knmi contribution to and specs jules beersma. euporias kick-off, barcelona, 6-8 november 20122 jules...
TRANSCRIPT
![Page 1: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/1.jpg)
KNMI contribution to
and SPECS
Jules Beersma
![Page 2: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/2.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 2
Jules Beersma WP 2.1
Albert Klein Tank WP 2.2 & 4.2
Gé Verver WP 2.2 & 4.2
![Page 3: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/3.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 3
Wim Som de Cerff WP 4.4 leader
Wilco Hazeleger SPECS
Bart van den Hurk SPECS
![Page 4: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/4.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 4
Contribution to EUPORIAS WP 2.1
Calibration and downscaling
![Page 5: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/5.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 5
Schematicrepresentation of the procedure
![Page 6: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/6.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 6
Schematicrepresentation of the procedure
![Page 7: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/7.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 7
Schematicrepresentation of the procedure
![Page 8: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/8.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 9
Contribution to EUPORIAS WP 2.2
Impact relevant Climate Information Indices
![Page 9: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/9.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 10
Datasets
ECA&D European Climate Assessment & Dataset:station data & climate indices
E-OBS European daily gridded observational dataset:precipitation, temperature and sea level pressure
![Page 10: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/10.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 11
Climate indices relevant for the Water Sector
Generate, Evaluate, Calibrate Climate Indices based on ECA&D, E-OBS, Reanalyses, Model hindcasts and forecasts
Assessment of the predictive skill in terms of these climate indices with a focus on Rhine and Meuse river discharge
Climate indices
![Page 11: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/11.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 12
Contribution to EUPORIAS WP 4.2
Climate services prototypes
![Page 12: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/12.jpg)
Designing user-oriented bulletins for specific sectors with an interpretation of s2d predictions and uncertainties, including links to the historical and current data and trends.
(Builds on the EURO4M Climate Indicator Bulletins that are based on historical data)
Depends on selected prototypes and predictive skill of indices
Bulletins
![Page 13: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/13.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 14
Contribution to EUPORIAS WP 4.4
Delivery tools
![Page 14: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/14.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 15
Objectives
To develop an interface which allows an effective delivery of the climate services developed in WP 4.2 to the general public and decision-makers
In this manner, goes beyond improving reliability of the s2d prediction systems by enhancing the usability of s2d forecasts in practical applications
![Page 15: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/15.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 16
Data dissemination
Inventory of existing data portals and tools (task 4.4.1)
Climate service architecture development (task 4.4.2)
Web interface for the service prototypes(task 4.4.4)
Data dissemination usingOGC services
44.1 Analyse existing portals44.1 Analyse
existing portals
44.2 Service architecture 44.2 Service architecture
44.3 Web interface for
service prototype
44.3 Web interface for
service prototype
44.3 Create products for non
specialists
44.3 Create products for non
specialists
Stakeholders: Climate adaptation
portals
Stakeholders: Non-specialists
D44.1 D44.1PM 21-30
PM 27-36 PM 30-48 PM 30-48
![Page 16: KNMI contribution to and SPECS Jules Beersma. Euporias kick-off, Barcelona, 6-8 November 20122 Jules BeersmaWP 2.1 Albert Klein Tank WP 2.2 & 4.2 Gé VerverWP](https://reader035.vdocument.in/reader035/viewer/2022070413/5697bfa11a28abf838c95e72/html5/thumbnails/16.jpg)
Euporias kick-off, Barcelona, 6-8 November 2012 17
Thank you