l i n c o l n i a p l a n n i n g d i s t r i c t s t u d ... · 10/13/2018  · account for pass...

38
L I N C O L N I A P L A N N I N G D I S T R I C T S T U D Y COMMUNITY MEETING Saturday, October 13, 2018 Holmes Middle School

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

L I N C O L N I A P L A N N I N G D I S T R I C T S T U D Y

COMMUNITY MEETING

Saturday, October 13, 2018

Holmes Middle School

Page 2: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

AGENDA Saturday October 13, 2018

1. Open House

2. Remarks from Supervisor Gross

3. Staff Presentation

4. Questions and Answers

5. Open House/Adjourn

Page 3: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Supervisor Penny Gross

Mason District, Fairfax County

Page 4: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Study Background

Page 5: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

PHASE I

PHASE 2 T A S K F O R C E

PHASE 3 T A S K F O R C E

Lincolnia Planning District Study authorized by the Board of Supervisors on July 9, 2013. Existing conditions analysis forms the basis for proposed editorial updates to the LPD Plan guidance. Plan revisions adopted by the BOS on Oct. 20, 2015.

Task Force convened in Feb. 2017. Recommendations to designate a 169-acre area as the Community Business Center and additional Plan guidance for the CBC adopted by the BOS on March 6, 2018.

Task Force identifies a smaller, 40-acre Opportunity Area within the CBC for further study. Staff and the Task Force consider land use and transportation alternatives within the Opportunity Area. Process for submitting site-specific proposals outside of the CBC is initiated, resulting in the submission of two proposals.

Page 6: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

6

7

Lincolnia Planning Study Phase 3 Process

3

Transportation Solutions Based on feedback from the

Visioning Exercise, staff presents five alternative transportation network scenarios. Task Force

selects two scenarios for testing.

1

Transportation Conditions Analyze transportation

network under existing and future conditions.

Transportation Results Results from the two selected

transportation scenarios presented. The Task Force

recommends a preferred scenario.

Finalize Land Use Scenario Finalize land use scenario based on the Task Force discussions and the

impacts analysis results.

Visioning Exercise Discuss potential land use

and transportation network changes for the opportunity

areas.

Land Use Vision Based on feedback

Visioning Exercise, the Task Force reviews potential land use alternatives for

the CBC.

4

Finalize Land Use + Transportation Scenario

The refined land use scenario and preferred transportation scenario

will be tested.

Community

Meeting to help refine land use and

transportation recommendations

Page 7: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBC

Page 8: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Draft August 2018

Opportunity Area Boundary and Subunits

Opportunity Area Boundary and draft subunits

Subunit A Subunit C

Subunit B-1 Subunit

B-2

Draft August 2018

Page 9: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

PLANNING OBJECTIVES LINCOLNIA COMMUNITY BUSINESS CENTER

+ Create a vibrant neighborhood destination with public open spaces, parks, outdoor

dining and cafes, and entertainment areas.

+ Strategically focus appropriate growth to protect Lincolnia’s low density residential neighborhoods from development pressure.

+ Create an integrated multimodal approach to transportation challenges in the area.

+ Create an attractive neighborhood through quality urban design guidance.

+ Preserve and expand Lincolnia’s housing affordability.

Page 10: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

-

Draft Building

Height Map (Conceptual)

Maximum

12 stories

Maximum

10 Stories

Maximum

5 7 Stories

Maximum

4 Stories

12

10

5

7

5

6

4

4

4

For compatibility, the tallest buildings are

proposed in the eastern portion of the

opportunity area.

Page 11: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

-

Opportunity Area Land Use Comparison

Existing Development &

Comprehensive

Plan

Draft

Land Use

Alternative

Retail approx.

586,300 sf

Retail approx.

373,100 sf

Office approx.

98,400 sf

Office approx.

143,400 sf

Residential approx.

0 sf

Residential approx.

1,468,000 sf

*Existing development represents build out of the adopted Comprehensive Plan

Page 12: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBCC

Opportunity Area Transportation Analysis

12 intersections counted in November 2017

Page 13: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBCC

Opportunity Area Transportation Analysis: Existing Conditions

• Heavy movements from SB

Beauregard to EB Little River

Turnpike

• Heavy EB and WB thru

movements on Little River

Turnpike

• Delays heaviest at the Little

River Turnpike & Beauregard

intersection in the PM

Page 14: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBCC

Opportunity Area Transportation Analysis – Baseline Results: Adopted Comp Plan Land Use (2040)

• Significant delay and congestion

within the CBC

• Beauregard and Little River

Turnpike shows LOS F for both AM

and PM

• Queuing along Little River Tnpk,

Beauregard, N Chambliss and

Lincolnia, both AM and PM

Page 15: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBCC

Opportunity Area Transportation Analysis – Alternatives 2 & 3 Identified for Testing

Alt. 1 Alt. 2 Alt. 3

*Alternative 2: Oasis Extension as a 2-Lane Road testing is underway

Page 16: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area within the Lincolnia CBCC

Opportunity Area Transportation Analysis – Proposed Land Use and Alternative 3 LOS (AM/PM)

Alternative 3 vs. Baseline

• Major reduction in travel delay

• Better bicycling and walking

opportunities

• Provides improved access to the CBC

• Overall operational improvement

• Reduction in delay and queuing

along Chambliss St.

• Slight intersection degradation at

Little River Turnpike and Oasis Dr.

Page 17: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Opportunity Area Parks Need

Urban Parks Framework: • Increase in residents and

employees generates a need for

4.07 acres of urban park land.

• Urban parks should be integrated

into the development.

Comp Plan Considerations: • Support the creation of a Central

Green or Civic Plaza.

• Provide trail connections.

Page 18: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Schools Serving the Opportunity Area as of SY 2018-19

Elementary

Parklawn

Weyanoke

Middle School

Holmes

High School

Annandale

Page 19: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

--

- -

-

P

Opportunity Area Public Schools

School Capacity Projected Student Yield

School

Program

Capacity

SY 2017 18

Membership

(9/30/17)

Program

Capacity

Utilization

SY 2017 18

Projected

Membership

SY 2022 23

Capacity

Utilization

SY 2022 23

Annandale HS 2,519 2,136 85% 2,220 88%

Holmes MS 1,176 993 84% 980 83%

Parklawn ES 798 713 89% 667 84%

Weyanoke ES 646 510 79% 523 81%

Proposed

School Level Student

Yield

High 47

Middle 29

Elementary 93

Total Student

Count 169

2015 Countywide Student Capacities and projected memberships based on the adopted FY 2019 23 Capital Yield Ratios (Nov 2016) Improvement Program (January 2018)

Capital Improvement Program updated annually, and includes:

• School capacity data

• Estimated student yield from proposed development

• Potential solutions for consideration to alleviate current and projected school capacity deficits

Page 20: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Questions + Answer

Page 21: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Site-Specific Proposals

Page 22: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

H A L I F A X O F F I C E P A R K

Page 23: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

5250 & 5252 Cherokee Ave Planned and developed with Office Use

-

-

NORTH

Indian Run Cherokee Ave.

Proposal to convert two existing

office buildings into multifamily

residential use for a total of approx.

130 dwelling units. Proposal also adds

3 stories to the existing structures for a

building height of seven stories.

3.2 acres Developed and

planned for office use

130,000 sf residential use

(130 dus) proposed

Navaho Dr. I 395 Indian Run

Page 24: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

- -

-

Halifax Office Park - Transportation

Trip Generation Comparison

AM PM Land Use (ITE Code) Quantities Daily Trips In Out Total In Out Total

Current Plan Office (710) Halifax Office - Trip Generation Comparison

69 KSF 743 79 13 92 13 67 80

Total Trips Generated (unadjusted) 743 79 13 92 13 67 80

Proposed Plan

Multifamily Mid Rise (221) 130 DU 707 11 33 44 35 22 57

Total Trips Generated (unadjusted) 707 11 33 44 35 22 57

Gross Impact Over Comprehensive Plan -36 -68 20 -48 22 -45 -23

Trip generation is derived from the Institute of Traffic Engineers (ITE), Trip Generation, 10th edition (2017).

Trip Generation estimates are provided for general order of magnitude comparisons only, and do

not account for pass by, internal capture, or traffic reductions as result of proximity to transit stations.

Page 25: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

-

~

Halifax Office Park - Transportation (cont.)

Access and Pedestrian Connections

• One vehicular access point, un signalized intersection of Cherokee Ave. and

Navajo Dr.

• Cherokee Ave. daily volume is 3700 (VDOT data)

• There are no pedestrian facilities to access the site, such as sidewalks along

Cherokee Ave.

Trails Plan

• A minor paved trail is planned along the Indian Run Stream Valley on the western

and southern edge of the property

• The Fairfax County Trails Map shows a major paved trail planned along Cherokee

Ave.

Transit Services

• The area is not directly served by transit services

• Bus stop located 3/4 mile to the south on Edsall Road (Fairfax Connector Routes

321 and 322)

Page 26: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Halifax Office Park - Generated Parks Need

Parkland Need Generated Area is outside of CBC

Local Suburban 1.84 acres District/Countywide 4.78 acres

Proposal: 130 Multifamily

Dwelling Units Rectangle Fields 0.14 fields

Multiuse Courts 0.18 courts

Allowable Residential Playgrounds 0.13 playgrounds Population: 368

• The additional park needs are calculated based on the proposed density.

• Halifax Office Park is located outside of the CBC, therefore the Urban Parks

Framework does not apply.

Page 27: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Schools Serving Halifax Office Park as of SY 2018-19

Elementary

Bren Mar Park

Middle School

Holmes

High School

Edison

Plaza 500

Halifax

Office Park

Page 28: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

--

- -

-

P

Halifax Office Park - Public Schools

School Capacity Projected Student Yield

School

Program

Capacity

SY 2017 18

Membership

(9/30/17)

Program

Capacity

Utilization

SY 2017 18

Projected

Membership

SY 2022 23

Capacity

Utilization

SY 2022 23

Edison HS 2,102 2,060 98% 2,234 106%

Holmes MS 1,176 993 84% 980 83%

Bren Mar Park

ES 540 504 93% 465 86%

Proposed

School Level Student

Yield

High 4

Middle 2

Elementary 8

Total Student

Count 14

Capacities and projected memberships based on the adopted FY 2019 23 Captial Improvement Program (January 2018) 2015 Countywide Student

Yield Ratios (Nov 2016)

Capital Improvement Program updated annually, and includes:

• School capacity data

• Estimated student yield from proposed development

• Potential solutions for consideration to alleviate current and projected school capacity deficits

Page 29: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

P L A Z A 5 0 0

Page 30: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Backlick Run S. Pickett St. Edsall Rd. Norfolk Southern

Developed with primarily

industrial use with limited office

use. Planned for industrial use.

Proposed to redevelop as a

primarily residential mixed use

development with some retail Edsall Rd.

34.4 Acres / Industrial

744,005 sf Planned Potential

80,000 sf retail / 2.9 mil sf res Proposed

Page 31: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Plaza 500 – Generated Parks Need

Area is outside of CBC Parkland Need Generated Local Suburban District/Countywide

19.81 acres 51.51 acres

Proposal: 1,400 Multifamily

Dwelling Units Youth Baseball Fields 0.55 fields

Rectangle Fields 1.47 fields

Allowable Residential Youth Softball Fields 0.45 fields

Multiuse Courts 1.89 courts

Playgrounds 1.42 playgrounds

Population: 3,962

• The additional park needs are calculated based on the proposed density.

• Halifax Office Park is located outside of the CBC, therefore the Urban Parks Framework does not apply.

Page 32: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

- --

Plaza 500 - Transportation

Trip Generation Comparison

AM Peak Hour PM Peak Hour

Land Use (ITE Code) Quantities Daily Trips In Out Total In Out Total

Current Plan

Warehouse (150) 746 KSF 1,224 98 29 127 38 104 142

Total Trips Generated 1,224 98 29 127 38 104 142

Proposed Alternative

Multi-Family High Rise (222) 1400 DU 5,728 97 308 405 296 189 485

Retail (820) 80 KSF 5,166 47 29 75 221 240 461

Total Trips Generated 10,894 144 337 480 517 429 946

Gross Impact Over Comprehensive Plan 9,670 46 308 353 479 325 804

Trip generation is derived from the Institute of Traffic Engineers (ITE), Trip Generation, 10th edition (2017).

Trip Generation estimates are provided for general order of magnitude comparisons only, and do not account for pass by, internal capture, or traffic reductions as result of proximity to transit stations.

Page 33: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

-

Plaza 500 - Transportation (cont.)

Chapter 870, 2011 Acts of Assembly:

• A Plan amendment that results in an additional 5,000 daily trips requires VDOT review

• Plaza 500 meets 5,000 daily trips threshold

Access

• Access via Edsall Road in Fairfax County and Pickett Street in City of Alexandria

• Average Annual Daily Traffic (AADT) for Edsall Road: 17,000 VDOT data

• Pickett Street accessing the site is a two lane roadway with parking and a bike lane on both sides

• AADT of Pickett Street: 12,000 VDOT data

Page 34: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

-

-

Plaza 500 - Transportation (cont.)

Transit Services

• Metro Bus Routes 21A and 21D provide service

• Fairfax Connector Routes 321 and 322 operate along Edsall Road

• Alexandria Dash Routes AT 1,5 and 8 provide service near the site

Transit Oriented Development (TOD):

• Van Dorn Metro station more than a mile away

• Fairfax County TOD guidelines generally apply ¼ ½ mile from Metro Station

Bicycle Facilities

• No existing on street biking facilities in the Edsall Rd. (Fairfax County side)

• Bike Map indicates biking on Edsall Rd. requires significant caution

• Bicycle Master Plan recommends bike lanes and shared use path along Edsall Rd.

• For the northern section of Plaza 500, Bicycle Master Plan recommends sharrows connecting

S. Pickett St. to Edsall Rd.

Trails Plan

• Stream valley trail planned adjacent to the Turkeycock Run Stream Valley

• A major trail is planned along Edsall Rd.

Page 35: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Schools Serving Plaza 500 as of SY 2018-19

Elementary

Bren Mar Park

Middle School

Holmes

High School

Edison

Plaza 500

Halifax

Office Park

Page 36: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

--

- -

-

P

Plaza 500 - Public Schools

School Capacity Projected Student Yield

School

Program

Capacity

SY 2017 18

Membership

(9/30/17)

Program

Capacity

Utilization

SY 2017 18

Projected

Membership

SY 2022 23

Capacity

Utilization

SY 2022 23

Edison HS 2,102 2,060 98% 2,234 106%

Holmes MS 1,176 993 84% 980 83%

Bren Mar Park

ES 540 504 93% 465 86%

Capacities and projected memberships based on the adopted FY 2019 23 Capital Improvement Program (January 2018) 2015 Countywide Student Yield

Ratios (Nov 2016)

• Projected student yield based on concept provided by the Dept. of Planning and Zoning that includes a mix of single-family attached and multi-family residential units.

Proposed

School Level Student

Yield

High 53 to 59

Middle 31 to 34

Elementary 106 to 116

Total Student

Count 190 to 209

Page 37: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

Questions + Answer

Page 38: L I N C O L N I A P L A N N I N G D I S T R I C T S T U D ... · 10/13/2018  · account for pass by, internal capture, or traffic reductions as result of proximity to transit stations

End of Presentation