FAULT LIMITING TECHNOLOGIES IN DISTRIBUTION NETWORKS
David KLAUS, Adrian WILSON - Applied Superconductor Ltd, UK; Joachim BOCK, Achim HOBL - Nexans SuperConductors, DE; Darren JONES - Electricity North West, UK; Jamie
McWILLIAM – ScottishPower, UK; Alan CREIGHTON CE Electric UK, UK; Larry MASUR, Franco MORICONI - Zenergy Power plc, UK
![Page 2: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/2.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Collaboration Agreement for 1 pilot installation each with ScottishPower, Electricity North West and CE Electric UK
![Page 3: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/3.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Applied Superconductor’s Role•Understand Network Operator’s Problems
•Secure Order and Prepare Specification
•Undertake Network Response Studies
•Define Routine and Type Test Requirements
•Design and Assemble Protection, Control, Monitoringand Cooling Systems for Pilots 1&2
•Deliver, Install, Commission, Monitor and Maintain
![Page 4: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/4.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 1 - Electricity North West11kV resistive SFCLNormal current 100A Prospective Fault 20kA rms; 50kA pk86% clamping
09 2008 Type Tested03 2009 Installed at site04 2010 Trial Complete
![Page 5: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/5.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 2 – Scottish Power11kV resistive SFCLNormal current 400A Prospective Fault 20kA rms; 50kA pk85% clamping
12 2010 Type Tested
![Page 6: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/6.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 3 – CE Electric UK11kV pre-saturated core SFCLNormal current 1250A Prospective Fault 6.2kA rms; 17kA pk20% clamping
06 2011 Type Testing in progress
![Page 7: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/7.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 4 – CE Electric UK33kV pre-saturated core SFCLNormal current 800A Prospective Fault 8.5kA rms; 23kA pk40% clamping
06 2011 Design in progress
![Page 8: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/8.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 1 - Electricity North West11kV resistive SFCLNormal current 100A Prospective Fault 20kA rms; 50kA pk86% clamping
09 2008 Type Tested03 2009 Installed at site04 2010 Trial Complete
![Page 9: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/9.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 10: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/10.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 11: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/11.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
48 of the BSCCO components connected in series constitute each phase of the limiter. The series assemblies are immersed in liquid nitrogen cooled to below its boiling point. The nitrogen head pressure is below atmospheric pressure.
![Page 12: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/12.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
fault currentlimited fault
current
Up to 90% clampingClamps within 1.5 msNormal current 800ARecovery within 3 minsRemoves DC component
Resistive Fault Current Limiter
![Page 13: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/13.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 14: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/14.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 15: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/15.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
InterlockingAlarmsTemperature ControlText ReportsSCADA Interface Remote Control / MonitoringData Storage and displayPlatform for Relay, PLC programming tools.
P
T1
T2
L1
L2 L3
Helium Compressor
Water ChillerProgrammableLogic Controller
T3T4
I 1,2,3
T in
VaVb
PC
3G Modem
Internet
Coldhead
T out H in
Fault Recorder
Protection Relays
Flow
![Page 16: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/16.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 17: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/17.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Successful trial with good availability of limiter
Noise primarily from cooling system requires mitigation
Cryocooler compressor requires cooling water and ambient air temperatures to be maintained within a narrow range
Liquid nitrogen handling straightforward and safe with appropriate training
Limiter impedance has negligible effect on current sharing
Means for remote reset of modems and PC required
![Page 18: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/18.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 2 – Scottish Power11kV resistive SFCLNormal current 400A Prospective Fault 20kA rms; 50kA pk85% clamping
12 2010 Type Tested
![Page 19: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/19.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 20: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/20.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 21: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/21.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 22: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/22.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 23: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/23.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 24: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/24.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 25: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/25.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 26: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/26.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 3 – CE Electric UK11kV pre-saturated core SFCLNormal current 1250A Prospective Fault 6.2kA rms; 17kA pk20% clamping
06 2011 Type Testing in progress
![Page 27: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/27.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 28: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/28.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 29: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/29.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pre-saturated Core Fault Current Limiterfault currentlimited fault current
Up to 50% clampingInstantaneous RecoveryNormal current 2000A
![Page 30: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/30.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 31: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/31.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 32: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/32.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 33: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/33.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 34: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/34.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 35: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/35.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 36: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/36.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 37: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/37.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
Pilot 4 – CE Electric UK33kV pre-saturated core SFCLNormal current 800A Prospective Fault 8.5kA rms; 23kA pk40% clamping
06 2011 Design in progress
![Page 38: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/38.jpg)
Frankfurt (Germany), 6-9 June 2011
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
![Page 39: Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456](https://reader036.vdocument.in/reader036/viewer/2022062310/568162c0550346895dd3504b/html5/thumbnails/39.jpg)
Frankfurt (Germany), 6-9 June 2011
Thank You!
Klaus D.W. et al. – United Kingdom – RIF Session 1 – 0456
FAULT LIMITING TECHNOLOGIES IN DISTRIBUTION NETWORKS
David KLAUS, Adrian WILSON - Applied Superconductor Ltd, UK; Joachim BOCK, Achim HOBL - Nexans SuperConductors, DE; Darren JONES - Electricity North West,UK; Jamie
McWILLIAM – ScottishPower, UK; Alan CREIGHTON CE Electric UK, UK; Larry MASUR, Franco MORICONI - Zenergy Power plc, UK