1
2 424 La Salle River Dunlop Drain Forecasting and Flood Coordination Branch May 10, 2011 0 1 2 3 0.5 Kilometers 0 1 2 3 0.5 Miles Water Stewardship Connects to Map 2 Connects to Map 4 Note: Inundation zones based on preliminary analysis, caution should be exercised in determining risk. Subject to revision Imagery: 1994, 1995, 2008 & 2009 Potential Controlled Release Inundation Zone Map 3 of 6 Map depicts a Potential Controlled Release Inundation Zone of 4000 cfs. However it should be noted that a lower flow could result in a reduced Inundation Zone. Railway Numbered Highways Designated Drains Potential Controlled Release Inundation Zone - 4000 cfs Communities Provincial Waterways

Upload: koosterhuis

Post on 28-Nov-2014

17 views

Category:

Documents


4 download

DESCRIPTION

La Salle PTH2

TRANSCRIPT

2

424

La Salle River

Dunlo

p Drai

n

Forecasting and Flood Coordination BranchMay 10, 2011

0 1 2 30.5 Kilometers0 1 2 30.5 Miles

Water Stewardship

Connects toMap 2

Connects toMap 4

Note:Inundation zones based on preliminary analysis, caution should be exercised in determining risk.Subject to revisionImagery:1994, 1995, 2008 & 2009

Potential Controlled Release Inundation Zone

Map 3 of 6Map depicts a Potential

Controlled ReleaseInundation Zone

of 4000 cfs.However it should

be noted that a lower flow could result

in a reducedInundation Zone.

RailwayNumbered Highways

Designated Drains

Potential Controlled ReleaseInundation Zone - 4000 cfs Communities

Provincial Waterways