kingsrose mining corporate presentation

23
Exceptional grades, exceptional costs, exceptional growth Corporate Presentation May 2012

Upload: kingsrose-mining

Post on 26-Mar-2016

219 views

Category:

Documents


3 download

DESCRIPTION

Kingsrose Mining Corporate Presentation - May 2012

TRANSCRIPT

Page 1: Kingsrose Mining Corporate Presentation

Exceptional grades, exceptional costs, exceptional growth Corporate Presentation May 2012

Page 2: Kingsrose Mining Corporate Presentation

Kingsrose – Strategic Focus

•  Specialist Miner •  Focus on, non-mechanized, narrow vein mining

•  Geological Focus •  “Rim of Fire” •  Bonanza Grade, Low Sulphidation Epithermals

•  Key Project • Way Linggo (85%) in Sumatra, Indonesia

Page 3: Kingsrose Mining Corporate Presentation

3

Kingsrose … The Approach

•  Developing Country – A need to be socially responsible •  Respect for local customs, cultures and beliefs •  Local workforce – 4 expats only

•  Focus on regional economic output and employment multipliers •  Sustainable outputs from training, education and social programs •  A development strategy focused on self-funding growth •  A commitment to rewarding our shareholders

Page 4: Kingsrose Mining Corporate Presentation

4

Kingsrose … Rewarding our Shareholders

•  Capital Appreciation.

•  Over 500% share price increase in 3 years

•  Organic Growth – self

funding a $14m exploration budget this year from cash flow

•  Dividends • Announced intent to pay an interim dividend in 2012

Good Liquidity

Page 5: Kingsrose Mining Corporate Presentation

5

Kingsrose … Geological Setting - Way Linggo Project

Page 6: Kingsrose Mining Corporate Presentation

6

Kingsrose … Way Linggo on the “Rim of Fire”

•  Located in the Rim of Fire and on the Trans Sumatra Fault Zone

•  World’s second-most significant source of gold deposits – Tertiary Age

Page 7: Kingsrose Mining Corporate Presentation

7

Way Linggo Mine – operations

Page 8: Kingsrose Mining Corporate Presentation

8

Way Linggo – Total Mineral Resource Estimate (JORC)

DDH 226 -Talang Santo

4.65m @ 16.31 g/t Au,47 g/t Ag (from 305.6 m) Including 1.75m @ 37.9 g/t Au, 117 g/t Ag (from 308.5 m)

Classification Tonnes Au g/t Ag g/t Au oz Ag oz

Measured Way Linggo 467,400 12.44 166.8 186,940 2,506,500

Indicated Way Linggo 182,800 6.09 84.5 35,790 496,600

Inferred Way Linggo 60,200 3.77 38.1 7,300 73,700

Subtotal Way Linggo 710,000 10.24 135.6 230,030 3,076,800

Inferred Talang Santo 879,400 5.89 14.6 166,400 413,000

Grand Total 1,589,400 7.89 14.6 396,430 3,489,800

Page 9: Kingsrose Mining Corporate Presentation

9

Way Linggo – The scorecard

2011 Act Calendar year

Mill Tonnes t 106,410 Gold grade g/t 12.9 Silver grade g/t 166 Gold Produced oz 40,497 Silver Produced oz 479,362 Cash Cost after silver credits US$/oz 139 D&A US$/oz 213 Government Royalties US$/oz 40 Total Cost $/oz 392

2012 financial year forecast •  37,000 ounces of gold Next financial year forecast •  40,000-50,000 ounces of gold

Medium term •  targeting production of 55-65 koz

of gold per year

Page 10: Kingsrose Mining Corporate Presentation

10

Way Linggo Mine

•  Orebody drilled just 350m along strike and 200m vertically •  Epithermal veins continuous in all directions •  Possible extensions to extend ore system

250m

150m

1m @ 2.1 g/t Au, 3,390 g/t Ag

2.25m @ 0.7 g/t Au, 546 g/t Ag

Page 11: Kingsrose Mining Corporate Presentation

11

Talang Santo – Major Cluster of Epithermal Veining

•  The first priority target to be extensively drill tested

•  Located just 7km north of Way Linggo with a haul road in place

•  Resource Estimate (Inferred) 879,000t @ 5.9 g/t Au & 14.6g/t Ag

166,400oz Gold & 413,000oz Silver •  Drill-out continues and system

expanding along strike and improving at depth

Page 12: Kingsrose Mining Corporate Presentation

12

Talang Santo – Ore system expanding

Latest drill results - mineralisation is open to the west, east & at depth

600m

350m

Page 13: Kingsrose Mining Corporate Presentation

600m

350m

13

Talang Santo – Ore system expanding

Comparison to Way Linggo

250m

150m

Page 14: Kingsrose Mining Corporate Presentation

14

Talang Santo – The Second Mine

•  Development starts - just 9 months after the first significant drill result •  Trial mining has commenced – ore production expected to supplement

Way Linggo ore feed late in June quarter 2012 (12 months from discovery) •  Low Capital Cost as Infrastructure already in place

Page 15: Kingsrose Mining Corporate Presentation

15

Way Linggo Process Plant

•  Free milling ore (non-refractory) •  140,000tpa conventional plant •  Crushing > milling > leach >merrill-crowe > smelting > gold & silver dore •  Gold and silver refined at refinery in Java, Indonesia •  SAG mill installed mid-2011 to de-bottleneck materials handling issues •  Grinding capacity in place to expand processing to

200,000tpa

Page 16: Kingsrose Mining Corporate Presentation

16

Organic Growth – Exploration and Mine Development

Objective – to self-fund exploration & project development from cashflow 1.  Mining Way Linggo 2.  Developing Talang Santo 3.  Exploring for 3rd mining front

•  Exploration Strategy & Budget – US$14m for 2011-12 year, 12 drill rigs •  Priority on mine extensions, Linggo-Sapta, Semung Kecil and Rowo Rejo prospects •  Build on geological dataset, prioritise targets and drill test •  Drill out new discoveries and continue testing other targets at the same time

Page 17: Kingsrose Mining Corporate Presentation

17

Immense exploration upside

•  100sqkm 4th Generation Contract of Work

•  17 defined epithermal zones/targets

•  Epithermal veins exist and/or outcrop

•  Strong gold and associated metal anomalism exists

•  Intense epithermal clay alteration

•  Drilling a number of priority targets – with encouraging results

• 12 rigs in action • 6 field teams • $14M budget

over the next 12 months

Top 3 priorities Talang cluster Way Linggo mine

extensions Linggo Sapta,

Semung Kecil & Rowo Rejo

Page 18: Kingsrose Mining Corporate Presentation

Exceptional growth – Aggressive drilling program

•  Drill testing of priority Targets: •  Extensions to the Way Linggo and Talang Santo mines •  Way Sapta – a structural look-alike to Way Linggo – good outcropping veins. •  Semung Kecil – high grade epithermal floats •  Rowo Rejo – big sinter

and breccia development with major CSAMT anomaly

Page 19: Kingsrose Mining Corporate Presentation

Corporate Summary

Board Members

19

Corporate Structure Market ASX Share Code KRM Listed Option Code KRMO Share Price $1.18 52 week high/low $1.05 - $1.88 Shares on Issue 279 Million Options on Issue 19 Million Shares fully diluted 298 Million Market Capitalisation $329 Million Cash and Bullion (30 Apr) $43 Million As at 30 April 2012

John Morris Chairman

Chris Start Managing Director

Tim Spencer Finance Director

Bill Phillips Director

Peter Cook Director

Page 20: Kingsrose Mining Corporate Presentation

20

Kingsrose – Achieving and Performing

•  Our Achievements – In the past 3 years: •  Acquired, permitted, designed, developed and delivered production from

the Way Linggo mine •  Emerged as one of the lowest cost gold miners in the world. •  Developed the project with a socially responsible, technically appropriate

and regionally acceptable method •  Fulfilled a strategy to become locally managed •  Achieved a position of self-funding exploration and project development •  Made a second major discovery with more to come

Page 21: Kingsrose Mining Corporate Presentation

21

Why Invest in Kingsrose?

Exceptional Grade Specialist high-grade narrow vein miners – We chase profit not ounces.

Exceptional Cost Sub US$300/oz after silver credits. Exceptional Growth Second mine at Talang Santo & exceptional prospectivity

Rewarding our Shareholders Maiden Dividend to be paid in June Qtr 2012

Page 22: Kingsrose Mining Corporate Presentation

22

Disclaimer General Disclaimer

•  This presentation has been prepared by Kingsrose Mining Limited (“Kingsrose” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation contains forecasts and forward looking statements. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments may differ materially from those expressed or implied. Kingsrose has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, Kingsrose makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation. This overview of Kingsrose does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investment decision. The SARINC target statement has been based on data provided by Regional of Sardinia, Italy. The estimate of the potential quantity and grade are considered conceptual in nature as there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.

Competent Person Statement •  The information in this report that relates to exploration results, mineral resources and ore reserves is based on information

compiled by Mr. Peter G. Cook, BSc Applied Geol, MSc (Min Econ), who is a Member of the Australasian Institute of Mining and Metallurgy, and a Director of and consultant to Kingsrose Mining Limited. Mr. Cook has sufficient experience which is relevant to the styles of mineralisation and types of deposits and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“JORC Code”). Mr. Cook consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Page 23: Kingsrose Mining Corporate Presentation

23

Board of Directors – Highly Experienced & Successful

John Morris Chairman

Mr. Morris has over 36 years experience in exploration, project development and management of public listed resource companies. He has held prior directorships in a number of gold and base metals public companies in Australia and overseas including Forsayth NL, Uruguay Mineral Exploration Plc and Amerisur Resources Plc (formerly Chaco Resources Plc/Gold Mines of Sardinia Plc)

Chris Start Managing Director

Mr. Start graduated from RMIT as a Metallurgical Engineer with honors in 1988 and has over 23 years of experience in the mining industry. He has worked as a metallurgist, in management positions and as a consultant at a number of mine sites including Kidston, Murrin Murrin, Granny Smith and Boddington. Mr. Start also has international experience working as the Processing Manager at Mt Muro gold and silver mine in Indonesia and as the General Manager at the Musselwhite gold mine in Canada. In addition to his extensive operations experience, Mr Start also has a Master of Science Degree in Mineral Economics.

Tim Spencer Finance Director

Mr Spencer is an economist and qualified accountant with over 16 years experience in various accounting, treasury and finance roles, which included periods with gold companies and a gold refining and trading enterprise. He has particular expertise in precious metals markets and in hedging strategies.

Peter Cook Director

Peter Cook is a Geologist and Mineral Economist and is the current Non-Executive Chairman of Metals X Limited, Aragon Resources Limited and Pacific Niugini Limited. He is also a director of Westgold Resources Limited. He has previously been Managing Director of Hill 50 Gold Ltd, Harmony Gold Australia Pty Ltd, Abelle Ltd and Metals X Limited. Mr. Cook has 28 years in various aspects of the resource sector and brings significant expertise in exploration, mine and corporate management.

Bill Phillips Director

Mr. Phillips has over 30 years experience in mining contracting and mine management, much of which has been gained in Western Australia. He is highly regarded as a leading specialist in underground narrow vein mining. He has managed or been instrumental in the successful development of 16 mines either in the role of contractor or as owner/shareholder. Mr. Phillips most recent role was overseeing development, mining and production at Medusa Mining Limited’s Co-O gold mine in the southern Philippines. He is now focused solely on the Way Linggo gold/silver mine located in Sumatra.