king soopers #147€¦ · plsv phone (demarc only) ahead yield only g ue ue ue ue ue ’” ”...

5
AHEAD YIELD AHEAD ONLY YIELD G UE UE UE UE UE H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg - Aaron Johnston - 8/29/2019 GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 KING SOOPERS #147 A PORTION OF SECTION 1, TOWNSHIP 13 SOUTH, RANGE 65 WEST OF THE 6TH P.M., EL PASO COUNTY, COLORADO GRADING AND EROSION CONTROL PLAN FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1 SITE

Upload: others

Post on 31-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KING SOOPERS #147€¦ · PLSV PHONE (DEMARC ONLY) AHEAD YIELD ONLY G UE UE UE UE UE ’” ” STAMP H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg

PHONE

(DEMARC ONLY)

PLSV

AH

EA

D

YIELD

AH

EA

D

ON

LY

YIELD

G

UE UE UE

UEUE

’ ”

STAMP

H:\K

in

g S

oo

pe

rs - C

ity M

arke

t\C

O, F

alco

n - K

SS

00

01

47

W

oo

dm

en

&

M

erid

ia

n\C

AD

D\2

-P

la

n\K

SS

14

7_

C2

.0

-G

EC

-C

OV

ER

.d

wg

- A

aro

n Jo

hn

sto

n - 8

/2

9/2

01

9

GallowayUS.com

6162 S. Willow Drive, Suite 320

Greenwood Village, CO 80111

303.770.8884

CLIENT LOGO

KING SOOPERS #147

A PORTION OF SECTION 1, TOWNSHIP 13 SOUTH, RANGE 65 WESTOF THE 6TH P.M., EL PASO COUNTY, COLORADO

GRADING AND EROSION CONTROL PLAN

FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1

SITE

AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text
LOT 4
AutoCAD SHX Text
LOT 5
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text
LOT 7
AutoCAD SHX Text
LOT 8
AutoCAD SHX Text
LOT 9
AutoCAD SHX Text
LOT 10
AutoCAD SHX Text
LOT 1
AutoCAD SHX Text
LOT 11
AutoCAD SHX Text
LOT 3
AutoCAD SHX Text
LOT 2
AutoCAD SHX Text
E. WOODSMEN ROAD
AutoCAD SHX Text
1. SURVEY INFORMATION AND TOPOGRAPHIC CONTOURS WERE PROVIDED BY OTHERS. GALLOWAY SURVEY INFORMATION AND TOPOGRAPHIC CONTOURS WERE PROVIDED BY OTHERS. GALLOWAY & COMPANY INC. CANNOT BE HELD LIABLE FOR ANY INACCURACY IN THE SURVEY INFORMATION. 2. EL PASO COUNTY SHALL NOT BE LIABLE FOR THE MAINTENANCE OF PRIVATE IMPROVEMENTS EL PASO COUNTY SHALL NOT BE LIABLE FOR THE MAINTENANCE OF PRIVATE IMPROVEMENTS AS SHOWN ON THESE PLANS.
AutoCAD SHX Text
PROJECT DESCRIPTION: CONSTRUCTION OF A 123,000 SQUARE FOOT RETAIL BUILDING AND 9 DISPENSER ISLAND FUEL CENTER WITH ASSOCIATED LANDSCAPING, PARKING, AND DRIVES. CURRENT ZONING: CR
AutoCAD SHX Text
APPLICANT/DEVELOPER
AutoCAD SHX Text
KING SOOPERS INC.
AutoCAD SHX Text
65 TEJON STREET
AutoCAD SHX Text
TEL: (303) 778-3123
AutoCAD SHX Text
CONTACT: LOWELL GOOD
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
GALLOWAY & COMPANY, INC.
AutoCAD SHX Text
6162 SOUTH WILLOW DRIVE, SUITE 320
AutoCAD SHX Text
GREENWOOD VILLAGE, COLORADO 80111
AutoCAD SHX Text
TEL: (303) 770-8884
AutoCAD SHX Text
FAX: (303) 770-3636
AutoCAD SHX Text
CONTACT: JENNY ROMANO, P.E.
AutoCAD SHX Text
AutoCAD SHX Text
LANDSCAPE ARCHITECT
AutoCAD SHX Text
SCALE: 1" = 1000'
AutoCAD SHX Text
SITE
AutoCAD SHX Text
SURVEYOR
AutoCAD SHX Text
TEL: (719) 633-8533
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
LIST OF CONTACTS
AutoCAD SHX Text
GALLOWAY & COMPANY, INC.
AutoCAD SHX Text
6162 SOUTH WILLOW DRIVE, SUITE 320
AutoCAD SHX Text
GREENWOOD VILLAGE, COLORADO 80111
AutoCAD SHX Text
TEL: (303) 770-8884
AutoCAD SHX Text
FAX: (303) 770-3636
AutoCAD SHX Text
CONTACT: TIM NELSON
AutoCAD SHX Text
AutoCAD SHX Text
CONTACT: CAMERON FORTH
AutoCAD SHX Text
DENVER, COLORADO 80223
AutoCAD SHX Text
GENERAL SITE DESCRIPTION
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
CR ARCHITECTURE & DESIGN
AutoCAD SHX Text
600 VINE STREET, SUITE 2210
AutoCAD SHX Text
CINCINNATI, OHIO 45202
AutoCAD SHX Text
TEL: (513) 721-8080
AutoCAD SHX Text
CONTACT: ANTHONY FREY, AIA
AutoCAD SHX Text
AutoCAD SHX Text
PARCEL A-PROPOSED LOT 2, FALCON MARKETPLACE: A PARCEL OF LAND LOCATED IN THE SE1/4 OF THE SE1/4 OF SECTION 1, T1S, R65W OF THE 6TH P.M., COUNTY OF EL PASO, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SE1/4 OF THE SE1/4 OF SECTION 1 AND CONSIDERING THE NORTH LINE OF SAID SE1/4 OF THE SE1/4 TO BEAR N89°44’22”E, WITH ALL BEARINGS CONTAINED 22”E, WITH ALL BEARINGS CONTAINED E, WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO, THENCE S58°03'43"E, 441.14 FEET TO THE POINT OF BEGINNING; THENCE N89°57'46"E, 593.94 FEET; THENCE N65°54'56"E, 21.89 FEET; THENCE S00°00'00"E, 597.35 FEET TO A POINT OF CURVE TO THE RIGHT; THENCE SOUTHWESTERLY 102.10 FEET ALONG THE ARC OF SAID CURVE TO A POINT TANGENT, SAID ARC HAVING A RADIUS OF 65.00 FEET, A CENTRAL ANGLE OF 90°00'00" AND BEING SUBTENDED BY A CHORD THAT BEARS S45°00'00"W, 91.92 FEET; THENCE S08°38'52"W, 216.79 FEET; THENCE N00°00'00"W, 653.47 FEET TO A POINT OF CURVE TO THE LEFT; THENCE SOUTHWESTERLY 15.85 FEET ALONG THE ARC OF SAID CURVE TO A POINT TANGENT, SAID ARC HAVING A RADIUS OF 110.00 FEET, A CENTRAL ANGLE OF 8°15'26" AND BEING SUBTENDED BY A CHORD THAT BEARS S85°52'17"W, 15.84 FEET; THENCE N00°00'00"E, 286.96 FEET; THENCE N90°00'00"E, 120.34 FEET; THENCE N00°00'00"E, 367.21 FEET TO THE POINT OF BEGINNING; CONTAINING 434,617 SQUARE FEET (9.977 ACRES), MORE OR LESS. PARCEL B: A PARCEL OF LAND LOCATED IN THE SE1/4 OF THE SE1/4 OF SECTION 1, T1S, R65W OF THE 6TH P.M., COUNTY OF EL PASO, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SE1/4 OF THE SE1/4 OF SECTION 1 AND CONSIDERING THE NORTH LINE OF SAID SE1/4 OF THE SE1/4 TO BEAR N89°44'22”E, WITH ALL BEARINGS CONTAINED HEREIN RELATIVE E, WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO, THENCE S84°18'42"E, 1130.90 FEET TO THE POINT OF BEGINNING; THENCE N00°00'00"E, 114.83 FEET, THENCE S47°12'19"E, 49.83 FEET; THENCE S00°29'49"E, 215.48 FEET; THENCE N90°00'00"W, 239.55 FEET; THENCE N00°00'00"E, 153.98 FEET TO A POINT OF CURVE TO THE RIGHT; THENCE NORTHEASTERLY 68.58 FEET ALONG THE ARC OF SAID CURVE TO A POINT TANGENT, SAID ARC HAVING A RADIUS OF 99.00 FEET, A CENTRAL ANGLE OF 39°41'32" AND BEING SUBTENDED BY A CHORD THAT BEARS N19°50'46"E, 67.22 FEET; THENCE N39°41'32"E, 4.17 FEET TO A POINT OF CURVE TO THE RIGHT; THENCE NORTHEASTERLY 70.24 FEET ALONG THE ARC OF SAID CURVE TO A POINT TANGENT, SAID ARC HAVING A RADIUS OF 80.00 FEET, A CENTRAL ANGLE OF 50°18'28" AND BEING SUBTENDED BY A CHORD THAT BEARS N64°50'46"E, 68.01 FEET TO THE POINT OF BEGINNING. CONTAINING 57,020 SQUARE FEET (1.309 ACRES), MORE OR LESS.
AutoCAD SHX Text
THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO CHTHE CRITERIA ESTABLISHED BY THE COUNTY FOR DETAILED ROADWAY, DRAINAGE, GRADING AND EROSION CONTROL PLANS AND SPECIFICATIONS, AND SAID PLANS AND SPECIFICATIONS ARE IN CONFORMITY WITH APPLICABLE MASTER DRAINAGE PLANS AND MASTER TRANSPORTATION PLANS. SAID PLANS AND SPECIFICATIONS MEET THE PURPOSES FOR WHICH THE PARTICULAR ROADWAY AND DRAINAGE FACILITIES ARE DESIGNED AND ARE CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. I ACCEPT RESPONSIBILITY FOR ANY LIABILITY CAUSED BY ANY NEGLIGENT ACTS, ERRORS OR OMISSIONS ON MY PART IN PREPARATION OF THESE DETAILED PLANS AND SPECIFICATIONS. JENNIFER ROMANO, P.E. #44401 DATE I, THE OWNER/DEVELOPER HAVE READ AND WILL COMPLY WITH ALL OF THE REQUIREMENTS SPECIFIED IN THESE DETAILED PLANS AND SPECIFICATIONS. DILLON REAL ESTATE CO., INC., A KANSAS CORPORATION COUNTY PLAN REVIEW IS PROVIDED ONLY FOR GENERAL CONFORMANCE WITH COUNTY DESIGN CRITERIA. THE COUNTY IS NOT RESPONSIBLE FOR THE ACCURACY AND ADEQUACY OF THE DESIGN, DIMENSIONS, AND/OR ELEVATIONS WHICH SHALL BE CONFIRMED AT THE JOB SITE. THE COUNTY THROUGH THE APPROVAL OF THIS DOCUMENT ASSUMES NO RESPONSIBILITY FOR COMPLETENESS AND/OR ACCURACY OF THIS DOCUMENT. FILED IN ACCORDANCE WITH THE REQUIREMENTS OF THE EL PASO COUNTY LAND DEVELOPMENT CODE, DRAINAGE CRITERIA MANUAL, VOLUMES 1 AND 2, AND ENGINEERING CRITERIA MANUAL AS AMENDED. ANDRE P. BRACKIN, P.E., DATE COUNTY ENGINEER / ECM ADMINISTRATOR
AutoCAD SHX Text
DESIGN ENGINEER'S STATEMENT
AutoCAD SHX Text
OWNER/DEVELOPER'S STATEMENT
AutoCAD SHX Text
EL PASO COUNTY:
AutoCAD SHX Text
JRR
AutoCAD SHX Text
C2.0
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
ACJ
AutoCAD SHX Text
LEGAL DESCRIPTION
AutoCAD SHX Text
EL PASO COUNTY PLANNING & COMMUNITY DEVELOPMENT
AutoCAD SHX Text
2880 INTERNATIONAL CIRCLE
AutoCAD SHX Text
TEL: (719) 520-6306
AutoCAD SHX Text
COLORADO SPRINGS, CO 80910
AutoCAD SHX Text
CONTACT: KARI PARSONS
AutoCAD SHX Text
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Drawn By:
AutoCAD SHX Text
Project No:
AutoCAD SHX Text
Checked By:
AutoCAD SHX Text
Init.
AutoCAD SHX Text
#
AutoCAD SHX Text
Issue / Description
AutoCAD SHX Text
Date
AutoCAD SHX Text
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED.
AutoCAD SHX Text
COPYRIGHT
AutoCAD SHX Text
King Soopers Supermarket / Petroleum 65 Tejon Street Denver, CO 80223 Phone (303) 778-3053 Fax (303) 871-9262
AutoCAD SHX Text
8/29/19
AutoCAD SHX Text
KSS000147
AutoCAD SHX Text
KING SOOPERS #147 FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1 E. WOODMEN ROAD & MERIDIAN ROAD FALCON, CO
AutoCAD SHX Text
1 C2.0 COVER SHEET C2.0 COVER SHEET COVER SHEET 2 C2.1 GRADING AND EROSION CONTROL PLAN C2.1 GRADING AND EROSION CONTROL PLAN GRADING AND EROSION CONTROL PLAN 3 C2.2 GRADING AND EROSION CONTROL DETAILSC2.2 GRADING AND EROSION CONTROL DETAILSGRADING AND EROSION CONTROL DETAILS
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text
SCALE: 1" = 300'
AutoCAD SHX Text
SITE MAP
AutoCAD SHX Text
CLARK SURVEYING
AutoCAD SHX Text
COLORADO SPRINGS, CO 80903
AutoCAD SHX Text
119 N. WAHSATCH AVE.
Steve Kuehster
text box
Provide with the next submittal. Instructions are provided below the list of attachments. Checklists can be found at: https://planningdevelopment.elpasoco.com/wp-content/uploads/Engineering/EngineeringDocuments/Copy-of-GEC-SWMP_Checklists.xlsx
Steve Kuehster
EPC ENG Review
Steve Kuehster
Pen
-
Steve Kuehster
text box
Steve Kuehster
arrow & box
In accordance with ECM Section 1.12, these construction documents will be valid for construction for a period of 2 years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, the plans will need to be resubmitted for approval, including payment of review fees at the Planning and Community Development Directors discretion.
Steve Kuehster
text box
Jennifer Irvine, P.E
Steve Kuehster
text box
Further comments will be provided with a complete submittal including the checklist, etc.
Page 2: KING SOOPERS #147€¦ · PLSV PHONE (DEMARC ONLY) AHEAD YIELD ONLY G UE UE UE UE UE ’” ” STAMP H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg

STM

STM

STM

STM

STM

STM

6''STM

6''ST

M6''

STM

6''STM

6''STM

6''STM

6''STM

6''STM

6''ST

M6''

STM

6''STM

6''STM

6''STM

6''STM

123,000 SF (BUILDING)

PHONE

(DEMARC ONLY)

PLSV

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LODLOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

IP-1IP-1

IP-1

IP-1

IP-1IP-1

IP-1

IP-1

VTC

VTC

CWA

CWA

IP-1

SP

SF SF

SF

SF SF SF

SSA

PT

STAMP

H:\K

in

g S

oo

pe

rs - C

ity M

arke

t\C

O, F

alco

n - K

SS

00

01

47

W

oo

dm

en

&

M

erid

ia

n\C

AD

D\2

-P

la

n\K

SS

14

7_

C2

.1

-P

-G

RA

DE

.d

wg - A

aro

n Jo

hn

sto

n - 8

/2

9/2

01

9

GallowayUS.com

6162 S. Willow Drive, Suite 320

Greenwood Village, CO 80111

303.770.8884

CLIENT LOGO

KING SOOPERS #147

A PORTION OF SECTION 1, TOWNSHIP 13 SOUTH, RANGE 65 WESTOF THE 6TH P.M., EL PASO COUNTY, COLORADO

GRADING AND EROSION CONTROL PLAN

FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1

FLOW ARROW

LIMITS OF DISTURBANCE (11.50 AC.)

CWA

SSA

SF

LOD

CONSTRUCTION VEHICLE ENTRY

SILT FENCE

CONCRETE WASHOUT

STABILIZED STAGING AREA

VTC

2.56%

IP-1

SP

WP

PT

IP-1 - AREA INLET PROTECTION

SITE POSTING (CONTACTS AND PERMITS)

WASHOUT POSTING

PORTABLE TOILET

IP-3 IP-3 - SUMP INLET PROTECTION

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

EXISTING STORM SEWER

PROPOSED STORM SEWER (LESS THAN 12")

EXISTING STORM SEWER

PROPOSED STORM SEWER

IP-4 IP-4 - ON-GRADE INLET PROTECTION

SM

ECB EROSION CONTROL BLANKET

SEEDING AND MULCHING (SEE LANDSCAPE PLANS)

1. SEE OVERALL CD EROSION CONTROL DETAIL SHEE.2. STORMWATER DISCHARGES FROM CONSTRUCTION SITES SHALL NOT CAUSE OR THREATEN TO CAUSE

POLLUTION, CONTAMINATION, OR DEGRADATION OF STATE WATERS. ALL WORK AND EARTH DISTURBANCESHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF ANY ON-SITE OR OFF SITE WATERS,INCLUDING WETLANDS.

3. NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR GRAPHIC REPRESENTATION, ALLDESIGN AND CONSTRUCTION RELATED TO ROADS, STORM DRAINAGE AND EROSION CONTROL SHALLCONFORM TO THE STANDARDS AND REQUIREMENTS OF THE MOST RECENT VERSION OF THE RELEVANTADOPTED EL PASO COUNTY STANDARDS, INCLUDING THE LAND DEVELOPMENT CODE, THE ENGINEERINGCRITERIA MANUAL, THE DRAINAGE CRITERIA MANUAL, AND THE DRAINAGE CRITERIA MANUAL VOLUME 2.ANY DEVIATIONS TO REGULATIONS AND STANDARDS MUST BE REQUESTED, AND APPROVED, IN WRITING.

4. A SEPARATE STORMWATER MANAGEMENT PLAN (SMWP) FOR THIS PROJECT SHALL BE COMPLETED AND ANEROSION AND STORMWATER QUALITY CONTROL PERMIT (ESQCP) ISSUED PRIOR TO COMMENCINGCONSTRUCTION. DURING CONSTRUCTION THE SWMP IS THE RESPONSIBILITY OF THE DESIGNATEDSTORMWATER MANAGER, SHALL BE LOCATED ON SITE AT ALL TIMES AND SHALL BE KEPT UP TO DATE WITHWORK PROGRESS AND CHANGES IN THE FIELD.

5. ONCE THE ESQCP HAS BEEN ISSUED, THE CONTRACTOR MAY INSTALL THE INITIAL STAGE EROSION ANDSEDIMENT CONTROL BMPS AS INDICATED ON THE GEC. A PRECONSTRUCTION MEETING BETWEEN THECONTRACTOR, ENGINEER, AND EL PASO COUNTY WILL BE HELD PRIOR TO ANY CONSTRUCTION. IT IS THERESPONSIBILITY OF THE APPLICANT TO COORDINATE THE MEETING TIME AND PLACE WITH COUNTY DSDINSPECTIONS STAFF.

6. SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR ANY DISTURBED LANDAREA SHALL BE COMPLETED WITHIN 21 CALENDAR DAYS AFTER FINAL GRADING, OR FINAL EARTHDISTURBANCE, HAS BEEN COMPLETED. DISTURBED AREAS AND STOCKPILES WHICH ARE NOT AT FINALGRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS SHALL ALSO BE MULCHED WITHIN 21 DAYSAFTER INTERIM GRADING. AN AREA THAT IS GOING TO REMAIN IN AN INTERIM STATE FOR MORE THAN 60DAYS SHALL ALSO BE SEEDED. ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND BMPS SHALL BEMAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED ANDESTABLISHED.

7. TEMPORARY SOIL EROSION CONTROL FACILITIES SHALL BE REMOVED AND EARTH DISTURBANCE AREASGRADED AND STABILIZED WITH PERMANENT SOIL EROSION CONTROL MEASURES PURSUANT TOSTANDARDS AND SPECIFICATION PRESCRIBED IN THE DCM VOLUME II AND THE ENGINEERING CRITERIAMANUAL APPENDIX I.

8. ALL PERSONS ENGAGED IN EARTH DISTURBANCE SHALL IMPLEMENT AND MAINTAIN ACCEPTABLE SOILEROSION AND SEDIMENT CONTROL MEASURES INCLUDING BMPS IN CONFORMANCE WITH THE EROSIONCONTROL TECHNICAL STANDARDS OF THE DRAINAGE CRITERIA MANUAL (DCM) VOLUME II AND INACCORDANCE WITH THE STORMWATER MANAGEMENT PLAN (SWMP).

9. ALL TEMPORARY EROSION CONTROL FACILITIES INCLUDING BMPS AND ALL PERMANENT FACILITIESINTENDED TO CONTROL EROSION OF ANY EARTH DISTURBANCE OPERATIONS, SHALL BE INSTALLED ASDEFINED IN THE APPROVED PLANS, THE SWMP AND THE DCM VOLUME II AND MAINTAINED THROUGHOUTTHE DURATION OF THE EARTH DISTURBANCE OPERATION.

10. ANY EARTH DISTURBANCE SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY REDUCEACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION. ALL DISTURBANCES SHALL BE DESIGNED,CONSTRUCTED, AND COMPLETED SO THAT THE EXPOSED AREA OF ANY DISTURBED LAND SHALL BELIMITED TO THE SHORTEST PRACTICAL PERIOD OF TIME.

11. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND CONSTRUCTED FOR THE CONVEYANCE OFSTORMWATER AROUND, THROUGH, OR FROM THE EARTH DISTURBANCE AREA SHALL BE DESIGNED TOLIMITTHE DISCHARGE TO A NON-EROSIVE VELOCITY.

12. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH THE SWMP. NOWASH WATER SHALL BE DISCHARGED TO OR ALLOWED TO RUNOFF TO STATE WATERS, INCLUDING ANYSURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR FACILITIES.

13. EROSION CONTROL BLANKETING IS TO BE USED ON SLOPES STEEPER THAN 3:1.14. BUILDING, CONSTRUCTION, EXCAVATION, OR OTHER WASTE MATERIALS SHALL NOT BE TEMPORARILY

PLACED OR STORED IN THE STREET, ALLEY, OR OTHER PUBLIC WAY, UNLESS IN ACCORDANCE WITH ANAPPROVED TRAFFIC CONTROL PLAN. BMP’S MAY BE REQUIRED BY EL PASO COUNTY ENGINEERING IFDEEMED NECESSARY, BASED ON SPECIFIC CONDITIONS AND CIRCUMSTANCES.

15. VEHICLE TRACKING OF SOILS AND CONSTRUCTION DEBRIS OFF-SITE SHALL BE MINIMIZED. MATERIALSTRACKED OFFSITE SHALL BE CLEANED UP AND PROPERLY DISPOSED OF IMMEDIATELY.

16. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL WASTES FROM THE CONSTRUCTION SITEFOR DISPOSAL IN ACCORDANCE WITH LOCAL AND STATE REGULATORY REQUIREMENTS. NOCONSTRUCTION DEBRIS, TREE SLASH, BUILDING MATERIAL WASTES OR UNUSED BUILDING MATERIALSSHALL BE BURIED, DUMPED, OR DISCHARGED AT THE SITE.

17. THE OWNER, SITE DEVELOPER, CONTRACTOR, AND/OR THEIR AUTHORIZED AGENTS SHALL BERESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION DEBRIS, DIRT, TRASH, ROCK, SEDIMENT, ANDSAND THAT MAY ACCUMULATE IN THE STORM SEWER OR OTHER DRAINAGE CONVEYANCE SYSTEM ANDSTORMWATER APPURTENANCES AS A RESULT OF SITE DEVELOPMENT.

18. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS PRACTICAL,TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE. ALL MATERIALSSTORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR ORIGINAL CONTAINERS, WITHORIGINAL MANUFACTURER’S LABELS.

19. NO CHEMICALS ARE TO BE USED BY THE CONTRACTOR, WHICH HAVE THE POTENTIAL TO BE RELEASED INSTORMWATER UNLESS PERMISSION FOR THE USE OF A SPECIFIC CHEMICAL IS GRANTED IN WRITING BYTHE ECM ADMINISTRATOR. IN GRANTING THE USE OF SUCH CHEMICALS, SPECIAL CONDITIONS ANDMONITORING MAY BE REQUIRED.

20. BULK STORAGE STRUCTURES FOR PETROLEUM PRODUCTS AND OTHER CHEMICALS SHALL HAVEADEQUATE PROTECTION SO AS TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL FROMENTERING STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM ORFACILITIES.

21. NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORMWATER FLOW IN THE FLOW LINE OF THE CURB ANDGUTTER OR IN THE DITCHLINE.

22. INDIVIDUALS SHALL COMPLY WITH THE “COLORADO WATER QUALITY CONTROL ACT” (TITLE 25, ARTICLE 8,CRS), AND THE “CLEAN WATER ACT” (33 USC 1344), IN ADDITION TO THE REQUIREMENTS INCLUDED IN THEDCM VOLUME II AND THE ECM APPENDIX I. ALL APPROPRIATE PERMITS MUST BE OBTAINED BY THECONTRACTOR PRIOR TO CONSTRUCTION (NPDES, FLOODPLAIN, 404, FUGITIVE DUST, ETC.). IN THE EVENTOF CONFLICTS BETWEEN THESE REQUIREMENTS AND LAWS, RULES, OR REGULATIONS OF OTHERFEDERAL, STATE, OR COUNTY AGENCIES, THE MORE RESTRICTIVE LAWS, RULES, OR REGULATIONS SHALLAPPLY.

23. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE AT APPROVED CONSTRUCTION ACCESS POINTS.24. PRIOR TO ACTUAL CONSTRUCTION THE PERMITEE SHALL VERIFY THE LOCATION OF EXISTING UTILITIES.25. A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED AS

REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.26. THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY GROUND AND SHALL BE CONSIDERED A PART

OF THESE PLANS.27. AT LEAST TEN DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION, FOR PROJECTS THAT WILL

DISTURB 1 ACRE OR MORE, THE OWNER OR OPERATOR OF CONSTRUCTION ACTIVITY SHALL SUBMIT APERMIT APPLICATION FOR STORMWATER DISCHARGE TO THE COLORADO DEPARTMENT OF PUBLIC HEALTHAND ENVIRONMENT, WATER QUALITY DIVISION. THE APPLICATION CONTAINS CERTIFICATION OFCOMPLETION OF A STORMWATER MANAGEMENT PLAN (SWMP), OF WHICH THIS GRADING AND EROSIONCONTROL PLAN MAY BE A PART. FOR INFORMATION OR APPLICATION MATERIALS CONTACT:COLORADODEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION

WQCD – PERMITS4300 CHERRY CREEK DRIVE SOUTHDENVER, CO 80246-1530

ATTN: PERMITS UNIT

THE PLAN SHALL NOT SUBSTANTIALLY CHANGE THE DEPTH OF COVER, OR ACCESS TO UTILITY FACILITIES.ADDITIONALLY, THE PLAN SHALL NOT INCREASE OR DIVERT WATER TOWARDS UTILITY FACILITIES. ANY CHANGES TOUTILITY FACILITIES TO ACCOMMODATE THE PLAN, MUST BE DISCUSSED AND AGREED TO BY THE AFFECTED UTILITYPRIOR TO IMPLEMENTING THE PLAN. THE RESULTING COST TO RELOCATE OR PROTECT UTILITIES, OR PROVIDEINTERIM ACCESS IS AT THE EXPENSE OF THE PLAN APPLICANT.

SCALE: 1"=60'

0 30 6010

AutoCAD SHX Text
MERIDIAN ROAD (PUBLIC R.O.W. VARIES)
AutoCAD SHX Text
LOT 4
AutoCAD SHX Text
LOT 5
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text
LOT 1
AutoCAD SHX Text
LOT 11
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
LOT 3
AutoCAD SHX Text
LOT 4
AutoCAD SHX Text
LOT 5
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text
LOT 1
AutoCAD SHX Text
LOT 11
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
LOT 3
AutoCAD SHX Text
T
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Drawn By:
AutoCAD SHX Text
Project No:
AutoCAD SHX Text
Checked By:
AutoCAD SHX Text
Init.
AutoCAD SHX Text
#
AutoCAD SHX Text
Issue / Description
AutoCAD SHX Text
Date
AutoCAD SHX Text
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED.
AutoCAD SHX Text
COPYRIGHT
AutoCAD SHX Text
King Soopers Supermarket / Petroleum 65 Tejon Street Denver, CO 80223 Phone (303) 778-3053 Fax (303) 871-9262
AutoCAD SHX Text
8/29/19
AutoCAD SHX Text
KSS000147
AutoCAD SHX Text
KING SOOPERS #147 FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1 E. WOODMEN ROAD & MERIDIAN ROAD FALCON, CO
AutoCAD SHX Text
GRADING AND EROSION CONTROL LEGEND
AutoCAD SHX Text
STS
AutoCAD SHX Text
STS
AutoCAD SHX Text
STS
AutoCAD SHX Text
STS
AutoCAD SHX Text
5224
AutoCAD SHX Text
5224
AutoCAD SHX Text
EL PASO COUNTY GRADING AND EROSION CONTROL NOTES
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
RUNOFF COEFFICIENT TABLE
AutoCAD SHX Text
EXISTING COEFFICIENTS
AutoCAD SHX Text
PROPOSED COEFFICIENTS
AutoCAD SHX Text
5-YEAR
AutoCAD SHX Text
100-YEAR
AutoCAD SHX Text
5-YEAR
AutoCAD SHX Text
100-YEAR
AutoCAD SHX Text
COMPOSITE COEFFICIENT
AutoCAD SHX Text
0.75
AutoCAD SHX Text
0.84
AutoCAD SHX Text
0.75
AutoCAD SHX Text
0.84
AutoCAD SHX Text
GRADING SUMMARY TABLE
AutoCAD SHX Text
TOTAL DISTURBED AREA
AutoCAD SHX Text
500,798 SQ. FT. (11.50 AC)
AutoCAD SHX Text
TOTAL IMPORT
AutoCAD SHX Text
474 CUBIC YD.
AutoCAD SHX Text
C2.1
AutoCAD SHX Text
GRADING AND EROSION CONTROL PLAN
AutoCAD SHX Text
JRR
AutoCAD SHX Text
ACJ
Steve Kuehster
arrow & box
Complete title and date
Steve Kuehster
text box
Ensure notes are per the checklist, website provided on the cover sheet.
Steve Kuehster
text box
1.) Provide flow arrows for the building pad area. 2.) Provide sediment traps for the rough graded area per the criteria recommendations. 3.) Provide a note that explains how the full spectrum ponds will be used for sediment control. ( will the be completed and the outlet structure needs to be protected or will the be used as sediment traps and completed after the building and surfacing is in-place.
Steve Kuehster
text box
b.) Show subdivision names g.) show existing utilities j.) Show FEMA floodplain p.) Identify areas of cut and fill r.) Call out slopes of detention ponds and identify slope protection. cc.) identify all easements. General; Identify all storm sewer facilities and label sizes etc. Also label By others or part of the work with this plan. Provide a note discussing the LOMR CLOMR and show inundation area.
Page 3: KING SOOPERS #147€¦ · PLSV PHONE (DEMARC ONLY) AHEAD YIELD ONLY G UE UE UE UE UE ’” ” STAMP H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg

STAMP

H:\K

in

g S

oo

pe

rs - C

ity M

arke

t\C

O, F

alco

n - K

SS

00

01

47

W

oo

dm

en

&

M

erid

ia

n\C

AD

D\2

-P

la

n\K

SS

14

7_

C2

.2

-G

EC

-D

ET

AIL

S.d

wg

- A

aro

n Jo

hn

sto

n - 8

/2

9/2

01

9

GallowayUS.com

6162 S. Willow Drive, Suite 320

Greenwood Village, CO 80111

303.770.8884

CLIENT LOGO

KING SOOPERS #147

A PORTION OF SECTION 1, TOWNSHIP 13 SOUTH, RANGE 65 WESTOF THE 6TH P.M., EL PASO COUNTY, COLORADO

GRADING AND EROSION CONTROL PLAN

FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1

1. AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING ANDCONTROLLING EROSION DUE TO WIND AND RUNOFF. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FORMAINTAINING EROSION CONTROL FACILITIES SHOWN.

2. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO UNFORESEEN PROBLEMS OR IF THE PLANDOES NOT FUNCTION AS INTENDED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING DRAINAGE AND EROSION CONTROL FACILITIES ASREQUIRED. STREETS SHALL BE KEPT CLEAN OF DEBRIS FROM TRAFFIC FROM THIS SITE.

4. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE PAVED, SEEDED WITH NATIVE VEGETATION, ORLANDSCAPED. REFER TO LANDSCAPE PLANS FOR PERMANENT SEED MIX AND PLANTING SPECIFICATIONS.

5. EROSION CONTROL STRUCTURES BELOW SODDED AREAS MAY BE REMOVED ONCE SOD AND FINAL LANDSCAPINGIS IN PLACE. EROSION CONTROL STRUCTURES BELOW SEEDED AREAS MUST REMAIN IN PLACE UNTIL THE ENTIREAREA HAS ESTABLISHED A MATURE COVERING OF HEALTHY VEGETATION. EROSION CONTROL IN PROPOSEDPAVED AREAS SHALL REMAIN IN PLACE UNTIL PAVEMENT IS COMPLETE.

6. THIS PLAN IS ONLY TO BE USED FOR INSTALLATION OF EROSION CONTROL FACILITIES. DO NOT USE THIS PLAN FORGRADING OR STORM SEWER CONSTRUCTION.

7. CONTRACTOR SHALL USE VEHICLE TRACKING CONTROL AT ALL LOCATIONS WHERE VEHICLES WILL EXIT THE SITE.CONTROL FACILITIES WILL BE MAINTAINED WHILE CONSTRUCTION IS IN PROGRESS, MOVED WHEN NECESSARY,AND REMOVED WHEN SITE IS PAVED.

THE GENERAL REQUIREMENTS FOR EROSION CONTROL WORK SHALL BE AS FOLLOWS:

1. ANY LAND DISTURBING ACTIVITY SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY REDUCEACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION.

2. STRUCTURAL EROSION CONTROL MEASURES INCLUDED IN THE APPROVED PLAN ARE TO BE INSTALLED PRIOR TOSOIL DISTURBANCE. INSTALLATION WILL MEET SPECIFICATIONS SHOWN ON THE DETAIL SHEET. CONTROLMEASURES NECESSARY FOR CONTINUING PHASES OF CONSTRUCTION SHALL BE INSTALLED AS DETAILED IN THESUBMITTED CONSTRUCTION SCHEDULE OR AS NEEDED IN PROGRESSION TO THE FINAL EROSION CONTROL PLAN.

3. ALL LAND DISTURBING ACTIVITIES SHALL BE DESIGNED, CONSTRUCTED AND COMPLETED IN SUCH A MANNER THATTHE EXPOSURE TIME OF DISTURBED LAND SHALL BE LIMITED TO THE SHORTEST POSSIBLE PERIOD OF TIME.

4. SEDIMENT CAUSED BY ACCELERATED SOIL EROSION SHALL BE REMOVED FROM RUNOFF WATER BEFORE LEAVINGTHE SITE.

5. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND CONSTRUCTED FOR THE CONVEYANCE OF WATERAROUND, THROUGH OR FROM THE LAND DISTURBING ACTIVITY SHALL BE DESIGNED TO LIMIT THE WATER FLOW TOA NON-EROSIVE VELOCITY.

6. TEMPORARY SOIL EROSION CONTROL FACILITIES SHALL BE REMOVED AND AREAS OF LAND DISTURBANCEGRADED AND STABILIZED WITH PERMANENT SOIL EROSION CONTROL MEASURES PURSUANT TO APPROVED PLANSAND SPECIFICATIONS.

7. THE PERMITEE IS RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL STRUCTURES. THESESTRUCTURES ARE TO BE INSPECTED BY THE PERMITEE EVERY 14 DAYS AND AFTER EVERY PRECIPITATION EVENTTO INSURE THEIR EFFICIENCY AND TO EVALUATE MAINTENANCE NEEDS OR PER LOCAL INSPECTIONREQUIREMENTS. MAINTENANCE OF THESE STRUCTURES MAY BE DIRECTED AT ANY TIME BY A CITY OR STATEREPRESENTATIVE.

8. THESE STANDARDS DO NOT SUPPLANT ANY CITY, STATE OR FEDERAL REQUIREMENTS. CONTRACTOR SHALLALWAYS ADHERE TO THE STRICTER STANDARD SHOULD ANY DISCREPANCY ARISE.

IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED WEEKLY AND AFTER EACHSIGNIFICANT RAINFALL. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR:1. THE CONSTRUCTION ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING AND

FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROMVEHICLE OR SITE ONTO ROADWAY MUST BE REMOVED IMMEDIATELY.

2. GRAVEL FILTERS, GRAVEL SOCKS OR OTHER INLET PROTECTION WILL BE CHECKED REGULARLY FORSEDIMENTATION BUILDUP AND CLEANED AS REQUIRED.

1. VEHICLE TRACKING CONTROL SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE ENTIRE DURATION OF THEPROJECT.

2. THE INLET PROTECTION SHOWN ON THE ENCLOSED EROSION CONTROL PLAN SHALL BE SECURED AND PLACEDACCORDING TO THE DETAILS CONTAINED ON THIS PLAN.

3. THE CONSTRUCTION SUPERINTENDENT SHALL HAVE OVERALL RESPONSIBILITY FOR PLAN IMPLEMENTATION.SUPERINTENDENT RESPONSIBLE FOR SEEING THAT APPROPRIATE CONSTRUCTION WORKERS ANDSUBCONTRACTORS ARE AWARE OF ALL PROVISIONS OF THE PLAN.

4. CONTRACTOR SHALL ESTABLISH FINAL LANDSCAPING STABILIZATION PER THE LANDSCAPING PLANS & EROSIONCONTROL PLAN IN THIS SET AT THE COMPLETION OF THE PROJECT.

5. CLEAN-UP:A. TRANSPORT TRASH AND DEBRIS, AND SURPLUS AND UNACCEPTABLE SOIL MATERIALS FROM PROJECT SITE

AND LEGALLY DISPOSE OF THEM.B. REMOVE ALL TEMPORARY SHORING, BRACING, EROSION CONTROL, AND OTHER PROTECTION DEVICES WHEN

NO LONGER REQUIRED BY CITY.

PERFORMANCE STANDARDS

MANAGEMENT STRATEGIES

GENERAL NOTES

MAINTENANCE

AutoCAD SHX Text
JRR
AutoCAD SHX Text
C2.2
AutoCAD SHX Text
GRADING AND EROSION CONTROL DETAILS
AutoCAD SHX Text
ACJ
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Drawn By:
AutoCAD SHX Text
Project No:
AutoCAD SHX Text
Checked By:
AutoCAD SHX Text
Init.
AutoCAD SHX Text
#
AutoCAD SHX Text
Issue / Description
AutoCAD SHX Text
Date
AutoCAD SHX Text
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED.
AutoCAD SHX Text
COPYRIGHT
AutoCAD SHX Text
King Soopers Supermarket / Petroleum 65 Tejon Street Denver, CO 80223 Phone (303) 778-3053 Fax (303) 871-9262
AutoCAD SHX Text
8/29/19
AutoCAD SHX Text
KSS000147
AutoCAD SHX Text
KING SOOPERS #147 FALCON MARKETPLACE LOTS 2 & 3, BLOCK 1 E. WOODMEN ROAD & MERIDIAN ROAD FALCON, CO
Page 4: KING SOOPERS #147€¦ · PLSV PHONE (DEMARC ONLY) AHEAD YIELD ONLY G UE UE UE UE UE ’” ” STAMP H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg

GEC V_1 redlines.pdf Markup Summary

Subject: text boxPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:48:49 AMStatus: Color: Layer: Space:

Provide with the next submittal. Instructions areprovided below the list of attachments. Checklistscan be found at:https://planningdevelopment.elpasoco.com/wp-content/uploads/Engineering/EngineeringDocuments/Copy-of-GEC-SWMP_Checklists.xlsx

[1] 1 COVER SHEET (7)

Subject: EPC ENG ReviewPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:49:14 AMStatus: Color: Layer: Space:

Subject: PenPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:52:00 AMStatus: Color: Layer: Space:

-

Subject: arrow & boxPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:56:42 AMStatus: Color: Layer: Space:

In accordance with ECM Section 1.12, theseconstruction documents will be valid forconstruction for a period of 2 years from the datesigned by the El Paso County Engineer. Ifconstruction has not started within those 2 years,the plans will need to be resubmitted for approval,including payment of review fees at the Planningand Community Development Directors discretion.

Subject: text boxPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:57:05 AMStatus: Color: Layer: Space:

Jennifer Irvine, P.E

Subject: text boxPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 11:57:16 AMStatus: Color: Layer: Space:

Provide with the next submittal. Instructions are provided below the list of attachments. Checklistscan be found at:https://planningdevelopment.elpasoco.com/wp-content/uploads/Engineering/EngineeringDocuments/Copy-of-GEC-SWMP_Checklists.xlsx

11/05/2019 11:49:14 AM

EPC Planning & CommunityDevelopment Department

Engineering Review

[email protected]

(719) 520-6813

In accordance with ECM Section 1.12,these construction documents will be validfor construction for a period of 2 years fromthe date signed by the El Paso CountyEngineer. If construction has not startedwithin those 2 years, the plans will need tobe resubmitted for approval, includingpayment of review fees at the Planning andCommunity Development Directorsdiscretion.

Jennifer Irvine, P.E

Page 5: KING SOOPERS #147€¦ · PLSV PHONE (DEMARC ONLY) AHEAD YIELD ONLY G UE UE UE UE UE ’” ” STAMP H:\King Soopers - City Market\CO, Falcon - KSS000147 Woodmen & Meridian\CADD\2-Plan\KSS147_C2.0-GEC-COVER.dwg

Subject: text boxPage Label: [1] 1 COVER SHEETAuthor: Steve KuehsterDate: 11/5/2019 12:37:19 PMStatus: Color: Layer: Space:

Further comments will be provided with a completesubmittal including the checklist, etc.

Subject: arrow & boxPage Label: [3] 3 GRADING AND EROSION CONTROL DETAILSAuthor: Steve KuehsterDate: 11/4/2019 1:03:03 PMStatus: Color: Layer: Space:

Complete title and date

[3] 3 GRADING AND EROSION CONTROL DETAILS (4)

Subject: text boxPage Label: [3] 3 GRADING AND EROSION CONTROL DETAILSAuthor: Steve KuehsterDate: 11/5/2019 12:00:18 PMStatus: Color: Layer: Space:

Ensure notes are per the checklist, websiteprovided on the cover sheet.

Subject: text boxPage Label: [3] 3 GRADING AND EROSION CONTROL DETAILSAuthor: Steve KuehsterDate: 11/5/2019 12:16:40 PMStatus: Color: Layer: Space:

1.) Provide flow arrows for the building pad area. 2.) Provide sediment traps for the rough gradedarea per the criteria recommendations. 3.) Provide a note that explains how the fullspectrum ponds will be used for sediment control. ( will the be completed and the outlet structureneeds to be protected or will the be used assediment traps and completed after the buildingand surfacing is in-place.

Subject: text boxPage Label: [3] 3 GRADING AND EROSION CONTROL DETAILSAuthor: Steve KuehsterDate: 11/5/2019 12:34:30 PMStatus: Color: Layer: Space:

b.) Show subdivision names g.) show existingutilities j.) Show FEMA floodplain p.) Identifyareas of cut and fill r.) Call out slopes of detentionponds and identify slope protection. cc.) identify alleasements. General; Identify all storm sewer facilities and labelsizes etc. Also label By others or part of the workwith this plan. Provide a note discussing the LOMR CLOMR andshow inundation area.

Further comments will beprovided with a completesubmittal including thechecklist, etc.

STM

STM

STORMWATER UNLESS PERMISSION FOR THE USE OF A SPECIFIC CHEMICAL IS GRANTHE ECM ADMINISTRATOR. IN GRANTING THE USE OF SUCH CHEMICALS, SPECIAL COMONITORING MAY BE REQUIRED.

20. BULK STORAGE STRUCTURES FOR PETROLEUM PRODUCTS AND OTHER CHEMICALS ADEQUATE PROTECTION SO AS TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLEDENTERING STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAIFACILITIES.

21. NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORMWATER FLOW IN THE FLOW LIGUTTER OR IN THE DITCHLINE.

22. INDIVIDUALS SHALL COMPLY WITH THE “COLORADO WATER QUALITY CONTROL ACT”

CRS), AND THE “CLEAN WATER ACT” (33 USC 1344), IN ADDITION TO THE REQUIREMENDCM VOLUME II AND THE ECM APPENDIX I. ALL APPROPRIATE PERMITS MUST BE OBTCONTRACTOR PRIOR TO CONSTRUCTION (NPDES, FLOODPLAIN, 404, FUGITIVE DUST,OF CONFLICTS BETWEEN THESE REQUIREMENTS AND LAWS, RULES, OR REGULATIOFEDERAL, STATE, OR COUNTY AGENCIES, THE MORE RESTRICTIVE LAWS, RULES, ORAPPLY.

23. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE AT APPROVED CONSTRUC24. PRIOR TO ACTUAL CONSTRUCTION THE PERMITEE SHALL VERIFY THE LOCATION OF 25. A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS

REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.26. THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY GROUND AND SHALL BE

OF THESE PLANS.27. AT LEAST TEN DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION, FOR PR

DISTURB 1 ACRE OR MORE, THE OWNER OR OPERATOR OF CONSTRUCTION ACTIVITYPERMIT APPLICATION FOR STORMWATER DISCHARGE TO THE COLORADO DEPARTMEAND ENVIRONMENT, WATER QUALITY DIVISION. THE APPLICATION CONTAINS CERTIFCOMPLETION OF A STORMWATER MANAGEMENT PLAN (SWMP), OF WHICH THIS GRADCONTROL PLAN MAY BE A PART. FOR INFORMATION OR APPLICATION MATERIALS CODEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIV

WQCD – PERMITS4300 CHERRY CREEK DRIVE SOUTHDENVER, CO 80246-1530

ATTN: PERMITS UNIT

Complete title and date

. SITES SHALL NOT CAUSE OR THREATEN TO CAUSE

F STATE WATERS. ALL WORK AND EARTH DISTURBANCELUTION OF ANY ON-SITE OR OFF SITE WATERS,

TH OF COVER, OR ACCESS TO UTILITY FACILITIES.ERT WATER TOWARDS UTILITY FACILITIES. ANY CHANGES TOBE DISCUSSED AND AGREED TO BY THE AFFECTED UTILITYST TO RELOCATE OR PROTECT UTILITIES, OR PROVIDEICANT. Ensure notes are per the

checklist, website provided onthe cover sheet.

00 SF (BUILDING)

PHONE

(DEMARC ONLY)

PLSV

P-1

1.) Provide flow arrows for the building pad area. 2.) Provide sediment traps for the rough gradedarea per the criteria recommendations. 3.) Provide a note that explains how the fullspectrum ponds will be used for sediment control. ( will the be completed and the outlet structureneeds to be protected or will the be used assediment traps and completed after the buildingand surfacing is in-place.

6''STM

6''STM

6''STM

6''STM 123,000 SF (BUILDING)

PLSV

IP-1

VTC

CWA

IP

SF

b.) Show subdivision names g.) show existing utilities j.) Show FEMA floodplain p.) Identify areasof cut and fill r.) Call out slopes of detention ponds and identify slope protection. cc.) identify alleasements. General; Identify all storm sewer facilities and label sizes etc. Also label By others or part of thework with this plan. Provide a note discussing the LOMR CLOMR and show inundation area.