    Abilene City Council

    LAKE KIRBY DAM REPAIRS

    September 25, 2014

    1

  • 8/11/2019 Lake Kirby Dam Repairs

    2/21

    AGENDA

    LAKE KIRBY DAM REPAIRS

    Items of Discussion:

    1. Issues With Lake Kirby Dam

    2. Recommended Improvements

    3. Questions and Discussion

    2

  • 8/11/2019 Lake Kirby Dam Repairs

    3/21

    ITEM 1

    ISSUES WITH LAKE KIRBY DAM

    3

  • 8/11/2019 Lake Kirby Dam Repairs

    4/21

    Lake Kirby Dam

    4

    Main Embankment: 4,200 ft long

    earthen embankment with rock

    riprap upstream slope protection

    Service Spillway: 520 ft wideearth/rock spillway channel

    at east end of dam

    West Levee (Emergency Spillway):

    6,000 ft long earthen embankment

  • 8/11/2019 Lake Kirby Dam Repairs

    5/21

    ISSUES WITH LAKE KIRBY DAM

    A Dam Safety Regulations

    (TCEQ Regulations in Title 30 TAC Chapter 299)

    Classified as IntermediateSize& High Hazard Dam

    Regulation: dam & spillways pass at least 81% of PMF

    Existing dam and spillways only pass 73% of PMF

    Pass 81% PMF - raise dam 0.7 feet (minimum)

    Pass 100% - raise dam 1.6 feet (recommended)

    B Erosion of Dam / West Levee and Restricted Drainage

    Erosion of upstream slope (water side)

    Erosion of west levee (emergency spillway) Erosion of downstream slope

    Vegetation restricting drainage around toe of dam

    5

  • 8/11/2019 Lake Kirby Dam Repairs

    6/21

    Erosion of Upstream Slope

    6

  • 8/11/2019 Lake Kirby Dam Repairs

    7/21

  • 8/11/2019 Lake Kirby Dam Repairs

    8/21

    Downstream Slope - Vegetation

    8

    Vegetation

    restricting drainage

    around toe of dam

  • 8/11/2019 Lake Kirby Dam Repairs

    9/21

    ISSUES WITH TRAFFIC ACCESSING

    LAKE KIRBY

    A Traffic Issues on West Side of Dam

    TxDOT requested closure of two access points on

    east side off Highway 83/84

    B Traffic Issues on East Side of Dam

    Inadequate and poorly defined roadway

    Roadway floods when Lake Kirby is spilling

    C Traffic Issues Across Dam

    Non-standard, narrow roadway with inadequate end

    transitions.

    9

  • 8/11/2019 Lake Kirby Dam Repairs

    10/21

    Traffic Issues on West Side of Dam

    Closure of Access Points off Hwy. 83/84

    West Side

    Cut-Through

    ExistingDriveway

    10

  • 8/11/2019 Lake Kirby Dam Repairs

    11/21

    Traffic Issues on West Side of Dam

    West Side Cut-Through

    11

    West Levee Roadway

  • 8/11/2019 Lake Kirby Dam Repairs

    12/21

    Traffic Issues on East Side of Dam

    Service Spillway/East End of Dam

    12

    Inadequate and poorly

    defined roadway that floods

    when Lake Kirby is spilling

  • 8/11/2019 Lake Kirby Dam Repairs

    13/21

    Traffic Issues Across Dam

    Existing Dam Crest Roadway Not Suitable for Public Traffic

    13

    Soft, thin

    shoulders

    Non-standard,

    narrow roadway, withinadequate end

    transitions.

  • 8/11/2019 Lake Kirby Dam Repairs

    14/21

  • 8/11/2019 Lake Kirby Dam Repairs

    15/21

    RECOMMENDED IMPROVEMENTS

    Clear vegetation along dam, west levee, & toe-of-dam

    Repair erosion on dam and west leveeRaise dam with compacted fill to meet 100% PMF

    Resulting crest width of 15 feet

    Implement new traffic control plan

    Motorized vehicle access to east & west sides of lake

    No unauthorized motorized vehicles on dam crest

    Dam crest is accessible to pedestrians and bicycles

    Work with TxDOT to close Hwy. 83/84 access points

    Extend west levee roadway to Spur 707

    Fencing to restrict access downstream of dam

    Cost $3,869,00015

  • 8/11/2019 Lake Kirby Dam Repairs

    16/21

    Future Dam Crest View

    16

  • 8/11/2019 Lake Kirby Dam Repairs

    17/21

    Traffic Control for Lake Kirby

    17

    East Turnaround,

    Gated at boatramp

    with no motorized

    vehicular access to

    spillway and dam

    West Turnaround, Gated at

    turnaround with no motorized

    vehicular access to dam

    Install new flexible

    base roadway andnew traffic driveway

    at east Spur 707

    Eliminate existing

    traffic driveway andcut-through at

    Highway 83/84

    Only non-motorized vehicular

    traffic, pedestrians, and

    authorized maintenance

    vehicles on dam & spillway

  • 8/11/2019 Lake Kirby Dam Repairs

    18/21

    Segment 1 Roadway

    18

    Construct new

    flexible base

    roadway

    Eliminate existingtraffic driveway at

    Highway 83/84

    Install new traffic

    driveway at

    East Spur 707

  • 8/11/2019 Lake Kirby Dam Repairs

    19/21

    IMPROVEMENTS - SUMMARY

    19

    Proposed Improvement

    Dam Safety Issues

    Raise dam to meet 100% PMF

    Upstream slope repairs

    West levee repairs

    Downstream vegetation removal

    Access Issues

    Remove existing access points to Hwy. 83/84

    New fence to restrict downstream access

    Extend new road to Spur 707

    No Public Motorized Traffic on dam crest roadway

    Cost $3,869,000

  • 8/11/2019 Lake Kirby Dam Repairs

    20/21

    ITEM 3

    QUESTIONS AND DISCUSSION

    20