Abilene City Council
LAKE KIRBY DAM REPAIRS
September 25, 2014
1
-
8/11/2019 Lake Kirby Dam Repairs
2/21
AGENDA
LAKE KIRBY DAM REPAIRS
Items of Discussion:
1. Issues With Lake Kirby Dam
2. Recommended Improvements
3. Questions and Discussion
2
-
8/11/2019 Lake Kirby Dam Repairs
3/21
ITEM 1
ISSUES WITH LAKE KIRBY DAM
3
-
8/11/2019 Lake Kirby Dam Repairs
4/21
Lake Kirby Dam
4
Main Embankment: 4,200 ft long
earthen embankment with rock
riprap upstream slope protection
Service Spillway: 520 ft wideearth/rock spillway channel
at east end of dam
West Levee (Emergency Spillway):
6,000 ft long earthen embankment
-
8/11/2019 Lake Kirby Dam Repairs
5/21
ISSUES WITH LAKE KIRBY DAM
A Dam Safety Regulations
(TCEQ Regulations in Title 30 TAC Chapter 299)
Classified as IntermediateSize& High Hazard Dam
Regulation: dam & spillways pass at least 81% of PMF
Existing dam and spillways only pass 73% of PMF
Pass 81% PMF - raise dam 0.7 feet (minimum)
Pass 100% - raise dam 1.6 feet (recommended)
B Erosion of Dam / West Levee and Restricted Drainage
Erosion of upstream slope (water side)
Erosion of west levee (emergency spillway) Erosion of downstream slope
Vegetation restricting drainage around toe of dam
5
-
8/11/2019 Lake Kirby Dam Repairs
6/21
Erosion of Upstream Slope
6
-
8/11/2019 Lake Kirby Dam Repairs
7/21
-
8/11/2019 Lake Kirby Dam Repairs
8/21
Downstream Slope - Vegetation
8
Vegetation
restricting drainage
around toe of dam
-
8/11/2019 Lake Kirby Dam Repairs
9/21
ISSUES WITH TRAFFIC ACCESSING
LAKE KIRBY
A Traffic Issues on West Side of Dam
TxDOT requested closure of two access points on
east side off Highway 83/84
B Traffic Issues on East Side of Dam
Inadequate and poorly defined roadway
Roadway floods when Lake Kirby is spilling
C Traffic Issues Across Dam
Non-standard, narrow roadway with inadequate end
transitions.
9
-
8/11/2019 Lake Kirby Dam Repairs
10/21
Traffic Issues on West Side of Dam
Closure of Access Points off Hwy. 83/84
West Side
Cut-Through
ExistingDriveway
10
-
8/11/2019 Lake Kirby Dam Repairs
11/21
Traffic Issues on West Side of Dam
West Side Cut-Through
11
West Levee Roadway
-
8/11/2019 Lake Kirby Dam Repairs
12/21
Traffic Issues on East Side of Dam
Service Spillway/East End of Dam
12
Inadequate and poorly
defined roadway that floods
when Lake Kirby is spilling
-
8/11/2019 Lake Kirby Dam Repairs
13/21
Traffic Issues Across Dam
Existing Dam Crest Roadway Not Suitable for Public Traffic
13
Soft, thin
shoulders
Non-standard,
narrow roadway, withinadequate end
transitions.
-
8/11/2019 Lake Kirby Dam Repairs
14/21
-
8/11/2019 Lake Kirby Dam Repairs
15/21
RECOMMENDED IMPROVEMENTS
Clear vegetation along dam, west levee, & toe-of-dam
Repair erosion on dam and west leveeRaise dam with compacted fill to meet 100% PMF
Resulting crest width of 15 feet
Implement new traffic control plan
Motorized vehicle access to east & west sides of lake
No unauthorized motorized vehicles on dam crest
Dam crest is accessible to pedestrians and bicycles
Work with TxDOT to close Hwy. 83/84 access points
Extend west levee roadway to Spur 707
Fencing to restrict access downstream of dam
Cost $3,869,00015
-
8/11/2019 Lake Kirby Dam Repairs
16/21
Future Dam Crest View
16
-
8/11/2019 Lake Kirby Dam Repairs
17/21
Traffic Control for Lake Kirby
17
East Turnaround,
Gated at boatramp
with no motorized
vehicular access to
spillway and dam
West Turnaround, Gated at
turnaround with no motorized
vehicular access to dam
Install new flexible
base roadway andnew traffic driveway
at east Spur 707
Eliminate existing
traffic driveway andcut-through at
Highway 83/84
Only non-motorized vehicular
traffic, pedestrians, and
authorized maintenance
vehicles on dam & spillway
-
8/11/2019 Lake Kirby Dam Repairs
18/21
Segment 1 Roadway
18
Construct new
flexible base
roadway
Eliminate existingtraffic driveway at
Highway 83/84
Install new traffic
driveway at
East Spur 707
-
8/11/2019 Lake Kirby Dam Repairs
19/21
IMPROVEMENTS - SUMMARY
19
Proposed Improvement
Dam Safety Issues
Raise dam to meet 100% PMF
Upstream slope repairs
West levee repairs
Downstream vegetation removal
Access Issues
Remove existing access points to Hwy. 83/84
New fence to restrict downstream access
Extend new road to Spur 707
No Public Motorized Traffic on dam crest roadway
Cost $3,869,000
-
8/11/2019 Lake Kirby Dam Repairs
20/21
ITEM 3
QUESTIONS AND DISCUSSION