ktmb - rc asia engineering sdn bhd · works for 118 units townhouse on lot pt3565, jalan 1/70d, off...
TRANSCRIPT
KTMB
SPKK G7
CLAB
MOF
CIDB G7
REGISTERED WITH
CORPORATE
INFORMATION
COMPANY NAME : RC ASIA ENGINEERING SDN BHD
(FORMERLY KNOWN AS REL CARE SDN. BHD.)
COMPANY REGISTRATION NO : 598588-M
BUSINESS ADDRESS : NO.48, JLN SS22/21,
DAMANSARA JAYA,
47400 PETALING JAYA,
SELANGOR DARUL EHSAN.
TELEPHONE : 03-77252231
FAX : 03-77252270
INCORPORATION DATE : 12th NOVEMBER 2002
AUTHORISED CAPITAL : RM 1 Million
PAID UP CAPITAL : RM 1 Million
BANKER : STANDARD CHARTERED
MALAYAN BANKING BERHAD
CIMB BANK BERHAD
RHB BANK BERHAD
OCBC AL-AMIN BANK BERHAD
ALLIANCE BANK BERHAD
COMPANY SECRETARY : ACCASIA CORPORATE CONSULTANTS S/B
STATEMENT
MISSION
Mission Statement
To establish RC Asia Engineering as a competent
Engineering Services Provider to the local Railway
Industry.
RC Asia Engineering will adopt and implement
Industry Best Practices and is committed to
Engineering Excellence.
Integrity and Professionalism shall be upheld in all
RC Asia Engineering’s dealings with Customers,
Suppliers and Business Associates.
RC Asia Engineering will endeavour to provide
our Customers consistently High Quality Services
at Competitive Prices.
RC Asia Engineering is committed to attracting
and retaining in its employ the best people in the
industry.
RC Asia Engineering will adopt a Progressive and
Dynamic approach tempered by Financial
Discipline to grow the business and enhance
Shareholder wealth.
COMPANY
BACKGROUND
RC Asia Engineering Sdn Bhd started out as JLJY Rel Care Enterprise
which was established in 1996 and was positioned to provide
engineering services and support to KTMB and existing Main
Contractors in various railway yard and track-upgrading and
rehabilitation projects.
JLJY Rel Care Enterprise continued to grow and establish itself as a
Competent and Reliable Engineering Services Provider and by the
year 2002 had a total of 150 competent and skilled personnel
conversant with all types of track engineering work.
To reflect the Organization’s Capability and Standing in the industry, it
was decided in 2002 to incorporate a private limited company, REL
CARE SDN. BHD. to take over the business of JLJY Enterprise. The
company name was subsequently changed to RC ASIA ENGINEERING
SDN BHD.
RC Asia Engineering Is now an established and reputable contractor
specializing in all manner of railway track engineering works. With a
professional management team ably supported by dedicated and
skilled engineering personnel, RC Asia Engineering is well placed to
serve the Railway Industry.
RC Asia Engineering’s commitment to Engineering Excellencesteeped in Professionalism and Quality is key to the successfulprocurement and execution of a variety of railway projects. Andnotable is the Ballast Undercutting and Replacement project on150
kilometres of the East Coast Line, which is the first time work of thisnature has been attempted on a scale of this magnitude in Malaysia.
We have been involved in the implementation of the Electrified
Double Tracking Project from Ipoh – Rawang (200 km), Electrified
Double Tracking Project from Seremban – Gemas (100 km) and
Electrified Double Tracking Project from Ipoh – Padang Besar (300
km).
Our repertoire of work also includes rehabilitation and upgrading
of existing wooden sleeper tracks to concrete sleeper tracks with
UIC 54 kg rails (200 km)
Our professionalism and competency has been recognized by the
Ministry of Transport and the major railway operator, KTMB
(Malayan Railway). Hence, we have been called upon by the
latter to assist in reviving and or completing ‘sick projects’.
Challenges bring out the best in our people. They are self
motivated and hold themselves to the highest standards of
accountability for quality and deliverables. Our peoples’
commitment by way of ripple effect inspire those who work with
and around us to reach for the same exacting standards.
■ KTMB (Malayan Railway)
■ IRCON INTERNATIONAL
■ LEIGHTON
■ BALFOUR BEATTY
■ BOMBARDIER
■ COLAS RAIL ASIA SDN BHD
■ MMC-GAMUDA JV
■ UEM
■ YTL
■ EMRAIL
■ FAJARBARU BUILDER SDN BHD
■ ANSALDO
We have successfully implemented work for :
KEY PERSONNEL
R. KUMARESAN
[ DIRECTOR ]
JAMES ANTHONY DASS
[ DIRECTOR ]
KESAVAN KRISHNAN
[ DIRECTOR ]
BATHMANATHAN
[ FINANCE]
ALEXANDAR RONALD KUMAR
[ DIRECTOR ]
WORKFORCE
1. M.Nethiananthen Project Manager
2. Surendran Parameswaran Engineer
3. Sri Sarawanan Kunabalan Engineer
4. Mohd Azzil Fahmi Rezli Engineer
5. Rajaratnam PWI
6. Abdul Mujib Surveyor
7. Megat Hafizuddin Surveyor
8. Dhevendran Safety manager
9. Ashok Kumar Safety Supervisor
10. Sri Latha Marimuthu Senior Accounts Executive
11. Jevitha Marimuthu Accounts Executive
12. TamilMalar Admin Executive
13. S.Christhuvaraju Senior Track Supervisor
14. Francis Arulnathan Senior Track Supervisor
15. Nor Azli Abd.Rahman Senior Track Supervisor
16. Balakrishnan Senior Track Supervisor
17. Sanusi Senior Track Supervisor
18. Jeyakumar Track Supervisor
19. Santharan Track Supervisor
20. Track Ass Supervisor 20 Nos.
21. Skilled Workers 220 Nos.
ORGANIZATION CHART
20 TRACK ASS. SUPERVISOR
SURENENGINEER
SANTHARANTRACK SUPERVISOR
JAMES ANTHONY DASSDIRECTOR
KESAVAN KRISHNAN DIRECTORS
M.NETHIANANTHEN PROJECT MANAGER
R. KUMARESANDIRECTOR
DHEVENDRANSAFETY MANAGER
BALAKRISHNANTRACK SUPERVISOR
FAHMIENGINEER
BATHMANATHANFINANCE CONTROLLER
MEGATSURVEYOR
LATHASNR ACCOUNTS EXC
ABDUL MUJIBSURVEY ENGINEER
JEVITHAACCOUNTS EXEC
TAMILMALARADMIN EXEC
FRANCISTRACK
SUPERVISOR
AZLITRACK
SUPERVISOR
K.ARASANTRACK
SUPERVISOR
LABOUR FORCE (210)
CHRISTHUVA RAJSENIOR TRACK SUPERVISOR
JEYAKUMARTRACK SUPERVISOR
SUBERAMANIUMSENIOR TRACK SUPERVISOR
SANUSITRACK
SUPERVISOR
RAJARATNAMP.W.I
ASHOK KUMARSAFETY SUPERVISOR
BOARD
MANAGEMENT
SITE STAFF NANDATRACK
SUPERVISOR
SRI SARAWANAENGINEER
SIRONP.W.I
M. RAMAMURTHYP.W.I
ALEXANDAR RONALD KUMAR
DIRECTORS
Client References
KERETAPI TANAH MELAYU BERHAD(Malayan Railway)
En.Mohd Ramli B. Mohd Noh (General Manager - Permanent Way)
Tn. Haji Hilmi Mohamad (General Manager –Project Management)
Suzaini Mohd Oilus Senior Engineer , Permanent Way Department
IRCON International Limited
Mr. Hitesh Khanna - Regional Director Mr. Parmod Kumar – Project Director
Mr.Laxmi Narayanan - Project Director
Lion Pacific Engineering Sdn Bhd
Datin Gumasundari - Director
LEIGHTON
Mr. Dhamodharan Krishnan - Project Superintendent
KL CONSULTANTS (KLC)
Mr. Ramesh Krishnan - Director
Mr. Arshad Puasa - Consultants
KLIA CONSULTANTS
Mr. Ir Huzairi Ismail Consultants
ALSTOM
• Mr. Saminathan Project Manager.
MINCONSULT
• Mr. Sivananda Raj Consultants
SPECIALIZATION
AND
CORE COMPETANCIES
TRACK WORKS
CABLING WORKS
CIVIL STRUCTURAL WORKS
RAILWAY ENGINEERING
Over the past 20 years RC Asia Engineering has been able to
mould itself to Industry best practices and successfully
delivered major project of every kind. Our expertise has
been an inspiration to our many clients. We are well
prepared to handle work such as: -
New Railway Track Linking
Undercutting of Ballast and Ballast Cleaning
Turnouts Installation
Level Crossing Installation.
Destressing of Rail Track
Track Maintenance
Track Dismantling Thermite Welding and Flush Butt Welding
Track Diversion
Survey of existing track
Ultrasonic Test
Power Rail Installation
Lim Rail Installation
In-Situ Casting turnout
Construction of Slab Track
Installation of Scissor Crossover
CABLING WORKS
While RC Asia Engineering’s core competency is track work, in
its quest to become a multi faceted contractor, it has taken on
and successfully delivered Cabling works. In this respect we
have a team which is capable of executing the following
Cabling work scope:-
CABLE ( SIGNALING CABLE – VARIOUS SIZES )
FIBER OPTIC CABLE (MULTIPLE CORE)
POWER CABLE ( VARIOUS SIZES )
AUTOMATIC TRAIN PROTECTION (ATP) SYSTEM
OTHER WAYSIDE EQUIPMENT
CIVIL STRUCTURAL WORKS
RC Asia Engineering has also been involved in
Civil Structural work as part of its objective to
become an Engineering Procurement and
Construction Management Outfit. For a start, RC
Asia Engineering has been involved in earth work
and structure construction. Scope of works
involved are:-
Walkway Construction
Derailment Wall Construction
Cable Trough Construction
Culverts and Drainage Construction
Steel structure Construction
Earth work
Road Works
CURRENTPROJECT
COMPLETEDPROJECT
ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)
1
Rehabilition of Track Formation replacement of Ballast and Associated Works between Jerantut,Pahang to Gua Musang Railway Station,Kelantan (Package B)
FAJARBARU BUILDER SDN BHD
Aug 2016 -Jan 2019
47,000,000.00
2 Projek Landasan Keretapi Dari Subang Jaya-Terminal SKYPARK (FASA 1)
LION PACIFIC SED BHD Mac 2016 -January 2017
3,080,000.00
3
Labour Supply For East Residence,KLGCC - Rectification and Upgrading Works for Block G,H,I (39 units) for completion of balance of works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, Mukim Batu Dalam Kuala Lumpur
GSIB SDN BHD June 2013-March 2017
1,400,000.00
CURRENT PROJECT SUMMARIES
MAJOR COMPLETED PROJECT SUMMARIES
ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)
1 Supply Manpower For Kelana Jaya
Line Extension Project.
Colas Rail Asia
Sdn Bhd
April - May
2016 1,500,000.00
2 Destressing and Welding Works
From Paloh to Kulai.KTMB
April - June
2015 300,300.00
3 M370-Northern Double Tracking
Project Between Ipoh and Padang
Besar - Supply of Labour for
Temporary Track Diversion.
Emrail Sdn.Bhd.June 2010 -
Apr 2015 10,000,000.00
4 Proposed Fourth lane Widening
Between Sungai Buloh (KM457) and
Rawang Interchange (KM443.90)-
Package C
AlloyMtdJuly 2014-May
2015 240,000.00
5 Proposed Rail Renewal And
Associated Works From Batang
Benar to Seremban in Central
Region
KTMBJuly 2014 -
Dec 2014 240,000.00
6 Design, Manufacture, Supply,
Deliver, Assemble, Replace, test
and Commission Of New 1:6
Shallow Depth Scissor Crossover at
Sentul Timur Siding for Ampang Line
Unik Kukuh
Sdn.Bhd.
June - Nov
2014 400,000.00
7 Klang Valley Mass Rapid Transit
Project Between Sg.Buloh To
Kajang. (SBK-S-06-Trackworks).
Package: Depot Trackworks.( To
provide Light Weight Tie Tamper
and Operator to carry out Tamping
Work)
GJA-NBCT Rail
JV
Apr - October
2014 470,000.00
8 Construction And Completion Of
Viaduct Guideway And Other
Associated Works From Taman
Mesra To Kajang Station - Extension
and Rehabilitation of Track and
Associated Work at Kajang (KTMB)
Station ( Track Work ).
Touch Tronics
Rail And Services
Sdn.Bhd.
Sept 2013-
May 2014 1,600,000.00
9 Electrified Double Track Priject
Between Ipoh And Padang Besar
Systems- Provision of Manpower
Supply for Termination Works
Balfour BeattyOct 2013-April
2014 500,000.00
ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)
10 Work for Temporary/ Permanent
Diversion between Seremban to
Tampin CH461.234 to
CH500.400:Electrified Double Track
Project from Seremban to
Gemas(Package A)
Ircon
International
Feb 2010 - Jul
2013 8,000,000.00
11 TrackWork for Main Line Track for
Electrified Double Track in Tampin to
Batang Melaka sectiob from
CH510800 to CH535500, Package B.
Ircon
International
May 2011-Jul
2013 7,700,000.00
12 Design, Construction, Completion,
Testing, Commissioning and
Maintenance of the Electrified
Double Track Project between
Seremban-Gemas: Signalling,
Trenching, cable Lying and
Asscociated work Between Sg.Gadut
and Rembau Station.
Fabricontrol
Const.(M) Sdn
Bhd
May-Nov
2011 1,260,000.00
13 Design, Construction,Completion,
Testing, Commissioning and
Maintenance of the Electrified
Double Track Project between
Seremban-Gemas: Supply of general
workers on daily basis for
maintenance of existing railway
track.
Ircon
International
Limited
Feb2009-
Feb2010 288,000.00
14 M370-Northern Double Tracking
Project between Ipoh and Padang
Besar - Supply of labours for
Temporary Track Diversion.
Emrail Sdn.
Bhd.
June2009-
May2010 350,000.00
15 Rehabilitation and strengthen of
track and associated works between
Seremban and Rembau Railway
Station.
AKS Sepakat
Sdn. Bhd.
May2009-
Dec2009 1,700,000.00
16 Design, Construction,Completion,
Testing, Commissioning and
Maintenance of the Electrified
Double Track Project between
Seremban-Gemas: Tender for
Construction and Establishment of
Rail Stacking Yard in existing
Seremban Railway Yard.
Ircon
International
Limited
Sept2008-
Nov2008 608,000.00
MAJOR COMPLETED PROJECT SUMMARIES
ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)
17 Dismantling of recovered wooden
sleeper panels stacked at various
station yards, sorting according to
various grade and component and
stacking at the station yards.(Gemas
to Tampin)
Hisniaga
Sdn.Bhd.
June2008-
Dec2008 370,000.00
18 Rehabilitation and strengthening of
track and associated works between
Seremban and Rembau Railway
Station
AKS Sepakat
Sdn. Bhd.
Mac2008-
Aug2008 1,590,000.00
19 Track Rehabilitation & Strengthening -
Complete Track Renewal (CTR) Work
with UIC 54kg rail, PSC sleeper &
distressing between Parit Buntar -
Bukit merah and Bukit Merah - Taiping
Stations.
Ircon
International
Limited
Jan2007-
April2008 2,500,000.00
20 Track Rehabilitation & Strengthening -
Earthwork & Track work for raising and
renewal of track by laying temporary
diversion between Parit Buntar-Bukit
Merah and Bukit Merah-Taiping
Stations.
Ircon
International
Limited
Feb -
Dec2007 3,199,000.00
21 Replacement of Ballast & Associated
Works between Kerdau to
Sg.Yu,Pahang.
Emrail Sdn.
Bhd.
Oct2002-
Aug2005 18,000,000.00
22 Double Tracking Work between
Rawang to Ipoh (maintenance
team).
Emrail Sdn.
Bhd.
Dec2005-
Dec2006 1,200,000.00
23 Double Tracking Work between
Rawang to Ipoh (maintenance
team)
Emrail Sdn.
Bhd.
Oct2003-
Dec2004 1,300,000.00
24 Double Tracking Work between
Rawang to Ipoh (maintenance
team)
Emrail Sdn.
Bhd.
Dec2002-
Dec2003 1,100,000.00
MAJOR COMPLETED PROJECT SUMMARIES
PICTORIAL RECORD
OF
TRACK ENGINEERING
CONSTRUCTION OF SLAB TRACK
LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS
COMPLETED PROJECT
RC Asia Engineering has been deployed by Colas Rail Asia in their LRT line construction. With good team works from both collaboration, the management and ground staffs and worker had successfully completed the project within the timeline. This made RCA as hands-on contractor in this scope of work
IN-SITU CASTING OF DERAILMENT WALL
LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS
COMPLETED PROJECT
With good dedication RCA wasgiven privilege to adopt thisscope of work in the observationof Colas Rail Asia. RCA manage todeliver the job within thetimeline and made its trackrecord in this field.
IN-SITU CASTING OF TURNOUTS
LRT EXTENSION LINE BETWEEN
KELANA JAYA TO PUTRA HEIGHTS
COMPLETED PROJECT
In-situ casting of Turnout activates was constructed first time in
Malaysia and we were proudly to declare that we venture this
expertise from the above project. We have installed more than 50
sets.
CONSTRUCTION OF WALKWAY
COMPELETED PROJECT
PROJEK MASS RAPID TRANSIT LEMBAH KLANG JAJARAN SUNGAI BULOH – KAJANG.
RC Asia Engineering was engaged to install the supplied walkway in the MRT line. In venturing this job, RCA has delivered the given quantity with complete handing over within the contract timeline.
CABLE TROUGH INSTALLATION
COMPLETED PROJECT
LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS
Cable Trough installation was carried out in two method. The footing was done in-situ casting and the cable trough was installed as precast unit.
INSTALLATION OF LIM RAILS & POWER RAIL
LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS
COMPELETED PROJECT
Our expertise in handling these particular materials without scratching,
damaging and installing from small scale had given good impression to
handle the major portion of the project and completing them within the
projection timeline.
SHALLOW DEPTH SCISSOR CROSSOVER
Dismantling and clearing Works
Mapping of points works
Complete Installation of Scissor Crossover Work
Installation of Hording Works
DESIGN, MANUFACTURE, SUPPLY, ASSEMBLE, REPLACE, TEST AND COMMISSION OF NEW 1:6 SHALLOW DEPTH SCISSOR CROSSOVER AT SENTUL TIMUR SIDING FOR AMPANG LINE.
COMPLETE TRACK LINKING WORKS
COMPLETED PROJECT FOR IRCON INTERNATIONAL LTD
- DOUBLE TRACK PROJECT SEREMBAN TO SG. GADUT
- DOUBLE TRACK PROJECT TAMPIN TO BTG. MELAKA
COMPLETED PROJECT FOR EMRAIL SDN BHD
- RAWANG TO IPOH
RC Asia has largest ever experience in track construction and working with multi national companies in the country. Collaboration with client in suppling materials and RCA delivering the work made to grow this large.
COMPLETED PROJECT FOR EMRAIL – LEIGHTON SDN BHD
- IPOH TO PADANG BESAR
PORTAL QUICK RELAYING SYSTEM
With good background in railway engineering RC Asia have been
delivering lifeline projects without problems. These have been
proven from the below completed project.
COMPLETED PROJECT UNDER IRCON INTERNATIONAL
- TAIPING TO BUKIT MERAH – LION PACIFIC - BUKIT MERAH TO PARIT BUNTAR – LOH & LOH- PARIT BUNTAR TO BUKIT MERTAJAM – AMAN
SELAMA
COMPLETED PROJECT FOR AKS SEPAKAT SDN BHD
- SEREMBAN TO REMBAU – AKS SEPAKAT SDN BHD
EXTENSION OF SIDING LINE AND ADDITIONAL 3RD LINE WORKS
SITE CLEARING WORK
FORMATION WORK
TRACK CONSTRUCTION
COMPLETED WORK
- BUKIT MERAH STATION - IRCON- TAIPING YARD - IRCON- PARIT BUNTAR YARD – IRCON- SEREMBAN YARD - IRCON- PLENTONG YARD - KTMB- KEMPAS YARD – KTMB- SEREMBAN YARD - KTMB
FORMATION WORK
COMPLETED PROJECT
- TAIPING YARD KTMB – IRCON- KEMPAS YARD KTMB – KTMB- SEREMBAN YARD KTMB – KTMB- SEREMBAN NEW YARD – IRCON
ROAD WORK
COMPLETED PROJECT
- TAIPING YARD – IRCON- SEREMBAN YARD – IRCON- BTG.MELAKA - IRCON
TURNOUTS INSTALLATION
PSC SLEEPER TURNOUTS
TIMBER SLEEPER TURNOUTS
- KUALA LIPIS KTMB – EMRAIL- KERAMBIT KTMB – EMRAIL- JERANTUT KTMB - EMRAIL- TAIPING KTMB - IRCON- BUKIT MERAH KTMB – IRCON- PLENTONG KTMB – KTMB- TAMPIN KTMB - IRCON
- SEREMBAN KTMB – IRCON- SG. GADUT KTMB – IRCON
COMPLETED PROJECT
PORTABLE MECHNICAL TAMPING WORKS
■ Manual Mechanical Tamping works been carried out at various section in the Railway construction.
■ Track Rehabilitation Works for KTMB.
■ Rectification of Derailment Spot in KTMB.
■ Initial Tamping of newly constructed Track in Double Tracking Project.
■ Initial Tamping of Newly Constructed Track in MTR depot Track
COMPLETED PROJECT
CIVIL & DRAINAGE CONSTRUCTION
Rehabilitation Track KTMB Taiping Double Track Seremban - Gemas Rehabilitation Track Kerdau – Sg Yu Civil Construction for GSIB
RC Asia Engineering Sdn BhdSince:1996