kls quattro system - kls steuerungstechnik gmbh · transport system installation ca. 1 day....

2
KLS QUATTRO SYSTEM The flexible solution for medical product storage www.kls-system.de Illustration shows optional variations KLS QUATTRO SYSTEM KLS premium service 24 hours hotline stand by, 365 days of the year. Professional hotline support for all operator queries. Remote maintenance and system observation with error detection and preventive trouble shooting to avoid system failure. System adjustment to accommodate changes in stock structure. Hotline Onsite maintenance Statutory changes / Product updates Software adaptation by statutory changes e.g. 2 dimensional codes. Updates for control and database software. Software updates for image recognition. Interface development for enterprise resource planning systems e.g. blister packing and label printing. Annual system inspection, outside business hours. Testing of all mechanical components (motor, drives, switch devices etc.) Testing and/or exchanging of computer components. Replacement of worn parts (incl. power supply). Working hours, travelling costs and all replaced components.* * Exceptions: damage caused by improper handling or elemental damage. KLS Steuerungstechnik GmbH The art of engineering - made in Germany Im Gewerbegebiet 19 · 66709 Weiskirchen [email protected] · www.kls-system.de Tel. (+49) 6876-7003-0 · Fax (+49) 6876-7003-70

Upload: others

Post on 16-Sep-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KLS QUATTRO SYSTEM - KLS Steuerungstechnik GmbH · Transport system installation ca. 1 day. Initiation and test runs ca. 0.5 day. The KLS Quattro System is ready to be loaded. System

KLS QUATTRO SYSTEMThe fl exible solution for medical product storage

www.kls-system.de

Illustration shows optional variations

KLS QUATTRO SYSTEM

KLS premium service

24 hours hotline stand by, 365 days of the year.

Professional hotline support for all operator queries.

Remote maintenance and system observation with error detection and preventive trouble shooting to avoid system failure.

System adjustment to accommodate changes in stock structure.

Hotline

Onsite maintenance

Statutory changes / Product updates

Software adaptation by statutory changes e.g. 2 dimensional codes.

Updates for control and database software.

Software updates for image recognition.

Interface development for enterprise resource planning systems e.g. blister packing and label printing.

Annual system inspection, outside business hours.

Testing of all mechanical components (motor, drives, switch devices etc.)

Testing and/or exchanging of computer components.

Replacement of worn parts (incl. power supply).

Working hours, travelling costs and all replaced components.** Exceptions: damage caused by improper handling or elemental damage.

KLS Steuerungstechnik GmbHThe art of engineering - made in Germany

Im Gewerbegebiet 19 · 66709 Weiskirchen

[email protected] · www.kls-system.de

Tel. (+49) 6876-7003-0 · Fax (+49) 6876-7003-70

Page 2: KLS QUATTRO SYSTEM - KLS Steuerungstechnik GmbH · Transport system installation ca. 1 day. Initiation and test runs ca. 0.5 day. The KLS Quattro System is ready to be loaded. System

KLS Clever SystemProjektbegleitung, Installation und Inbetriebnahme

Inspection of installation conditions, measurement taking and planning.

Determination of installation dates.

Creation of a 3-dimensional construction plan.

Coordination of contractors by your KLS project team.

System construction and test run at the KLS production centre in Weiskirchen, Germany.

System installation ca. 2.5 days.

Transport system installation ca. 1 day.

Initiation and test runs ca. 0.5 day.

The KLS Quattro System is ready to be loaded.

System demonstration, training and safety instructions for pharmacy employees, by a KLS engineer.

System approval and distribution of administrative rights.

Concluding dialogue with your project engineer.

The professional engineers of the KLS hotline team resume further support. (24/7 hotline with remote system observation for preventive troubleshooting)

Annual system inspection and servicing on site.

Technical data Project support, installation and initiation

KLS CLever SystemEine große Entlastungauch für kleine ApothekenKLS QUATTRO SYSTEM

Storage scheme drawer framework with chaotic volume optimized storage system

Number of framework columns 4

Capacity up to 35.000 packages

Measurements width from 275 up to 385 cm length from 315 up to 525 cm height from 180 up to 400 cm

Options round package storage, integrated label printer, refrigerator, video surveillance and laser protection system

Storage fully or semi automatic, storage possible from all sides

Delivery up to 450 packages an hour

Outer casing KLS standard casing with sound and heat insulated aluminium panels in a silver metallic look outer casing can be delivered in any colour or material

Noise emission ≤ 48 dB in standard casing / ≤ 36 dB in super silent casing

Gripping techniques double vacuum gripper for large and heavy packages electro magnetic gripper for drawer opening

Adaptations double vacuum gripper for large and heavy packages, asymmetrical construction in varying heights and widths available recommended for pharmacies with quadratic storage room for large amounts of storage and/or pharmacies with low ceilings

Construction time ca. 8-12 weeks

Installation ca. 3-4 days

KLS engagement / Project begin

Installation, initiation and training

Project completion, services and support

www.kls-system.de