kissimmee river restoration contract 13b florida department of environmental protection permit no.:...

19
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By Greg Kennedy

Upload: ethel-smith

Post on 15-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Kissimmee River Restoration Contract 13B

Florida Department of Environmental Protection Permit No.: EI 0272794-001

Aerial Photos Taken April 1, 2009By Greg Kennedy

Page 2: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

C-38

Spoil Mound B North

Northern Extent of C-38 Backfill for the 13-B Contract

Bypass Flow Way now drying due to flow

returning to the Historic and newly excavated Kissimmee Channel

Page 3: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Northern Extent of C-38 Backfill for the 13-B Contract

Culvert Crossing Washed Out During Initial Flows to the Restored Oxbows

Direction of Flow

Page 4: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Spoil Mound B North

C-38 To Be Filled

Restored Section of the Oxbow

Page 5: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Bypass Flow Way

Spoil Mound B North

Backfilled C-38

Restored Oxbow

Page 6: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Backfilled C-38

Drying Bypass Flow Way

C-38 To Be Backfilled

Restored Oxbow

Page 7: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Restored Oxbow

Spoil Mound B SouthC-38 To Be Backfilled

Page 8: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Spoil mound B South

C-38 To Be Backfilled

Bypass Flow Way

Restored Oxbow

Page 9: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Spoil Mound B South

Restored Oxbows

Bypass Flow Way

Page 10: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Spoil Mound B South

Partially Filled C-38

Restored Oxbows

Page 11: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Drying Bypass Flow Way

Partially Filled C-38

Restored Oxbow

Plugged C-38

Page 12: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Substantially Degraded Spoil Mound B South

Page 13: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Degraded Portion of Spoil Mound B South

Page 14: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Dredging of Historic Oxbow

Degraded Portion of Spoil Mound B South

Partially Filled C-38

Page 15: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Historic River Channel Being Dredged to Design Depth

Turbidity Generated from the Cutter Head on the Dredge

Note: The Plume Moving Up River Indicating an Absence of Flow

Page 16: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

All oxbows visible in this photograph were excavated from former Kissimmee River Marsh

Partially Filled C-38

Page 17: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Partially Filled C-38

Newly Excavated Oxbows

Page 18: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Substantially Filled C-38

Newly Created Oxbows

Page 19: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By

Southern Limit of Contract 13B and Northern Limit of Contract 13A

Limit of Newly Excavated Oxbows as part of Contract 13B

Oxbow Excavated as Part of Contract 13A

Filled C-38