G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
By Ir. Dr. Gue See Sew
http://www.gnpgeo.com.my
![Page 2: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/2.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONTENTS
• SOIL NAIL– INTRODUCTION– DESIGN CONCEPT– MODES OF FAILURES– CONSTRUCTION SEQUENCE– TESTING
![Page 3: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/3.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Soil Nail Slope Failure
![Page 4: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/4.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
FACE FAILURE
CORRECTMain reinforcement at back of steel plate
INCORRECTMain reinforcement in front of steel plate
Main reinforcement
Steel plate
Main reinforcement
Steel plate
Shotcrete facing
Shotcrete facing
Soil face
Soil face X
![Page 5: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/5.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 6: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/6.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 7: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/7.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
INTRODUCTION
• ADVANTAGES– Minimum Loss of Land– Minimum Temporary Shoring– Minimum Earthwork
**More suitable for cut ground.
![Page 8: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/8.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Required Space
SLOPE CHASING
![Page 9: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/9.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
INTRODUCTION
• DISADVANTAGES– Nail Encroachment Lot Boundary
![Page 10: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/10.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 11: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/11.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DESIGN CONCEPT
• Common design reference– BS8006 : Code of practice for Strengthened/
reinforcement soils and other fills (1995)– Federal Highway Administration (FHWA) :
Manual for Design & Construction Monitoring of Soil Nail Walls (1998)
– Department of Transport (DoT) : Design Manual for Roads and Bridges, Vol. 4, Section 1, Part 4, HA68/94 (1994)
![Page 12: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/12.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
FREE LENGTH FIXED LENGTH
![Page 13: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/13.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DESIGN CONCEPT- FRICTION
• Ultimate Unit Friction– fsu=4~6 NSPT
• Ultimate Friction for Each Nail– fsuAsL
As = Surface Area of NailL = Length of Nail
![Page 14: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/14.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DESIGN CONCEPT- GROUT-STEEL BOND STRESS
Conditions of Contact Surface
Ultimate Bond Stress
Locally Noded Strand3,000kPa
Clean Deform Bar2,000kPa
Clean & Crimped Wire1,500kPa
Clean & Plain Bar/Wire1,000kPa
![Page 15: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/15.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DESIGN CONCEPT- STEEL
• BS8110 (Ultimate) : TN = 0.87 × fy × As
• FHWA (Allowable) : TN = 0.55 × fy × As
• Steel Elements/Connection : BS5950• Reinforced Concrete : BS8110
![Page 16: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/16.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
MODE OF FAILURES
• Three Modes of External Stability
SLIDING TOPPLING BEARING CAPACITY
![Page 17: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/17.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Failure Mode –
Nails Pull Out of Resistant Zone
b) Pullout Failure
Failure Mode –
Face Failure and “Active” Zone Sliding Off Front of Nails
a) Face Failure
![Page 18: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/18.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
MINIMUM FOS: 1.40
Failure Mode –
Tensile Failure of Tendon
c) Nail Tendon Failure
![Page 19: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/19.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 20: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/20.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONSTRUCTION
Maximum 2.0m
![Page 21: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/21.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 22: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/22.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DRILLING- Down the Hole Hammer
Backheads
Chuck Valve
WearsleeveSpring
Distributor
Internal Cylinder Piston Piston
Retainer Ring
Bit Retainder
Ring
Bit
• DTH Piston : Direct impact on bit & less loss of impact energy
• Penetration Rate ∝ Air Pressure
• Compressed Air : Power Source & Flushing Medium
![Page 23: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/23.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DRILLING- TRICONE BIT
79mm NW Casing Advancer
75mm TriconeDrillbit
![Page 24: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/24.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
DRILLING BIT – TUNGSTEN CARBIDE
![Page 25: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/25.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SOIL NAIL
![Page 26: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/26.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SOIL NAIL SPECIFICATION
• Galvanized thickness of 85µm (Minimum)
• To be checked with Magnetic Gauge
• 2 coats of zink coater (6 hours apart) should be applied after threading and to scratched surfaces
![Page 27: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/27.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SOIL NAIL- CENTRALIZER
![Page 28: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/28.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SOIL NAIL- CENTRALIZER
• Minimum size = Hole diameter – 12mm
• Minimum of grade D PVC pipe
• Must not collapse under weight of nail
• Maximum 4m c/c spacing
![Page 29: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/29.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
GROUT MIX
• Specify NON-SHRINKAGE grout
• W/C ratio = 0.45
• Grout Mix = Cement : A/Shrinkage Agent : Water50kg :0.5kg (or as specified) : 22.5kg
• Grout Strength (28 days)= 30MPa( 7 days)= 21MPa (70%)
![Page 30: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/30.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
GROUTING METHOD
• Low pressure pump
• To be grouted on the same day as drilling
• Tremie bottom up with grout pipe installed till the end of nail.
• Overspill for 30 seconds
![Page 31: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/31.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SCHEMATICS
![Page 32: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/32.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 33: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/33.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 34: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/34.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
FACE FAILURE
CORRECTMain reinforcement at back of steel plate
INCORRECTMain reinforcement in front of steel plate
Main reinforcement
Steel plate
Main reinforcement
Steel plate
Shotcrete facing
Shotcrete facing
Soil face
Soil face X
![Page 35: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/35.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
HORIZONTAL DRAIN
• Inserted deeper within the slope (Weepholes likely to get clogged)
• Wrapped around with geotextile (TS20)
• Waterstop to be wrapped with geotextileand secured with steel wire
![Page 36: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/36.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
HORIZONTAL DRAIN
![Page 37: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/37.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 38: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/38.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 39: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/39.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 40: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/40.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
FACING
• Three types of facing– Pad Facing
• Used when soil is not susceptible to surface erosion
• Presence of obstruction
– Shotcrete • For soils which are prone to erosion
– Grid Beam• Used when soil is not susceptible to surface
erosion
![Page 41: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/41.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PAD FACING
![Page 42: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/42.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SHOTCRETE FACING
![Page 43: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/43.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
GRID BEAM FACING
![Page 44: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/44.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 45: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/45.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PULLOUT TEST
• To measure and confirm fixed end frictionof soil nail
![Page 46: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/46.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PULLOUT TESTS
• Preliminary Pull Out Test– Sacrificial test of additional point
• Working Pull Out Test– Nail is stress only to working load
• Instrumented– With strain gauge
![Page 47: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/47.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
PULLOUT TEST
![Page 48: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/48.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 49: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/49.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
By Ir. Dr. Gue See Sew
http://www.gnpgeo.com.my
![Page 50: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/50.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONTENTS
• Introduction• Types of Failures• Options
• Design Concept of Rock Bolt
- Netting
- Scaling
- Shotcreting
- Rock Bolt
![Page 51: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/51.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
INTRODUCTION
![Page 52: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/52.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
INTRODUCTION
![Page 53: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/53.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
INTRODUCTION
• Used to stabilize weak rock mass.
• Acts in the same manner as soil nail.
![Page 54: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/54.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 55: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/55.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
TYPES OF FAILURES - SLIDING
MULTIPLE BLOCKS/MULTIPLE PLANE SLIDING
SINGLE BLOCK/SINGLE PLANE SLIDING
SINGLE BLOCK/STEPPED PLANE SLIDING
![Page 56: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/56.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SLIDING FAILURE
Planar Failure
![Page 57: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/57.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
TYPES OF FAILURES - WEDGE
SINGLE WEDGE
/MULTIPLE INTERSECTING PLANES
SINGLE WEDGE
/TWO INTERSECTING PLANES
![Page 58: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/58.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
WEDGE FAILURE
![Page 59: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/59.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
TYPES OF FAILURES - TOPPLING
Toppling failure in hard rock which can form columnar structure separated by steeply dipping discontinuities
![Page 60: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/60.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
TOPPLING FAILURE
![Page 61: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/61.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
STEREOGRAPHIC PLOT ANALYSIS
Wedge Failure Zone
Toppling Failure Zone
![Page 62: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/62.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 63: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/63.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
OPTIONS
• Shotcreting– To prevent loose rocks from falling
• Scaling– To chisel off small loose rocks
• Rock Bolt– To stabilize large rock mass
![Page 64: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/64.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
NETTING
![Page 65: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/65.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SCALING
![Page 66: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/66.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SHOTCRETING
![Page 67: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/67.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
ROCK BOLT
![Page 68: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/68.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
![Page 69: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/69.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
Fg
Fgx
Fgy
Ff
'cos'sin φµφ mgmg =
'cos'sin φµφ =
µφφ =
'cos
'sin
'tanφµ =
fgx FF =
![Page 70: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/70.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
ROCK BOLT
FAILURE PLANE
GROUT
![Page 71: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/71.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
SCHEMATICS
![Page 72: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/72.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
COMPONENTS OF ROCK BOLTT40 Galvanized Steel Bars
Galvanized Steel Plates
![Page 73: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/73.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
ROCK BOLT SPECIFICATION
• Galvanized thickness of 85µm (Minimum)
• To be checked with Magnetic Gauge
• 2 coats of zink coater (6 hours apart) should be applied after threading and to scratched surfaces
![Page 74: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/74.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CENTRALIZER
![Page 75: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/75.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
ROCK BOLT CENTRALIZER
• Minimum size = Hole diameter – 12mm
• Minimum of grade D PVC pipe
• Must not collapse under weight of nail
• Maximum 4m c/c spacing
![Page 76: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/76.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
THINGS TO CHECK - SHOTCRETE
• Ensure sufficient:– Properly protected weepholes– Lapping of BRC wire mesh– Cover of BRC & rock surface
• Ensure shotcreting is done TOP DOWN
![Page 77: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/77.jpg)
G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))
CONCLUSION
• 100% Check and Review Design
• Site Supervision
![Page 78: DocumentL1](https://reader031.vdocument.in/reader031/viewer/2022020320/5695cfd21a28ab9b028fb3f6/html5/thumbnails/78.jpg)