o The FCD's "Be Flood Ready" flood preparedness brochure was mailed to King Countyresidents.
Staff HoursThe invoice packet also includes a report showing staff hours by name and project number.Hours charged to non-FCD project numbers are not included in this billing.
King County Flood Control District February 24, 2020 72
Melani PedrozaJanuary 14,2020Page 3
Tasks for this period include:
Section Management Tasksa
o
a
Section management oversight and supervisory responsibilities; hiring new and vacantpositions; review and discussion of capital projects and operating programs with unitswithin the River and Floodplain Management Section (RFMS); organizational and hiringimplementation; training; performance appraisal reviews; and flood warning centeroversight (75 hours).Coordination and communication with the Water and Land Resources Division (WLRD)Director and Assistant Division Director and FCD Executive Director and ExecutiveCommittee staff on capital project and operating program implementation including FCDBoard, Executive Committee, Advisory Committee, and Basin Technical Committeemeetings (33 hours).Participation in meetings, reviewing documentation, project coordination and gate
meeting participation including FEMA's Community Assistance Visit (CAV),Willowmoor, Middle Fork Snoqualmie River CIS, Lower Russell Road, Pacific RightBank, Old Jeffs Farm, Black River Pump Station, Jan Road, Strike Team 2019-2020flood damage repairs, South Fork Snoqualmie PL 84-99, Levee Breach Analysis, andFarm Pad and Home Elevation programs (60 hours).
Section-Wide Capital Proqram Implementation Oversighto Section-wide capital program implementation oversight, weekly meetings with Section
manageî, biweekly meetings with basin supervisors (Green, Snoqualmie, Strike Team,
Cedar/V/hite), FCD tracker, monthly Capital Improvement Project (CIP) coordination,managing supervisors meeting, FCD check-in meeting, standing gate Òommittee
meetings, Tolt Pipeline/Burns property, new capital strike team discussion, ContractlJser's Group, Water Resource Inventory Area (WRIA) 9 discussion, Gate 3 Herzman,CIP tracking, Equity and Social Justice (ESJ) planning CIP worksheet, U.S. Army Corpsof Engineers (Corps) topics, King County Wastewater Treatment Division (WTD) lean
efforts review (124 hours).o Lower Russell capital project team internal meeting, monthly coordination meeting with
Kent, construction management performance review, site management plan meeting withKent, Noble warehouse options (24.5 hours).
o Cedar Basin: Maplewood literature review meeting, Herzman setback meeting (4 hours).o Flood Patrol training program (2.5 hours).
Green River Basin Taskso Green River Basin: Project/Program Manager (PPM) 3 candidate review, Old Jefß Farm
revetment briefing, Black River Pump Station/Stuck River meeting, Mitchell meeting and
term sheet, Lones 60% design review (21 hours).o Lower Green River Corridor Plan (LGRCP): Hydraulic and Hydrologic (H&H) meeting
with Northwest Hydraulic Consultants, Inc. (NHC) and memo review (3 hours).
Countvwide Policy Prosram Services
King County Flood Control District February 24, 2020 73
Melani PedrozaJanuary 14,2020Page 4
a Providing the FCD with requested additions and revisions to the2020 budget and2020-2025 capital program, FCD review of acquisition requests, communication materials,coordination with the King County office of Performance, Strategy, and Budget,responding to FCD questions about new positions and converting term-limited temporarypositions to permanent as part of King County's supplemental budget, supervision ofstaff, participation in ESJ committee work groups, participation in capital project gatemeetings and supervisory meetings for the Section (142 hours).
This Billing Statement has been prepared in accordance with Section 4: Invoices as set forth inthe Interlocal Agreement between King County and the King County Flood Control Zone DistrictRegarding Support Services, approved by OrdinanceFCZD 2007-05.02 of King County FloodControl Zone District's Board of Supervisors on December 10,2007 . Separate statements havebeen prepared for operating expenditures and capital improvement project expenditures.
Upon approval, please ask the FCD Executive Director to sign the Special Journal District EntryForm and email the document to Nitin Chadha, Manager, Finance and Administration Section inthe Water and Land Resources Division of the Department of Natural Resources and Parks. TheSpecial Journal District Entry Form will then be entered into the King County Financial system.
If you have any questions or need additional information, please do not hesitate to contact NitinChadha, Manager, Finance and Administration Section at 206-477 -5991.
Sincerely,
9.êZJosh BaldiDivision Director
Enclosures
Michelle clark, Executive Director, King county Flood control DistrictMichael Murphy, Interim Deputy Division Director, water and Land Resources
Division (WLRD), Department of Natural Resources and Parks (DNRP)Nitin Chadha, Manager, Finance and Administration Section, WLRD, DNRP
cc
King County Flood Control District February 24, 2020 74
H¡Department of Executive ServicesFinance & Business Operations DivisionF¡nancial Management SectionADM-ES-0653
Sprctnl Drsrnrcr Jounrunl Erurnv Fonn¡
Please lete the form, rint n, scan a and send it to GL.OracleE
KinOCOuntv 500 4th Ave= Seattle, WA 98104
G L. OracleEBS@ki ngcounty. gov
n cou
Receipt(Enter Amount)
5,073,991.22
5,073,991.225,073,991.22
Disbursement(Enter Amount)
5,073,991.22
Future(5 digits)
sû0ilt
Total
Bars(7 dig¡ts)
Account(5 digits)
24218
33833
nflfinnn
Cost Center(6 dis¡ts)
û'lôôôn
nnnnnn
Project(7 dis¡ts)
Fund(9 d¡sits)
1 9001 001 0
000001 561
3
4
Ã
b
Note: Amounts must be positive numbers. The totaldebit must equalthe totalcredit.
f f.fOV ZOf O reimbursement,Fld Operating & Capitalservices
Explanation/Description
CONTACT INFORMATION Typed or Printed
Organization lKing County Water & Land Resources Divison
Phone * llzoo¡ 477-4728lkatrina.jon nston@kingcou nty. gov
Contact trtame lKatrina Johnston
ExtEmail
AUTHORIZATION
Certification for Payment (By Authorized Signer) RCW 42.24.080I hereby certify that I have the authority over the funds listed above and authorize the transaction
Date I
Emaill
Document #
Phone #l
Entered By IDate Entered
ritle IApproved by
Print Name
ACCOUNT INFORMATION
Ledger
Currency
Source luanuat
Accounting Date (rvrvnonv) |
Category ltntertunO Transferslxc clouat
lusoREQUESTOR INFORMATION
Line
1
2
Rev080'12014King County Flood Control District February 24, 2020 75
King County Flood Control District February 24, 2020 76
ffi Flood District Operating Billing: November 2019 1-6-Dec-L9
NotesDescription
Annual Maintenance
Flood Hazards Plan, Grants, Outreach
Flood Hazard Studies, Maps, Technical Services
Flood Preparation, Flood Warning Center
Program Management, Supervision, Finance, Budget
Program I mplementation
Overhead / Central Costs
Total
Notes
20L9AdoptedBudget
53,327,4.sr
S675,380
S2,598,9i.6
51,,L27,992
5L,lz7,or7
5246,986
S3,135,313
$12,839,055
20L8Contract
Carryovers
CurrentMonth's
Expenditures
52L3,04L.62
$64,969.77
S38,957.67
Su8,588.66
5L4L,774.t9
5s7,779.90
S192,340.96
So
$o
so
$o
so
so
5o
Year to DateExpenditures
5L,791,,rs9.76
$580,679.33
S801,533.97
$39+,sq.sg
5L,62s,749.s7
5692,577.54
$¡,ozr,zge.gr
PercentExpended
s4%
86%
3r%
35%
94%
280%
96%
So igzt,4sz.t7 $8,897,985.57 69%
King County Flood Control District February 24, 2020 77
King County Flood Control District February 24, 2020 78
Operating Billing Detail: November 2OL9
Project Project Name
Annual Maintenance
Account Description
REGULAR SALARIED EM PLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
TEMPORARY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
MISC OPERATING SUPPLIES
MAINTENANCE PARTS MATERIALS
MISC SERVICES CHARGES
COUNTY PARKING GARAGE LOT
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIREC-T COST RATE 6
Account Expenditure
s7,613.02
s6,o96.oo
52,477.83
S4,09s.67
s173.s0
S46.6e
(s1,964.2s)
$2,784.261
(s9,164.48)
($5,239.83)
(s9,063.83)
(s160.80)
(s1,526.88)
55,726,28
5297.ts
s2,339.L7
s1,250.95
s2,s29.80
523.62
532s.17
57,739.17
s760.19
s238.23
s8.04
s300.00
53,025.22
57,729.65
$2,894.32
s487.6s
S137.28
Ss3.66
s30.68
Ss1.34
$8.64
1t28378
tt28378
1128378
tt2837B
7728378
t128378
0000000
0000000
0000000
0000000
0000000
0000000
0000000
111L889
1111889
111-1-889
1111889
1111889
1111889
1111889
Lr28200
tt28200
rr28200
tL28200
rt28200
tL28200
tL28200
rL28200
7128200
1111839
1111839
1111839
1111839
1111839
561010 ADMIN DEFAULT
5610].0 ADMIN DEFAULÏ
561010 ADMIN DEFAULT
561010 ADMIN DEFAULT
561010 ADMIN DEFAULT
56101"0 ADMIN DEFAULT
Default
Default
Default
Default
Default
Default
Default
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPËCTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILITY INSPECTION
WLFLD AM FACILIW INSPECTION
WLFLD AM FACILIW INSPECTION
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM IMPLEMENT & COORD
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
WLFLD AM LOG JAM INVST&RELOC
51110
51315
s1320
51330
51340
51361
51115
s1392
82100
82200
82300
82s00
82600
51110
51t20
82100
82200
82300
82400
82600
5t-110
52290
s239t
53890
55040
82100
82200
82300
82600
51110
82100
82200
82300
82600
Monday, December 16, 2OL9 Page 1 of 10King County Flood Control District February 24, 2020 79
Project
T1-ITB41
1tL7B41_
trL194t
11,]-1847
7171841
1111841
1111841"
7ttt84t
trt1847
1124994
L124994
1124994
!724994
1124994
1t24994
7724994
1124994
1124994
tt24994
1724994
7124994
1,124994
1124994
r124994
1124994
1724994
1t24994
1r_11885
11"11885
1111885
1111885
111L885
1111885
1111885
Category Total
Project Name
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM MAINT RIVER FACILITY
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTAIION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD AM SMP IMPLEMENTATION
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD SÏ GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
WLFLD ST GREEN R PUMP STATIONS
Account
5111"0
51330
5239r
53108
55050
82100
82200
82300
82600
51110
5l_130
sr"330
s2391
53105
53520
s3521
53522
53524
53525
53710
s5050
55191
82100
82200
82300
82500
82600
51110
53527
53522
82100
82200
82300
82600
Account Description
REGULAR SALARIED EMPLOYEE
RETIREMENT
MAINTENANCE PARTS MATERIALS
CONSTRUCTION CONTRACTS
ROAD EQUIP ER R
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
OVERTIME
REÏIREMENT
MAINTENANCE PARTS MATERIALS
OTHER CONÏRACTUAL PROF SVCS
UÏILITIES
UTILITIES ELECTRICITY
UTILITIES WATER SEWER
UTILITIES SURFACE WATER UTILITY
UTILITIES NATURAL GAS
RENT LEASE
ROAD EQUIP ER R
ADULT JUVENILE DETENTION
EMPLOYER PAID BENEFITS
PAID TIME OIF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
UTILITIES ELECTRICITY
UTILIÏIES WATER SEWER
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
Expenditure
54,7so.7s
S8o.so
s211".s9
Sgz,¡ss.¿r
52,784.4i.
s2,119.10
5986.77
s2,496.99
s1sB.18
s13,466.39
s1,689.39
s1"60.1"s
ii"sr.22
s22,140.00
s2s8.s1
5467.19
S6,ss7.43
532.62
s108.s2
S1,833.47
s8,039.60
5r.,330.00
Ss,68r".or.
s2,B90.17
s7,289.31
S34s.s6
s636.97
s7sB.32
$6,1s1.0s
$22O.73
5296.44
s169.so
5283.62
547.76
5213,o41..62
Flood Hazards Plan, Grants, Outreach
Monday, December 1,6, 2019 Page 2 of 10King County Flood Control District February 24, 2020 80
Project
lootrTt
L00LL7r
700717L
7001171
t00rr7t
TOOTLTT
LOOILTL
0000000
0000000
0000000
0000000
0000000
0000000
11L1869
11r.1869
1111869
1111869
1111869
1111869
1111"869
ttttg84
r.111884
LLLL884
1111884
11-11884
1111831
1111831
1111831
1111831
1111831
1111831
1111831
1111831
1111831
1111831
1111831
1128139
Project Name
561005 ADMIN DEFAULÏ
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
561005 ADMIN DEFAULT
Default
Default
Default
Default
Default
Defa u lt
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP EDUCTN & PUB OUTRCH
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP GENERAL INQUIRIES
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP KCFCZD IMPL & COORD
WLFLD PP LARGE WOOD STUDIES
Account
5111"0
51315
51320
s1330
51340
s1355
51361
51115
s1392
82100
82200
82300
82600
51110
53101
53220
82100
82200
82300
82600
51110
82100
82200
82300
82600
51110
53311
s3710
s3803
55010
ss050
55265
82100
82200
82300
82600
51110
Account Description
REGU LAR SALARIED EM PLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
FLEX BENEFIT CASHBACK
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
PROFESSIONAL SERVICES PRINÏIN
POSTAGE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARI ED EM PLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REG ULAR SALARIED EM PLOYEE
TRAVEL SUBSISTENCE OUT OF SÏA
RENT LEASE
DUES MEMBERSHIPS
MOTOR POOL ER R SERVICE
ROAD EQUIP ER R
KCIT CUSTOMER SUPPORT SERVIC
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGU LAR SALARIED EM PLOYEE
Expenditure
52,564.78
54,572.00
S1,947.38
s3,298.28
5216.84
s6s.oo
s37.68
Saoz.re
s273.20
(se,023.08)
(ss,1s8.81)
(s8,632.88)
(s1,4s4.3s)
s3,383.39
$9,4s4.84
s8,423.63
51,322.58
s7s6.16
S1,265.39
s213.18
s994.7s
S¡as.s¿
5222.30
5372.03
562.70
s8,035.81
Ss39.o1
s62.r.0
S49o.oo
s2,032.oo
572t.oo
ss9o.s8
s3,t4!.27
s1,795.92
s3,oos.32
ss06.26
55,263.87
Monday, December 76, 2019 Page 3 of 10King County Flood Control District February 24, 2020 81
Project
112B139
7t2Br39
1128139
T72BT39
711,1873
LrLt873
11,11873
ttrL873
tttrg73
1ttt873
Category Total
Project Name
WLFLD PP LARGE WOOD STUDIES
WLFLD PP LARGE WOOD STUDIES
WLFLD PP LARGE WOOD STUDIES
WLFLD PP LARGE WOOD STUDIES
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
WLFLD PP RIVER & FLDPLN PLAN
Hazard Studies, Maps, Technical Services
1OO1-T72 561007 ADMIN DEFAULT
7OOT172 561007 ADMIN DEFAULT
TOOI772 561007 ADMIN DEFAULT
TOOT172 561007 ADMIN DEFAULT
TOOITT2 561007 ADMIN DEFAULT
TOOT772 561007 ADMIN DEFAULT
TOO]-T72 561007 ADMIN DEFAULT
1OO1I72 561007 ADMIN DEFAULT
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
0000000 Default
7771878 WLFLD CEDAR/WHTTE rMpL & COORD
11.rt878 WLFLD CEDAR/WHtTE tMPL & COORD
71.!1878 WLFLD CEDAR/WH|TE tMPL & COORD
t7tt878 WLFLD CEDAR/WHTTE rMpL & COORD
11.17878 WLFLD CEDAR/WH|TE tMPL & COORD
ttt1878 WLFLD CEDAR/WH|TE tMPL & COORD
Ittt878 WLFLD CEDAR/WHTTE tMpL & COORD
tttt878 WLFLD CEDAR/WHtTE rMpL & COORD
7t7I87B WLFLD CEDAR/WHTTE rMpL & COORD
Account
82100
82200
82300
82600
5111-0
53770
82100
82200
82300
82600
Account Description
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
RENT LEASE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
PAY DIFFERENÏIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
FLEX BENEFIT CASHBACK
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COSÏ RATE 6
REGULAR SALARIED EMPLOYEE
TEMPORARY
PROFESSIONAL SERVICES
TRAVEL SUBSISTENCE OUT OF STA
DUES MEMBERSHIPS
TRAINING
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
Expenditure
S2,0s7.69
5t,t76.44
S1,968.66
s331.62
s8,s10.97
(Szs.oo¡
s3,326.91
S1,902.13
Ss,rss.ro
ss36.21
564,969.ij
59,257.69
Sszs.oo
So,ogo.oo
52,628.07
54,42O.s6
s173.s0
s6s.oo
Sso.sz
(s11,38s.7s)
(s1,820.11)
(s9,420.3s)
(Ss,386.30)
$9,273.20)
(s141.28)
(s1,s62.16)
S13,235.17
5t,arc.gz
Ss3.so
s663.31
s16s.00
Ss67.so
Ss,173.63
S2,sss.o2
ss,s7s.oo
Flood
51110
51L44
5l-315
51320
51330
51340
51355
51361
51115
51392
82tOO
82200
82300
82500
82600
51110
5r"120
s3102
53311
53803
53814
82100
82200
82300
Monday, December 1,6, 20L9 Page 4 of 10King County Flood Control District February 24, 2020 82
Project
ttttSTB
trLtg78
rr28t36
LL28T36
LL28L36
11281-36
1"L28136
1128138
1"128138
1128138
1"r"28138
1128138
r-128138
1128138
1-r"28138
11281-38
Ltt4299
tLt4299
LLt4299
r1r4299
!174299
rrt4299
11r4299
ttt4299
1133606
11"11836
11_11836
111"1836
1111836
1111836
Category Total
Project Name
WLFLD CEDAR/WHITE IMPL & COORD
WLFLD CEDAR/WHITE IMPL & COORD
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH CMZ STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH FLOOD STUDIES
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH IMPLEMENT & COORD
WLFLD TCH KC STM FAC INUDA MAP
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
WLFLD TCH SEDIMENT MON & MGMT
Account
82400
82600
51110
82100
82200
82300
82600
51110
51130
52180
52202
82100
82200
82300
82500
82600
51110
51130
53803
82100
82200
82300
82500
82600
53104
51110
82100
82200
82300
82600
Account Description
EXTRA HELP INDUST INS OH
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
OVERTIME
MINOR ASSET NON CONÏR LÏ 5K
SUPPLIES MISCELLANEOUS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
OVERTIME
DUES MEMBERSHIPS
EMPLOYER PAID BENEFIÏS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
CONSULTANT SERVICES
REG U LAR SALARI ED EM PLOYEE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECÏ COSTS
INDIRECT COST RATE 6
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
REGULAR SALARIED EMPLOYEE
EMERGENCY MGMT DIV
Expenditure
5132.84
se3s.os
S3,s9o.eo
s1,403.69
Ssoz.e o
s1,343.01
5226.29
52,719.L9
S433.91
Si"oo.r.8
S32.39
Si.,062.91
S6o7.7s
S1,179.33
s88.30
s198.62
s8,952.98
s260.3s
S14s.oo
s3,49s.64
s2,000.s7
s3,445.92
ss2.e8
Ssso.so
(s13,616.94)
s2,26s.s9
Sass.sz
Ss06.3s
s847.3s
s142.77
S39,957.67
(s10,439.00)
(s2,s13.00)
SqEr.+t
$97,487.73
Flood Preparation, Flood Warning Center
0000000 Default
0000000 Default
1123053 WLFLD PP FLD PREPAREDNESS
1]-23053 WLFLD PP FLD PREPAREDNESS
5111_5
51392
51110
55149
Monday, December 76, 21tg Page 5 of 10King County Flood Control District February 24, 2020 83
Project
1"123053
1123053
1123053
1123053
ttttS82
ttL1882
tttr882
71Lt882
tIL1882
1111882
7r7t982
1111882
1111883
1111883
1111883
111"1883
1,111883
1111883
1137524
1,L37524
1,137524
1737524
t137524
1737524
1137524
Lt37524
7!37524
1,t37524
Category Total
Project Name
WLFLD PP FLD PREPAREDNESS
WLFLD PP FLD PREPAREDNESS
WLFLD PP FLD PREPAREDNESS
WLFLD PP FLD PREPAREDNESS
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP FWC PREP & TRAINING
WLFLD PP SANDBAGS
WLFLD PP SANDBAGS
WLFLD PP SANDBAGS
WLFLD PP SANDBAGS
WLFLD PP SANDBAGS
WLFLD PP SANDBAGS
WLRLD PP FLD EVENÏ to/ztltg
WLRLD PP FLD EVENT 1ol21l19
WLRLD PP FLD EVENT 7O/27h9
WLRLD PP FLD EVENT L0/21/19
WLRLD PP FLD EVENT r0/2r/t9
WLRLD PP FLD EVENT TO/2I/T9
WLRLD PP FLD EVENT 1Ol2]./19
WLRLD PP FLD EVENT IO/2T/79
WLRLD PP FLD EVENT 1ol21l19
WLRLD PP FLD EVENT TO/21h9
Account
82100
82200
82300
82600
51110
51120
53212
82100
82200
82300
82400
82600
51110
5371-0
82r"00
82200
82300
82600
5r"110
511,20
51130
53330
82100
82200
82300
82400
82s00
82600
Account Description
EMPLOYER PAID BENEFITS
PAID ÏIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
TEMPORARY
SERVICES COMMUNICATIONS TELE
EMPLOYER PAID BENEFITS
PAID ÏIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
RENT LEASE
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
ÏEMPORARY
OVERTIME
PU RCHASE D IRANSPORTATION
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COSI' RATE 6
REGULAR SALARIED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSÏRIAL INSURANCE
Expenditure
S168.67
S96.43
s161.36
527.!e
54,481.04
s183.39
$i"03.Ls
57,749.27
s1,003.56
S1,812.s3
S14.s8
s277.37
s269.67
$3,268.27
S1os.42
Søo.zt
sL00.ss
SL7.oo
S6,672.38
s101.89
s3,411.99
S3o.oo
s2,607.89
s1,s14.7s
S4,100.41
Ss.ro
S6e4.34
ss79.7s
S118,588.66
526,s29.32
s184.60
s19,812.00
57,4r7.3r
S13,948.28
Sqs¡.aa
Program Management, Supervision, Finance, Budget
!001.T73 561008 ADMIN DEFAULT
1001173 561008 ADMIN DEFAULT
LOOL773 561008 ADMIN DEFAULT
1001173 561008 ADMIN DEFAULT
TOO7T73 561008 ADMIN DEFAULT
1001173 561008 ADMIN DEFAULT
51110
5LL44
51315
51320
51330
51340
Monday, December 16, 2019 Page 6 of 1-0King County Flood Control District February 24, 2020 84
Project
taotfi3
0000000
0000000
0000000
0000000
0000000
0000000
0000000
1"111891
1111-891
1111891
1111891
1111891
ttrtSgt11r-1891
1111891
1r"1-1891
1111891
1111891
1111891
1111891
1111891
1111891
1111891
1111891
Category Total
Project Name
561OOB ADMIN DEFAULT
Default
Default
Defa u lt
Defa u lt
Default
Default
Default
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
WLFLD MGMT PROGRAM
MGMT
MGMT
MGMT
MGMT
MGMT
MGMT
MGMT
MGMT
MGMT
MGMÏ
MGMÏ
MGMT
MGMT
MGMT
MGMÏ
MGMT
MGMT
Account
s1361
51115
51392
82100
82200
82300
82500
82600
51110
51130
51,143
52tro
52202
52275
53100
53102
53330
53710
53814
55265
82100
82200
82300
82s00
82600
Account Description
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EMPLOYEE
OVERTIME
DUTY ASSIGNMENT
OFFICE SUPPLIES
SUPPLIES MISCELLANEOUS
SUPPLIES BOOKS SUBSCRIPTIONS
ADVERTISING
PROFESSIONAL SERVICES
PU RCHASE D TRANSPO RTATIO N
RENT LEASE
TRAINING
KCIT CUSTOMER SUPPORT SERVIC
EMPLOYER PAID BENEFITS
PAID-TIME OFF
INDIRECT COSTS
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGU LAR SALARI ED EM PLOYEE
PAY DIFFERENTIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REGULAR SALARIED EMPLOYEE
PAY DIFFERENTIAL PREMIUM
Expenditure
S14o.10
S8,s82.21
Sr,osa.ge
(s30,400.15)
$r7,3s7.27)
1s29,137.07)
(s28.14)
(s4,e08.07)
s68,0s9.74
S138.27
$7s8.71
Si"64.96
s66.s3
s1.oo
$743.00
Sse.so
S63.oo
s167.00
52,74s.r8
s7s2.63
526,478.42
s1s,104.75
525,327.84
s28.14
S4,266.60
514t,774.r9
58,92s.s7
s276.90
Sr.o,668.oo
54,64L.43
57,ss2.e6
S390.34
s89.2s
S10,931.82
s369.20
Program lmplementation
TAOTLíT 561001ADMIN DEFAULT
LOOLLíT 561001ADMIN DEFAULT
LOO7T67 561001ADMIN DEFAULT
LOO1.T67 561001ADMIN DEFAULT
7007T67 561001ADMIN DEFAULT
LOOT1.67 561001ADMIN DEFAULT
LOOLIíT 561001ADMIN DEFAULÏ
1001168 561002 ADMIN DEFAULT
]"OO].168 561002 ADMIN DEFAULT
51110
57144
51315
51320
51330
51340
51361
51110
57144
Monday, December t6, 2019 Page 7 of 10King County Flood Control District February 24, 2020 85
Project
1001168
100116B
1001168
1001168
1001168
1001169
1001169
r"001169
r_001169
100r"169
1001169
1001169
t00tr70
7003"170
1001170
1,001,170
1001170
7007770
7130774
t130774
tr30774
rr30774
7130774
1130774
1130774
0000000
0000000
0000000
0000000
0000000
0000000
0000000
0000000
rtt!870
1111870
IIt1870
7711870
Project Name
561002 ADMIN DEFAULT
56T002 ADMIN DEFAULT
561002 ADMIN DEFAULT
561002 ADMIN DEFAULT
561002 ADMIN DEFAULT
561003 ADMIN DEFAULT
561003 ADMIN DEFAULT
561003 ADMIN DEFAULT
56]-003 ADMIN DEFAULT
561003 ADMIN DEFAULT
561003 ADMIN DEFAULT
561003 ADMIN DEFAULT
561004 ADMIN DEFAULT
561004 ADMIN DEFAULT
561004 ADMIN DEFAULT
56]"004 ADMIN DEFAULT
561004 ADMIN DEFAULT
561004 ADMIN DEFAULT
561O11ADMIN DEFAULT
561011ADMIN DEFAULT
561011 ADMIN DEFAULT
561011ADMIN DEFAULT
561011ADMIN DEFAULT
561O11ADMIN DEFAULT
561011 ADMIN DEFAULT
Defa u lt
Default
Default
Defau lt
Default
Defa u lt
Default
Default
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
Account
51315
51320
5L330
51340
51361
5111-0
57744
51315
51320
51330
51340
51361
51110
51315
s1320
51"330
51340
51361
51110
5tL44
513L5
51320
51330
51340
51361
51115
51"392
82100
82200
82300
82400
82s00
82600
51110
51130
52202
52227
Account Descr¡pt¡on
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REG ULAR SALARIED EM PLOYEE
PAY DIFFERENÏIAL PREMIUM
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REGULAR SALARIED EM PLOYEE
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
REGULAR SALARIED EM PLOYEE
PAY DIFFERENTIAL PREMIU M
MED DENTAL LIFE INS BENEFITS/N
SOCIAL SECURITY MEDICARE FICA
RETIREMENT
INDUSTRIAL INSURANCE
WA ST FAMILY AND MED LEA
LABOR ACCRUAL ADJ GL ONLY
BENEFIT ACCRUAL ADJ GL ONLY
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
OVERTIME BENEFITS
INDIRECT COST RATE 6
REGU LAR SALARIED EM PLOYEE
OVERTIME
SU PPLIES MISCELLAN EOUS
SUPPLIES VEHICLE
Expenditure
s7,62o.oo
s3,401.60
ss,793.B2
S347.1"6
Seo. ro
S10,022.53
s230.76
$10,668.00
54,773.47
Sa,zro.:g
s21.6.84
ss3.7o
$rt,L76.28
Stz,tsz.oo
S+,gss.zs
s8,420.63
st_73.s0
ss6.o3
St,ttt.zs
s323.06
S13,716.00
(S3,+zs.oa¡
s9,085.18
S3eo.34
$103.61
s22,19r.09
Stt,zst.aq
(s97,659.89)
(Sss,837.43)
(s96,793.31)
(s467.10)
(s630.01)
(s16,304.s4)
514,649.78
5242.8O
S66.os
5L42.62
Monday, December 16, 2019 Page B of 10King County Flood Control District February 24, 2020 86
Project
rttt870
7171870
!7L1870
11l-L870
tttL870
1L1"1870
r7t!870
ttttg70
ttt7870
111188L
1111881
1111881
1111881
1111881
1111881
1111855
1r"1r"855
1111855
1111855
1111855
1111855
1111855
111"1"855
1111855
1111855
1130783
1130783
1130783
1130783
1130783
1730783
1130783
1130783
1L30783
1130783
1130783
11_30783
Account
s2290
53102
53710
s3890
82100
82200
82300
82s00
82600
51110
53814
82100
82200
82300
82600
51110
53102
53311-
53803
55011-
55050
82100
82200
82300
82600
51110
5tL20
5tL43
52tto
s2202
53102
s3311
s3803
82100
82200
82300
82400
Expenditure
s143.36
s187.oo
s362.2s
S8.04
s5,726.18
53,274.0s
Ss,s6s.62
S49.41
S938.28
s10,810.84
s149.oo
54,322.75
s2,388.65
s4,307.59
562e.21
5L7,796.33
Ss3.so
Ss39.o1
s16s.oo
S187.so
Ss6s.so
s6,9s4.7e
54,Lo4.4o
57,257.1r
5992.e8
s15,126.90
s603.61
s26.84
S8.s4
$r"99.2s
S187.oo
s828.68
s3Ls.oo
ss,913.17
S3,380.84
s5,883.09
547.e9
Project Name
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD ECOLOGIC SVCS IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD GREEN RIVER IMPL COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD SNOQ IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
WLFLD ST IMPLEMENT & COORD
Account Description
MISC OPERATING SUPPLIES
PROFESSIONAL SERVICES
RENT LEASE
MISC SERVICES CHARGES
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
OVERTIME BÊNEFITS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
TRAINING
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECÏ COSTS
INDIRECT COST RATE 6
REGUTAR SALARIED EM PLOYEE
PROFESSIONAL SERVICES
TRAVEL SUBSISTENCE OUT OF STA
DUES MEMBERSHIPS
EQUIPMENT USAGE
ROAD EQUIP ER R
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
INDIRECT COST RATE 6
REGULAR SALARIED EM PLOYEE
TEMPORARY
DUTY ASSIGNMENT
OFFICE SUPPLIES
SU PPLIES MISCELLAN EOUS
PROFESSIONAL SERVICES
TRAVEL SUBSISTENCE OUT OF STA
DUES MEMBERSHIPS
EMPLOYER PAID BENEFITS
PAID TIME OFF
INDIRECT COSTS
EXTRA HELP INDUST INS OH
Monday, December L6, 2OI9 Page 9 of 10King County Flood Control District February 24, 2020 87
Project
1130783
Category Total
Project Name
WLFLD ST IMPLEMENT & COORD
Overhead / Central Costs
0000000 Default
1111848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1]"11848 WLFLD DEFLT CENTRAL COSTS
1.1.TT848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1]"].].848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
7LTI848 WLFLD DEFLT CENTRAL COSTS
1111848 WLFLD DEFLT CENTRAL COSTS
1-1-1.T848 WLFLD DEFLT CENTRAL COSTS
Category Total
Grand Total
Account
82600
5720r
55025
55026
55027
55040
55052
55150
55201
55252
55265
55268
55270
55347
58021
58077
5737.82
s27]40.0s
Srr,res.gz
(s1_,060.s2)
s2,1"00.00
Ss,sso.s8
Salst.zs
s23,792.00
s6,150.67
s3,116.78
5t,gtt.ts
s1,405.67
Sz,sg¿.gs
ss3,s30.66
S6so.oo
Sr.92,340.96
5927,4s2.L7
Expenditure
Sgsr.oz
Ss7,779.30
Account Description
INDIRECT COST RATE 6
INTERFUN D INTEREST AUTO
ITS I N FRASTRUCTU RE EXPEN D
GIS OPERATIONS
TECH SERVICE REBATE
COUNTY PARKING GARAGE LOT
GIS MATRIX SERVICES
PROSECUTING ATTORNEY
OVERH EAD COST ALLOCATION
INSURANCE SVC
KCIT CUSTOMER SUPPORT SERVIC
KCIT eGOVERN M ENT SERVICES
KCIT COU NTYWI DE SERVICES
BRC SVC CHARGES
T T SURFACE WATER MGMT
TT KCIT CIP FUND
Monday, December 16, 20tg Page 10 of 1-0King County Flood Control District February 24, 2020 88
Flood District Capital Billing: November 2019
Skykom ish/Miller Rivers
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanationLTDExp
PcntExpProject Description
Program : Stand-Alone Projects
1135532 WLFLO TIMBERLANE 20I9 REPAIR
Program Subtotal:
Program: SF Skykomish Repetitive Loss Mitigation
1044461 WLFLO SF SKYKMSH REP LOSS MIT
Program Subtotal:
Total: Skykomish/Miller Rivers
$3,934.55 $600,000 $147,599 250io $600,000
$3,934.55 $600,000 $147,599 25% $600,000
$6,067.10 $1,264,809 $422,962 33% $868,795
$6,067.10 $1,264,809 $422,962 33Yo $868,795
810,001.65 $1,864,809 $570,561 $1,468,795
Monday, December I 6, 2019 Pdge 1 of 14
King County Flood Control District February 24, 2020 89
Upper Snoqualmie River
Project Description
Program : Stand-Alone Projects1121044 WLFLI CIRCLE R RANCH RISK RED
1044469 WLFLI MF SNO CORRIDOR PLAN
1132629 WLFLI RECORD OFFICE 2016 REPAIR
1132628 WLFL1 REINIG RD 2016 REPAIR
1129364 WLFL1 SHAKE MILL LB 2016 REPAIR
1129363 WLFLI SHAKE MILL RB 2016 REPAIR
1132630 WLFL1 SI VIEW RM4 2017 REPAIR
1132338 WLFLI USACE PL 84-99 SF SNO
Program Subtotal:
Program: Upper Sno Residential Flood Mitigation1044517 WLFLI UPR SNO RES FLD MITIGTN
Program Subtotal
Program: WLFLI SF SNO LEVEE REMEDIATION
1133200 WLFLI SF G-I SEEPAGE RM2.27
Program Subtotal:
Total: Upper Snoqualmie River
$140,851.16 $13,990,706 $4,951,480 35% $8,884,133
$2,166.00 $25,523,988 $6,412,233 250/o $7,494,986
$2,166.00 $25,523,988 $6,412,233 25% $7,494,986
61,847-09 $295,673 $194,5s6 66% $295,673
$1,847.09 $295,673 $194,556 66% $295,673
$144,864.25 $39,810,367 $11,558,269 616,674,792
CurrentMonthBilling
$10,928.00
$1,972.27
$2,797.62
$49,462.55
$57,762.59
$14,239.41
$2,709.31
$979.41
ProjectedTotal Cost
$4,666,249
$1,824,912
$987,835
$1,464,166
$3,550,000
$51,090
$396,754
$1,049,699
LTDExp
$231,068
$1,639,900
888,236
$838,893
$1,808,042
$21,635
$283,784
$39,922
LTDBudget
$540,1 65
$1 ,824,912
s987,835
$1,200,000
$3,550,000
$51,090
$396,754
6333,377
WLRBudget
Adj ExplanationPcntExp
5%
90%
9%
57%
51%
42%
72%
4%
Monday, December 1 6, 2019 Page 2 of 14
King County Flood Control District February 24, 2020 90
Lower Snoqualmie River
Project Description
Program : Stand-Alone Projects
1044581 WLFL2 FARM FLOOD TSK FORCE IMP
1044576 WLFL2 L SNO/ALDAIR CORRDOR PLN
1122633 WLFL2 SE 19TH WAY REVETMENT
1112046 WLFL2 SINNEMA QUAALE 2011 REPR
1044579 WLFL2 TOLT PIPELINE PROTECTION
Program Subtotal:
Total: Lower Snoqualmie River
$31,575.85 $34,796,719 $32,521,131 93% $33,548,495
$31 ,575.85 $34,796,719 632,521 ,1 31 $33,548,495
CurrentMonthBilling
$5,341.37
$1 ,158.09
$21,472.00
$632.50
$2,971.89
ProjectedTotal Cost
$1,591 ,488
$8,002,354
$1,916,294
$12,508,516
$10,778,068
LTDExp
$829,199
$7,018,583
$1,670,709
$12,444,499
s10,558,140
LTDBudget
8979,803
$7,365,814
$1,916,294
$12,508,516
$10,778,068
WLRBudget
Adj ExplanationPcntExp
52To
88%
87%
99%
98%
Monday, December 16, 2019 Page 3 of 14
King County Flood Control District February 24, 2020 91
Tolt River
Project Description
Program : Stand-Alone Projects1132019 WLFL3 HOLBERG FEASIBILITY
1131803 WLFL3 L FREW LEVEE SETBACK
1131565 WLFL3 SAN SOUCI REACH IMPRVMNTS
1131560 WLFL3 SEDIMENT MGMT FEAS
1131562 WLFL3 SR 203 BR IMPRVMNTS FEAS
1131559 WLFL3 TOLT R LEVEE L.O.S, ANALYSIS
1126597 WLFL3 TOLT R RD ELEVATION FEAS
Program Subtotal:
Program: Tolt River Mile 1,1 Levee Setback1112058 WLFL3 TOLT R MILE 1.1 ACQ
Program Subtotal:
Total: Tolt River
$54,638.56 $7,586,205 $897,403 12% $2,364,822
$534.59 $4,306,107 $4,028,589 94% $4,120,014
$534.59 $4,306,107 $4,028,589 94% $4,120,014
$55,173.15 $11,892,312 $4,925,991 $6,484,936
CurrentMonthBilling
$5,204.19
93,756.61
$2,690.89
$17,404.67
$876.50
$24,651.73
$5s.97
ProjectedTotal Cost
6263,969
$3,360,048
$2,500,000
$402,805
$s95,900
$413,484
6250,000
LTDExp
$204,557
$215,777
$2,901
$96,406
$22,009
$305,593
850,160
LTDBudget
WLRBudget
Adj ExplanationPcntExp
77o/o
6o/o
0o/o
24o/o
6%
74%
20%
$263,969
$478,664
$160,000
$402,805
$395,900
s413,484
6250,000
Monday, December 1 6, 2019 Page 4 ôf 14
King County Flood Control District February 24, 2020 92
Raging River
Project Description
Program: Alpine Manor Moblle Home Park Acq1044647 WLFL4 ALPINE MANOR MOB PRK ACQ
Program Subtotal:
Total: Raging River
$78.98 $1,853,460 $941,595 51% $1,041,245
$78.98 $1,853,460 $941,595 51Yo 51,041,245
878.98 $1,853,460 $941,595 $1,041,245
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanationLTDExp
PcntExp
Monday, December I 6, 201 I Page 5 of 14
King County Flood Control District February 24, 2020 93
Sammamish River
Project Description
Program : Stand.Alone Projects1124988 WLFLS SAMMAMISH R BANK REPAIRS
1112037 WLFL5 WILLOWMOOR FLDPLAIN REST
Program Subtotal:
Total: Sammamish Ríver
$149,617.45 $6,712,707 $4,342,015 65% $4,701,042
$149,617.45 $6,712,707 $4,342,015 $4,701,042
CurrentMonthBÍlling
$10,572.97
$1s9,044.48
ProjectedTotal Cost
$1,180,065
$5,532,642
LTDExp
$1,175,342
63,166,673
LTDBudget
$1,180,065
$3,520,977
WLRBudget
Adj ExplanatíonPcntExp
100%
57%
Monday, December 16, 2019 Page 6 of 14
King County Flood Control District February 24, 2020 94
Cedar River
Project Description
Program : Stand-Alone Projects
1044734 WLFLT CDR PRE-CONST STRTGC ACQ
1116060 WLFLT CEDAR LEVEE SETBACK FEAS
1131691 WLFLT CEDAR RIVER TRAIL SITE 2A BANK
1128284 WLFLT FBD CORRIDOR IMPL
1131549 WLFLT HERZMAN LEVEE SETBACK AND TR
1131550 WLFLT JAN ROAD NEIGHBORHOOD
1131687 WLFLT MAPLEWOOD FËASIBILITY STUDY
1119888 WLFLT RIVERBEND MHP ACQ
1130557 WLFLT SR 169 FEASIBILITY STUDY
Program Subtotal:
Total: Cedar River
$93,665.91 $32,504,680 $18,217,967 56% $21,039,198
$93,665.91 $32,504,680 $18,217,967 $21,039,199
CurrentMonthBilling
$1,207-38
$221.04
$1,985.57
$5,846.39
$45,895.24
$21,901.52
$2,184.53
$3,685.47
$10,738.77
ProjectedTotal Cost
$5,530,532
$1,987,587
$290,000
$5,311,784
s5,236,128
$7,780,561
$490,246
$5,231,042
$646,800
LTDExp
$3,951,587
$1,852,687
$19,354
$5,742,936
$1 ,164,350
$549,1 44
$288,392
$4,374,514
$275,003
LTDBudget
$4,330,5s2
$1,987,587
$290,000
$5,311 ,784
$1,266,476
$1,484,731
$490,246
$5,231,042
$646,800
WLRBudget
Adj ExplanationPcntExp
71%
93%
7%
108%
22%
5S%
84%
43%
Monday, December 1 6, 2o1 9 Page 7 of 14
King County Flood Control District February 24, 2020 95
Green River
Project Description
Program : Stand-Alone Projects
1129569 WLFLS BRPS CONTROL BLDG RPLCMT
1129574 WLFLB BRPS HIGH-USE ENGINES
1135536 WLFLS GALLIDYKSTRA 2O2O REPAIR
1130118 WLFLS LWR GRN R CORR PLAN/EIS
1112056 WLFLB LWR RUSSELL LEVEE SETBCK
1 127209 WLFLB OLD JEFFS FARM REVETMENT
1135539 WLFLS TUK REVETMNT 20I9 REPAIR
1129367 WLFLS TUK-205 GACO WSTRN RPAIR
1129203 WLFLS S PARK DRAIN IMPROVMNTS
Program Subtotal:
Program: Green R PL84-99 Mitigation
1 115400 WLFLS TEUFEL PL84.99 MIT
Program Subtotal:
Program: Green Pre-Construction Acquisition1133719 WLFL8 BARNABY'S DESIMONE ACQ
1044961 WLFLs GREEN PRE-CONSTRCTN ACQ
Program Subtotal
Total: Green River
s2,074,031.44 $85,512,719 $18,769,781 22% $39,330,155
$16,34s.89 $3,069,379 $4,137,492 135% $4,545,865
$16,343.89 $3,069,379 $4,137,492 135% $4,545,865
CurrentMonthBilling
$4,350.74
$86,447.00
$8,595.76
$21,373.91
$1,852,495.26
$2,466.52
$90,693.79
$7,485.74
$122.72
$1,238.46
$523.98
ProjectedTotal Cost
$9,260,109
$1,484,646
$1,200,000
$1,743,249
$s5,687,298
$2,800,000
$500,000
$15,732,418
$17,105,000
$1,800,000
635,368,856
LTDExp
$4,614
$1,316,76s
$64,522
$320,964
$15,334,658
$300,367
$21 8,468
$835,841
$373,584
$1,804,693
s371,955
LTDBudget
$380,506
$1,484,646
$200,000
$1 ,743,249
$17,462,534
$826,802
$500,000
$15,732,418
$1,000,000
$1,800,000
$8,564856
WLRBudget
Adj ExplanationPcntExp
o%
8S%
5%
18%
43%
11%
44%
5%
20
't00%
1o/o
$1,762.44 $37,168,856 $2,'t76,648 6% $10,368,856
$2,092,137.77 6125,750,954 $25,083,921 $54,244,876
Monday, December 16, 2019 Page I of 14
King County Flood Control District February 24, 2020 96
White River
Project Description
Program : Stand-Alone Projects
1132340 WLFLg BUTTE AVE FLOOD MITIGATION
1112049 WLFLg COUNTYLINE TO A STREET
1112038 WLFLg RIGHT BANK LEVEE SETBACK
1 1 34345 WLFLg SLIPPERY CREEK ACQ
1135541 WLFLg STUCK R DR 2019 REPAIR
Program Subtotal:
Total: White River
$157,016.08 $53,987,523 $37,113,463 69% $38,697,576
$157,016.08 $53,987,523 $37,113,463 $38,697,576
CurrentMonthBilling
$83,099.84
$828.44
$66,588-96
$144.92
$6,353.92
ProjectedTotal Cost
$470,000
$24,070,195
$29,067,328
$180,000
$200,000
LTDExp
$21 5,188
$23,886,886
$12,816,255
$115,610
$79,522
LTDBudget
$470,000
$24,004,419
$13,843,157
$180,000
$200,000
WLRBudget
Adj ExplanationPcntExp
46%
99%
44%
64%
40%
Monday, Decembet 1 6, 201 I Page I of 14
King County Flood Control District February 24, 2020 97
Grant Funds
Project DescriptÍon
Program: WLFLG WATERSHED MGMT GRANTS
1117333 WLFLG WRIA GRANTS
Program Subtotal:
Program: WLFLG FLOOD REDUCTION GRANTS
1122628 WLFLG FLOOD REDUCTION GRANTS
Program Subtotal:
Total: Grant Funds
$653,548.37 $58,394,440 $22,425,164 380/o $32,303,948
$653,548.37 $58,394,440 $22,425,164 38o/o $32,303,948
$363,583.62 $35,027,736 $10,388,166 30% $17,852,257
$363,583.62 $35,027,736 $10,388,166 30% $17,852,257
$1,017,131.99 $93,422,176 $32,813,329 $50,156,205
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanationLTDExp
PcntExp
Monday, December 16, 2019 Page 10 of 14
King County Flood Control District February 24, 2020 98
Monitori n g/Mai ntenance
Project Description
Program: Stand-Alone Projects
1135538 WLFLS PUGETWAY CULVERT
Program Subtotal:
Program : Effectiveness Monitoring
1131252 WLFLM 42BTH AVE SE BRIDGE SM
1121301 WLFLM BELMONDO EM
1135995 WLFLM CEDAR FISH META-ANALYSIS
1121302 WLFLM CEDAR RAPIDS EM
1132748 WLFLM CIRCLE RVR RANCH SM
1121306 WLFLM COUNTYLINE REACH EM
1 1 1 2022 WLFLM EFFECTIVENESS MONITORING
1135994 WLFLM ISSAQUAH CHINOOK STUDY
1121310 WLFLM LOWER RUSSELL EM
1121315 WLFLM LWDiRIPARIAN CANOPY SI
1121322 WLFLM MILLER & SF SKY EM
1 1 35858 WLFLM MONITORING COORDINATION
1123321 WLFLM MOUTH OFTAYLOR EM
1131247 WLFLM PACIFIC RIGHT BANK EM
1121299 WLFLM REDDINGTON EM
1137146 WLFLM REINIG ROAD SM
1123320 WLFLM RIVERBEND REACH EM
1137135 WLFLM SAMMAMISH BANK REPAIR SM
1131248 WLFLM SE .19TH WAY REVETMENT SM
1121318 WLFLM SINNEMA QUAALE SM
1135859 WLFLM SMALL PROJECTS
1137148 WLFLM SNOQ SMALL REPAIRS SM
1137145 WLFLM STOSSEL RB 2O1B SM
1131243 WLFLMTEUFELSM
CurrentMonthBilling
$464.70
$2,271.22
$3,736.42
$2,460.67
$959.91
$3,757.88
$46.12
$129.78
$1,184.91
$1,182.27
$843.29
85,098.07
$218.01
$92.48
$5,609.94
$93.63
$40.36
$1 ,875.11
$1,485-64
$210.82
$1,106.87
$655.39
$374.50
$2,178.28
ProjectedTotal Cost
$5,667,995
LTDExp
$18,599
$105,076
$10,616
$202,617
$11,712
$279,198
$126,783
$10,413
$143,446
$118,743
$843
$53,232
$4,682
$1,164
$190,059
$562
$92,784
$3,709
$36,183
$29,252
$5,153
$1,s02
$653
$88,1 54
LTDBudget
WLRBudget
Adj Explanation
s49.09 $1,800,000
$49.09 $r,800,000
Pcnt
$630 0% $1,800,000
$630 oYo $1,800,000
Exp
2%
$21,708
8135,486
$0
$201,658
$1,161
$234,266
$129,635
$0
$129,409
$109,225
$0
$0
$0
$50,000
$186,634
$0
$61,707
$0
$41,536
$26,023
$0
$0
$0
$90,646
Monday, December 16, 2019 Page 11 of 14
King County Flood Control District February 24, 2020 99
Monitori ng/Mai ntena nce
Project
CurrentMonthBilling
ProjectedTotal Cost
LTDBudget
WLRBudget
Adj ExplanationPcnt
Description
1121317 WLFLM WINKELMAN SM
Program Subtotal:
Total: Monitoring/Maintenance
LTDExp
$16,677.57 $145,5s4 969,804
952,753.84 $5,667,995 $1,680,466 30o/o $1,48S,898
$52,802.93 $7,467,995 $1,681,096 $3,288,898
Exp
Monday, December 1 6, 2019 Page 12 of 14
King County Flood Control District February 24, 2020 100
Subregional Opportunity Fund
Project Description
Program: Subregional Opportunity Fund
1045174 WLFLO ISSAQUAH SUBRGNL OP
1045177 WLFLO KING CO UNINC SUBRGNL OP
1045042 WLFLO SUBREGNL OPPRTNry FUND
Program Subtotal
Total Subregional Opportunity Fund
$s,449.38
$476,551.00
$527.07 $87,257,574
CurrentMonthBillÍng
ProjectedTotal Cost
LTDExp
$651,445
$5,665,017
$165,043
LTDBudget
, $997,807
$5,861,207
$484,1 54
WLRBudget
Adj ExplanationPcntExp
0%
$480,527.45 $87,257,574 $6,481,505 7% $7,343,168
$480,527.45 887,257,574 $6,481,505 $7,343,168
Monday, December 1 6, 201 9 Page 13 of 14
King County Flood Control District February 24, 2020 101
Admin
Project Description
Program: Default (lnterest Expense/Temp Accruals)0000000 Defaull
1045333 WLFLX FLOOD MATERIAL STOCKPILE
Program Subtotal:
Total: Admin
Total This Billing:
$500,000 0% $500,000
($38,0il.4r) $500,000 $267,277 53% $500,000
($38,054.41) $500,000 $267,277 $500,000
$4,246,539.05
CurrentMonthBilling
($3s,533.02)
$1,478.61
ProjectedTotal Cost
LTDExp
$265,474
$1,803
LTDBudget
WLRBudget
Adj ExplanatÍonPcntExp
Monday, December 16, 2019 Page 14 of 14
King County Flood Control District February 24, 2020 102
Flood District Staffing Report: November 2019
Annual Maintenance
561010 ADMIN DIFAULT
Buitrago,Kristopher Dean Environmental Scientist I
Bergrud,Shawn A Engineer ll
Koon,John Douglas Engineer lll
Henry,Alexis Osborne Environmental Scientist lll
Total: 561010 ADMIN DEFAULT
WLFLD AM FACILITV INSPECTION: CEDAR/SAMMAMISH 1111889.3
Russell,Luke A lntern lll (Graduate lntern)
Strazer,Mary J Engineer lll
Winjum,Tracy Charles Engineer ll
Brummer,Christopher J Engineer lV
Sandford,Nancy Faegenburg Project/Program Managerlll
Total: wLFLD AM FACILITY INSPECTION: CEDAR/SAMMAMISH 1111889.3
WLFLD AM FACIL¡TY INSPECTION: GREEN 1111889.2
Jonson,Clarizza Engineer lll
Clark,Richard Engineer ll
TotaI: WLFLD AM FACILITV INSPECTION: GREEN 1111889.2
WLFLD AM FACILITY INSPECTION: RFI DATABASE MGMT 1111889.8
Comanor,Kyle Engineer lll
Total: WLFLD AM FACILITY INSPECTION: RFI DATABASE MGMT 1111889.8
WTFLD AM FACILITY INSPECTION: SNOQ/SF SKYKOMISH 1111889.1
Gelaw,Ashagrie A Engineer ll
Wright,Oliv¡a M Engineer ll
Smith,Jay Brian Engineer lll
Kays,Gus Brian Engineer lll
Barton,Chase M Engineer lV
Sebhat,Naod Engineer I
Total; WLFLD AM FACILITY INSPECTION: SNOQ/SF SKYKOMISH 1111889.1
WLFLD AM FACILITY INSPECT¡ON: WHITE 1111889.4
Brummer,Christopher J Engineer lV
Strazer,Mary J Engineer lll
Total: WLFLD AM FACILITY INSPECTION: WHITE 1111889.4
WLFLD AM IMPLEMENT & COORD: ADMIN TIME LL282OO.4
Koon,John Douglas Engineer lll
Buitrago,Kristopher Dean Environmental Scientist I
Cu rrentMonth Hours YTD Hours
L7.O
34.0
62.0
40.0
153.0
8.0
1.5
7.0
2.0
L.0
19.5
2.O
18.0
20.0
20.0
20.0
511.O
381.0
362.0
244.O
1,504.0
1"12.5
92.5
62.0
27.0
19.0
313.0
75.0
44.0
119.0
171..0
t7t.o
20.5
11_.5
32.0
350.5
2t2.5
t7.01_8.0
6.5
2.5
4.0
4.0
52.0
286.s
s5,0
50.5
46,0
22.5
4,0
464.5
7.0
5.5
L2.5
30.0
28.5
Monday, December 16, 2019 Page L of 26King County Flood Control District February 24, 2020 103
Flood District Staffing Report: November 2OLg
Henry,Alexis Osborne EnvironmentalScientist lll
Bergrud,Shawn A Engineer ll
Total: WLFLD AM IMPLEMENT & COORD: ADMIN TIME 1L28200.4
WLFLD AM IMPLEMENT & COORD: EXT COORD 1128200.1
Buitrago,Kristopher Dean Environmental Scientist I
Gelaw,Ashagrie A Engineer ll
Total: WLFLD AM IMPLEMENT & COORD: EXT COORÐ 1128200.1
WLFLD AM IMPLEMENT & COORD: RFMS COORDINATION t128200.2
Koon,John Douglas Engineer lll
Buitrago,Kristopher Dean Environmental Scientist I
Henry,Alexis Osborne Environmental Scientist lll
TOTAI: WLFLD AM IMPLEMENT & COORD: RFMS COORD]NATION 1128200.2
WLFLD AM LOG JAM INVST&RELOC: LW INVESTIGATION 1111839.1
Chiang,Sophia N Engineer lll
Total: WLFLD AM LOG JAM INVST&RELOC: LW INVESTIGATION 1111839.1
WLFLD AM MAINT RIVER FACILITY: PL 84-99 IMPL 1111841.13
Young,Jay K Engineer lll
Althauser,Donald R Engineer lll
Willaford,Clint Equipment Operator
Lehnhoff,Kenneth Utility Worker ll
Skagen,Jeff E Truck Driver ll
Satterlund,Jeffrey C Crew Chief
Kaluza,Ryan James Utility Worker ll
Total: WLFLD AM MAINT R¡VER FACILITY: PL 84-99 IMPL 1111841.13
WLFLD AM MAINT RIVER FACILITY: ROADS 1111841.3
Willaford,Clint Equipment Operator
Lehnhoff,Kenneth Utility Worker ll
Total: WLFLD AM MAINT RIVER FACIUTY: ROADS 1111841.3
WLFLD AM MAINT RIVER FACILITY: TZ MAINTENENCE 1111841.19
Carlos,Ricardo Contract Specialist I
TOTAI: WLFLD AM MAINT RIVER FACILITY: TZ MAINTENENCE 1111841.19
WLFLD AM SMP IMPLEMENTATION: ALDAIR z0tg t124994.t4
Kis-Young,Darian V Engineer I
Total: WLFLD AM SMP IMPLEMENTATION: ALDAIR 2019 tt24994.t4
WLFLD AM SMP IMPLIMENTATION: CEDAR/SAMMAMISH 1124994.8
Cu rre ntMonth Hours
4.0
1s.0
77.5
17.5
8.0
25.5
30.s
16.5
8.0
55.0
9.0
35.5
1_5.5
14.o
s.0
18.0
4.0
101.0
4.0
3,5
7.5
2.O
2.O
2.0
2.4
YTD Hours
181.0
L63.0
907.0
221.0
8.0
229.0
350.5
L48.0
39.0
537.5
333.5
160.0
38.s
37.O
26.O
20.0
4.0
619.0
4.0
3.5
7.5
2.0
2.O
2.0
2.0
76.0
76.0
Monday, December 1"6, 20Lg
0.5
0.5
Page 2 of 26King County Flood Control District February 24, 2020 104
Flood District Staffing Report: November 2OL9
Buitrago,Kristopher Dean EnvironmentalScientist I
Koon,John Douglas Engineer lll
Henry,Alexis Osborne EnvironmentalScientist lll
Samra,Laxhdip Kaur Contract Specialist I
Totat: WLFLD AM SMP IMPLEMENTATION: CEDAR/SAMMAMISH tL24994.8
WLFLD AM SMP IMPLEMENTATION: GREEN 1L24994.9
Buitrago,Kristopher Dean EnvironmentalScientist I
Bergrud,Shawn A Engineer ll
Koon,John Douglas Engineer lll
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLD AM SMP IMPLEMENTATION: GREEN t124994.9
WLFLD AM SMP IMPLEMENTATION: SMP DEVELOPMENT Lt24994.I2
Henry,Alexis Osborne EnvironmentalScientist lll
Koon,John Douglas Engineer lll
Amrhein,Seth J Environmental Scientist ll
Radloff,Judith K EnvironmentalScientist lll
Reardon,Julie M Administrative Specialist lll
Total: WLFLD AM SMP IMPLEMENTATION: SMP DEVELOPMENT tL24994.t2
WLFLD AM SMP IMPLEMENTATION: SNOQ/SKYKOMISH LL24994.3
Buitrago,Kristopher Dean EnvironmentalScientist I
Koon,John Douglas Engineer lll
Dorfler,Jeffrey L Equipment Operator
Willaford,Clint Equipment Operator
Patterson,Don W Crew Chief
LehnhofiKenneth Utility Worker ll
Kaluza,Ryan James Utility Worker ll
Satterlund,Jeffrey C Crew Chief
Walters,Terri K Truck Driver ll
Henry,Alexis Osborne Environmental Scientist lll
Corneloup,Christophe Patrice Truck Driver ll
Carlos,Ricardo Contract Specialist I
l(otarski,James Daniel Vegetation Specialist
TOTAI: WLFLD AM SMP IMPLEMENTATION: SNOQ,/SKYKOMISH T!24994.3
WLFLD AM SMP IMPLEMINTATION: WHITE t124994.LL
Buitrago,Kristopher Dean Environmental Scientist I
Bergrud,Shawn A Engineer ll
Shelton,StephanieMelissa EnvironmentalScientistlV
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLD AM SMP IMPLEMENTATION: WHITI Lt24994.tL
Cu rre ntMonth Hours
7.5
1.5
5.0
1.0
15.0
8.0
11.0
4.0
2.0
25.0
90.0
l.o3.0
0.5
1.0
101.5
34.0
t7.o
9.0
38.0
9.0
33.0
5.0
20.0
9.0
6.0
5.0
1.0
2.0
188.0
YTD Hours
80.0
36.5
13.0
12.o
141.5
89.5
78.0
54.5
22.0
244.O
59.0
s1.0
9.0
9.0
128.0
1",002.0
96.0
37.5
27.5
4.0
L,t67.O
165.5
1L6.5
68.5
38.0
34,0
33,0
29.0
20.0
13.0
t2.o
8.0
5.0
2.0
544.5
M onday, December 16, 2019
1.5
6,0
2.0
2.O
11.5
Page 3 of 26King County Flood Control District February 24, 2020 105
Flood District Staffing Report: November 2OL9
WLTLD ST GREEN R PUMP STATIONS: GENERAL PUMP ADMIN 1111885.1
Bean,Thomas Charles Engineer lV
Total: WLFLD ST GREEN R PUMP STATIONS: GENERAT PUMP ADMIN 1111885.
Cu rre ntMonth Hours
12.5
L2.5
YTD Hours
49.0
49.0
Total: Annual Maintenance
Flood Hazards Plan, Grants, Outreach
561.005 ADMIN DEFAULT
Vanderpool,Kathleen Project/Program Manager lV
Paine,MitchellC Project/Program Manager ll
Zweig,Kenneth S Project/Program Manager lll
Total: 561005 ADM¡N DEFAUTT
WLFLD PP EDUCTN & PUB OUTRCH: OUTREACH PLANNING 1111869.2
Walker,Monica H Project/Program Manager lll
Vanderpool,Kathleen Project/Program Manager lV
Tota|: WIFLD PP EDUCTN & PUB OUTRCH: OUTREACH PIANNING L1LT869.2
WLFLD PP GENERAL INQUIRIES: DEFAULT L111884.1
Zweig,Kenneth S Project/Program Manager lll
Walker,Monica H Project/Program Manager lll
TOTAI: WLFLD PP GENERAL INQUIRIES: DEFAULT 1111884.1
WLFLD PP KCFCZD IMPL & COORD: ADMINISTRATIVE TIME 1111831.4
Vanderpool,Kathleen Project/Program Manager lV
Zweig,Kenneth S Project/Program Manager lll
Paine,Mitchell C Project/Program Manager ll
Alba,Christine J Contract Specialist I
Total: WLFLD PP KCFCZD IMPL & COORD: ADMINISTRATIVE TIME 1L1.1831.4
WLFLD PP KCFCZD IMPL & COORD: EXT COORDINATION 1111831.L
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLD PP KCFCZD IMPL & COORD: EXT COORDINATION 1111831.1
WLFLD PP KCFCZD lMPt & COORD: FLOOD HAZ CERTIF¡CAT 1111831.7
Wright,Olivia M Engineer ll
Strazer,Mary J Engineer lll
Total: WLFLD PP KCFCZD IMPL & COORD: FLOOD HAZ CERTIFICAT 1111831.7
WLFLD PP KCFCZD IMPL & COORD; RFMS COORDINATION 1111831.2
Vanderpool,Kathleen Project/Program Manager lV
TOTAI: WLFLD PP KCFCZD IMPI & COORD: RFMS COORDINATION 1111831.2
901.5 7,257.5
16.0
16.0
1_6.0
48.0
23.8
37.0
60.8
14.0
14.0
1_8.0
0.5
18.5
s0.0
21,.0
1.0
1.3
79.3
382.0
296.0
2t9.O
957.0
126.0
93.0
2L9.O
140.0
0.5
140.5
612.s
22t.O
196.5
13.3
1,049.3
62.0
62.0
34.0
2.5
36.5
492.O
492.0
4.O
2.5
6.5
4L.0
41.0
Monday, December 1-6, 201-9 Page 4 of 26King County Flood Control District February 24, 2020 106
Flood District Staffing Report: November 2OL9
WLFLD PP LARGE WOOD STUDIES: PRGM HPA 1128139.12
Akyuz,Katherine A Capital Project Manager lV
Heckendorf,DanielG Engineer lll
Vanderpool,Kathleen Project/Program Manager lV
Bannister,ThomasAndrew EnvironmentalScientistlll
Bunn,Jeremy T Environmental Scientist lll
Lott,Frederic C Engineer ll
Lincoln,Alexandra E Environmental Scientist lll
Shelton,StephanieMelissa EnvironmentalScientistlV
Brummer,Christopher J Engineer lV
Total: WLFLD pP LARGE WOOD STUDIES: PRGM HPA 1128139.12
WLFLD PP RaV:R & FLDPLN PLAN: CRS COMPLIANCE 1Lt1873.7
Paine,Mitchell C Project/Program Manager ll
Vanderpool,Kathleen Project/Program Manager lV
Total: WLFLD PP RIVER & FLDPLN PIAN: CRS COMPLIANCE LtLt873.7
WLFLD PP RIVER & FLDPLN PLAN: FLD PLAN UPDATE 1111873.1
Paine,MitchellC Project/Program Manager ll
Vanderpool,Kathleen Project/Program Manager lV
Walker,Monica H Project/Program Manager lll
Tota|: WLFLD PP RIVER & FLDPTN PLAN: FLD PLAN UPDATE ''TTI873.L
WLFLD PP RIVER & FLDPLN PLAN: HOME ELEV PROG DEV 1111873.3
Zweig,Kenneth S Project/Program Manager lll
Lewis,Teresa S Project/Program Manager lll
Total: WLFLD PP RIVER & FLDPLN PLAN: HOME ELEV PROG DEV 1111873.3
CurrentMonth Hours
53.0
8.5
3.0
3.0
3.5
2.0
8.3
5.0
4.0
90.3
40.0
6.0
46.0
103.0
7.0
9.3
119.3
t2.o2.0
t4.0
YTD Hours
98.0
s2.5
3s.0
29.0
23.0
15,5
11.3
5,0
5.0
274.3
L,037.0
62.0
1,099.0
251.5
69.5
12.8
333.8
281".0
21.5
308.5
Total: Flood Hazards Plan, Grants, Outreach
Flood Hazard Studies, Maps, Technical Services
561007 ADM¡N DEFAULT
Comanor,Kyle Engineer lll
Bunn,Jeremy T Environmental Scientist lll
RadloflJudith K EnvironmentalScientist lll
Lott,Frederic C Engineer ll
Lott,Frederic C GIS Specialist - Senior
Total: 561007 ADMIN DEFAULÏ
WLFLD CEDAR/WHITE IMPL & COORD: ADMIN TIME LLLL878.4
Russell,Luke A lntern lll (Graduate lntern)
Brummer,Christopher J Engineer lV
537.5 4,971.8
22.0
32.0
27.O
59.5
44.0
184.5
82.0
69.0
416.0
318.0
267.0
82.5
44.0
L,127.5
272.5
266.5
M onday, December 16, 2O!9 Page 5 of 26King County Flood Control District February 24, 2020 107
Flood District Staffing Report: November 2019
Akyuz,Katherine A Capital Project Manager lV
Sandford,Nancy Faegenburg Project/Program Managerlll
Walker,Monica H Project/Program Manager lll
Strazer,Mary i Engineer lll
Heckendorf,Daniel G Engineer lll
Winjum,Tracy Charles Engineer ll
Johnston,Katrina L Business & Finance Officer lll
Total: WLFLD CEDAR/WHITE IMPL & COORD: ADMTN TIME 1111878.4
WLFLD CEDAR/WHITE IMPL & COORD: EXT COORDINATION 1111878.1
Brummer,Christopher J Engineer lV
Walker,Monica H Project/Program Manager lll
Akyuz,Katherine A Capital Project Manager lV
Heckendorf,DanielG Engineer lll
Total: WLFLD CEDAR/WHITE lMPt & COORD: EXT COORDINATION ttLl878.t
WLFLD CEDAR/WHITE IMPL & COORDT PACIFIC PUMP STATION 1111878.6
Walker,Monica H Project/Program Manager lll
Total: WLFLD CEDAR/WHITE IMPL & COORD: PACIFIC PUMP STATION tttt97
WLFLD CEDAR/WHITE IMPL & COORD: RFMS COORDINATION Lttt878.2
Sandford,Nancy Faegenburg Project/Program Manager lll
Reinelt,Lorin Managing Engineer
Strazer,Mary J Engineer lll
Walker,Monica H Project/Program Manager lll
Total: WLFLD CEDAR/WHITE IMPL & COORD: RFMS COORDINATION 1111878.
WLFLD TCH CMz STUDIES: GREENWATER CMz 1128t36.7
RadloffJudith K EnvironmentalScientist lll
Total: WLFLD TCH CMZ STUDIES: GREENWATER CMZ 1128135.7
WLFLD TCH CMZ STUDIES: RAGING 1128136.5
Bunn,Jeremy T Environmental Scientist lll
Walker,Monica H Project/Program Manager lll
Lewis,Teresa S Project/Program Manager lll
Total: WLFLD TCH CMZ STUDIES: RAGING 1128136.5
WLFLD TCH CMZ STUDIES: WHITE 1128136.11
Radloff,Judith K Environmental Scientist lll
Walker,Monica H Project/Program Manager lll
Lott,Frederic C Engineer ll
Lott,Frederic C GIS Specialist - Senior
TotaI: WLFLD TCH CMZ STUDIES: WHITE LL28L36.IL
Cu rrentMonth Hours
L9.0
29.5
16.3
10.0
7.5
t4.o2.0
249.3
YTD Hours
139.0
1"36.0
103.s
87.0
62.0
s5.0
2.0
L,123.5
20.0
6.8
4.0
1.5
32.3
7.0
7.O
31.0
14.5
11.5
10.8
67.8
2.5
2.s
3.5
3.5
33.0
12.o
8.0
1.5
54.5
20.5
20.5
297.3
128.8
100.0
526.0
208.0
137.3
2L.5
1.0
367.8
5.5
2.O
8.5
6.3
22.3
15.0
12.8
3.0
30.8
23.0
t2.o2.5
1.0
38.s
M onday, December L6, z}tg Page 6 of 26King County Flood Control District February 24, 2020 108
Flood District Staffing Report: November 2OL9
WLFLD TCH FLOOD STUDIIS: LEVEE ANALYSIS PH L 1128138.4
Radloff,Judith K EnvironmentalScientist lll
Comanor,Kyle Engineer lll
Total: WLFLD TCH FLOOD STUDIES: LEVEE ANALYSIS PH 1 1128138.4
WLFLD TCH FLOOD STUDIES: SF SKY & ZONE A FLD Lt28t38.7
Comanor,Kyle Engineer lll
Alba,Christine J Contract Specialist I
Total: WLFLD TCH FLOOD STUDIES: SF SKY & ZONE A FLD 1128138.7
WLFLD TCH IMPLEMËNT & COORD: ADMINISTRATIVE TIME tLT4299.4
Bunn,Jeremy T Environmental Scientist lll
Radloff,Judith K EnvironmentalScientist lll
Comanor,Kyle Engineer lll
Lott,Frederic C Engineer ll
Lott,Frederic C GIS Specialist - Senior
Total: WLFLD TCH IMPLEMENT & COORD: ADMINISTRAT¡VE TIME Ltt4299.4
WLFLD TCH IMPLEMENT & COORD: EXT COORDINATION Ltt4299.L
Comanor,Kyle Engineer lll
Radloff,Judith K EnvironmentalScientist lll
Lott,Frederic C GIS Specialist - Senior
Total: WLFLÐ TCH ¡MPLEMENT & COORD: EXT COORDINATION Ltt4299.t
WLFLD TCH IMPLEMENT & COORD: RFMS COORDINAT¡ON L1L4299.2
Comanor,Kyle Engineer lll
Lott,Frederic C Engineer ll
RadloflJudith K EnvironmentalScientist lll
Bunn,Jeremy T Environmental Scientist lll
Lott,Frederic C GIS Specialist - Senior
Total; WLFLD TCH IMPLEMENT & COORD: RFMS COORDINATION LLt4299.2
WLFLD TCH SED¡MENT MON & MGMT: CEDAR 1111836.8
Lott,Frederic C GIS Specialist - Senior
Total: WLFLD TCH SEDIMENT MON & MGMT: CEDAR 1111836.8
WLFLD TCH SEDIMENT MON & MGMT: GREEN 1111836.9
Lott,Frederic C GIS Specialist - Senior
Total: WLFLD TCH SEDIMENT MON & MGMT: GREEN 1111836.9
WLFLD TCH SEDIMENT MON & MGMT: L SNO 1111836.3
Lott,Frederic C GIS Specialist - Senior
Cu rre ntMonth Hours
16.0
7.0
23.0
YTD Hours
101.5
7,0
108.5
162.0
71..0
233.0
309.0
229.3
184.0
66.5
7.0
795.8
296.0
53.5
1.0
350.5
499.0
143.s
118.5
76.0
3.5
840.5
2.0
2.O
l_.0
1.0
5.5
26.O
7.0
33.0
27.5
1_9.5
2s.0
1,0
7.0
80.0
26.0
4.0
1.0
31.0
42.0
3.5
6.5
0.5
3.5
56.0
2.0
2.0
1.0
1.0
M onday, Decem ber 16, 2019
5.5
PageT of26King County Flood Control District February 24, 2020 109
Flood District Staffing Report: November 2019
Carlos,Ricardo Contract Specialist I
Total: WLFLD TCH SEDIMENT MON & MGMT: t SNO 1111836.3
WLFLD TCH SEDIMENT MON & MGMT: RAGING 1111836.5
Lott,Frederic C GIS Specialist - Senior
Carlos,Ricardo Contract Specialist I
Tota|: WLFLD TCH SEDIMENT MON & MGMT: RAGING 1111836.5
WLTLD TCH SËÐIMENT MON & MGMT: TOLT 1111836.4
Bunn,Jeremy T Environmental Scientist lll
Lott,Frederic C Engineer ll
Lott,Frederic C GIS Specialist - Senior
Carlos,Ricardo Contract Specialist I
Total: WLFLD TCH SED¡MENT MON & MGMT: TOLT 1111836.4
WLFLD TCH SEDIMENT MON & MGMT: U SNO 111.1836.2
Bunn,Jeremy T Environmental Scientist lll
Lott,Frederic C GIS Specialist - Senior
Carlos,Ricardo Contract Specialist I
Total: WLFLD TCH SEDIMENT MON & MGMT: U SNO 1111836.2
WLFLD TCH SEDIMENT MON & MGMT: WHITE 1111836.11
Radloff,Judith K Environmental Scientist lll
Walker,Monica H Project/Program Manager lll
Lott,Frederic C GIS Specialist - Senior
Total: WLFLD TCH SEDIMENT MON & MGMT: WHITE 1111836.11
Cu rre ntMonth Hours
1.3
6.8
YTD Hours
1.3
6.8
26.0
16.5
4.0
1.3
47.8
49.5
2.0
1.3
52.8
23.8
6.8
4.5
35.0
1.5
1.3
2.8
1.5
1.3
2.8
5.5
5.5
4.0
1_.3
16.3
3.0
2.O
1.3
6.3
6.5
L.0
4.5
t2.oTotal: Flood Hazard Studies, Maps, Technical Services
Flood Preparation, Flood Warning Center
WLTLD PP FLD PREPAREDNESS: FID AWARENESS CAMPAI 1123053.3
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLD PP FLD PREPAREDNESS: FLD AWARINESS CAMPAI 1123053.3
WLFLD Pp FLD PREPAREDNESS: MAP INFO SERVaCE 1123053.2
Zweig,Kenneth S Project/Program Manager lll
Totalr WLFLD PP FLD PREPAREDNESS: MAP INFO SERVICE 1123053.2
WLFLD PP FtD PREPAREDNESS: OEM DAM SAFETY 1123053.1
Zweig,Kenneth S Project/Program Manager lll
TotaI: WLFLD PP FLD PREPAREDNESS: OEM DAM SAFETY 1123053.1
WLFLD PP FWC PREP & TRAINING: DEFAULT TASK 1111882.1
837.0 5,767.3
6.0
6.0
8.0
8.0
-6.0
-6.0
6.0
6.0
175.O
175.0
0.0
0.0
Monday, December 1"6, 20L9 Page 8 of 26King County Flood Control District February 24, 2020 110
Flood District Staffing Report: November 2OL9
Zweig,Kenneth S Project/Program Manager lll
Koon,John Douglas Engineer lll
Heckendorf,Daniel G Engineer lll
Polka,Jon David Engineer ll
Russell,Luke A lntern lll (Graduate lntern)
Knox,Matthew EnvironmentalScientist lll
Torres,Stella I Capitat Project Manager lll
RadloflJudith K EnvironmentalScientist lll
Strazer,Mary J Engineer lll
McPherson,Heather N Engineer I
Kara,Wendy H Engineer lll
Hardy,Jessy Marie Lucas Engineer ll
Gelaw,Ashagrie A Engineer ll
Wright,Olivia M Engineer ll
Ewing,Christopher Aaron Engineer lll
Amrhein,Seth J Environmental Scientist ll
Beggs,Mark Robert Ingineer ll
Kis-Young,Darian V Engineer I
Duncan,Brandon R Engineer ll
Hickey,Cynthia Engineer lll
Hallenius,Alexander D Engineer lll
Bilir,Sevin EnvironmentalScientist lll
Chiang,Sophia N Engineer lll
Robinson,Patricia A Project/Program Manager lll
Bowles,Mason B Environmental Scientist lll
Total: WLFLD PP FWC PREP & TRAINING: DËFAULT TASK 1111882.1
WLTLD PP FWC PREP & TRAINING: FWC DESIGN, CONSTRUC LILI882.2
Buitrago,Kristopher Dean Environmental Scientist I
Total: WLFLD PP FWC PREP & TRAINING: FWC DESIGN, CONSTRUC L1'L1882.2
WLFLD PP SANDBAGS: DEFAULT 1111883.1
Zweig,Kenneth S Project/Program Manager lll
Total: WLFLD PP SANDBAGS: DEFAULT 1111883.1
Cu rre ntMonth Hours
58.0
2.0
2.5
1.0
9.0
1.5
1.0
1.0
1.0
1.0
l_.0
1.0
1,0
1.0
l_.0
1-.0
1.0
1.0
1.0
1.0
1,0
1.0
1.0
1.0
1,0
93.0
YTD Hours
256.0
23.0
19.5
10.5
9.0
8.0
1.0
7.0
6.0
6.0
6.0
6.0
6.0
6.0
6,0
6.0
6.0
6.0
3.5
3.0
3.0
3.0
1.0
1,0
1.0
415.5
1.0
1.0
5.0
5.0
4.0
4.0
72.0
72.0
WLRLD PP FLD EVENT LOI¿IIIg
Knox,Matthew
Smith,Jay Brian
Kara,Wendy H
Radloff,Judith K
Koon,John Douglas
Kis-Young,Darian V
Lewis,Teresa S
Environmental Scientist lll
Engineer lll
Engineer lll
Environmental Scientist lll
Engineer lll
Engineer I
Project/Program Manager ll I
27.O
20.0
It.o13.0
12.0
1l-.5
11.0
21.0
20.0
17.o
13.0
12.0
L1.5
11.0
Monday, December 16, 201"9 Page 9 of 26King County Flood Control District February 24, 2020 111
Flood District Staffing Report: November 2OL9
Heckendorf,DanielG Engineer lll
Bergrud,Shawn A Engineer ll
Strazer,Mary J Engineer lll
Rose,Richelle M Project/Program Manager lll
McPherson,Heather N Engineer I
Zweig,Kenneth S Project/Program Manager lllHaley,Erin C Noxious Weed Control Spc ll
Barton,Chase M Engineer lV
Bilir,Sevin Environmentalscientist lll
Bunn,Jeremy T Environmental Scientist lll
Russell,Luke A lntern lll (Graduate lntern)
Total: WLRLD PP FLD EVENT 10/2t/t9
Cu rre ntMonth Hours
10.s
10.0
9.5
9.0
9,0
8.0
8.0
8.0
6.8
6.5
5.0
195.8
YTD Hours
10.5
10.0
9.5
9.0
9.0
8.0
8.0
8.0
6.8
6.5
5.0
195.8
Total: Flood Preparation, Flood Warning Center
Program Management, Supervis¡on, Finance, Budget
561008 ADMIN DEFAULT
Bleifuhs,Steven j Environmental Prog. Sect Mgr
lsaac,Edna M Contract Specialist I
Stypula,Jeanne M Managing Engineer
Klusman,Steven A Busíness & Finance Officer IV
Carbaugh,Tammy M Contract Specialist ll
Murray,Brian P Environmental Prog. Mng Supv
Johnston,Katrina L Business & Finance Officer lll
Aro,Sylvia K Administrative Specialist lll
Reinelt,Lorin Managing Engineer
Alba,Christine J Contract Specialist I
Whited,JoAnn E Contract Specialist I
Carlos,Ricardo Contract Specialist I
Tota|: 561008 ADMIN DEFAULT
WLFLD MGMT PROGRAM MGMT: ADMIN TIME 111189L.22
Stypula,Jeanne M Managing Fngineer
Johnston,Katrina L Business & Finance Officer lllKlusman,Steven A Business & Finance Officer lV
Total: WLFID MGMT PROGRAM MGMT: ADMIN TIME 1111891.22
WLFLD MGMT PROGRAM MGMT: AUDIT RESPONSE 1111891.4
Klusman,Steven A Business & Finance Officer lV
Johnston,Katrina L Business & Finance Officer lll
Carlos,Ricardo Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: AUDIT RESPONSE 1111891.4
302.8 868.3
160.0
33.0
s0.0
32.0
35.0
18,0
1"6.0
1_9.0
t7.o30.3
16.0
16.0
442.3
1,832.0
529.0
356.0
328.0
319.0
303.0
296.0
293.0
284.0
234.0
232.A
224.0
5,230.0
31.0
8.5
12.o
51.5
31-5.0
98.3
84.0
497.3
31,0
2t.o23.0
81.0
Monday, December 16, 201"9
19.0
16.8
1.0
36.8
Page 1"0 of 26King County Flood Control District February 24, 2020 112
Flood District Staffing Report: November 2019
WLFLD MGMT PROGRAM MGMT: CONTRACT ADMIN 1111891.1
Carlos,Ricardo Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
lsaac,Edna M Contract Specialist I
Alba,Christine J Contract Specialist I
Samra,Laxhdip Kaur Contract Specialist I
Whited,JoAnn E Contract Specialist I
Alvarado,Jessica A Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT ADMIN 1111891.1
WLFLD MGMT PROGRAM MGMT: CONTRACT DEV WLRD 1111891.11
Alba,Christine J Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Whited,JoAnn Ë Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT DEV WLRD 1111891.11
WLFLD MGMT PROGRAM MGMT: CONTRACT STRATEGIC 11L1891.13
Carlos,Ricardo Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: CONTRACT STRATEGIC 1111891.13
WLFLD MGMT PROGRAM MGMT: FINANCIAL MGMT 1111891.5
Johnston,Katrina L Business & Finance Officer lll
Klusman,Steven A Business & Finance Officer lV
TotaI: WLFLD MGMT PROGRAM MGMT: FINANCIAL MGMT 1111891.5
WLFLD MGMT PROGRAM MGMT: NEW H&H CONTRACT 1111891.9
Alvarado,Jessica A Contract Specialist I
Alba,Christine J Contract Specialist I
Whited,JoAnn E Contract Specialist I
TotaI: WLFLD MGMT PROGRAM MGMT: NEW H&H CONTRACT 1111891.9
WLFLD MGMT PROGRAM MGMT: NEW SURVEY CONTRACT 1111891.17
Alba,Christine J Contract Specialist I
lsaac,Edna M Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLD MGMT PROGRAM MGMT: NEW SURVEY CONTRACT 1111891.1
WLFLD MGMT PROGRAM MGMT: POLICIES & PROCEDURE LtLt8gL.Lz
Carlos,Ricardo Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLD MGMT PROGRAM MGMT: POLICIES & PROCEDURE tt1189t.12
CurrentMonth Hours YTD Hours
75.5
62.0
81.0
69.5
43.0
15.5
11.0
357.5
825,0
788.0
748.5
577.3
564.0
357.0
198.5
4,058.3
3.0
9.0
13.0
25.0
113.0
70.0
44.0
227.0
2.5
2.5
97.5
97.0
194.5
31.0
18.0
5.0
54.0
20.0
7.0
1.0
28.0
4.5
4.5
1,1_81.3
!,740.0
2,32L,3
228.0
91.0
9.0
328.0
64.0
43.5
4.0
111.5
49.5
41.0
90.5
Monday, December 16, 2019
2.0
1.0
3.0
Page 11 of 26King County Flood Control District February 24, 2020 113
Flood District Staffing Report: November 2019
WLFLD MGMT PROGRAM MGMT: RFMS COORDINATION 1.111891.2
Aro,Sylvia K Administrative Specialist lll
Murray,Brian P Environmental Prog. Mng Supv
Hepburn,SusanGwendolyn AdministrativeSpecialistlll
Stypula,Jeanne M Managing Engineer
Reinelt,Lorin Managing lngineer
lsaac,Edna M Contract Specialist I
Whited,JoAnn E Contract Specialist I
Total: WLFLD MGMT PROGRAM MGMT: RFMS COORDINATION 111!891.2
Cu rre ntMonth Hours YTD Hours
144.0
1.42.O
160.0
79.0
104.0
4.0
3.0
636.0
1.,617.O
1,387.O
1,280.0
1,L40.0
934.0
l_1,s
6.0
6,375.5
Total: Program Management, Supervision, Finance, B
Program I mplementation
561001ADMIN DEFAULT
Rose,Richelle M Project/Program Manager lll
Barton,Chase M Engineer lV
Wright,Olivia M Engineer ll
Kays,Gus Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
Smith,Jay Brian Engineer lll
Lewis,Teresa S Project/Program Manager lll
TotaI : 561001. ADMIN DEFAULT
561002 ADMIN DEFAULT
Young,Jay K Englneer lll
Kara,Fatin Engineer lV
Jonson,Clarizza Engineer lll
Robinson,Patricia A Project/Program Manager lll
Peters,Erik G Capital Project Manager lV
Total: 561002 ADMIN DEFAULT
561003 ADMIN DEFAULT
Sandford,Nancy Faegenburg Project/Program Manager lll
Heckendorf,DanielG Engineer lll
Akyuz,Katherine A Capital Project Manager lV
- Brummer,Christopher J Engineer lV
Winjum,Tracy Charles Engineer ll
Walker,Monica H Project/Program Manager lll
Strazer,Mary J Engineer lll
TOtâIr 561003 ADMIN DEFAULT
1,831.0 19,324.8
52.0
24.0
30.0
17.O
8.0
13.5
26.0
170.5
L4.O
115.0
35.5
16.0
8.0
188.5
53.0
11.0
24.0
13.0
32.5
32.0
13.8
t79.3
362.0
256.0
255.5
224.0
200.0
19L.5
159.0
1,648.0
560.0
395.3
298.0
289.0
240.O
7,782.3
312.0
328.s
280.0
237.4
235.5
224.0
82.B
1,759.8
Monday, December 16, 2019 Page 12 of 26King County Flood Control District February 24, 2020 114
Flood District Staffing Report: November 2OL9Cu rre nt
Month Hours YTD Hours
561004 ADMIN DEFAULT
Shelton,Stephanie Melissa Environmental
Bauman,Kerry Environmental
Bloxton,Thomas D Environmental
Amrhein,Seth J Environmental
Chiang,Sophia N Environmental
Bannister,Thomas Andrew Environmental
Knox,Matthew Environmental
Chiang,Sophia N Engineer lll
Lincoln,Alexandra E Environmental
TotaI: 561004 ADMIN DËFAULT
Scientist lV
Scientist lll
Scientist ll
Scientist ll
Scientist lll
Scientist lll
Scientist lll
Scientist lll
71.0
22.0
35.5
14.O
11.0
16.0
16.0
22.0
8.0
215.5
269.s
242.0
241..5
210.3
747.3
146.0
24.0
22.0
16.0
1,318.5
561011ADMIN DEFAULT
Bean,Thomas Charles Engineer lV
Beggs,Mark Robert Engineer ll
Ruebel,Mark W Capital Project Manager lV
Torres,Stella I Capital Project Manager lll
Garric,Craig M Engineer lll
Kis-Young,Darian V Engineer I
Hardy,Jessy Marie Lucas Engineer ll
McPherson,Heather N Engineer I
BartoliniVenegas,LindaY Project/ProgramManagerll
TotaI: 561011 ADM¡N DEFAULT
WLFLD GREEN RIVER IMPL COORD: ADMINISTRATIVE TIME 1111881.4
jonson,Clarizza Engineer lll
Kara,Fatin Engineer lV
Young,Jay K Engineer lll
Robinson,Patricia A Project/Program Manager lll
Peters,Erik G Capital Project Manager lV
Total: WLFLD GREEN RIVER IMPL COORD: ADMINISTRATIVE TIME 1111881.4
WLFLD GREEN RIVER IMPL COORD: EXT COORDINATION 1111881.1
Kara,Fatin Engineer lV
Jonson,Clarizza Engineer lll
Reinelt,Lorin Managing Engineer
Lauritzen,John Engineer lll
Total: WLFLD GREEN RIVER IMPL COORD: EXT COORDINATION 1111881.1
WLFLD GREEN RIVER IMPL COORD: RFMS COORDINATION 1111881.2
Kara,Fatin Engineer lV
Reinelt,Lorin Managing Engineer
t4.o26.0
1_8.0
L8.0
9.0
36.0
8.0
10.5
19.0
158.5
263.0
247.0
24r.0
188.0
159.0
152.8
146.5
98.8
51.5
1,553.5
69.5
20.0
16.0
5.0
3.0
113.5
613.5
267.5
21.1..5
113.0
68.0
t,273.5
370.0
247.5
56.0
16.0
689.5
466.8
136.5
6.5
10,5
3.5
L6.0
36.s
7.5
15.s
M onday, December L6, 2OL9 Page 13 of 26King County Flood Control District February 24, 2020 115
Flood District Staffing Report: November 20L9
Robinson,Patricia A Project/Program Manager lll
Peters,Erik G Capital Project Manager lV
Total: WLFLD GREEN RIVER IMPL COORD: RFMS COORDINATION 1111881.2
WLFLD SNOQ IMPLEMENT & COORD: ADMINISTRATIV: WORK 1111855.4
Barton,Chase M Engineer lV
Rose,Richelle M Project/Program Manager lll
Wright,Olivia M Engineer ll
Lewis,Teresa S Project/Program Manager lll
Smith,Jay Brian Engineer lll
Kays,Gus Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
TOTAI: WIFLD SNOQ IMPTTMËNT & COORD: ADMINISTRATIVE WORK 1111855
WLFLD SNOQ IMPLEMINT & COORD: EXT COORDINATION 1111855.1
Barton,Chase M Engineer lV
Lewis,Teresa S Project/Program Manager lll
Rose,Richelle M Project/Program Manager lll
Smith,Jay Brian Engineer lll
Total: WLFLD SNOQ IMPLEMENT & COORD: EXT COORDINATION 1111855.1
WLFLD SNOQ ¡MPLEMENT & COORD: RFMS COORDINATION 1111855.2
Barton,Chase M Engineer lV
Lewis,Teresa S Project/Program Manager lll
Kays,Gus Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
Pendergast,Robert E Engineer ll
Total: WLFLD SNOQ IMPLEMENT & COORD: RFMS COORDINAT¡ON 1111855.2
WLFLD ST IMPLEMENT & COORD: ADMIN TIME 1130783.4
Ruebel,Mark W Capital Project Manager lV
McPherson,Heather N Engineer I
Kis-Young,Darian V Engineer I
Hardy,Jessy Marie Lucas Engineer ll
Garric,Craig M Engineer lll
BartoliniVenegas,LindaY Project/ProgramManagerll
Bean,Thomas Charles Engineer lV
Beggs,Mark Robert Engineer ll
Torres,Stella I Capital Project Manager lll
Sebhat,Naod Engineer I
Total: WLFLD ST IMPLEMENT & COORD: ADMIN TIME 1130783.4
WLFLD ST IMPIEMENT & COORD: RFMS COORDINATION 1130783.2
Cu rre ntMonth Hours
7.0
10.0
40.0
25.s
47.5
3s.0
15.0
21,.5
11.0
10.5
166.0
20.0
15.0
17.5
2.0
54.5
32.5
9.5
2t.0
10.0
42.5
115.5
55.0
58.3
24.5
34.0
25.0
65.0
19.0
1"0.5
18.0
18.0
s27.5
YTD Hours
78.0
55.5
736.8
439.0
357.0
320.0
224.5
L86.0
73.5
46.s
1,646.5
235.0
148.5
90.0
42.0
515.5
384.5
I22.0
110.5
95.0
42.5
754.5
823.0
616.5
429.O
390.8
320.5
259.0
2r7.O
202.0
190.0
129.0
3,576.8
M onday, Decem ber L6, Z}tg Page 14 of 26King County Flood Control District February 24, 2020 116
Flood District Staffing Report: November 2OL9
Whlted,JoAnn E Contract Specialist I
Beggs,Mark Robert Engineer ll
Bean,Thomas Charles Engineer lV
Torres,Stella I Capital Project Manager lll
McPherson,Heather N Engineer I
Total: WLFLD ST IMPLEMENT & COORD: RFMS COORDINATION 1130783.2
Cu rre ntMonth Hours
13.0
2.0
4.0
4.0
3.0
26.0
YTD Hours
215.0
51.5
39.0
4.0
3.0
312.5
Total: Program lmplementation
Capital Projects
WLFLO SF SKYKMSH REP LOSS MIT
King,Lori D Real Property Agent lV
Lewis,Teresa S Project/Program Manager lll
Bergrud,Shawn A Engineer ll
Jackson,Robert B Real Property Agent lll
Reardon,Julie M Administrative Specialist lll
Total: WLFLO SF SKYKMSH REP LOSS MIT
WTFLO TIMBERLANE 2019 RTPAIR
Hardy,Jessy Marie Lucas Engineer ll
McPherson,Heather N Engineer I
Bloxton,Thomas D Environmental Scientist ll
Kis-Young,Darian V Engineer I
Sebhat,Naod Engineer I
Letourneau,PhilippeDavid Project/ProgramManagerlll
lsaac,Edna M Contract Specialist I
TotaI: WLFLO TIMSERTANE 2019 REPAIR
WLFL1 CIRCLE R RANCH RISK RED
Kays,Gus Brian Engineer lll
Wright,Olivia M Engineer ll
Bunn,Jeremy T Environmental Scientist lll
lsaac,Edna M Contract Specialist I
Kubo,Joshua EnvironmentalScientist lV
Knox,Matthew EnvironmentalScientist lll
Barton,Chase M Engineer lV
Carbaugh,Tammy M Contract Specialist ll
Total: WLFLI CIRCLE R RANCH RISK RED
1,79L.5 t7,567.5
11.0
4.0
1.0
3.5
1.5
2t.o
3.0
L9.0
3.0
2.5
25.0
1.0
4.0
57.5
35.0
22.s
17.0
9.0
4.0
87.5
399.5
260.8
L62.5
100.0
88.5
7.5
4.0
L,022.8
252.5
1.41.0
77.5
s3.0
36,0
23.5
23.5
14.0
62t.0
6L3.0
120.5
WLFL1 MF SNO CORRIDOR PLAN
Rose,Richelle M
Wright,Olivia M
Project/Program Manager I I I
Engineer ll
45.5
27.O
4.5
13.5
8.0
5.0
3.5
1_.0
108.0
27.0
2.0
Monday, December 16, T}tg Page L5 of 26King County Flood Control District February 24, 2020 117
Flood District Staffing Report: November 2019
Barton,Chase M Engineer lV
Amrhein,Seth J Environmental Scientist ll
Lewis,Teresa S Project/Program Manager lll
Kays,Gus Brian Engineer lll
Total: WLFL1 MF SNO CORR¡DOR PLAN
WLFLl. RECORD OFFICE 2016 REPR
Rose,Richelle M Project/Program Manager lll
Kays,Gus Brian Engineer lll
Barton,Chase M Engineer lV
King,Lori D Real Property Agent lV
Bloxton,Thomas D Environmental Scientist ll
Johnston,Katrina L Business & Finance Officer lll
TotaI: WLFL1 RFCORD OFFICE 2016 REPR
WLFL1 RTINIG RD 2016 REPAIR
Garric,Craig M Engineer lll
Beggs,Mark Robert Engineer ll
Bloxton,Thomas D Environmental Scientist ll
Torres,Stella I Capital Project Manager lll
Kis-Young,Darian V Engineer I
Hardy,Jessy Marie Lucas Engineer ll
Ward,Kevin R Engineer I
McPherson,Heather N Engineer I
Ruebel,Mark W Capital Project Manager lV
Radloff,Judith K EnvironmentalScientist lll
Sebhat,Naod Engineer I
Bartolini Venegas,Linda Y Project/Program Manager ll
Alba,Christine J Contract Specialist I
Shelton,StephanieMelissa EnvironmentalScientistlV
Total: WLFLI REINlG RD 2016 REPAIR
WLFtl SF G-l EROSION RM2.27
Smith,Daniel T Engineer ll
Kays,Gus Brian Engineer lll
Total: WIFLISF G-l EROSION RM2.27
CurrentMonth Hours
27.s
3.0
13.5
3.0
76.O
6.0
1i..0
3.0
2.O
2.O
1_.5
25.5
1_05.0
83.0
58.5
47.0
30.0
70.s
5.0
49.5
20.0
14.0
43.5
19.5
0.5
2.0
548.0
16.0
2.5
18.5
40.0
34.5
43,5
4.0
1.0
YTD Hours
105.5
102.8
95.5
87.5
L,124,8
11..5
62.5
15.5
L4.O
7.0
1.5
L72.O
884.0
861.3
442.0
372.0
346.5
328.0
139.0
13s.0
133.0
115.5
11"4.0
113.0
6.5
2.0
3,991.8
57.0
31.5
88.5
WLFL1 SHAKE MILL LB 2016 RPR
Kays,Gus Brian
Gelaw,Ashagrie A
Amrhein,Seth J
lsaac,Edna M
Rose,Richelle M
Engineer lll
Engineer ll
Environmental Scientist ll
Contract Specialist I
Project/Program Manager ll I
923.5
9L7.5
637.8
122.5
89.0
Monday, December 16, 2019 Page 16 of 26King County Flood Control District February 24, 2020 118
Flood District Staffing Report: November 2OL9
Barton,Chase M Engineer l!Carbaugh,Tammy M Contract Specialist ll
Kubo,Joshua EnvironmentalScientist IV
Shelton,StephanieMelissa EnvironmentalScientistlV
Buitrago,Kristopher Dean Environmental Scientist I
Bergrud,Shawn A Engineer ll
Total: WLFL1 SHAKE MILL LB 20L6 RPR
WLFL1 SHAKE MILL RB 2016 REPR
Bartolini Venegas,Linda Y Project/Program Manager ll
Hardy,Jessy Marie Lucas Engineer ll
Amrhein,Seth J Environmental Scientist ll
Sebhat,Naod Engineer I
Ruebel,Mark W Capital Project Manager lV
Kis-Young,Darian V Engineer I
Beggs,Mark Robert Engineer ll
Kays,Gus Brian Engineer lll
Koon,John Douglas Engineer lll
Bunn,Jeremy T Environmental Scientist lll
Total: WLFL1 SHAKE MILL RB 2015 REPR
WLFL1 SI VIEW RM4 2017 REPAIR
Kis-Young,Darian V Engineer I
McPherson,Heather N Engineer I
Bloxton,Thomas D EnvironmentalScientist ll
Beggs,Mark Robert Engineer ll
Total: WLFLI SIVlEW RM4 2017 REPAIR
WLFL1 UPR SNO RES FLD MITIGTN
Johnston,Katrina L Business & Finance Officer lll
Jackson,Robert B Real Property Agent lll
King,Lori D Real Property Agent lV
Samra,Laxhdip Kaur Contract Specialist I
Reardon,Julie M Administrative Specialist lll
Letourneau,PhilippeDavld Project/ProgramManagerlll
Total: WLFL1 UPR SNO RES FLD MITIGTN
WLFL1 USACE PL 84-99 SF SNO
Wright,Olivia M Engineer ll
Barton,Chase M Engineer lV
Total: WLFL1 USACE Pt 84-99 SF SNO
WLILz FARM FLOOD TSK FORCE IMP
Cu rre ntMonth Hours
4.0
1.0
11.0
4.5
5.0
6.0
154.5
YTD Hours
14.5
42.0
27.O
16.5
15.0
9.0
2,874.3
96.0
43.s
22.0
16,5
15.0
15.0
11.0
6.s
1.0
L.0
227.5
340.0
21.6.4
1_01.5
66.0
72E.5
24.3
9.0
8.0
4.0
1.5
0.8
47.5
330.0
32.5
362.5
4r_.0
43.5
22.0
16.5
9.0
L5.0
1"1-.0
6.s
1.0
1.0
166.5
L9.0
8.8
5.0
2.5
35.3
1_.0
9.0
8.0
1,0
1.5
0.8
2L.3
Monday, December 1"6, 20L9
7.0
2.0
9.0
Page t7 of 26King County Flood Control District February 24, 2020 119
Flood District Staffing Report: November 2OL9
Kameda,Wesley P Engineer ll
Carlos,Ricardo Contract Specialist I
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFL2 FARM FLOOD TSK FORCE IMP
WLFL2 L SNOIALDATR CORRDOR PLN
Lewis,Teresa S Project/Program Manager lll
Bergrud,Shawn A Engineer ll
Total: WLFL2 L SNO/ALDAIR CORRDOR PLN
WLILz SE 19ÏH WAY REVETMENT
Wright,Olivia M Engineer ll
Smith,Jay Brian Engineer lll
Bergrud,Shawn A Engineer ll
lsaac,Edna M Contract Specialist I
Total: WLFL2 SE 19TH WAY REVETMENT
WLFL2 SINNEMA qUAALE 2011REPR
Knox,Matthew Environmentalscientist lll
Tota|: WLFL2 SINNEMA QUAALE 2011 REPR
WIFL2 TOLT PIPEL¡NE PROTECTION
Garric,Craig M Engineer lll
Knox,Matthew Environmental Scientist lll
Alvarado,Jessica A Contract Specialist I
Whited,JoAnn E Contract Specialist I
Smith,Daniel T Engineer ll
Barton,Chase M Engineer lV
Wright,Olivia M Engineer ll
Total: WLFL2 TOLT PIPELINE PROTECTION
WLFL3 HOLBERG IEASIBILITY
Smith,Jay Brian Engineer lll
Wright,Olivia M Engineer ll
Pendergast,Robert E Engineer ll
TotaI: WLFL3 HOLBERG FEASIBILITY
WLFL3 SAN SOUCI REACH IMPVMNTS
Gelaw,Ashagrie A Engineer ll
Barton,Chase M Engineer lV
Tota|: W[FL3 SAN SOUCI REACH IMPVMNTS
WLFL3 SEDIMENT MGMT FEAS
Cu rre ntMonth Hours
3.5
1.0
1.0
5.5
8,0
3.0
11.0
L.0
5.8
4.O
1.0
11.8
YTD Hours
21..5
11.5
LO
34.0
80.5
23.0
103.5
159.0
124.3
99.0
2s.0
407.3
20.0
20.0
273.0
165.5
159.0
79.0
55.0
54.5
24.0
810.0
366.5
332.0
8.0
706.5
29.0
2.5
31.5
6.0
6.0
5.0
6,0
1.0
1.0
L2.O
1.5
2.0
28.s
28.0
1.5
29.5
5.0
33.0
8.0
46.0
Monday, December 16, 201"9 Page L8 of 26King County Flood Control District February 24, 2020 120
Flood District Staffing Report: November 2OL9
Lewis,Teresa S Project/Program Manager lll
Bunn,Jeremy T Environmental Scientist lll
Smith,Jay Brian Engineer lll
Amrhein,Seth J EnvironmentalScientist ll
Knox,Matthew EnvironmentalScientist lll
Barton,Chase M Engineer IV
Gelaw,Ashagrie A Engineer ll
Kubo,Joshua EnvironmentalScientist lV
TotaI: WLFL3 SEDIMENT MGMT FEAS
WLFL3 SR 203 BR IMPRVMNTS FEAS
Smith,Jay Brian Engineer lll
Lewis,Teresa S Project/Program Manager lll
Total: WLFL3 SR 203 BR ¡MPRVMNTS FEAS
WLFL3 TOLT LEVEE LOS ANALYSIS
Smith,Jay Brian Engineer lll
Gelaw,Ashagrie A Engineer ll
Pendergast,Robert E Engineer ll
Smith,Daniel T Engineer ll
Lewis,Teresa S Project/Program Manager lll
Barton,Chase M Engineer lV
Whited,JoAnn E Contract Specialist I
Funke,David Edward Engineer lll
TotaI: WIFL3 TOLT LEVEE LOS ANALYSIS
WLFL3 TOLT R MILE l.l SETBACK
King,Lori D Real ProPertY Agent lV
Lewis,Teresa S Project/Program Manager lll
Holecek,Linda L Real Property Agent Supervisor
Total: WLFL3 TOLT R MltE 1.1 SETBACK
WLFL3 TOLT R RD ELEVATION FEAS
Lewis,Teresa S Project/Program Manager lll
Totat: WLFL3 TOLT R RD ELEVATION FEAS
WLFL4 ALPINE MANOR MOB PRK ACQ
Letourneau,PhilippeDavid Project/ProgramManagerlll
Total: WLFL4 ALPINE MANOR MOB PRK ACQ
WLFLs SAMMAMISH R BANK REPAIRS
Heckendorf,Daniel G Engineer lll
Carlos,Ricardo Contract Specialist I
Cu rrentMonth Hours
39.0
58.0
8.5
33.0
7.5
1.0
20.0
2.0
169.0
5.0
3.0
8.0
YTD Hours
326.5
205.s
106.3
69.5
39.0
20.5
20.0
3.0
790.3
70.3
23.0
5.0
8.0
3.0
2.0
1.0
12.o
L24.3
116.8
59.0
775.8
490.3
190.0
144.5
72.0
51.0
28.0
11.0
1.4.0
1,006.8
55.0
22.5
2.0
79.5
66.5
31.0
2.0
0.5
2.0
4.5
0.5
0.5
4.5
4.5
0.8
0.8
0.8
0.8
M onday, Decem ber 1-6, 2Ot9
6.0
1.0
Page 19 of 26King County Flood Control District February 24, 2020 121
Flood District Staffing Report: November 2019
Tota|: WLFLs SAMMAMISH R BANK REPAIRS
WLFLs WILLOWMOOR FLDPLAIN REST
Akyuz,Katherine A Capital Project Manager lV
Bannister,ThomasAndrew Environmentalscientistlll
Heckendorf,DanielG Engineer lll
Brummer,Christopher J Engineer lV
Carbaugh,Tammy M Contract Specialist ll
Alvarado,Jessica A Contract Specialist I
TotaI: WLFL5 WILLOWMOOR FLDPLAIN REST
WLFLT CDR PRE-CONST STRTGC ACQ
Bergrud,Shawn A Engineer ll
Sandford,Nancy Faegenburg Project/Program Manager lll
Tota]: WLFLT CDR PRE-CONST STRTGC ACQ
WLFLT CEDAR LEVEE SETBACK FEAS
Heckendorf,Daniel G Engineer lll
TOTAI: WLFLT CEDAR LEVEE SETBACK FEAS
WLFLT CEDAR R TR SITE A BANK
Walker,Monica H Project/Program Manager lll
Bunn,Jeremy T Environmental Scientist lll
Brummer,Christopher J Engineer lV
Heckendorf,Daniel G Engineer lll
Tota|: WLFLT CEDAR R TR SITE A BANK
WLFLT FBD CORRIDOR IMPL
Ward,Kevin R Engineer I
Johnston,Katrina L Business & Finance Officer lll
Bergrud,Shawn A Engineer ll
Carlos,Ricardo Contract Specialist I
Total: WLFLT FBD CORRIDOR lMPt
Cu rrentMonth Hours
7.O
L9.0
6.0
8.5
1.0
1.0
3.0
38.5
9.0
3.0
12.0
YTD Hours
97.5
877.0
446.3
194.5
r42.4
25.0
l.o1,691.8
77.0
12.5
89.5
103.3
54.5
20.s
6.0
184.3
236.0
169.3
130.0
19.0
554.3
893.0
668.0
268.s
184.5
156.3
r21.8
102.0
78.O
2.0
2.O
8.5
8.5
8,3
2.5
2.0
6.0
18.8
1.0
1_6.8
11.0
5.0
39.8
WLFLT HERZMAN LEVEE SETBACK
Sandford,Na ncy Faegen bu rg
Winjum,Tracy Charles
Ba n nister,Thomas Andrew
Beggs,Mark Robert
Walker,Monica H
Radloff,Judith K
King,Lori D
Brummer,Christopher J
Project/Program Manager ll I
Engineer ll
Environmental Scientist lll
Engineer ll
Project/Program M anager I I I
Environmental Scientist lll
Real Property Agent lV
Engineer lV
63.0
38.0
4t.o11.5
12.5
6.0
19.0
15.0
Monday, December 1"6, 201"9 Page 20 of 26King County Flood Control District February 24, 2020 122
Flood District Staffing Report: November 2019
lsaac,Edna M Contract Specialist I
Engstrom,Kurt N Real Property Agent lV
Jackson,Robert B Real Property Agent lll
Reardon,Julie M Administrative Specialist lll
Samra,Laxhdip Kaur Contract Specialist I
Total: WLFLT HERZMAN LEVEE SETBACK
WLFLT JAN RD NBRHOOD IMPRVMNTS
Heckendorf,Daniel G Engineer lll
Bannister,ThomasAndrew EnvironmentalScientistlll
Radloff,Judith K EnvironmentalScientist lll
Alba,Christine J Contract Specialist I
Sandford,Nancy Faegenburg Project/Program Manager lll
Funke,David Edward Engineer lll
Brummer,Christopher J Engineer lV
Ward,Kevin R Engineer I
King,Lori D RealPropertyAgent lV
Lincoln,Alexandra E EnvironmentalScientist lll
Jackson,Robert B Real Property Agent lll
Total: WLFLT JAN RD NBRHOOD IMPRVMNTS
WLFLT MAPLEWOOD FEAS STUDY
Akyuz,Katherine A Capital Project Manager lV
Samra,Laxhdip Kaur Contract Specialist I
Bunn,Jeremy T Environmental Scientist lll
Brummer,Christopher J Engineer lV
Radloff,Judith K EnvironmentalScientist lll
Total: WLFLT MAPLEWOOD FEAS STUDY
WLTLT RIVERBEND MHP ACQ
Bergrud,Shawn A Engineer ll
Carlos,Ricardo Contract Specialist I
Tota!: WLFLT RIVERBEND MHP ACQ
Cu rre ntMonth Hours
4.0
27.0
1".0
1,5
1.0
240.5
89.s
36.0
12.0
4.5
5.0
5.0
5.0
42.3
6.0
3.0
1.0
209.3
YTD Hours
36.0
34.O
28.s
9.0
3.0
2,582.5
890.5
263.3
198.3
1,I2.0
95.5
7t.o57.0
51.3
2s.0
4.0
1.0
L,768.8
7.0
l.o0.5
1.0
2.0
17.5
76.5
58.0
42.0
16,0
6.5
199.0
63.0
3.0
66.0
35.0
3.0
38.0
WLFLT SR 169 FEASIBILITY STUDY
Winjum,Tracy Charles
Alvarado,Jessica A
Brummer,Christopher J
Walker,Monica H
Carlos,Rica rdo
Walters,Douglas Todd
Letou rneau,Philippe David
Scott,J Todd
Engineer ll
Contract Specialist I
Engineer lV
Project/Program Manager lll
Contract Specialist I
Engineer lll
Project/Program Manager lll
Project/Program Manager ll I
68.s
25.0
3.5
3.5
2.0
3.0
2.8
0.5
553.5
84.0
42.0
2s.8
21..5
6,5
3.5
0.5
M onday, December 76, 2019 Page 21 of 26King County Flood Control District February 24, 2020 123
Flood District Staffing Report: November 2019
TotaI: WLFLT SR 169 FEASIBILITY STUDY
WLFLS BARNABY'S DESIMONE ACq
King,Lori D Real Property Agent lV
Bergrud,Shawn A Engineer ll
TOTAI: WLFLS BARNABY'S DESIMONE ACq
WLFLS BRPS CONTROL BLDG RPLCMT
Gravette,Bruce R. Wastewater Engineer -Principal
Sutton,Peter Doyle Project Control Engineer ll
Total: WLFLS BRPS CONTROL BLDG RPLCMT
WLFLS BRPS HIGH-USE ENGINTS
Bean,Thomas Charles Engineer lV
Torres,Stella I Capital Project Manager lll
Ruebel,Mark W Capital Project Manager lV
Robinson,Patricia A Project/Program Manager lll
Garric,Craig M Engineer lll
Whited,JoAnn E Contract Specialist I
Jonson,Clarizza Engineer lll
Samra,Laxhdip Kaur Contract Specialist I
Bartolini Venegas,Linda Y ProjectlProgram Manager ll
Gregersen,Christopher N. Environmental Scientist I
Sebhat,Naod Engineer I
Funke,David Edward Engineer lll
Alvarado,Jessica A Contract Specialist I
Total: WLFLS BRPS HIGH-USE ENG¡NES
WLFLS GALLIDYKSTRA 2O2O REPAIR
Young,Jay K Engineer lll
Robinson,Patricia A Project/Program Manager lll
Kara,Fatin Engineer lV
Jonson,Clarizza Engineer lll
Lott,Frederic C Engineer ll
Kitamura,Kaoru Engineer I
Lott,Frederic C GIS Specialist - Senior
Total: WLFLS GALLIDYKSTRA 2020 REPAIR
WLFLS GREEN PRE-CONSTRCTN ACQ
King,LoriD RealPropertyAgent lV
Reardon,lulie M Administrative Specialist lll
Tota|; WLFLS GREEN PRE.CONSTRCTN ACq
Cu rre ntMonth Hours
108.8
2.0
9,0
11.0
25.s
2.0
27.5
110.5
72.0
46.0
55.0
16.0
fl.017.5
7.0
15,s
22.5
5.0
2.0
1.0
387.0
YTD Hours
737.3
95.0
35.0
130.0
26.s
2.0
28.5
1_,L80.0
328.0
298.0
222.0
1.87.5
152.0
130.0
110.0
90.s
68.0
45.5
l_r-.0
2.0
2,824.5
32.0
29.0
4.5
1.0
1.0
9.0
3.0
79.5
163.5
98.0
70.5
11.0
1L.0
9.0
3.0
366.0
L3.5
1_.5
15.0
Monday, December 16, 20L9
5.0
0.5
5.5
Page 22 of 26King County Flood Control District February 24, 2020 124
Flood District Staffing Report: November 2OL9
WLFLS LWR GRN R CORR PLANIEIS
Robinson,Patricia A Project/Program Manager lll
Reinelt,Lorin Managing Engineer
Lott,Frederic C Engineer ll
Carlos,Ricardo Contract Specialist I
Jonson,Clarizza Engineer lll
Total: WLFLS LWR GRN R CORR PLAN/EIS
WLILS LWR RUSSELT LEVEE SETBCK
Peters,Erik G Capital Project Manager lV
Bauman,Kerry EnvironmentalScientist lll
Holecek,Linda L Real Property Agent Supervisor
Reinelt,Lorin Managing Engineer
Schabert,Bradley J Real Property Agent lll
Letourneau,PhilippeDavid Project/ProgramManagerlll
Kitamura,Kaoru Engineer I
Whited,JoAnn E Contract Specialist I
Carbaugh,Tammy M Contract Specialist ll
King,LoriD RealPropertyAgent lV
Knox,Matthew EnvironmentalScientist lll
Bergrud,Shawn A Engineer ll
Shelton,StephanieMelissa EnvironmentalScientistlV
Jackson,Robert B Real Property Agent lll
Chiang,Sophia N Engineer lll
Total: WLFLS LWR RUSSELL LIVEE SETBCK
WLFLS OLD JEFFS FARM REVETMENÏ
Chiang,Sophia N EnvironmentalScientist lll
Jonson,Clarizza Engineer lll
Kara,Fatin Engineer lV
Bauman,Kerry EnvironmentalScientist lll
Chiang,Sophia N Engineer lll
Total: WLFLS OLD JEFFS FARM REVETMENT
Cu rre ntMonth Hours YTD Hours
47.0
3.0
2.0
3.0
2.s
57.5
516.0
53.0
46.5
8.0
2.5
626.0
270.0
176.5
82.0
21.5
4.0
554.0
139.0
26.0
31.0
l-5.0
2.0
4.0
36.5
3.0
5.0
2.0
1.0
3.0
3.0
0.5
1,0
272.0
L,389.5
485.5
273.0
254.0
140.0
73.8
55.s
45.5
44.0
t4.o
12.o
4.0
3.0
2.5
1.0
2,797.3
4.0
7.5
?q
4.0
4.0
22.0
WLFLS TEUFEL PL84-99 MIT
Chiang,Sophia N
Alvarado,iessica A
Dulan,Lica
Chiang,Sophia N
Elder,Gage
Knox,Matthew
Shelton,Stephanie Melissa
Environmental Scientist lll
Contract Specialist I
Engineer I
Engineer lll
Engineer I
Environmental Scientist lll
Environmental Scientist lV
1.0
5.0
1"9.0
17.0
9.0
3,0
2.0
131.5
34.0
19.0
77.O
9.0
5.0
2.O
Monday, December L6, 2OL9 Page 23 of 26King County Flood Control District February 24, 2020 125
Flood District Staffing Report: November 2019
Total: WLFLS TEUFEL PL84-99 MIT
WLFLS TUK REVETMNT 2019 REPAIR
Young,Jay K Engineer lll
Chiang,Sophia N EnvironmentalScientist lll
Patterson,Don W Crew Chief
Walters,Terri K Truck Driver ll
Dorfler,Jeffrey L Equipment Operator
Kara,Fatin Engineer lV
Reeve,MichaelShane Utility Worker ll
Peterson,Mykal Fale Equipment Operator
Saunders,Charles Utility Worker ll
Thomas,Anthony Michael Ut¡lity Worker ll
Schulz,Jay David Truck Driver lll
Corneloup,Christophe Patrice Truck Driver ll
Louie,Steven James Utility Worker ll
Chiang,Sophia N Engineer lll
Cray,Trevor Engineer lV
Buitrago,Kristopher Dean Environmental Scientist I
Clark,Richard Engineer ll
Kaluza,Ryan James Utility Worker ll
Hawkins,William Alexander Utility Worker ll
Letourneau,PhiliþpeDavid Project/ProgramManagerlll
Lehnhoff,Kenneth Utility Worker ll
Willaford,Clint Equipment Operator
Skagen,Jeff E Truck Driver ll
Samra,Laxhdip Kaur Contract Specialist I
Birk,Vanessa Lynne Crew Chief
Tota|: WLFIS TUK REVETMNT 2019 REPAIR
WLFLS ÏUK-205 USACE GACO-SEGAL
Jonson,Clarizza Engineer lll
King,Lori D Real Property Agent lV
lsaac,Edna M Contract Specialist I
TotaI: WLFLS TUK.2O5 USACE GACO.SEGAT
WLFLg COUNÏYIINE TO A STREEÏ
Lincoln,Alexandra E EnvironmentalScientist lll
Whited,JoAnn E Contract Specialist I
Total: WLFL9 COUNTYLINE TO A STREET
WLFLg RIGHT BANK LEVEE SETBACK
Strazer,Mary J Engineer lll
Cu rrentMonth Hours
s6.0
89.0
67.5
58.0
s8.8
56.0
4.O
52.5
6L.0
58.8
61.5
31.8
38.0
6.0
r.0.0
10.0
6.5
4.0
3.3
3.3
0.5
3.0
3.0
3.0
1.0
0.5
690.8
14.0
11".0
1.0
26.0
YTD Hours
2L7.5
428.5
294.5
87.0
75.8
73.0
70.8
69.5
69.0
66.8
61.s
5L.3
38.0
22.0
l_0,0
10.0
9.0
4,0
3.3
3.3
3.0
3.0
3.0
3.0
1.0
0.5
1,460.5
8.5
1.0
9.5
88,5
88.0
8.0
184.5
13.8
1.0
14.8
109.3 542.3
M onday, December 16, 7019 Page 24 ol 26King County Flood Control District February 24, 2020 126
Flood District Staffing Report: November 2OL9
Brummer,Christopher J Engineer lV
Walker,Monica H Project/Program Manager Ill
Shelton,StephanieMelissa EnvironmentalScientistlV
Lincoln,Alexandra E Environmental Scientist lll
Whited,JoAnn E Contract Specialist I
Bannister,ThomasAndrew EnvironmentalScientistlll
TotaI: WLFL9 RIGHT BANK LEVEE SETBACK
Cu rre ntMonth Hours
15.0
6.5
7.5
14.0
1.5
1.0
154.8
YTD Hours
341.0
165.3
744.0
58.3
15.5
10.0
L,276.3
363.0
1.42.0
124.5
106.0
75.0
42.3
5.0
2.5
860.3
414.5
4t4.5
8.0
8.0
104.5
104.5
25.0
25.0
WLFLg STUCK R DR 2019 REPAIR
Whited,JoAnn E
Kis-Young,Darian V
Beggs,Mark Robert
Bloxton,Thomas D
Ruebel,Mark W
Radloff,Judith K
Brummer,Christopher J
Shelton,Stephanie Melissa
Total: WLFL9 STUCK R DR 2019
Contract Specialist I
Engineer I
Engineer ll
Environmental Scientist ll
Capital Project Manager lV
Environmental Scientist lll
Engineer lV
Environmental Scientist lV
REPA¡R
2s.o
2.5
12.5
8.0
L2.O
2.O
1_.0
1,5
64.5
44.0
44.0
8.0
8.0
5,0
5.0
20.s
20.s
WLFLG FLOOD REDUCTION GRANTS
Harper,Kimberley Ann Grant Administrator
Total: WLFLG FLOOD REDUCT¡ON GRANTS
WLFLM MILLER & SF SKY EM
Knox,Matthew EnvironmentalScientist lll
Tota|: WLFLM MILLER & SF SKY EM
WLILO SUBREGNL OPPRTNTY FUND
Harper,Kimberley Ann Grant Administrator
TotaI: WLFLO SUBREGNL OPPRTNTY FUND
WLFLS PUGET WAY CULVERT
Walker,Monica H Project/Program Manager lll
Tota|: WLFLS PUGET WAY CULVERT
WLFLS S PARK DRAIN IMPROVMNTS
Walker,Monica H Project/Program Manager lll
Total: WLFLS S PARK DRAIN IMPROVMNTS
WLFLX FLOOD MATERIAL STOCKPILE
Kis-Young,Darian V Engineer I
TotaI: WLFLX FLOOD MATERIAL STOCKPILE
0.5
0.5
6.5
6.5
1.3
1.3
8.8
8.8
Monday, December 16, 2019 Page 25 of 26King County Flood Control District February 24, 2020 127
FIood District Staffing Report: November 2019
WLFLX WRIA GRANTS
Harper,Kimberley Ann
Total: WLFLX WRIA GRANTS
Grant Administrator
Cu rrentMonth Hours YTD Hours
33.0
33.0
44r.5
441.5
Total: Capital Projects
Grand Total:
4,394.0 35,856.8
10,595.3 91,613.8
Monday, December 16, 2079 Page 26 of 26King County Flood Control District February 24, 2020 128
Lund Consulting, Inc. 1941 26th Avenue East Seattle, WA 98112
206-612-8138 www.lundconsulting.com
Invoice: KCFCD 2020-1 Lower Green River Corridor Plan and EIS Project Manager January 31, 2020 Michelle Clark, Executive Director King County Flood Control District 1200 King County Courthouse 516 Third Avenue Seattle, WA 98104 Invoice period: January 1-31, 2020 Professional Services: Activities described below. Total Amount Due $12,360.00 Please remit payment to: Lund Consulting, Inc. 1941 26th Avenue East Seattle, WA 98112 Activity Report: Participate in weekly team check-in meetings. Hold briefing meeting with Executive Director. Meet with Chair and staff to discuss project status and schedule. Continue work to resolve direction for hydraulic model next steps. Work with Communications team on messages related to this phase of work and next steps.
King County Flood Control District February 24, 2020 129
[Blank Page]
King County Flood Control District February 24, 2020 130