lafayette school - sit meeting presentation (july 27, 2016)
TRANSCRIPT
Elevating the Quality of Life in the District
LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION
SIT PROJECT UPDATE
JULY 27, 2016
MEETING AGENDA
Elevating the Quality of Life in the District
� PROJECT UPDATE
� PLAYGROUND DESIGN REVIEW
� NEXT STEPS
� Q&A
Elevating the Quality of Life in the District
PROJECT UPDATES
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
� PARKING
� WORK HOURS
� Mon – Sat 7am – 7pm, 7pm – 12am Interior only
� Sundays 9am-6pm, Holidays as needed to maintain schedule
� After hours work details will be shared via email
� CONSTRUCTION UPDATE
� Schedule
� Progress
� Site Logistics Plans
� DESIGN UPDATE
ACTIVITY DESCRIPTION
MA
Y
JUN
E
JULY
AU
G
SE
PT
OC
T
NO
V
DE
C
JAN
FE
B
MA
R
AP
R
MA
Y
JUN
E
JULY
AU
G
SE
P
OC
T
NO
V
INSTALL TRAILERS
HAZMAT & BUILDING DEMO
FOUNDATIONS
STEEL ERECTION
INSTALL BUILDLING ENVELOPE
INSTALL INTERIOR WORK
INSTALL ROOFTOP EQUIPMENT & UTILITIES
SITEWORK PHASE 1
REMOVE TRAILERS FROM SITE
SITEWORK PHASE 2
2015 2016
SCHEDULE OVERVIEW
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
CONSTRUCTION UPDATEPhoto date: July 2016
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
CONSTRUCTION UPDATEPhoto date: July 2016
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
SITE LOGISTICS PLANS
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
DESIGN UPDATE
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
� GARDEN
� LANDSCAPE PLAN
� LIGHTING CONTROLS
� GYM LOGO
GARDEN
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
LANDSCAPE PLANElevating the Quality of Life in the District
Elevating the Quality of Life in the District
LIGHTING UPDATEElevating the Quality of Life in the District
Elevating the Quality of Life in the District
� EXTERIOR – All exterior lighting (except for the existing Washington Globes at the
playing field and the existing bollards at the west edge of the school site) are full
cut-off downlights with 3000K or 3500K lamping.
� DOOR LIGHTS – Recessed, cylindrical sconce, and surface mounted
downlights. At egress doors lights will be on all night.
� PATHWAY LIGHTS – New Bollards on occupancy sensors, Existing Bollards
connected to timer and turned off when building is unoccupied
� STEP LIGHTS, POLE LIGHTS - connected to timer and turned off when
building is unoccupied. Will turn on in an emergency
� PLAYING FIELD LIGHTS - on their old schedule, because they are not circuited
through the school.
� INTERIOR LIGHTING
� Classroom/ office, gym, multipurpose and library: off when the building is
unoccupied. Select “Emergency” light fixtures will turn on in an emergency.
� Main corridor, stairway and hall lights have limited select fixtures that
remain on as emergency lighting
LIGHTING UPDATEElevating the Quality of Life in the District
Elevating the Quality of Life in the District
GYM LOGOS
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND – Previously existing
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGNElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN - Pre-KElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – Pre-KElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – Pre-KElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN - KindergartenElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – KindergartenElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – KindergartenElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 1st – 3rd GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 1st – 3rd GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 1st – 3rd GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 4th – 5th GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 4th – 5th GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
PLAYGROUND DESIGN – 4th – 5th GradeElevating the Quality of Life in the District
Elevating the Quality of Life in the District
NEXT STEPS & PROJECT SCHEDULE
Elevating the Quality of Life in the District
Elevating the Quality of Life in the District
� August 8th, 2016 – SIT Tour of Modernized Lafayette ES
� August 15th, 2016 Teachers return
� August 22nd, 2016 First Day of School
� July – August 2016 - Trailer disconnection & removal
� Fall 2016 – Playgrounds and Site work complete
Comments / Questions / Answers